William Hartawan - Selection of Works

Page 1

@archihartawan

williamhartawan@yahoo.com

PORT FOLIO William Hartawan



W

W

“ALTA Sacred Mountain (Micro-Home)” 5 (Residential Housing (Masterplan))

U

“Grand G7 Hotel - Batu Ceper.” (3 Star - Hotel)

“Irregular Festival.” (Installation)

13

U

“Tarneit’s HustleHub!” (Retail Centre & Market)

University Project

P

Personal Projects

C

27

U

“The Winton Guest House” (Residential House)

53 41

“Kampung Raya.” (Social Housing)

19

U

“The Chameleon” (Art Gallery)

35

U

U

R

Design Competitions

W

“RMIT Performing Arts School.” (Performing Arts School)

47

Work Experience

R

Research Experience

CONTENTS



W

The People and Planet enterprise focuses on sustainability, which is to deliver a residential masterplan project that can positively impact the community, environment and local economy through research and innovation. The project is located in gesing near the peaks of

ALTA SACRED MOUNTAIN (MICRO HOME). MARS Architects - Denpasar (Bali), Indonesia. Architecture Internship (November 2022 to February 2023.) Typology: Residential Housing (Masterplan). Location: Gesing - Denpasar (Bali), Indonesia.

mount sanghyang. The design of the micro homes is as part of the master plan of the site. The residential homes are constructed using plywood with wood sheeting and louvres. The contribution to the project started in assisting in developing design solutions in floor plans and sections and producing weekly drawings, visualizations and 3d models for client presentations.


TYPE A - MICRO-HOUSE UNIT.

FIRST FLOOR.

SECOND FLOOR.

The floor plans shows the program of the two floors. The first floor shows the original entrance next to the tight kitchen space, which is aligned with the stairs. The stairs was a challenge in the project in terms of the dimensions of the risers and goings, and to ensure that it is not steep for a person to go up to the bedroom. The bedroom provides views towards the mountains and the rest of the forest.

@archihartawan.

@archihartawan. @archihartawan.


VIEW FROM UPPER CLIFF SIDE.

ENTRANCE FOR TYPE A & C.

After reciving feedback from the client, the drawings were produced using Rhino 3D to make linework drawings. This time the drawings shows the existing site conditions with the topography inserted into the file.

@archihartawan.

@archihartawan.


TESTING ON SITE.

TYPE A & C - OVERLOOKING THE SEA AND THE REST OF BALI’S COASTLINE HILLS.

TYPE B - SHOWING THE VIEW LOOKING TOWARDS MOUNT SANGHYANG.

These visualizations shows the line drawing of the villa and the image taken originally from the site. The objective of these renders are to imagine the condition of the views that look towards the mountain and the coastline.

@archihartawan.

@archihartawan.


FINAL RENDERINGS.

VIEW FROM LOWER GROUND OF THE HILLSIDE.

BIRD’S EYE VIEW 1.

BIRD’S EYE VIEW 2.

BIRD’S EYE VIEW 3.

@archihartawan.

@archihartawan.


STRUCTURAL DRAWINGS.

TOP VIEW.

AXONOMETRIC.

CROSS-SECTIONS. @archihartawan.

SIDE VIEW. @archihartawan.


STRUCTURAL CALCULATIONS.

DENSITY CALCULATION OF WOOD STRUCTURES.

CROSS-SECTION AND AXONOMETRIC GUIDES. This calculation table shows the volume of the respective structures of the micro home. The guides along with the caculations are used to help communicate and engage a discussion with the wood engineers regarding the construction of the project. @archihartawan.

@archihartawan.


@archihartawan.

@archihartawan.


W

The Grand G7 Hotel is located in Batu Ceper street in Central Jakarta at the district of Gambir, which is the localized district in Jakarta with attractions in close proximity such as the Merdeka Square and the Monas Monument.

GRAND G7 HOTEL - BATU CAPER. Sumber Rejeki Pramesti - Jakarta, Indonesia. Architecture Internship (July 2019 to February 2020.) Typology: Hospitality (3-Star Hotel) Location: Gambir - Jakarta, Indonesia. @archihartawan.

The Hotel features a swimming pool and gym with tropical garden features alongside a restaurant and bar at the rooftop. This project was contributed by myself and the architect team, where i was responsible in documentation drawings for toilets details as well as window and door schedules .

@archihartawan.


2060

1420

580

CEILING LEVEL MEZ 10455

150

2700

FW

FW

1530 FLOOR LEVEL MEZ 7175

Description

1470

TD 01Date

1060

PURPOSE OF ISSUE

1 : 20

820

1280 1980 FW

TBG-02

TBG-01

GRAND G7-HOTEL

TITLE

180

4100

790

CLIENT

WISANA BOGA DRAWN BY

CHECKED BY

Checker

SCALE (@ A1)

1300 1 : 20

DRAWING NUMBER

300

5

TBG-03

GROUND FLOOR TOILET DETAIL Author PLAN.

MEZZANINE MALE TOILET ELEVATION.

A151

MEZZANINE MALE MALE TOILETTOILET PLAN GROUND FLOOR 1 : 20

FLOOR LEVEL Mezzanine MEZ 7175

MEZZANINE MALE TOILET ELEV D

140

HDG-01

150

150

3280

150

4

1850

STATUS

2020 840

TD 09

A151

60

SUITABILITY DESCRIPTION

1:

730

450

A151

CODE

PROJECT

420

TD 10

GR

230

MALE TOILET CERAMIC 300 X300 TILE

1140

120

TOTO URINAL

920

DATE

01/29/20

PROJECT NUMBER

01

REV

A154 WHITE PAINT

DYSON HAND DRYER

GR

1:

2710 CEILING HEIGHT 5075

TOTO TOILET BASIN

1850

680

900

1980

2

580

250

900

480

4260 1500

610

680

TD 04

A151

CEILING LEVEL MEZ 10455

50

TD 03

3

FW 1780

TD 02

20

Rev

900

1430

31/01/2020 14:25:38

1340

1 : 20

@archihartawan.

FW

420

100

700

MEZZANINE MALE TOILET ELEV C

2090

FW

1110

DYSON HAND DRYER

750

GLASS PARTITION

840

390

HDM-01

TBM-01

150

150

3280

TOTO TOILET BASIN

2150

1440

900

2430

WHITE PAINT FINISH

@archihartawan.


