MEADOWSWEET DAIRY May 18th to June 6 GG-1300
Three weeks on this bill and a lot of ground was covered... literally with mulch and granitecrete, large slabs of stone and our wonderful miracle soil. The parking area is finished ready to get mulch. Such a nice addition to the entrance to the house. More Granitecrete was laid out and a new area developed. We go north and get the left over stone slabs and the cottage gets a fantastic make over. The wall gets finished to the hot tub area. Dave and Glenda take a field trip to pick out two nice water elements for Healdsburg and the cottage...
Monday, May 18th
Finally get that monkey puzzle burl right. GraniteCrete, mulch front for aproval, looks better than we thought
Tuesday May 19th
Demo area around Cottatge. Finish Steel work from tree to olive
Wednesday, May 20th
All hands on deck for GraniteCrete
Thursday, May 21
Install 5 yards of GraniteCrete, finish the outer edge of new planting area and the parking area near monkey puzzle tree
Friday May 22
Dave and Glenda go to Ameican Soil and pick out some basalt. finishing up granitecrete
Tuesday, May 26
excavation for piers and grade beam. Developing area and ideas for cottage terrace. irrigation for wildflowers and meadow in bone yard
Wednesday, May 27
Alfredo finishes up irrigation and he and Armando go to Kentfield project. Cottage with a lot of discussion has finally gotten a plan
Friday, May 29th
place down mulch over street path, pour concrete for the grade beam and piers
Monday, June 1st
Ron arrives to check out some installation, working on cottage and hot tub
Tuesday, June 2nd
Dave places plants for areas around Monkey Tree and Podicarpus. Cottage is looking great
Friday June 5th
Working on Pathway to hot tub area, place some large boulders, spread some Nuns canyon at end of day...
June 3rd and 4th birthday epic bike rides
June 3, Napa Adventure
June 4, West Marin Adventure