Jhoe Khar Prout Clinic | Architecture Proposal

Page 1

Proposal for

Building the Mon Community Clinic for the Jhoe Khar Prout Community in Mon State, Myanmar Jul 2019


THAILAND

Andaman Sea

°

°



1. The rain drains off the roof more quickly. 2. Air space in the high area of the roof is a buffer from the penetration of heat. 3. Building is orientated to maximise natural daylighting.

1

4. Cross ventilation at high roof level with prevailing wind direction, to draw air from the lower level.

2

3

4

5. Tropical monsoon climate (Jun - Sep)

4

6. Excessive Soil Erosion 7. Hilly / mountainous terrain 8. Maximising Solar and Hydro power for electricity 6 .

7

8


Bamboo

Recycled Timber

River Rocks

Hemp Rope

Tree Bark/Leaves

Gabion Walls

Rope Screen

Textured Walls

Bamboo Ceiling

Doors & Furniture


vehicular approach

main entrance

interior space: in patient department (IPD)

adjacent malaria laboratory


lowered entrance level

exposed footing

entrance corridor

deteriorating entrance facade

existing roofing

lowered entrance level

Existing Building

dilapidated timber structure


Existing facilities; Kitchen, Male & Female Medic sleeping area will be integrated with the proposed new building.

Slope ~ 10deg

Existing Malaria Laboratory to be maintained.

Existing timber clinic to be demolished; raw materials to be recycled into new building proposal.

Existing timber clinic to be maintained as temporary clinic during construction

N not to scale


Existing facilities; Kitchen, Male & Female Medic sleeping area to be converted to other use

Proposed new clinic

parking area

N not to scale

Slope ~ 10deg

driveway to waterfall

Existing Malaria Laboratory to be maintained.






Total Floor Area – 236.5 sqm Floor Area for Medical Wing – 168 sqm Floor Area for Staff Wing – 62 sqm Floor Area for connecting corridor – 6.5 sqm

N

(numbers in red – setting out for column grids, measured to center of columns)

M J L

J L

J

K F

H

E D

G A– B– C– D–

Entrance Foyer Reception Store (1.9 x 3.4m) Out-Patient Department, OPD (2 beds) E – Operation room (3.5 x 3.5m) F – Delivery room (3.5 x 3.5m) G – Waiting space (3.4m width)

H – In-Patient Department, IPD (10 beds) J – Toilet & Shower K – Connecting corridor (sheltered) L – Staff sleeping area (3.5 x 3.5m) M – Dining area (3.4 x 4.9m) N – Kitchen (1.9 x 5.0m)

B

C A

N not to scale


A – Solar panel systems (Electricity for mainly dry season) B – Hydro power system, to be verified against site conditions (Electricity to mainly monsoon season), C – Gabion walls to filter muddy water, slow down water flow & to prevent soil erosion D – Bio-swale, to reduce flooding & natural mosquito repellent

C C J

G

J F

H

 B to waterfall

D D

A

H

E – Linear building shape to maximise daylighting and minimise effect of soil erosion F– Steep roof to allow for fast monsoon season rain drain off G – High roof to allow intermediate roof space to act as heat buffer H – Maximising low level windows for natural daylighting and cross ventilation J – Septic tanks (maintainable)

D E

D

N not to scale


7. Roofing 6. Roof Structure 5. Ceiling

Metal with insulation : lightweight & durable

4. Doors & Windows Steel : Long lasting & ease of maintenance

3. Walls & Floors

Plasterboard : Ease of maintenance

2. Foundation & Columns

Recycled Timber : adapted from existing timber building, less wastage

1. Landscape Retaining Wall

Hollow block walls & tiled floor : long lasting & ease of maintenance

Concrete : long lasting & stable for key structures, sand and aggregates collected from nearby river

River stones : locally sourced


M H

F

K D– E– F– H–

OPD (2 beds) Operation room Delivery room IPD (10 beds)

K – Connecting corridor (sheltered) M – Dining area

E

D







2018

Jun 2019

Formulate and develop design brief

2018

Jun 2020

Finalise scheme

Construction on hold

Monsoon period, Not accessible to site

2019

May 2021 Construction complete

Monsoon period, Not accessible to site

2020

2021

Jan 2019

Dec 2019

Dec 2020

Review Preliminary scheme with community

Construction commence, Target to complete: - Major structure works - Roofing works

Construction recommence Target to complete: - Interior works


END This proposal is prepared by Trecia Lim from WeCreate Studio with support from Craftsmenship Pte Ltd & Thymn Pte Ltd | Follow us on Facebook I https://www.facebook.com/BuildingtheMonC ommunityClinic | Email us | (Trecia) wecreatestudio@outlook.com (Dada Rama) ) baandadavolunteer@gmail.com 1st presented in Jan 2019 1st revision in Jun 2019 2nd revision in Jul 2019