ALUMINIUM COMPOSITE FACADE WITH GOLD ARTIFICIAL FINISH AS SPECIFIED

580

700

890

Third Floor 18675

UNIVERSAL BEAM AS PER ENGINEER

WHITE PAINT FINISH @ WALL AS SPECIFIED

CLEAR GLASS AS SPECIFIED

8100

700

MARBLE FLOORING AS SPECIFIED

GLASS CURTAIN WALL AS SPECIFIED

930 180 Rev

MEZZANINE RAILING SECTION

BIRCH WOOD ARTIFICAL FINISH AS SPECIFIED

GROUND FLOOR TOILET DETAIL PLAN.

CLEAR GLASS AS SPECIFIED

ALUMINIUM HOLLOW FRAME RAILING AS SPECIFIED

3400

70

PROJECT

200

MARBLE FLOORING AS SPECIFIED

FACADE DETAIL

Author

720

CHECKED BY

Checker

SCALE (@ A1)

1460

CAFE RAILING SECTION 1 : 25

100

1 : 10

GROUND FLOOR TOILET DETAIL PLAN.

CONCRETE SLAB AS SPECIFIED BUY ENG

LOBBY CEILING H 6998

WISANA BOGA

DRAWN BY

1 : 25

800

200

700

700

740

FLOOR LEVEL 8TH 35675

CARPET

FLOOR LEVEL ME 7175

CLIENT

LIGHT BROWN ALUMINIUM FRAME FACADE AS SPECIFIED

Mezzanine 7175

GRAND G7-HOTEL

TITLE

CONCRETE SLAB AS SPECIFIED BY ENGINEER

GLASS ALUMINIUM F RAILING AS SPECIFIE

200 130

ALUMINIUM HANDLE AS SPECIFIED

STAINLESS ALUMINIUM FRAME AS SPECIFIED PURPOSE OF ISSUE

DATE

01/16/20

PROJECT NUMBER

01

DRAWING NUMBER

REV

A149

100

CLEAR TEMPERED GLASS AS SPECIFIED

STATUS

WHITE PAINT FINISH WALL AS SPECIFIED

SUITABILITY DESCRIPTION

700

BATIK ALUMINIUM FACADE AS SPECIFIED

CODE

1130

ALUMINIUM COMPOSITE FACADE WITH GOLD ARTIFICIAL FINISH AS SPECIFIED

ALUMINIUM FRAME BEYOND

@archihartawan.

Date

MEZZANINE 1 : 10

31/01/2020 14:25:04

1 : 10

FACADE DETAIL SECTION

Description

1 : 10

CAFE RAILING SECTION

Second Floor 10575

100

LOBBY CEILING HEIGHT 6998

10710

FLOOR LEVEL 8TH 35675

CONCRETE SLAB AS SPECIFIED BUY ENGINEER

FLOOR LEVEL MEZ 7175

200

CONCRETE SLAB AS SPECIFIED BY ENGINEER

CARPET

1130

NEON COMPLANY LOGO

GLASS ALUMINIUM FRAME RAILING AS SPECIFIED

200 130

ALUMINIUM HOLLOW FRAME RAILING AS SPECIFIED

GROUND FLOOR TOILET DETAIL PLAN.

800

800

800

800

800 CLEAR TEMPERED GLASS AS SPECIFIED

800

@archihartawan. ALUMINIUM HANDLE


GROUND FLOOR

LOCATION:

GROUND FLOOR DOOR NO:

3,4,6,7

LOCATION: 30,36 MEZZANINE GROUND FLOOR

13,14,15,16,17,18,19,20,21, 22,23 3,4,6,7 MEZZANINE 13,14,15,16,17,18,19,20,21,

22,23

13,14,15,16,17,18,19,20,21, 22,23

1060

DOOR NO:

30,36 DOOR NO:

LOCATION:

100

100 1060

100

2630

100

100

2630

FOURTH FLOOR SEVENTH FLOOR MEZANNINE FOURTH FLOOR -

DOOR MT1-MT5 NO:

MEZANNINE LOCATION:

SEVENTH FLOOR

FOURTH FLOOR SEVENTH FLOOR

100990 990

800

800

50

2040

2080

2040 2040

1030

1030 1030

GROUND FLOOR MEZZANINE SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR EIGHT FLOOR

F1,F2,F3,F4,F5,F6,F7,F8,F9

SEVENTH FLOOR

F

F

F

Ground Floor 2375

F

50

700

50

700

50

710

50

710

50

700

50

2110 2110 1010 1010

1510

1010

150 500 150

150

SAUNA & SPA DOOR

100 100

GROUND FLOOR

SECOND FLOOR THIRD FLOOR GROUND FLOOR FOURTH FLOOR MEZZANINE FIFTH FLOOR SECOND FLOOR SIXTH FLOOR THIRD FLOOR SEVENTHFLOOR FLOOR FOURTH EIGHT FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR EIGHT FLOOR

710

LOCATION: 150 500 150

CAFE DOOR

F

CAFE DOOR 1DOORS : 20 NO: CA1

DOORS NO:

LOCATION:

DOORS NO: CA1

1510

SUITABILITY DESCRIPTION

STATUS CODE

PURPOSE OFDESCRIPTION ISSUE SUITABILITY

STATUS

PURPOSE OF ISSUE

EIGHT FLOOR TITLE

LOCATION:

CAFE DOOR EIGHT FLOOR

CODE

SU

GRAND G7-HOTEL GRAND G7-HOTEL

PU

STATUS

G DOOR G ELEVATIONS DOOR ELEVATIONS WISANA BOGA WISANA Author Checker BOGA 01/22/20 PROJECT

1 : 20

TITLE

LOCATION:

DOORS NO:

LOCATION:

THIRD FLOOR

CA1

EIGHT FLOOR

CLIENT

TITLE

CLIENT

DOOR SCHEDULES.

Lobby Floor 1175

Date

CODE

LOCATION:

42,45

Lobby Floor 1175

1200

LOBBY ENTRANCE ELEV

Description Rev Date

PROJECT

DOORS NO:

Ground Floor Lobby Floor 2375

LOBBY ENTRANCE ELEV

Rev

PROJECT

1 : 20

THIRD FLOOR

1 : 20

Description

1510

42,45

SAUNA & SPA 42,45 THIRD DOOR FLOOR

Rev

50

Ground Floor 2375

1200 1200

2110

50

900

150 1710

50

150

50

1 : 20

F

100

DOORS NO:

FOURTH FLOOR SEVENTH FLOOR

50

500 DOOR 150 SAUNA150 & SPA

1175

@archihartawan.

