Aegre November 2020

Page 16

The Stamford Canal

Most IWA members in Lincolnshire know the local waterways and canal sections quite well with the majority probably believing the printed history of the canals and industrial revolution in England. Unfortunately the words ‘printed history’ are anathema to us here in the south of Lincolnshire. Because no-one documented the building and use of the Stamford Canal has meant that its position in the history of canals in England has been forgotten, down-graded and/or ignored. Our hope and intent is that its story will be told and everyone benefit from the research undertaken in recent years to show how important this very early canal was to Lincolnshire. A little bit of the recorded history will put this omission into context: The Stamford Canal received Parliamentary assent several times

from 1571 and was then built in the 1660’s, and by 1670 it was fully in use. On the 12.5 miles between Stamford and Market Deeping there were ten locks on the canal and two on the River Welland in Deeping St James. An average of 3,000 tons of Newcastle coal were transported yearly from Spalding towards Stamford, along with products from elsewhere, including Europe, brought in via the Wash. Manufactured goods returned from Stamford, with other goods and crops collected on the return. The last boats travelled from Stamford in 1863, with silting up and competition from the railways causing lack of trade. Built 100 years before the Bridgewater canal, it had provided almost exactly 200 years of daily use. The Bridgewater Canal first got assent in 1759, then Brindley’s design got assent in 1760 and it was built by 1761 with no locks.

Page 16 Aegre 158 - November 2020


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.