William Samin Portfolio 2017-2018

Page 1

PORTFOLIO 2017 | 2018



Selected Works | Portfolio 2017 - 2018


WILLIAM SAMIN 07/03/1994 phone. +62 822 7694 3935 (IDN) e-mail. william.samin94@gmail.com portofolio. issuu.com/williamsamin instagram. william_samin


EDUCATION

WORK EXPERIENCE

COMPETITIONS

University of North Sumatra (USU) Major in Architecture

2012-2016

Sutomo 2 - Senior High School

2009-2012

Sixthree Studio | Medan Junior Architect Developing design concepts, digital modeling; created presentation materials, visualizations & working drawings for variety of projects.

Feb 2017Apr 2019

Architerior | Medan Architectural Intern Assisted in the design development and digital modeling of low-rised hospitality project. Assisted in creating working drawings.

Nov 2016Jan 2017

The Last House of Mulholland Arch Out Loud Sixthree Studio Competition entry

Feb 2017

Tiny House Ryterna modul Architectural Challenge Individual Entry 3rd prize

SOFTWARE COMPETENCES

LANGUAGES

Experience in : Sketchup Indesign

Jan 2018

V-ray Autocad Mildly experience in : Grasshopper Illustrator Lightroom

Photoshop

Bahasa Native

English Intermediate

Hokkien Native

Lumion


CONTENTS This portfolio consisted of several projects from professional works and competitions. All selected works represent my skills and some architectural perspective.


G Office

08 - 15

J Hotel

16 - 25

Trapezoidal Mod

26 - 37

BI Office

38 - 48

Other Works

50 - 54

Travel | Photography

56 - 73


G OFFICE Home Office 2017 / Professional Work / Sixthree Studio

The purpose of this project is to design an independent home office for 2 people right in the green yard next to their house. The owner want a single space that accommodates working space and sitting / rest area at once with cozy, clean and bright interior.

inner space and outer space. Furthermore, perforated brick wall divides the plot into two area with different level of privacy, also provides a visual boundary from the road, while allowing occupant to look outside. On a yard surrounded by greenery, G office was designed to be a mass consisting of thin elements and floating above grass surface. The exterior facade mostly rendered in white to reflect the heat. This settings gives a soft and light impression to the building.

Being flanked by two-storey houses and existing rows of pine trees, plot area is partially shaded in the morning and evening. Additional shading is provided by a generous roof above. This allows extensive use of operable glass wall. Thus simultaneously, gives abundant of natural light to the interior and views to the yard, blurring two different entities,

scope of works. created design concept created digital modeling created presentation materials & visualizations

08


site area. 391 m2 built area. 65 m2 status. idea

09


Jl. Krisan, Medan, Indonesia

10


The Plot adequately shaded by surrounding houses and existing pine trees

The Program configured for minimal exposure from the road

The Elevated Floor raised from the ground to minimize entry of bugs as well as promotes air movement below

The Roof wide roof overhang blocks direct sunlight, likewise in both northern and southern solstices moment

The Screen Wall provide privacy and visually distance the office from the street

The Operable Glass Wall can be opened to allow airflow or be closed to provide physical barrier from outside while maintain view to green yard

11


4

3

2 1

1. 2. 3. 4.

entrance path verandah rest area workstation plan

12


the entrance path towards the office

view from the house

13


14


interior view I

interior view II

15


J HOTEL Interior Hotel Renovation 2017 / Professional Work / Sixthree Studio

J Hotel is a four-storey budget hotel located at a strategic location Jl. Waringin, Medan City, near downtown. The scope of this hotel renovation is lobby area, corridor and room units. Mainly, the renovation decisions are creating light well, reconfiguring layout and revamping the interior design to give the space a fresh new look.

by natural light. Then, the use of clear glass walls allows the light to access each room unit. All openings are oriented to massive walls to maintain the privacy of each room unit. This intervention allows the space unit to be brighter and more spacious, and also there is subtle interaction between guests and outside enviroment through the movement of natural light.