LOCATION:

MEZZANINE F1,F2,F3,F4,F5,F6,F7,F8,F9 LOCATION:

150

50

50

1710 1710

2020 2020

2110 2110

150

4400

F

800 900

150

F

2070 2070 2070

F

4400 4400

F

2020

2100 2100 100 100

2100 100

F

50

1 : 20 NO: DOORS

1 : 20

DOORS NO:

F1,F2,F3,F4,F5,F6,F7,F8,F9

LOCATION: MEZANNINE

900

Lobby Height 6775 6775

DORMA AUTOMATIC SLIDING DOOR AS SPECIFIED

1 : 20

LOCATION:

1DOORS : 20 NO:

LOCATION:

Lobby Height 6775

DORMA AUTOMATIC SLIDING DOOR AS SPECIFIED

F

40

4T1- 4T17 5T15T17 MT1-MT5 4T1- 4T17 6T1-GT17 5T1- 5T17 7T1-7T17 4T1- 4T17 6T1-GT17 5T1- 5T17 7T1-7T17 6T1-GT17 7T1-7T17

AS SPECIFIED

F

40

FOURTH FLOOR SEVENTH FLOOR MEZANNINE FOURTH FLOOR -

50 x 100 ALUMINIUM MULLION AS SPECIFIED 50 x 100 ALUMINIUM MULLION

F

2080 2080

MEZANNINE

DOOR NO:

Lobby Height

DORMA AUTOMATIC SLIDING DOOR AS SPECIFIED

2150

LOCATION:

MT1-MT5

LOCATION:

1 : 20

990

50 x 100 ALUMINIUM MULLION AS SPECIFIED

F

40

50

2190 2190

2150 21502190

DOOR 1 : 20NO:

50-69,72-123

2630

1 : 20

MEZANNINE

50-69,72-123 24,25,26,27,28 50-69,72-123

SECOND FLOOR

FIRE EXIT DOOR ELEVATION

LOCATION:

24,25,26,27,28 DOOR NO:

50

ROOM TOILET DOOR

24,25,26,27,28

SECOND FLOOR LOCATION:

900

FIRE50 EXITFIRE DOOR ELEVATION 900 50 EXIT DOOR ELEVATION

DOOR 1 :NO: 20

DOOR NO:

SECOND FLOOR

5050

900

ROOM TOILET DOORDOOR ROOM 1280TOILET 1 : 201 : 20

ROOM DOORS

LOCATION:

30,36

50

50 : 20 1 : 120

MEZZANINE

1060

50

ROOM DOORS 40DOORS 820 40 ROOM

70

1 : 20

DOOR 1 : 20NO:

1280 1280

50

LOCATION:

3,4,6,7

40 40

2000

1DOOR : 20 NO:

820 820

60

DOOR NO:

4040

70

ALUMINIUM DOOR

ALUMINIUM DOOR WITH GREY WITH GREY ARTIFICIAL FINISH ARTIFICIAL FINISH ALUMINIUM DOOR 50 WITH GREY ARTIFICIAL FINISH

1090

BALLROOM DOOR

1 : 20

180 420 180

DOOR FRAME

50

820 OFFICE DOOR

1 : 20

180 420 180

GLASS

50

70 DOOR 1670 BALLROOM DOOR BALLROOM

1 : 20

180 420 ALUMINIUM 180

DOOR FRAME SAFETY GLASS

2000 2000

30 820 DOOR 30 OFFICE 820 OFFICE 820 DOOR

DOOR HANDLE

ALUMINIUM GLASS

DOOR FRAME

SAFETY GLASS

ALUMINIUM GLASS

DOOR HANDLE

70

1670

DOOR HANDLE

SAFETY GLASS

60

1670

1000

60

70

KEY CARD ACCESS

2040

2090

ALUMINIUM FRAME

70

2090 2090

750 750

750

ALUMINIUM FRAME

30

MAGHOPANY WOOD FINISH MAGHOPANY WOOD FINISH

720

KEY CARD ACCESS

2040 2040

70 70

MAGHOPANY ALUMINIUM WOODFRAME FINISH

KEY CARD ACCESS

1000

1090 1090

820

ALUMINIUM FRAME

900

720

2110

30 30

1810 1810

1740

1810 1030 1030

ALUMINIUM FRAME

ALUMINIUM FRAME

1810

1740 1740

30 30 2050 2050

1030 2080 2080

2050

2080

TIMBER WOOD FINISH

820

50

50

70

30

TIMBER WOOD 880 FINISH

TIMBER WOOD FINISH

30

900

1810

880

1000

720

900

1810

880

DRAWN BY

CHECKED BY

SCALE (@ A1) DRAWN BY

PROJECT NUMBER CHECKED BY DATE

1 : 20 Author

01 Checker

DRAWING NUMBER SCALE (@ A1)

A168 1 : 20

DRAWING NUMBER

A168

DATE

ELE

01/22/20

PROJECT NUMBER

01

CLIENT

REV

REV

WIS

DRAWN BY @archihartawan.

Author

SCALE (@ A1)


2

SILVER COLORBOND ALUMINIUM ROOFING AS SPECIFIED

3

9900

4

7050

3300

Top Roof 38975

ARTIFICIAL GOLD ALUMINIUM FACADE AS SPECIFIED

FEMALE TOILET

CAFE

MALE TOILET

WC

3400

Eigth Floor 35675

ROOM

3400 3400

ROOM

TOILET

F

F

F

F

F

F

F

F

F

ROOM

TOILET WC

Fourth Floor 22075

F

F

F

F

F

F

F

F

F

F

F

F

TOILET

3400

ROOM

WC

TOILET

ROOM

WC

F

F

F

F

POOL AREA

FEMALE TOILET F

Third Floor 18675

ROOM

WC

2510

3000

ROOM

ROOM

TOILET

TOILET

Fifth Floor 25475

WC

WC

WC

WC

3400

F

TOILET

Seventh Floor 32275

Sixth Floor 28875

F

TOILET WC

SUSPENDED CEILING AS SPECIFIED

F

F

F

WC

F

MALE TOILET WC

Rev

Description

8100

POOL

BALLROOM F

3400

Second Floor 10575

HK

PRAYING ROOM

KITCHEN

4800

Mezzanine 7175

LOBBY

STATUS

PURPOSE OF ISSUE

1400 2380

PROJECT

3200

Basment 1 -1400

SUITABILITY DESCRIPTION

HALLWAY

Ground Floor 2375

Level 0 0

CODE

BASEMENT 1

TITLE

BASEMENT 2

3620

Basment 2 -4600

Basment 3 -8225

GRAND G7-HOTEL

CROSS SECTI CLIENT

BASEMENT 3

WISANA BOG DRAWN BY

Author

CHECKED BY

Checker

SCALE (@ A1)

CROSS SECTION 1 : 100

1 : 100

DRAWING NUMBER

A140

GROUND FLOOR TOILET DETAIL PLAN.

