Weston Rodberry - Professional Portfolio.

Page 1

Weston Rodberry


TETER, LLP

El Capitan Reclad - Modesto Junior College West Campus Modesto, CA 11,900 SF April 2017 to June 2019

El Capitan is a dance studio hall located on the Modesto Junior College Campus. The existing studio was a wood clad 1960s era building that needed to be repaired and who’s context needed to better fit the adjacent modern context. My Role: I took the initial sketches and modeled a concept similar to what was sketched. I was the Job Captain and sole resource on this project from Schematic Design to Completion. I managed all aspects of the project from take offs, consultant coordination (electrical), and agency approval. I also answered RFIs and reviewed submittals during the construction phase.


730/6510 8' - 0"

OPEN

CANOPY OUTLINE

STORAGE 119

MECHANICAL 120

ELECTRICAL 122

15 JCAF-31 AREAS

KEYNOTES

00.00

DESCRIPTION DATE

prior written authorization.

Teter, LLP expressly

ALUMINUM SOFFIT PLANK O/ 3/4" PANEL RAILS O/ 5/8" GWS O/ METAL STUDS SHEET METAL COPING DOOR AND FRAME AS SCHEDULED ALUMINUM CURTAINWALL any other project without

7.22

SLOPE

MARK W

O

-2 0 3-31

.

EN

O

No . C -3 2 0 9 4

R

CONNECTED

OT

GENERAL NOTES A. SEE STRUCTURAL FOR TOP OF STEEL ELEVATION (T.O.S.). REV IEW INFO B. RMA TION FOR C. REL EVA NCY

15 WALL SECTION - SOUTH

3/4" = 1'-0"

10

DRAWING TITLE

PLOT DATE: 12/11/2019 4:20:54 PM

0' - 0" T.O. SLAB

PROJECT NO.

19-11338 DRAWING

A411

BUILDING WALL SECTIONS

0' - 0" T.O. SLAB

VISALIA, CA

CORRIDOR 125

COS | GENERAL GRANT BUILDING EDUCATIONAL SUPPORT SERVICES SEQUOIAS COMMUNITY COLLEGE DISTRICT

8.01

4' - 0" B.O. WINDOW

prior written authorization.

any other project without

service, is not to be used

instrument of professional

incorporated herein, as an

property rights in these

ideas and designs

plans. This document, the

copyright and other

reserves its common law

Teter, LLP expressly

in whole or in part, for

PRELIMINARY DESIGN

DESCRIPTION DATE

12/11/19

MARK W

O

-2 0 3-31 .

OT

EN

O

R

No . C -3 2 0 9 4

NOT FOR D AR CONSTRUCTION SE D CH N T E

F CA L I F PRELIMINARY DESIGN 12/11/19

CONNECTED E NG INE E RS

FRESNO HEADQUARTERS

TETER, L LP

T E T ER

CA DESIGN PRELIMINARY 12/11/19

CONNECTED E NG INE E RS

VISALIA Il BAKERSFIELD Il MODESTO Il SAN LUIS OBISPO

MARK A RCH IT ECT S

A RCH IT ECT S

prior written authorization.

any other project without

instrument of professional

incorporated herein, as an

service, is not to be used

ideas and designs

plans. This document, the

property rights in these

copyright and other

reserves its common law

in whole or in part, for

PRELIMINARY DESIGN 12/11/19

Teter, LLP expressly

DESCRIPTION DATE

W

-2 0 3-31 .

EN

OT

5

CEILING HEIGHT

MECHANICAL GRILLES, SEE MECHANICAL.

G003

GENERAL NOTES

8 A410

A. CONTRACTOR SHALL PATCH, REPAIR OR REPLACE ANY ADJACENT WORK (WALL, CEILING, FLOOR SURFACES, ETC.) THAT IS DAMAGED, REMOVED AND/OR DEMOLISHED DURING THE COURSE OF CONSTRUCTION. SEE SPECIFICATION REQUIREMENTS FOR CUTTING & PATCHING. B. ALL WORK WITHIN, ON, OR ABOVE EXISTING CEILINGS SHALL BE PATCHED TO MATCH THE ADJACENT EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO ALL DEMOLITION REQUIRED TO REVPROPOSED IMPROVEMENTS (STRUCTURAL, PROPERLY INSTALL MECHANICAL, PLUMBING, ELECTRICAL, ETC.). IE W IN FO ADDITIONAL INFORMATION REGARDING a. SEE SPECIFICATIONS FOR RM CUTTING & PATCHING REQUIREMENTS. AT IO N TRADES FOR THE EXTENT OF b. COORDINATE WITH RESPECTIVE FO DEMOLITION AND PATCHBACK REQUIRED TO PROPERLY INSTALL R REL PROPOSED IMPROVEMENTS. EV AN C. EXISTING SPRAY-APPLIED FIRE PROOFING MATERIAL SHALL BE CY REMOVED AS REQUIRED FOR PROPER ATTACHMENT OF PROPOSED IMPROVEMENTS TO EXISTING STRUCTURAL BUILDING COMPONENTS.

