Bala bay inn case

Page 1

Bala Bay Inn Case Analyst: William Périco Neto

Process Owner: Ken and Tiffany Bol

Start Date: 06/17/2013

Purpose of Analysis: to increase pro,it margins and customer satisfaction by better matching capacity and demand on July and August Tuesday evenings, with the minimum investment possible. Current Conditions:

Seating Capacity: The restaurant has seats for 300 people. Buffet on Tuesdays reduces number os seats to 270 Ski Show: Every Tuesday in July and August, at 7:30 p.m. Attracts 95% of Tuesday’s customers Tuesday’s Prices Operation time: 5 p.m. to 9 p.m. Restaurant full between 5:30 p.m. and 7:30 p.m. Source Price ($) Quality of Pizza is a major concern of Mr. Bol, reason why only 20 pizzas are precooked on Tuesdays Adults Pizza Buffet 10.95 Current Pizza Production Capacity: 43 Large Pizzas/Hour Children Pizza Buffet 5.95 Current average table turnover time: 80 minutes Adults Menu 17.95 Current turnover on family pizza night between 5:30 p.m. and 7:30 p.m.: 1.51 Children Menu 10.57 Average waiting time for table on family pizza night: 30 to 40 minutes Estimated potential customer loss because of waiting time: 50 customers Maximum Tuesday’s pizza consumption: 100 pizzas for 540 customers, or 1/5 of a pizza per person

Target Conditions: Increase turnover between 5:30 p.m. and 7:30 p.m. to at least 2; Increase pizza production capacity to 60 pizzas/hr; Reduce average Table Turnover time to less than 60 minutes Root Case Analysis:

Current Nightly Pizza Revenues, Costs and Profit Analysis

50 potential customers lost every Family Pizza Nights

2. Why? 5 Why Analysis:

Because 95% of the customers plan to attend the Ski Show after dinner, which starts at 7:30 p.m.

3. Why? Most arrivals occur between 5:30 p.m. and 6:30 p.m., resulting in waiting time for tables of 30-40 min

Current Pizza Produc5on Capacity Type of Pizza

Dura5on (min)

Output (pizzas)

Time (PM)

Precooked 1

2

2

5:32

Fresh 1

10

6

5:42

Fresh 2

10

6

5:52

Fresh 3

10

6

6:02

Precooked 2

2

6

6:04

Fresh 4

10

Fresh 5

10

Fresh 6

10

Precooked 3

2

6 6 6 6

6:14

4. Why?

6:34

Kitchen

Server Flow

6:36

Fresh 7

10

6

6:46

Fresh 8

10

6

6:56

Precooked 4

2

6

6:58

Fresh 9

10

6

7:08

Fresh 10

10

6

7:18

Fresh 11

10

6

7:28

Total Capacity

118

86

Total Hourly Pizza Produc5on Capacity

Bar Side

Dining Room Side

Customer Pizza Wait to 15:

Buffet

Children Creating Havoc

Front Desk

Dining Room (65) Customer Pay Bill Wait to 10:

Pool Table

Bar (48) 15

Customer Table Wait to 30:

Bar Women Stairs

Server Drink Wait to 10:

Men

Inside Patio (78)

43

Pool Table

Foyer

Inside Patio (78) Front Entrance

Provide space for 30 extra-seats; Improve access and mobility of customers and staff members; Reduce transit in the Lobby; Extra space allows customers to get pizzas from both sides of the buffet

$0

Add 30 seats to the Dinning Room, expanding seating capacity to 300

Increase capacity to accommodate excessive demand; Increase customer satisfaction; Reduce waiting line and prevent potential customers from leaving; $ 337 nightly Profit Increase (12% profit growth)

$0

Increase amount of precooked pizzas to 30

Increase pizza production capacity to 61 pizzas per hour (42% capacity increase); Eliminates waitingtime for pizza at the Buffet; Reduces maximum waiting-time for Menu orders to 10 minutes

$0

Start making precooked pizzas 1:30 hr to 2 hrs before opening the restaurant

Assure pizza freshness and quality; Avoid losing quality due to excessive time prior to

$0

Hire 2 more servers

Improve service quality; Increase customers satisfaction; Preserve ratio of 5 tables per server (adjusted to new seating capacity)

Acquisition of 2 Electronic Payment Terminals

Reduce time for paying the bill by half; Reduce turnover time; Increase customer satisfaction; Same effect as opening the Second Bar, at an annual cost $148 lower

Operations

Capacity

Pizzas Needed

Original

540

100

Modified

600

120

New Produc5on Capacity Type of Pizza

Time (min)

Output (pizzas)

Time (PM)

Precooked 1

2

7.64

5:32

Fresh 1

10

7.64

5:42 5:44

Adults Pizza Buffet

244

10.95

2,671.8

Fresh 2

10

7.64

5:54

Children Pizza Buffet

244

5.95

1,451.8

Precooked 3

2

7.64

5:56

Fresh 3

10

7.64

6:06

Precooked 4

2

7.64

6:08

Fresh 4

10

7.64

6:18

Precooked 5

2

7.64

6:20

26

17.95

466.7

Children Menu

26

10.57

326.69

Total Revenues

4,916.99 30%

of Revenue

1,475.1 620 2,821.89

Current Turnover Time Task

Unit

Fresh 5

10

7.64

6:30

Fresh 6

10

7.64

6:40

Fresh 7

10

7.64

6:50

Fresh 8

10

7.64

7:00

Fresh 9

10

7.64

7:10

Best Case

Worse Case

WaiHng for table

30

40

Fresh 10

10

7.64

7:20

Drink order

2

10

Fresh 11

10

7.64

7:30

Menu order

15

20

Total Capacity

120

122

Buffet order

0

15

Eat pizza/entrée

20

30

Pay Bill

2

10

Menu Dinner 5me at Peak

69

110

Buffet Dinner 5me at Peak

54

105

Total Hourly Pizza Produc5on Capacity

minutes

Menu Dinner Average

89.5

Buffet Dinner Average

79.5

Each turnover takes

66%

of 2 Hours

Turnover in 2 hours

1.51

5:30 to 7:30 pm.