@archihartawan.

@archihartawan.

DA

01

PROJECT NUM

01



R

This elective is conducted as part of the Irregular Exhibition, which is located at the Cobblestone Pavilion in Melbourne Meat Market at North

IRREGULAR FESTIVAL. Exhibited by the North + West Melbourne Precinct Association. Part of NGV’s Melbourne Design Week 2024. Master of Architecture Year 2 - Architecture Research Elective. Typology: Installation. Location: North Melbourne - Melbourne, Victoria. @archihartawan.

Melbourne. This exhibition seeks to focus on the reimagination of public connection with the community via public spaces within West and North Melbourne. The exhibition is part of Melbourne Design Week 2024 from Thursday, 23rd May to Saturday, 25th May 2024. In this elective, I contributed to the design phase of the scaffold design alongside the research of precedents, components of a scaffold and the construction documetation, where the initial designs schemes were rejected due to budget constraints.

@archihartawan.


DISPLAY TABLE SHOWING MAPPING FOR KIDS TO PLAY.

@archihartawan.

@archihartawan.


@archihartawan.

INTERNAL VIEW 1

INTERNAL VIEW 2

INTRENAL VIEW 3

INTRENAL VIEW 4

@archihartawan.


FIRST ITERATION

FIRST ITERATION - PRELIMINARY INTERNAL VIEW

SECOND ITERATION - CHOSEN TO DEVELOP THE DESIGN FURTHER.

SECOND ITERATION - PRELIMINARY INTERNAL VIEW

@archihartawan.

@archihartawan.


ENTRY

EXIT Circulation from Harlan’s Scheme Seat

11.2 m

2.2 m

12 m

SCHEMATIC PLAN OF EXHIBITION

Combined from Delfina’s Scheme.

THIRD ITERATION - ISOMENTRIC VIEW

EXTERIOR WALL TYPE ELEVATIONS

@archihartawan.

@archihartawan.


2440.00

2440.00

1815.36

1755.85

1831.26

1000.00

3543.39

2857.11

1408.94

SCALE 1:100 @ A3

EXHIBITION INSTALLATION PLAN

FINAL DESIGN CHOSEN.

EXHIBITION SPACE MODELLED FOR DESIGN PRESENTATIONS.

@archihartawan.

@archihartawan.


550

650

1900

520

490

80

1270

1530

330

540

1500

1580

1430

700

1310

1990

2000 SEATING

FRONT ELEVATION SCALE 1:25

ALUMINUM TUBE 1500 mm x 48 mm Diameter

610

ALUMINUM TUBE 2000 mm x 48 mm Diameter

990

1200

240

FRONT ELEVATION - TABLE SCALE 1:25

990

1200

PLANK FOR TABLE ALUMINUM TUBE 600 mm x 48 mm Diameter

DOCUMENTATION DRAWINGS FOR INSTALLATION.

INSTALLATION ON SITE.

@archihartawan.

@archihartawan.



U

“Kampung Raya” (or the Celebrated Village in Indonesian) seeks to develop an alternate high density urban typology for the city of Denpasar (Bali) in Indonesia, seeking to explore how can an incremental

KAMPUNG RAYA. Master of Architecture Year 2 - Architecture Major Project (Thesis). Typology: Social Housing. Location: Seminyak - Denpasar (Bali), Indonesia. @archihartawan.

architectural intervention, specifically Public Housing can operate as an “infrastructure” within the city. The project accommodates nearly 900 residents and residential units at a densely-tight site and it is built adjacent to the public amenity spaces in between the units and uses accessories as a typological component, specifically porosity and protection to adapt to its climatic conditions whilst keeping its indigenous spatial quality from the ‘Warung’ typology.

@archihartawan.


SEMINYAK

1k

1

m

km

Space Remaining NEGATIVE SPACE.

Residential

Retail

Hotels

Entertainment

Accommodation

Restaurant/Cafe

Traffic from Jl. Bypass Ngurah Rai due to peak period for workers back home from Kuta & Seminyak via Sunset Road.

Office

20

(Percentage %)

15

10 Traffic from Jl. Bypass Ngurah Rai due to peak period for tourists who commute from the airport to the Nusa Dua Resort Complex.

5

0

Residential

Retail

Hotels

Entertainment

Accommodation

Restaurant/Cafe

Office

(Building Use)

Light traffic.

SEMINYAK URBAN PROGRAMMATIC RATIO.

@archihartawan.

Moderate traffic.

Heavy traffic.

WEEKDAY TRAFFIC ANALYSIS OF NUSA DUA.

@archihartawan.


Kos (Low-income Public Housing).

Open Balcony.

Laundry and clothing.

2 - star hotel. Seperate-owned Office.

Storage Building.

Front Signange.

Stone Cladding.

Convinience store.

Merajan (a Hindu praying shrine).

Footpath.

Parallel Parking. Balinese Pavilion used for extra seating space.

Stair Access to Hotel + Office. Balinese arch indicating the name of the ‘gang’ (alleyway).

Car parking at footpath due to a narrow road.

Main Road.

‘Kos’(Public Housing).

Hallway dividing the

FAC: 42.5% of 569 m2

hotel and office space FAC: 7% of 266 m2

2-Star Hotel.

Office space

FAC: 45% of 266 m2

(seperate ownership.) FAC: 21% of 266m2

Storage. FAC: 12% of 569 m2

Convinience Store. FAC: 24% of 266 m2 Balinese Pavilion (Extra Space). FAC: 12% of 569 m2

Warung Space. FAC: 19% of 569 m2

Storage. FAC: 3% of 266 m2 Merajan (Hindu Shrine). FAC: 7% of 569 m2

A ‘WARUNG (LOCAL INDONESIAN RESTAURANT)’ IN BALI.

@archihartawan.

A ‘CONVINIENCE STORE’ IN BALI.

@archihartawan.


ENTRY TO MAIN PLAZA.

ISOMETRIC VIEW OF THE URBAN BLOCK.

SMALL ALLEYWAY TO SHOPS AND RES. UNITS

@archihartawan.

THE NORTH PLAZA.

@archihartawan. @archihartawan.


INTERNAL VIEW 1.

INTERNAL VIEW 2.

INTERNAL VIEW 3.

