When you need to build in the cold, fast. Porotherm ZeroPlus™, the new mortar from Wienerberger, allows you to build up to 5x faster even in lower temperatures. Unlike existing thin-joint and conventional mortars that are for use at 3ºC and above, ZeroPlus™ mortar is designed to work at temperatures from 0ºC and rising. Wienerberger has developed ZeroPlus™ to work exclusively with the Porotherm Construction System, to give the same great benefits of the existing system, even in cold weather. Maximising build time in winter – earlier starts on cold days Extra build time in winter – up to 2 weeks additional build time Reducing downtime – reduced risk of stoppages for building contractors P roven performance - validated by CERAM as comparable to existing Porotherm mortar Supplied free – with the Porotherm Construction System ZeroPlus™ and Porotherm, keeping Britain building up to 5x faster all year round.
FAST DRY EFFICIENT STRONG SAFE SUSTAINABLE Even at 0°C
For more information contact the Porotherm team on 0845 303 2524
Technical information Storage and Processing Instructions Available as 15kg bag
MIXING Two methods of application are suitable for ZeroPlusโ ข mortar. Roller Method For a full bag mix add approximately 3.6 litres of clean water to the bucket then add the powder. Stir quickly and vigorously (using an agitator / paddle mixer) until a smooth, lump free consistency is produced. Allow to stand for 10 to 15 minutes and then stir again. The mixed mortar is transferred from the bucket into the special Porotherm mortar roller. Mortar is normally applied to a 5 to 6m length of horizontal joint using the mortar roller. The speed of rolling and the angle of application must be adjusted to ensure that an even mortar layer is applied evenly from the roller and covers the entire surface area of the horizontal joint. DIPPING Method Add between 4.5 and 4.8 litres of clean water to the bucket. Stir quickly and vigorously (using an agitator / paddle mixer) until a smooth, lump free consistency is produced. Allow to stand for 10 to 15 minutes and then stir again. Dip the underside of the block approximately 1 to 2mm deep in to the mortar (using a mortar tray) and then set in place immediately. The mortar must adhere completely to all the webs and shells of the block.
Processing Processing Time: Protected mortar; Approximately 4 hours at 20ยบC, but will be extended at lower temperatures and reduced at higher temperatures. Processing Temperature: Use only when the air temperature is at least 0ยบC and rising. Please be aware that internal situations may be colder than external and any wind chill factor must be taken in to consideration. Do not use when blocks or existing work are frozen. Do not mix with water that is partially frozen or is thawing. Mixing water should always be from a mains tap that has not been frozen. In addition, early strength development will be reduced at low temperatures and therefore, the blocks and mortar must be adequately protected at all times with appropriate insulating covers prior to and after application so that fresh masonry does not fall below 0ยบC. Mixing in an insulated bucket with an insulated lid is strongly recommended.
ADVICE This product contains cement and produces an alkaline reaction when it comes into contact with moisture/water. Therefore, ensure that skin and eyes are protected. If it should come into contact with the skin or eyes, rinse them thoroughly with water. Seek medical assistance immediately if it comes into contact with the eyes. Contains Chromium VI, however a reducing agent ensures that the Cr VI content of the mortar remains below 2ppm during the shelf life of the product. It may produce an allergic reaction. The information provided herein is based on extensive tests and practical experience. It does not apply to every application situation. For this reason we recommend that suitable site trials are carried out to determine optimum Xi procedures. Manufactured for Wienerberger Ltd. by N&C Building Products Ltd., Amicable Street, Burslem, Stoke on Trent ST6 3 BH. Tel 01782 833330 Fax 01782 834225
Approved PPE must be worn when using this product.
Wienerberger Ltd Wienerberger House Brooks Drive Cheadle Royal Business Park Cheadle, Cheshire SK8 3SA T 0161 491 8200 Customer Service Centre T 0845 303 2524 F 0844 555 5770 office@wienerberger.co.uk www.brick.co.uk