My Role: As an architect assigned to A600 the project I assisted the design team to develop the concept after meeting with members of the client’s users and determining the needs of the program. We did visioning exercises and several iterations of design review and approvals. I also assisted the design team with modeling and drafting the drawings through design development. a.

FIREPROOFING SHALL BE REPLACED ONCE IMPROVEMENTS ARE COMPLETED.

D. FOR MODIFICATIONS TO EXISTING SUSPENDED ACOUSTIC PANEL CEILING SYSTEM, SEE - / --E.

NORTH

1/8" = 1'-0"

FOR SUPPORT REQUIREMENTS FOR NEW LIGHT FIXTURES OR HVAC SYSTEM REGISTERS, SEE - / ---

10

Renderings below by: Megan Armanderiz

T E T ER

FRESNO HEADQUARTERS

TETER, L LP

VISALIA Il BAKERSFIELD Il MODESTO Il SAN LUIS OBISPO

TE

E NG INE E RS

SC

L IC E

ST A

A RCH IT ECT S

NOT FOR D AR CONSTRUCTION SE D CH N T E

IA

12' - 0" T.O. WINDOW

1

E

RN

T EC IT Y

F CA L I F PRELIMINARY DESIGN 12/11/19

8.23

7.22

15 A411

8 19-11338 A400

N.T.S.

ROOM SYMBOL

1'-0"

ELECTRICAL LIGHT FIXTURE, SEE ELECTRICAL.

E

GENDER NEUTRAL STAFF RR 134

PROJECT NO.

DRAWING

ROOM 101

FULL HEIGHT WALLS

GENDER NEUTRAL RESTROOM 133

OPEN

7 A400

FIRST FLOOR REFLECTED CEILING PLAN

19' - 2" B.O. FASCIA

3/4" = 1'-0"

10' - 0"

10 A411

2

6 A400

22' - 8" T.O. FASCIA

25 WALL SECTION - EAST

DRC LAB 130

10' - 0"

STRUCTURE

20' - 0" T.O. STEEL

3/4" = 1'-0"

DRC LAB 129

9' - 0"

STORAGE 121

19' - 2" B.O. FASCIA

WALL SECTION - NORTH

DRC DIRECTORS OFFICE 128

TE

EXPOSED STRUCTURAL DECK W/ BAR JOISTS @ 10' O.C., SEE STRUCTURAL.

DRC ASSESSMENT 131

OPEN

8' - 0"

SLOPE

0' - 0" T.O. SLAB

DRC 132

8' - 0"

OPEN

7.52 8.01 8.23

SLOPE

5/8" TYPE "X" GYP. BD. O/ METAL CEILING JOISTS.

7 A410

8' - 0"

8' - 0"

STORAGE 127

25

27' - 0" UPR. PARAPET

DRC ASSESSMENT 131

10'-0"

ST A

The College of the Sequoias needed to consolidate its student services and basic tutoring programs under one roof. The new building replaces two older buildings and is a new gateway into their existing campus from a prominent intersection. VERTICAL WOOD SLAT CEILING ASSEMBLY

D

WC STUDY 137

9' - 0"

CORRIDOR 125

OPEN

A412 715/0099

F

GENERAL TUTORIAL 152

DRC OFFICE 126B

E

REFLECTED CEILING PLAN

BUISNESS LAB 123

680/0099

27' - 0" UPR. PARAPET

ALUMINUM SOFFIT/CEILING PLANK ASSEMBLY, SEE 25 / A411

CONVERSATION ROOM 143

T EC IT Y

DRAWING TITLE

OPEN

MATH LAB 1 118 10'-0"

540/6400

SLOPE

LEGEND

12' - 0"

DRC OFFICE 126A

Visalia, CA 23,600 SQFT August 2019 to Present

VISALIA, CA

315/6400

3

22' - 8" T.O. FASCIA

WRITING CENTER 140

OPEN

9' - 0"

315/6420

1/8" = 1'-0"

7.52

WC STUDY 138

OPEN

UNASSIGNED

JCAF-31 PLAN

C

OPEN

in whole or in part, for

2

6 A410

TE

13' - 0"