PERSPECTIVE SECTION.

@archihartawan.

@archihartawan.


MARKET CANOPY VIEW.

ENTRANCE TO MARKET.

N

TYPICAL FLOOR PLAN (1:300).

@archihartawan.

RESTAURANT VIEW.

@archihartawan.


A1.

A2.

A3.

A4.

MASSING AXONOMETRIC OF ‘REMIX’.

ADJUSTMENT OF COMBINED “REMIX”.

@archihartawan.

TYPOLOGICAL ACCESORIES.

@archihartawan.



U

Tarneit’s HustleHub aims to address the perceived disconnections in Tarneit by creating a social network among local businesses. The project site, located near Tarneit Senior College, becomes a space that encourages community engagement

TARNEIT’S HUSTLEHUB! Master of Architecture Year 2 - Architecture Design Studio (Level 9). Typology: Retail Centre & Market. Location: Tarneit - Melbourne, Victoria.

where students are invited to buy necessities, enjoy coffee, and study at the plaza. The design incorporates a strategy to connect business owners’ houses below the HustleHub, facilitating easier access to the storage room downstairs. The project includes retail and entertainment shops, temporary stalls, and a plaza for relaxation and study, fostering a sense of community and connectivity in Tarneit.


ITERATION 1 - LAYERING.

ISOMETRIC VIEW ON SITE.

ISOMETRIC VIEW ON SITE.

ITERATION 2 - EMBEDDING.

@archihartawan.

@archihartawan.


LEAKES ROAD

9

9

VIEW FROM BEGOINA ROAD.

BEGOINA ROAD

9

9

9

Ta

t Se rnei

nior

ege Coll

9

N 10

6

8

7

3

9

2

3

2

1

LEGEND:

KINNER AVENUE

1 - retail shop

2- gaming store

3- bookstore

4- convenience store

5- stationary shop

6- dessert shop

7 - arts supplies

8 - clothing store

9 - open space for temporary stalls

PLAZA VIEW, SHOWING ENTRANCE TO THE MARKET.

10 - cafe

SECOND FLOOR PLAN

@archihartawan.

@archihartawan.


1 - Living Room 2 - Storage Room 3- Open Space For Temporary Stalls 4- Convenience Store 5 - Kitchen & Dining

OPERATIONAL PROCESS DIAGRAM:

tarneit senior college

shared backyard

1) THE BACKYARD IS TRANSFORMED INTO SHARED SPACES, ESTABLISHING A TRAJECTORY RELATIONSHIP WITH THE SENIOR COLLEGE AND THE SHARED BACKYARD.

to tarneit senior college

4 north point axis

2) THE BUILDING BLOCK ARE CONCEIVED BY FOLLOWING THE FACING TRAJECTORY OF THE SENIOR COLLEGE AND THE NORTH POINT AXIS. THE MASSING IS ATOP THE SUBURBAN HOUSES IN ORDER TO ALLOW DAYLIGHT INTO THE BACKYARD.

extruded plaza

3

3) THE NORTH SECTION IS LIFTED, ALLOWING AN EXTRUSION OF A SPACE THAT CAN ACT AS A CENTRAL PLAZA WHICH INCLUDES A CAFE AND MEET UP POINT.

2

1 5

4) THE SHIFT OF THE NORTH SECTION ALLOWS THE PLAZA TO GIVE ACCESS INTO COURTYARD.

SECTION CUTTING THROUGH THE MARKET AND THE EXISTING HOUSES. (1:100)

@archihartawan.

@archihartawan.


TEMPORARY STALLS MARKET SECTION.

EXPLODED AXONOMETRIC.

INTERIOR OF INDOOR RETAIL MARKET.

@archihartawan.

@archihartawan.



U

The Chameleon seeks to develop an architectural form and language using generative and sculptural toolsets as an ornamental intervention. The project is surrounded by the local Victorian archetypes within the urban context of Carlton, where it is taking inspiration

THE CHAMELEON.

of the existing ornaments from the design of Victorian Houses at Rathdowne Street, showcasing swirly and fibrous architectural qualities. The contrasting transitions between the exterior and interior results a series of

Master of Architecture Year 1 - Architecture Design Studio (Level 7).

enclosed chambers with fiberous appendages acting as

Typology: Art Gallery. Location: Carlton - Melbourne, Victoria.

dense transition of the architecture.

an architectural ornament growing around the enclosed rooms and gallery spaces, creating a simple to thick and


Array Mesh Tool Stacking

Inflate Tool Blobbed Effects

Curvature of a Component Surface Textural Treatment

Flowing Transition Movement Knobbly Snake Hook Tool

Porosity

Discrete Curvature Tool Color Differentiation

Thinness

POROUS SCULPTURE OBJECT (DLA SYSTEM ALGORITHM).

Inflated Transition

Thin Transition

Sharp Strands

POROUS SCULPTURE OBJECT - CLOSE UP VIGNETTES.

STRANGE ALGORITHMIC TAXONOMY OF OBJECTS.

@archihartawan.

@archihartawan.


GROUND FLOOR ENTRANCE ARCH.

WAVY & SHARP DETAILED OBJECTS.

WINDOW ARCH.

Inflated Brick & Flaky Facade Detail

EXTERIOR FACADE - CLOSE UP VIGNETTES.

@archihartawan.

Window Frame Detail

WINDOW FRAME.

@archihartawan.


CROSS-SECTION THROUGH THE GALLERY.

1ST FLOOR SMALL GALLERY WITH A LIGHT COLOURED FIBEROUS SCULPTURE.

1ST FLOOR SMALL GALLERY, SHOWING WINDOW ATTACHMENT INTO INTERIOR WALL.

@archihartawan.

1ST FLOOR GALLERY SPACE, SHOWING THE CEILING’S AESTHETIC.

@archihartawan.


SMALL GALLERY, WITH SWIRLY & FLAKY SCULPTURE.

2ND FLOOR VIEWING GALLERY, SHOWING DIRECTIONALITY LANGUAGES IN THE TOPOLOGY TEXTURE.

LARGE GALLERY SPACE, WITH SMOOTH & POROUS SCULPTURE.

@archihartawan.

@archihartawan.



U

The project is surrounded by the local Victorian archetypes within the residential urban context. It’s use of materiality and colours are bright and

THE WINTON GUEST HOUSE. Advanced Diploma of Building Design Year 1 - Building Design Studio (Residential). Typology: Residential House. Location: Elsternwick - Melbourne, Victoria.

minimal within the surrounding street scape in order for contrasting the Victorian materiality. This project seeks to contrast the existing street scape and the surrounding context, by considering a combination of concrete and dark steel materiality and construction and also contrasting its pattern language of a typical Victorian cladding facade.


