Sea Level Rise Protection Strategy
2040 In the buffer zone, different approaches can be implemented in reponse to the specific local needs. For hard edge conditions, an intermediate recreational zone designation could be created on the new land prior to developers.
Strategic Relocation
2017
2030
A large proportion of the informal settlements are being encroached by the rising sea level. Some of the worst condition housing are located on the fringe of the water and subject to serious damage in flooding season
The most urgent task is to strategically relocate the impacted residents to safe area with decent quality housing and amenity infrastructures. Schools, markets, churches, and other facilities should provide a better quality life there.
The Hard edge approach will be based on the elevated land and evolve into multiple types of formal developments that create density, public spaces, and job opportunities in a new urban district. Nicely vegetated pedestrian promenades creates an active waterfront. elevated [hill] as waterfront park space
[ecological] water treatment facilities Soft Edge Protection Transect
Tourism District Commercial Corridor
New District Mixed-use Corridor
Proposed Master Plan The proposal tries to provide a systematic response for the 5.08 sq km area to manage urban growth under pressing risks of climate change, urban water sanitation, and development equity.
Relocation District BRT Corridor
The Corridor Approach For both the new district and the relocation zone, a series of corridor typologies are proposed to organize the development process that integrate mobility, business and urban ecology to facilitate efficient and effective future growth.
2050 (Hard Edge)
Relocation District Canal Park Corridor
2050 (Soft Edge) The Soft edge can evolve into two branches given different specific site conditions. The hill scenario will use the earth from previous dredging to build a protective hill as a dike that also accommodates walking trails and additional road connectivity. In areas with higher elevation, the treatment scenario will utilize the biological water treatment methods and create a purifying band that serves the community.
Sabana Station TOD Development Strategy
Development Typologies
FAR limit: 5.0
FAR limit: 5.0
FAR limit: 5.0
FAR limit: 4.0
FAR limit: 4.0
FAR limit: 3.0
FAR limit: 3.0
FAR limit: 3.0
FAR limit: 2.0
Tercer Milenio Park Redevelopment Strategy
Sabana TOD Site Plan 1
Upgraded Sabana Station
2
High density office and retail development
3
Separate entrance for car traffic and pedestrian bridge
4
Mixed-use residential community
5
Realigned Carrera 18 with commercial frontage
Calle 19 Road
La Presentación School
5
4
3 La Sagrada Pasion Church
2
1
Sabana Commercial Mall
>50% of Increase in
population in the past 20 years
370,000 unit
housing shortage in Bogota
Colombian economy is growing steadily at 3% on average in the past 5 years
San Jos Church
concentration of resources along regionanl rail
growth potential via linkages
Central Technical School
15
6
Calle 13
7
10 Calle 11 Promena
de
11
13 San José Hospital
Voto Nacional Basílica
12
City View from Mount Monserrate
Tercer Milenio Park Old City
Voto Nacional
El Bronx
La Sabana Station
CBD
Airport
14
To La Candelaria
(Old City)
Calle 7 Road
High mixed-use development plaza
7
Preserved historic public building
8
Infill apartment and townhouse development
9
Upgraded Plaza España Park
10
Calle 11 Pedestrian Promenade
Road
8 9
6
11
Mid-density infill development
12
Shelter and community health center
13
Student housing development
14
María Eugenia Rojas Park
Sample Block Typologies Arcades Retail Streetfront
Green Building Systems
Community Commercial
Market-rate Development
Historic Features
Public Space
19
Site Context
4
18
Economic drivers
3
17
The city of Semarang is located in the center of Java Island, the most populated and urbanized island of Indonesia. It is 400 km away from the capital city Jakarta, connected by coastline highway, railway and a growing import-export seaport.
1
16 15
5
Mobility system
10
6
JAVA SEA
INDONESIA
2
7
Jakarta Semarang
14
JAVA ISLAND INDOENSIA
INDIAN OCEAN
Water channeling and drainage
Public realm
The site sits at the intersection point of the expanding port and the confluence of the historic semarang river. Coastline along the two sides of the city resides some of the best mangrove habitats in the island, only to be cut off at the port entrance.
9
1
Waterfront development
2
Bandarharjo Waterfront Market 10
Protection Dikeway
3
Local Ferry Terminal
11
4
Preserved fish ponds and mangrove band
Higher density commercial development
12
Riverfront flood park and rain gardens
5
Infill development along dikeway
9
13
Residential development
Entry public plaza and pedestrian street
14
Crescent floodable park and cantilevered housing
7
Floating market with historic facade
15
New social housing
16
Technical school
17
Convention center
New connector road and infill mixed-use development
11
Historic fortress park
6
8
8
12
18
Retention pond and park
19
Mangrove restoration and education park
13