Outside Patio (100)

Core Problem Statement: Current Seating and Pizza Production capacities limit Bala Bay Inn’s capability to serve Family Pizza Night demand with the desired food and service efficiency and quality levels. As a result, customers are being turned away, and served customers’ satisfaction is significantly reduced. Development of CPS: Both Seating and Pizza Production capacity constraints can be solved with low investments and simple adjustments. In total, five recommendations will be combined in order to better match capacity and demand, thus resulting in higher productivity and efficiency, profit margins and customer satisfaction.

A new oven would require investments of $12,500. It would increase capacity by 77%, creating excessive capacity of 21%. Although it would solve Tuesday’s problems, it would also create excessive capacity for regular evenings. Considering that the Ski Show only happens 8 times a year, acquiring another oven to satisfy these nights only would represent an uneconomical decision.

Increasing Precooked Pizzas to 30 without losing Quality Precooking 30 pizzas requires 5 oven operations with 6 pizzas each, for 8 minutes each operation. This requires a total of 40 minutes to precook all pizzas. In order to assure minimum time to complete cooking pizzas and preserve freshness, precooked production should start 50 minutes before opening the restaurant. By adopting this strategy, it is possible to increase pizza production capacity by 40%, while still preserving the high-­‐quality of precooked pizzas that Ken demands. TOTAL CAPACITY:

300 SEATS

Kitchen

Conditions at Family Pizza Night

Dance Floor - Lounge

Customer Wait 0 min for Pizza

Server Flow Buffet Customer Flow

Bar Side

Dining Room Side

Front Desk

Pool Table

Pool Table

Foyer Dining Room (95) Customer Wait 5 min to Pay Bill

Customer Wait 5 min for table

Bar Women Stairs

Server Drink Wait to 2:

Inside Patio (78) Front Entrance

Source

Customers

Adults Pizza Buffet

270

Children Pizza Buffet Adults Menu Children Menu

Outside Patio (100)

$300

Price ($)

Total ($)

10.95

2,965.5

270

5.95

1,606.5

30

17.95

538.95

30

12.57

376.95

Total Revenues

5,478.45

Total Pizza Costs

30%

of Revenue

Total Staff Costs

1,643.54 676

Total Pizza Profit

3,158.92

New Turnover Time Task

Best Case

Worse Case

WaiHng for table

5

15

Drink order

2

10

Menu order

2

10

Buffet order

0

10

Eat pizza/entrée

20

30

Pay Bill

1

5

Menu Dinner 5me at Peak

30

70

Buffet Dinner 5me at Peak

28

Menu Dinner Average Buffet Dinner Average

Men

Inside Patio (78)

61

Bar (48) 15

$56 / night

Poten5al Nightly Pizza Revenues

The reasons why you don’t need a second oven

7.64

Customer Flow

Dance Floor - Lounge

Move the buffet to the Dance Floor

2

Total Pizza Profit

270 SEATS

Existing Conditions at Family Pizza Night

$0

Precooked 2

5. Why?

6:24

Increase pizza area by 27% - from 1,133 cm2 to 1,444 cm2; Increase each oven cycle capacity from 6 large pizzas to the equivalent of 7.64 large pizzas

Total ($)

Adults Menu

Cost

Change Pizza format to Squares

Price ($)

Because of limited seating and pizza production capacity Total Staff Costs

TOTAL CAPACITY:

Benefit

Customers

Source

Total Pizza Costs

Seating capacity: reduced by 30 to accommodate Buffet Pizza production capacity: because of limited oven production capacity + too few precooked pizzas

Countermeasure

Effect Confirmation:

Goal Statement: Increase seating and pizza production capacity to accommodate 50 more people between 5:30 p.m. and 7:30 p.m., resulting in higher profitability and customers’ satisfaction on Family Pizza Nights

1. Why?

Countermeasures & Benefits

Approval Date: 07/01/2013

Unit

minutes

70 50 49

Each turnover takes

41%

of 2 Hours

Turnover in 2 hours

2.45

5:30 to 7:30 pm.

Implementation Scheme: Since no signi,icant investment is required by the recommendations, all of them should be

implemented immediately: 1) Converting pizza format to squares does not require signi,icant modi,ications, and should be implemented immediately 2) The buffet should be placed on the Dance Floor on Family Pizza Tuesdays only 3) The 2 extra servers should be hired only for Family Pizza Tuesdays in July and August 4) The 40 extra precooked pizzas should only be done on Family Pizza Tuesdays in July and August. Precooked production should be started 1:30 hr to 2 hrs prior to opening the restaurant 5) The acquisition of the 2 electronic payment terminals should also be done immediately, especially because it will last for several years, and accelerate the time for paying the bill every day in the Bala Bay Inn, thus reducing the average table turnover time and improving customers satisfaction

Evaluation and Debrief State: Meet again by the end of August to evaluate each of the recommendations, and how they contributed to solve the Core Problem Statement

Conclusions: Combined, the recommendations can increase 1) nightly pro,its by $337 (12% pro,it growth), 2) pizza

production capacity to 120 pizzas between 5:30 and 7:30; and 3) the turnover between these two hours to 2.45, which represents an average table turnover time of 50 minutes. In short, these ,ive measures not only solve the constraints in both seating and pizza production capacity, but also provide signi,icant safety capacity for potential demand increases.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.