The current condition of all room units are without direct windows outside so that the room feels cloistered and damp. Therefore, a continuous gap space upwards is created by reducing approximately 2 m2 area of each unit. This gap space will be freely penetrated

Hotel interior is renewed by changing the materials, furniture, artificial lighting and overall mood and style of the interior. This give a new ambient to the hotel and unique experience to guests.

scope of works. developed design concept created digital modeling created presentation materials & visualizations

16


area. 290 m2 status. idea

17


Jl. Waringin, Medan, Indonesia

18


lobby

receptionist

unit

corridor

existing condition

19


Before

After there are 3 vertical shafts that allow natural light to reach to each unit room in ground floor area, produces diffuse light gradations that are softer than the above floors

20


Before

After there are 4 vertical shaft, including the center shaft between the units. Glass openings from each room unit are oriented to massive walls to maintain the privacy of each unit

21


BEFORE

AFTER

Before

AFTER

After

22


the corridor

23


the entrance

the receptionist

24


the lobby

the room unit

25


TRAPEZOIDAL MOD Modular Tiny House 2018 / Competition / Individual Entry

The objective is to design a “Tiny House� to be used as holiday retreat or home away from home. Therefore, Tiny house has to be designed to be transportable and should be usable all year round (in Eastern Europe geographical location).

Adaptability is important aspect in designing this tiny retreat house. The on-stilt design allows the house to be placed on uncertain terrain. The SIP board structure provide durable and energy-eficient features to the house. While pivot walls and door can be fully closed as protection from bad weather condition.

The house should be based on modular construction & has a footprint of no more than 25 square meters. This module will be a core module and should feature 4 mandatory zones: kitchen, sanitary room, sleeping area and living area. Expansion module should be treated as addition to the core module and offer only certain area expansion.

The Main volume of the house is consisted of 2 modules which can be mounted horizontally or stacked vertically. Inside the house accomodates all the basic needs of two people. Area under the main volume was used for storages to maintain a spacious space above.

scope of works. created design concept created digital modeling created presentation materials & visualizations

26


area. 25 m2 status. idea

27


The Program Mandatory program : kitchen, sanitary room, living area & sleeping area

Zoning Programs are arranged in accordance with functional relations and organized according to wet and dry functions

Uniform Modules Separation of wet and dry function zone into 2 typical modules

Configuration Modules can be mounted horizontally or stacked vertically

28


Terrain Adaptability Possibility to adapt to various terrain and location. The on-stilt design makes the house can be placed in a crowded location with minimum footprints

Open / Enclose Pivot walls and glazing doors can be opened so that air can be freely flowing or closed as protection from bad weather as well as privacy needs

Future Exapansion Typical modules facilitate possible future expansion

Multipurpose Area The integration of sleeping and living area into a flexible space & floor level storages to store rollable sleeping mattress, folded furniture & other equipments

29


1. 2. 3.

living + sleeping area kitchen + dining area bathroom

3 2

1

m

plan - horizontal configuration

30

.5

1

2


the horizontal configuration

31


section

32


extensive view to the vast landscape from the living area

flexible area to accomodate vary range of indoor activity

33


2

1

m

1. 2. 3.

kitchen + dining area bathroom living + sleeping area

3

plan - vertical configuration

34

.5

1

2


the vertical configuration

35


section

36


couch seating is concealed under the floor

secluded rest area

37


BELAWAN INDAH OFFICE Logistic Service Office 2018 / Professional Work / Sixthree Studio

Belawan Indah is a land transportation logistics service company in North Sumatra. Their head office is in Belawan, while the new office planned will be in a new strategic industrial area in Medan (KIM 5). The existing condition of the site is empty and there are still many vacant lots in the surrounding area. However, in the future it will certainly be filled with other factories.

and massive walls surround the office perimeter to provide privacy from passing over logistics vehicles and also the surrounding environment, with several wall openings as entry points and counters. The ground floor is provided for workplaces that have direct relations with the public, then the first floor is devoted to spaces that require higher privacy and workplaces that have less proximity to public. The last, second floor is used for amenities and rest area.

