Wapato Irrigation Project (WIP) was founded by the federal government in the early 20th century to irrigation the Yakama Nation reservation in central Washington State. Today, WIP diverts several hundred thousand acre-feet of water from the Yakima River and local creeks each year to service around 150,000 acres of irrigated agricultural land. While WIP is a federally owned project that is operated by the Bureau of Indian Affairs (BIA), some of the engineering and operating duties are handled by the Yakama Nation through the Yakama Tribal Engineering Program. This split between federal ownership and local service can sometimes lead to difficulties with efficient hiring, procurement, and maintenance. WIP’s infrastructure is also dated and in need of funding for maintenance and repairs.