MASSING ITERATION 1.

MASSING ITERATION 2. 60

58

N

MASSING ITERATION 3.

56

REGENT STREET

MASSING ITERATION 4. FLOOR PLAN.

@archihartawan.

@archihartawan. @archihartawan.


SPATIAL TESTING ITERATIONS.

STREETSCAPE ELEVATION.

@archihartawan.

@archihartawan.


Sleeping

OFFICE SPACE.

Working

Living

SECOND ENTRY TO KITCHEN. AXONOMETRIC DRAWING SHOWING SPATIAL CONFIGURATIONS & ENTRANCES.

@archihartawan.

@archihartawan. @archihartawan.


BEDROOM VIEW.

FAMILY COURTYARD. LIVING & DINING SPACE.

@archihartawan.

@archihartawan.



U

This project is located on Carlton, adjacent to the Melbourne CBD, within close proximity to the RMIT University Precinct which consisted of university buildings within the city. RMIT became the client for this project and wishes to build a performing arts school for students studying dance and performance courses.

RMIT PERFORMING ARTS SCHOOL Bachelor of Architectural Design Year 3 - Architectural Technology 4 Typology: Performing Arts School Location: Carlton - Melbourne, Victoria.

The project focused on the documentation of the project, where facade details and architectural plans, section and elevations were produced.


STAINLESS STEEL BOX SECTION WITH SOFT BRUSH FINISH 4 mm TO ATTACH IN CONCRETE UPSTAND PACKER TO ATTACH AND FIX WITH BOX SECTION

5

523

BACKING ROD WITH SEALENT

FALL 1°

ZINC PARAPET

TO MATCH CONCRETE CAPPING UPSTAND WITH PACKER

FALL 1°

GENERAL NOTES

STAINLESS STEEL BOX DYNABOLT 40 mm WITH SOFT SECTION BRUSH FINISH 4 mm TO FIXED ON CONCRETE IN CONCRETE UPSTAND ATTACH UPSTAND

CONCRETE TILING FINISH AS SPECIFIED SPYHONIC DRAINAGE SYSTEM AS SPECIFIED

420

1 A402

ROOFTOP 41050

WHILE EVERY CA HIGHLIGHTING A WARRANT THE A OF SUCH HIGHLIG BE DEEMED TO H HIMSELF AS TO T DRAWINGS.

GALVANISED BACKING ROD WITH STEELANGELED BAR SEALENT 60 mm FIXED TO CONCRETE UPSTAND

422

5

THE CONTRACTO ON SITE. ANY DIS DIMENSIONS ARE TO THE ARCHITE ACCOUNT IS THIS

THIS DRAWING S FOR ITS INTENDE

ABBREVIATION L

CONCRETE UPSTAND

FALL 1°

ALUMINIUM POP RIVETS AT

DYNABOLT DIAMETER 4.8 mm 40 mm CONCRETE TILING FIXED ON CONCRETE FINISH AS SPECIFIED UPSTAND

298

THREADED TIE

210

SPYHONIC DRAINAGE BARSCREWED INTO CASTGALVANISED SYSTEM AS SPECIFIED INFERRULES PRIOR STEELANGELED BAR STEEL ANGLED mm FIXED TO TOCASTING60THE FLOOR BRACKETS, FIXED WITH CONCRETE UPSTAND 420

200

POP RIVETS

1 A402

210

AGRAFFE, 5MM ALUMINIUM, FIXED ONTO ROOFTOP 41050 FACADE PANEL

ALUMINIUM POP RIVETS AT

DIAMETER mm SUSPENSION RAILS,4.8 5MM ALUMINIUM, FIXED ONTO THREADED TIE WALL CONSOLE BARSCREWED INTO CAST-

298

INFERRULES PRIOR

200

STEEL SUSPENSION RAILS, 5MMANGLED TOCASTING THE FLOOR BRACKETS, FIXED WITH ALUMINIUM, FIXED ONTO POP RIVETS WALL CONSOLE AGRAFFE, 5MM DYNABOLT, SUSPENSION RAILS, 5MM ALUMINIUM, FIXED ONTO ALUMINIUM, ANCHORING WALL FIXED ONTO WALL CONSOLE TILTED SUSPENDEDFACADE PANEL CONSOLE ONTO THE CEILING SUSPENSION RAILS, 5MM CONRETE WALL

Rev

D

CODE

SU

STATUS

PU

ALUMINIUM, FIXED ONTO

WALL CONSOLE RED WOOD AUDITORIUM DYNABOLT, ACOUSTIC PANEL ANCHORING WALL TILTED SUSPENDED CONSOLE ONTO THE METAL WALL ATTACHED TO CEILING CONRETE WALL CONSOLE, FIXING CONCRETE PANEL RED WOOD AUDITORIUM VERTICAL PROFILE ACOUSTIC PANEL AND CONCRETE WALL METAL WALL ATTACHED TO TOGETHER CONSOLE, FIXING CONCRETE PANEL

PERFO S

VERTICAL PROFILE AND CONCRETE WALL TOGETHER

AUDITORIUM 385

PROJECT

AGRAFFE, 5MM ALUMINIUM, FIXED ONTO AGRAFFE, 5MM FACADE PANEL ALUMINIUM, FIXED ONTO

385

AUDITORIUM

TITLE

DETAIL RO

FACADE PANEL

30

180 20

153

CLIENT

30

180

153

196196

20

113

113 30

RM

30 DRAWN BY

2 1 : 10 DETAIL - FACADE ROOFTOP

DETAIL - FACADE ROOFTOP

2

DETAIL - FACADE ROOFTOP

1 : 10

@archihartawan.

1

DETAIL - FACADE ROOFTOP CORNER

1 - FACADE DETAIL CORNER 1: 2FACADE DETAIL ROOFTOP ROOFTOP CORNER 1:2

WILLIAM

SCALE (@ A1)

As indicated

DRAWING NUMBER

A402

@archihartawan.