Belawan Indah office is composed of 3 floors, designed as a large open-plan office with outer spaces and inner spaces intertwined with each other and linear corridor simplifying connections between spaces. While the robust

scope of works. developed design concept created digital modeling created presentation materials & visualizations prepared working drawings

38


site area. 1650 m2 building area. 2015 m2 status. be built in 2020

39


KIM 5, Medan, Indonesia

40


front view

41


Ground floor office area meeting area supporting facilities service vertical circulation

1st floor office area director area service vertical circulation

2nd floor supporting facilities service vertical circulation

The Wall barrier wall transparency

42


9 11 UP

8

6

6

7

10

5

4

3

2

1

m

1. 2. 3. 4. 5. 6. 7. 8. 9.

receptionist purchasing dept. office cashier dept. office distribution dept. office auditorium meeting room interview room HR dept. office control room

11 UP

12

13

10. 11. 12. 13. 14. 15. 16. 17. 18.

legal officer room toilet IT dept. office finance dept. room marketing dept. room director room director lounge general manager room IT warehouse

19

2

4

accounting dept. office Trifaco Group office service area storage cafetaria hall rooftop

6

20

18

14

17 15

15

22

19. 20. 21. 22. 23. 24. 25.

15

16

23

24

UP

25

25

43

21

15

25

8


corridor, groundfloor

corridor, 1st floor

44


1 2 3 4

5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

11. 12. 13. 14. 15.

50mm white gravel composite roof floor slab + 2.3mm bitumen waterproof coating + cement mortar screed alkyd coated 100mm equal steel angle edge restraint 1mm aluminium capping concealed led strip light white painted 12mm interior gypsum board white painted casted concrete wall 8mm tempered glass with concealed 20mm aluminium U- channel frame fully encased composite column composite floor slab + cement mortar screed + underlayer foam + light grey nylon fiber carpet

16. 17. 18. 19.

detail section

45

steel W-section girder steel W-section beam 1� reveal bead for ceiling reveal roller shutter 200mm plastered brick wall with cement skim coat finished 12mm tempered glass with concealed 20mm aluminium U- channel frame yellow cane palm concealed led strip light buffalo grass


INTERIOR

EXTERIOR

light grey nylon fiber carpet, base : floor slab + cement mortar screed + underlayer foam 12mm tempered glass with concealed 20mm aluminium U- channel frame 80 20 50 50 50

23

white painted exterior slab concealed LED strip light inside aluminium u-channel case buffalo grass

typical detail I

light grey nylon fiber carpet, base : floor slab + cement mortar screed + underlayer foam

12 40

400

160

50

white painted casted concrete wall

12

1� reveal bead for ceiling reveal

150

white painted 12mm interior gypsum board typical detail II

46


purchasing department office

cashier department office

47


director room

restroom

48


OTHER WORKS


TB Hotel Lobby 2018 / Professional Work / Sixthree Studio

scope of works. developed design concept created digital modeling created visualizations

50


3

2

1

1. 2. 3. 4.

drop-off area / entrance lobby & lounge receptionist lift lobby lobby plan

51

4


Semalam Hostel 2017 / Professional Work / Sixthree Studio

scope of works. developed design concept created digital modeling created presentation materials & visualizations prepared working drawings

52


stacking bricks

skylight

53


before | after

54


TRAVEL | PHOTOGRAPHY


The Jam Factory Modernity in Tropical Climate

2018 / Bangkok, Thailand

56


57


TCDC Creative Design Center

2018 / Bangkok, Thailand

58


59


Naiipa Art Complex Architecture in Urban Forest

2018 / Bangkok, Thailand

60


61


Open House Co-living Space

2018 / Bangkok, Thailand

62


63


Long Museum West Bund Vault Concrete Museum

2018 / Shanghai, China

64


65


Fosun Foundation Moving Veils Art Center

2018 / Shanghai, China

66


67


Toba Lake The Ancient Crater

2017 / North Sumatra, Indonesia

68


69


Samosir Island Volcanic Island of Lake Toba

2017 / North Sumatra, Indonesia

70


71


Tjong A Fie Mansion Cross-Cultural Ancient Architecture

2018 / North Sumatra, Indonesia

72


73


thank you



william.samin94@gmail.com +62 822 7694 3935


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.