Westminster Magazine Spring/Summer 2017

Page 46

WC MEMORIES

EICHENAUER 1966

E

ichenauer Hall was built during President Will Orr’s expansion program. Plans were approved by the

Board of Trustees in the spring of 1965, and the men’s residence hall was completed in 1966 at a cost of $930,000. In September 1966, the new dormitory welcomed 260 students. Named for John B. Eichenauer, a former trustee and generous benefactor, the brick construction is notable for its suite-style living and semi-private bathroom facilities, the one-time envy of many female students. Today, the three-floor facility houses both men and women. ~ Compiled by Dorothy Pollock ’46

4 4 w w w.w e s t m i n s t e r. e d u


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.