GENERAL NOTE

A

THE CONTRACT ON SITE. ANY D DIMENSIONS AR TO THE ARCHIT ACCOUNT IS TH

TUNDRA GREY TUNDRA CONCRETE GREY CONCRETE TILE FLOORINGTILE AS FLOORING AS SPECIFIED & SCHEDULED SPECIFIED & SCHEDULED

RED MARBLE TILE REDFINISH MARBLE TOTILE FINISH TO MATCH WITH MORTAR MATCH WITH BED MORTAR BED

SCREED

ABBREVIATION

U BAR AS PER U BAR AS PER STRUCTURAL ENGINEER STRUCTURAL ENGINEER

GALVANIZED STEEL GALVANIZED STEEL ANGLED BAR 60ANGLED mm TO BAR 60 mm TO WELD IN CONCRETE WELD WALL IN CONCRETE WALL

ALUMINIUM CURTAIN ALUMINIUM WALLCURTAIN TO WALL TO MATCH CONCRETE MATCH SLAB CONCRETE SLAB

CAST IN-PLATECAST WELDED IN-PLATE WELDED TO ANGLED BAR TO ANGLED BAR

206

206

18

18

203

203

ALUMINIUM WINDOW ALUMINIUM SILL WINDOW SILL TO SIT ABOVE PACKER TO SIT ABOVE PACKER

GROUND FLOOR 50

REINFORCED MESH REINFORCED IN SLAB MESH IN SLAB

611

GROUND FLOOR 50

C.O.S

SCREED

THIS DRAWING FOR ITS INTEND

EXISITING FOOTPATH EXISITING FOOTPATH

CHECK ON SITE

MORTAR

C.O.S

MORTAR

WHILE EVERY C HIGHLIGHTING A WARRANT THE OF SUCH HIGHL BE DEEMED TO HIMSELF AS TO DRAWINGS.

CHECK ON SITE

A

Rev

D

CODE

S

STATUS

P

611

PROJECTING STEEL PROJECTING BARS STEEL BARS FROM SLAB FROM SLAB 300

SQUARE COLOUMN SQUARE COLOUMN

300

PROJECT

PERFO S TITLE

DETAI C DETAIL - GROUND TO BASEMENT CONNECTION

DETAIL - GROUND DETAIL - TO GROUND BASEMENT TO BASEMENT CONNECTION CONNECTION 2 1:5 2 1:5

@archihartawan.

DETAIL - GROUND TO FOOTPATH CONNECTION

DETAIL - GROUND DETAIL - TO GROUND FOOTPATH TO FOOTPATH CONNECTION CONNECTION 1 1:5 1 1:5

CLIENT

RM DRAWN BY @archihartawan.

WILLIAM

SCALE (@ A1)


1

1

2

3

4

2

3

5620

5620

5465

5940

4

5

5 5465

5940

4870

4870

ROOF 44550 LB-01

3500

LB-01 CAFE & ROOFTOP

ROOFTOP

GENERAL NOTES 8620

190

THE CONTRACTOR MUST CHECK ALL DIMENSIONS ON SITE. ANY DISCREPANCIES IN THE FIGURED DIMENSIONS ARE TO BE REPORTED IMMEDIATELY FC-01 ? TO THE ARCHITECT OR ENGINEER. ON NO ACCOUNT IS THIS DRAWING TO BE SCALED.

8218

WHILE EVERY CARE HAS BEEN EXERCISED IN HIGHLIGHTING AMMENDMENTS MJM DOES NOT WARRANT THE ACCURACY AND COMPLETENESS OF SUCH HIGHLIGHTING. THE CONTRACTOR SHALL BE DEEMED TO HAVE VERIFIED AND SATISFIED HIMSELF AS TO THE ACTUAL AMENDMENTS TO THE FC-01 DRAWINGS. ?

1 A301

A200 1

1 A402

FC-01 ? AUDITORIUM

41050 4000

180

9TH FLOOR 37050

FC-01 ?

AUDITORIUM

4000

2600

THIS DRAWING SHALL NOT BE USED OTHER THAN FOR ITS INTENDED PURPOSE AS STATED HEREIN.

A

MA-01

MA-01

MA-01

8TH FLOOR

MA-01

33050 FC-01 CT-01

STAFF & ADMINISTRATION OFFICES

FC-01 ?

4000

ABBREVIATION LEGEND

7TH FLOOR

1 A401

FC-01 CT-01

FC-01 ?

DRAMA CLASSROOMS

4000

29050

6TH FLOOR

8000

HALLWAY

25050

DANCE STUDIO FL-06

MA-01 FC-01 CT-01

DRAMA CLASSROOMS

FC-01

4000

91 m²

5TH FLOOR

FC-01 ?

STORAGE

FC-01 ?

MUSIC ROOMS

16 m²

2

FL-06 2

A200

4TH FLOOR 17050 1 A403

B

FC-01 ?

FC-01 ?

MUSIC ROOMS

Rev

2800

HYD. RISER

DN

UP

DN

Description

Date

3RD FLOOR 13050

FC-01 ?

FC-01 ?

DANCE STUDIOS

UP

1

4000

MA-01

90400

4000

A201

4000

21050

A300

C

CODE

SUITABILITY DESCRIPTION

STATUS

PURPOSE OF ISSUE

2ND FLOOR

MA-01 ?

FC-02

DANCE STUDIOS CT-01

PROJECT

5790

FL-06 FC-02

1ST FLOOR

PERFORMING ARTS SCHOOL

4550

CT-01

CORRIDOR

4500

HALLWAY

9050

4500

1 A400

TITLE

GROUND FLOOR

FIRST FLOOR PLAN 6 m²

MALE TOILET

FEMALE TOILET

14 m²

13 m²

FL-03

50

MALE BATHROOM AND CHANGE ROOM

LB-02

FL-03

4000

DISABLED TOILET

CLIENT

D

BASEMENT

1

1ST FLOOR 1 : 50

-3950

1402

RMIT UNIVERSITY DRAWN BY

CHECKED BY

DATE

WILLIAM H. SCALE (@ A1) 1 : 50

Checker

03/21/22

PROJECT NUMBER

Project Number

DRAWING NUMBER

REV

A102

1

1 : 100

DRAWING SHALL NOT BE USED OTHER THAN ITS INTENDED PURPOSE AS STATED HEREIN.

E EVERY CARE HAS BEEN EXERCISED IN LIGHTING AMMENDMENTS MJM DOES NOT RANT THE ACCURACY AND COMPLETENESS UCH HIGHLIGHTING. THE CONTRACTOR SHALL EEMED TO HAVE VERIFIED AND SATISFIED ELF AS TO THE ACTUAL AMENDMENTS TO THE WINGS.

CONTRACTOR MUST CHECK ALL DIMENSIONS ITE. ANY DISCREPANCIES IN THE FIGURED NSIONS ARE TO BE REPORTED IMMEDIATELY HE ARCHITECT OR ENGINEER. ON NO OUNT IS THIS DRAWING TO BE SCALED.

