Week 8 The task was to blow up of a given 1:10 detail into a 1:1 A1 format. We choose one part of the case study. Our case study is Queens Collage.
h
This is the wall which I drawing in the Queens college. Because the wall is already completed, I could not see it from the outside. It is the concrete wall. It formed by the steel and the concrete frames which could span greater distances and carry heavier loads than timber structure.The concrete frames are typically rigid frames and quality as noncombustible, fire-resistive construction. The grough shows the connection of the wall. Clip angle welded to anchor plat Anchor bolt Shim pads and nonshrink grout Continuous strip footing