8' - 0"

310/4930

568 SF 540/6230

136 SF 715/0099

CONVERSATION ROOM 142

16'-0"

CORRIDOR 124

service, is not to be used

248 SF 250/4930

OPEN

OPEN

250/4930

8 A410

STORAGE 154

CORRIDOR 135

instrument of professional

248 SF 250/4930

0.97%

OPEN

250/4903

E

B STORAGE 153

10'-0"

210/4999

E

STA

0.24%

ESL ASSESSMENT 144

9' - 0"

210/4930

GENDER NEUTRAL RESTROOM 133

E

College of the Sequoias General Grant Building Student Services Center

COS | GENERAL GRANT BUILDING EDUCATIONAL SUPPORT SERVICES SEQUOIAS COMMUNITY COLLEGE DISTRICT

210/4903

ADMISS ACTIV CLINIC STUDENT CARE 131

CORRIDOR 125

DP 121

0.24% 0.21%

15'-0"

T EC IT Y

12' - 0"

incorporated herein, as an

85 SF 730/6510

MECHANICAL STORAGE 120

OPEN

LANGUAGE CENTER 141

BIO/CHEM LAB 117

ideas and designs

PLOT DATE: 12/11/2019 9:43:59 AM

142 SF 315/6420

STORAGE 119

206

OFFICE 114

CONVERSATION ROOM 115

property rights in these

DSPS OFFICE SERVICE 128

GENERAL STUDIES NON-CLASS LAB 130

21,351

8' - 0"

ESL INSTSRUCTION LAB 145

9' - 0"

STORAGE 155

MATH LAB 2 116

540/6230

770 SF 540/6230

GENERAL STUDIES NON-CLASS LAB 129

21,145

OFFICE 113 OPEN

copyright and other

80 SF 315/6420

72 SF 730/6510

36

RECEPTION 148

CORRIDOR 15,002 111

STORAGE 110

210/1700

GENDER NEUTRAL STAFF RR 134

ADMISS ACTIV CLINIC STUDENT CARE 132

15,038 20,938 413

417 486

reserves its common law

80 SF 315/6420

STORAGE 127

369 SF 250/1700

ELECTRICAL 122

C:\Users\tony.pavone\Documents\11338-A-COS_BASIC SKILLS CENTER-2019_tony.pavone@teterae.com.rvt

DSPS OFFICE SERVICE 123

N/A N/A

TYP.

10'-0"

JCAF-31 Index

PLOT DATE: 12/11/2019 4:22:06 PM

1212 SF 210/1700

DSPS OFFICE SERVICE 126

1 1

Assignment 8'General - 0" Bldg M&O and Support

plans. This document, the

MATHEMATICS NON CLASS LAB 123

418 487

0099 6510

8' - 0"

250/1700

E

0.87%

8.37

DRAWING TITLE

7 A410

175 SF 250/4903

CORRIDOR 124

2

OPEN

10' - 0"

HUMANITIES NON-CLASS LAB 137

CORRIDOR 135

232

230

D

175 SF 250/4903

1100 SF 210/4903

0.00% 0.00% 0.67% 0.22% 0.11%

VEST 107

D

HUMANITIES NON-CLASS LAB 138

CORRIDOR 139

HUMANITIES CLASS LAB 140

0 0 2 3 3

General Assignment

10'-0"

110 SF 250/4930

194 SF 250/4930

180 180 302 1,338 2,729

0099

IT 109

OPEN

180 180 300 1,335 2,726

JCAF-31 PLAN

GENERAL STUDIES NON-CLASS LAB 143

405 SF 250/1700

MATHEMATICS CLASS LAB 118

Admissions Activities JANITOR OPEN Other Student 106Services

R

MEN 108

General VESTStudiesLOBBY 100 Other Student Services 105 DSPS

No . C -3 2 0 9 4

DP/Computer Service Storage

8' - 0"

NOT FOR D AR CONSTRUCTION SE D CH N T E

715 730

10' - 0"

8' - 0"

OPEN

14'-0"

4930 6400 6420

6230 6400

WOMEN 104

0.52% 0.00%

FRESNO HEADQUARTERS

Meeting Room

8' - 0"

10' - 0"

4 0

TETER, L L P

680

8' - 0"

0.58% 0.22% 0.67% 19' - 3" -0.37%

VISALIA Il BAKERSFIELD Il MODESTO Il SAN LUIS OBISPO

Clinic ST Care Clinic ST Care

0.38% 0.00%

T E T ER

Office Office Service Office Service

540 540

2 0

O LIF

774 400

310 315 315

530 800

A

OF

770 400

GENERAL EDUCATION CLASSROOM 112

GENERAL STUDIES NON-CLASS LAB 142

180 SF 250/4903

1202 SF 210/1700

1700 4903

8' - 0"