ERAL NOTES

REVIATION LEGEND

STATUS

CODE ITABILITY DESCRIPTION

Dat

RPOSE OF ISSUE

PROJECT

TITLE

CLIENT

SCALE (@ A1)

DRAWN BY CHECKED BY

Description

CT NUMBER

Rev

SECTION A-A

RMIT UNIVERSITY

17/05/2

Project Number

WILLIAM

PERFORMING ARTS SCHOOL

1 : 100

MIHO

A300

@archihartawan.

SECTION A-A

CROSS-SECTION.

DRAWING NUMBER

1ST FLOOR PLAN.

@archihartawan.


5

4 4870

3

2

5940

1

5465

D

5520

C 5790

B

A

2800

8000

2

3

5520

4

5465

5

5940

3500

1

ROOF 44550

3500

ROOF 44550

ROOFTOP 41050

4870

ROOFTOP 41050

4000 9TH FLOOR 37050

THE CONTRACTOR MUST CHECK ALL DIMENSIONS ON SITE. ANY DISCREPANCIES IN THE FIGURED DIMENSIONS ARE TO BE REPORTED IMMEDIATELY TO THE ARCHITECT OR ENGINEER. ON NO ACCOUNT IS THIS DRAWING TO BE SCALED.

4000 3

4

5465

5940

5 4870

ABBREVIATION LEGEND

FC-1

1

FC-1

7TH FLOOR 29050

THIS DRAWING SHALL NOT BE USED OTHER THAN FOR ITS INTENDED PURPOSE AS STATED HEREIN.

4000

2 5520

ABBREVIATION L

4000

8000

7TH FLOOR 29050

THIS DRAWING S FOR ITS INTENDE

8TH FLOOR 33050

WHILE EVERY CARE HAS BEEN EXERCISED IN HIGHLIGHTING AMMENDMENTS MJM DOES NOT WARRANT THE ACCURACY AND COMPLETENESS OF SUCH HIGHLIGHTING. THE CONTRACTOR SHALL BE DEEMED TO HAVE VERIFIED AND SATISFIED HIMSELF AS TO THE ACTUAL AMENDMENTS TO THE DRAWINGS.

FC-2

WHILE EVERY CA HIGHLIGHTING A WARRANT THE A OF SUCH HIGHLI BE DEEMED TO H HIMSELF AS TO T DRAWINGS.

4000

GENERAL NOTES

8TH FLOOR 33050

1

9TH FLOOR 37050

FC-1

4000

FC-1

THE CONTRACTO ON SITE. ANY DIS DIMENSIONS ARE TO THE ARCHITE ACCOUNT IS THI

4000

A

4000

GENERAL NOTES 1 A301

A301

6TH FLOOR 25050

6TH FLOOR 25050

4000

4000

A GENERAL NOTES THE CONTRACTOR MUST CHECK ALL DIMENSIONS ON SITE. ANY DISCREPANCIES IN THE FIGURED DIMENSIONS ARE TO BE REPORTED IMMEDIATELY

5TH FLOOR TO THE ARCHITECT OR ENGINEER. ON NO ACCOUNT IS THIS DRAWING TO BE SCALED. 21050

5TH FLOOR 21050

4000

WHILE EVERY CARE HAS BEEN EXERCISED IN HIGHLIGHTING AMMENDMENTS MJM DOES NOT WARRANT THE ACCURACY AND COMPLETENESS OF SUCH HIGHLIGHTING. THE CONTRACTOR SHALL BE DEEMED TO HAVE VERIFIED AND SATISFIED HIMSELF AS TO THE ACTUAL AMENDMENTS TO THE DRAWINGS.

4000

8000

2800

B

THIS DRAWING SHALL NOT BE USED OTHER THAN FOR ITS INTENDED PURPOSE AS STATED HEREIN.

4000

C

4TH FLOOR 17050

FC-1

EXISTING BUILDING

3RD FLOOR 13050

5790

2800

4000

B

1

2ND FLOOR 9050

A300

Rev

5790

1ST FLOOR Rev 4550

D

Description

D

SUITABILITY DESCRIPTION

NORTH ELEVATION 1 : 100

EXPOSED CEILING

SUITABILITY DESCRIPTION

STATUS

PURPOSE OF ISSUE

STATUS

PURPOSE OF ISSUE

RMIT BUILDING 101

CONCRETE FINISH CEILING ELEVATION. TITLE

REFLECTED CEILING PLAN - GROUND FLOOR REFLECTED CEILING PLAN - GROUND FLOOR 1

1 : 50

ACCESS HATCH

ELEVATIO

CEILING LIGHT

GROUND FLOOR GF 50 41

CLIENT

RMIT

2

REFLECTED CEILING PLAN GROUND FLOOR EAST ELEVATION 1 : 100

DRAWN BY

WILLIAM SCALE (@ A1)

1 : 100

DRAWING NUMBER

A200

CLIENT

CLIENT

RMIT UNIVERSITY

CEILING LIGHT

PU

TITLE

RMIT UNIVERSITY

DOWNLIGHT

DOWNLIGHT

STATUS

TITLE

RMIT BUILDING 100X100 WHITE PLASTERBOARD CEILING 101

FLUROSCENT LIGHTREFLECTED CEILING PLAN GROUND FLOOR CONCRETE FINISH CEILING

ACCESS HATCH

SU

PROJECT

100X100 WHITE PLASTERBOARD CEILING

FLUROSCENT LIGHT

CODE

RMIT 1ST FLOOR 4550

GROUND FLOOR GF 50 41

EXPOSED CEILING

1

@archihartawan.

CODE

Date

CODE

D

PROJECT

4500

4500

LEGEND

LEGEND

1 : 50

Date

PROJECT

REFLECTED CEILING PLAN.

1

Description

2ND FLOOR 9050

4500

C

Rev

3RD FLOOR 13050

4500

FC-1

4000

A300

4000

4TH FLOOR 17050 ABBREVIATION LEGEND

1

DRAWN BY

CHECKED BY

DATE

WILLIAM

MIHO

24/05/22

SCALE (@ A1)

PROJECT NUMBER

1 : 50

Project Number

DRAWING NUMBER

A105

REV

DRAWN BY

CHECKED BY

DATE

WILLIAM

MIHO

24/05/22

SCALE (@ A1)

PROJECT NUMBER

1 : 50

Project Number

DRAWING NUMBER

A105

REV

@archihartawan.


William Hartawan +61 4111 94 994 williamhartawan@yahoo.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.