MATHEMATICS NON-CLASS LAB 117

MATHEMATICS CLASS LAB 116

GENERAL4 TUTORIAL -5 152

Total GSF

95 SF 315/6400

HUMANITIES NON-CLASS LAB 115

14 5

604 1,345

400 SF 250/4903

OFFICE SERVICE 114

D

2,414 2,305

600 1,350

STAFF BREAK Mathematics ROOM Humanities 103

HUMANITIES NON-CLASS LAB 144

1205 SF 210/4903

110 SF 310/4930

40 SF 730/6510

2,400 2,300

General Studies Other Disc Studies

PRELIMINARY DESIGN

1140 SF 210/4999

10 SF 730/6510

HUMANITIES CLASS LAB 141

GENERAL STUDIES OFFICE 113

Mathematics Humanities

4930 4999

Total ASF GSF BLDG Eaves (50% area)

604 SF 210/4930

STORAGE 146A

46 SF 715/0099

STORAGE 155

C

1700 4903

12/11/19

CORRIDOR 111

100 SF 730/6510

OTHER INTER-DISC STUDIES CLASS LAB 112

C

GENERAL STUDIES CLASS LAB 145

Class Lab

250

15 A412

205 SF 210/4999

528 800

VISALIA, CA

85 SF 315/6400

STORAGE 146B IT STORAGE 146

6 A410

Humanities General Studies

Non-Class Lab Non-Class Lab

%

COS | GENERAL GRANT BUILDING EDUCATIONAL SUPPORT SERVICES SEQUOIAS COMMUNITY COLLEGE DISTRICT

C:\Users\tony.pavone\Documents\11338-A-COS_BASIC SKILLS CENTER-2019_tony.pavone@teterae.com.rvt

C:\Users\weston.rodberry\Documents\11338-A-COS_BASIC SKILLS CENTER-2019_weston.rodberry.rvt

160 SF 715/0099

85 SF 730/6510

4903 4930

Class LabOPEN

STORAGE 102

STORAGE 154

Non-Class Lab Non-Class Lab

Class Lab CONFERENCE ROOM 101 Lab Class

10 A412 250

85 SF 730/6510

OTHER INTER-DISC STUDIES CLASS LAB 145A

OFFICE SERVICE 150

70 SF 310/4930

10 SF 730/6510

STORAGE 110

210 210

Difference

SC

IT 109

GENERAL STUDIES OFFICE 149

RECEPTION 148

VEST 107

C

210 210

CLINIC STUDENT CARE COUNTER 151

JANITOR 106 MEN 108

B A1

ASF

L IC E

WOMEN 104

B

STORAGE 153

Color Code

FINDINGS

ASF

IA

VEST 105

76 SF 715/0099

250 250

PRELIMINARY PLANS Department

1

IT/COMM STO 102

12-11-19

TOP

RN

LOBBY 100

232 SF 680/0099

DATE PREPARED:

Description

SC

2729 SF 540/6400

JCAF 31 AREA AND WSCH COMPARISON FPP JCAF 31 Color code Room Type

L IC E

CLINIC STUDENT CARE 152

EMPLOYEE 103

MEETING ROOM 101

A1 A A

00.00

TUBULAR SKYLIGHT

IA

B A1

KEYNOTES 8.37

A1

25 A411

1

FREESTANDING STRUCTURE

A

TETER, LLP

2

RN

2

PROJECT NO.

19-11338

DRAWING


Additional Work at TETER, LLP Selma HS Stadium Honor Wall Summer 2018 As a smaller role in a larger project, I was tasked to design a donor sign for a large high school stadium project. I took precedent examples and came up with a concept in water jetted metal slats. I did the design concept, initial detailing, and concept rendering for this portion of the project.

Stockton New ES (Modular Campus and Site Built MPR May 2018 to Present As a design professional on a new elementary school campus my role was to translate the sketched designs for the exteriors of the modular building to the model. I also sketched and finalized the floor patterns and ceilings. I assisted with design on the site built MPR and was on the team from concept to agency approval. I also submitted and assisted with getting approvals through the county health department for approval for cafeteria operations.

Ballico Elementary School April 2017 to June 2019 As a design professional on a new elementary school modular building. I modeled and drafted the design and casework on a six classroom middle school block with student and staff restrooms. I was on the project from Concept to Agency Approval. I also assisted with RFIs during construction phase.