Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
2
Project Objectives Introduction: • Client is a Special Health Authority in Europe • Has an ongoing requirement for “Blood Collection Systems” with a value of approximate € 29 Million/annum
Objectives:
•
•
To identify who capable Blood Bag System suppliers in Asia, prior to the tender publication. To create awareness with the Asian suppliers for the upcoming Official Journal of the European Union (OJEU) tender and its requirements The key MUST criteria: 1. CE marked as Class IIb medical devices against EU Directive 93/42/EEC. 2. EN/ISO 3826- Part 1, 2 & 3 3. Principles of EU Good Manufacturing Practice: EN ISO 13485
Final deliverables:
•
• RFI/RFQ analysis report with list of recommended suppliers • Supplier profiles © 2015 Dragon Sourcing. All rights reserved.
3
Supplier identification process was initiated within the Asian Countries to build long list of suppliers.
China
Pakistan
South Japan Korea
India
Taiwan Thailand Vietnam Philippines Malaysia Singapore Indonesia
Š 2015 Dragon Sourcing. All rights reserved.
4
Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
5
Approach & Schedule, Stage 1: Supplier Pre-Qualification No. Step Deliverables Demand Analysis Project Requirement 1. Work with client to define and understand the products and requirements (specs, volumes, materials, Questionnaire production technology requirements, Quality tests, Standards, etc.) Kick-Off Report Supply Market Analysis 2. Identify long list of potential suppliers in the selected markets by leveraging B2B Websites, DS Supplier Long List Database, Fair catalogues, Chamber of Commerce, Magazines, Network, References. Telephone Pre-screening Selection of suppliers to be included in the RFI/RFP process by telephone pre-screening based on 3. Shortlist for RFI/RFQ agreed simple criteria (e.g. capability to make the product, minimum company size, interest in participating) Develop RFI/RFQ RFI/RFQ Template Prepare an RFI/RFQ document, with an aligned Balanced Scorecard that has the objective to pre Balanced Scorecard 4. qualify the competitiveness and capabilities of the suppliers, including: Background, financial, Client Introduction Letter and product experience, Quality certification & processes, Social Responsibility, Manufacturing/technology capability) Milestone 1: RFI/RFQ & Scorecard Approved Conduct RFI/RFQ Administration 5. The RFI/RFQ is translated to the local languages as relevant, and distributed to the relevant suppliers, • Completed RFI/RFQs with telephone follow-up to push for maximum participation. Analyze RFI/RFQ Responses RFI/RFQ Report Analysis of RFI/RFQ responses, estimation of logistics costs, and preparation of a report which profiles Supplier Profiles 6. & objectively ranks the suppliers by capability and competitiveness, including a recommendation for Proposed Shortlist for those to be audited/Sampled. Audit/Samples. Milestone 2: Shortlist for Auditing/Sampling Agreed © 2015 Dragon Sourcing. All rights reserved..
6
The sourcing process was completed in 9 weeks. Not started
Done
In process
Delay
Steps
Duration/week commencing
1. Demand Analysis
1
2. Supply Market Analysis
2
3. Telephone pre-screening
1
4. Develop RFI/RFQ
1
5. Administer RFI/RFQ process
5
6. Analyze RFI/RFQ Responses & submit RFQ report.
Š 2015 Dragon Sourcing. All rights reserved.
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
Week 7
Week 8
Week 9
07-13/ 07-17
07-20/ 07-24
07-27/ 07-31
08-03/ 08-07
08-10/ 08-14
08-17/ 08-21
08-24/ 08-28
08-31/ 09-04
09-07/ 09-11
1
Supplier recommendations for auditing/sampling.
1
7
2
Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
8
Whole Blood Collection Systems including Leucodepletion Filter (nearly € 27 Million in spend).
System
Whole Blood Collection Systems including Leucodepletion Filters
1
Top and Top (TAT) Blood collection system for whole blood filtration
Image
Remark
Forecasted Qty Y3 (Systems)*
Nil
1.7 M
Nil
XXX
F E XXXXX
D A B
H
G
C
D E
2
Bottom and Top (BAT) Blood collection system for red cell concentrates (RCC) filtration
F
G H
A C B D
3
E
F G
Bottom and Top (BAT) Blood collection system for RCC filtration with integral plasma filter (IPF)
H
I
J
A C
Note: This Blood collection system is similar to System 2 with the exception of having a plasma filter and an additional (empty) pack to receive plasma prior to filtration.
XXX
B
4
Whole blood collection system without anticoagulant
Note: This Blood collection system is a dry system which contains no anticoagulant.
* Y3 is forecasted for use from 01/05/2015 – 30/04/2016
© 2015 Dragon Sourcing. All rights reserved.
9
XXX
Ancillary Blood Processing Systems (Primary Components, nearly € 1.8 Million in spend).
No.
Ancillary Blood Processing Systems (Primary Components)
Forecasted Qty (Sets) Y3
1
Figure 1 - Quadruple transfer system for the storage of platelets for neonatal use.
6,000
2
Figure 2 - Quadruple transfer system for the storage of frozen plasma for neonatal use.
XXX
3
Figure 3 - Quadruple transfer system for the storage of red cells for neonatal use.
XXX
4
Figure 4 - Sextuplet transfer system for the storage of red cells for neonatal use.
XXX
5
Figure 5 - Single transfer pack for the handling of waste material or storage of plasma components.
XXX
6
Figure 6 - Cryoprecipitate pooling system.
XXX
7
Figure 7 - Single plasma filter system.
XXX
8
Figure 8 - Double plasma filter system.
XXX
9
Figure 11 - Platelet storage system.
XXX
10
Figure 13 - Platelet pooling filter system.
XXX
11
Figure 14 - Platelet pooling filter system with integral sampling device.
XXX
* Y3 is forecasted for use from 01/05/2015 – 30/04/2016
© 2015 Dragon Sourcing. All rights reserved.
10
Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
11
DS identified 142 suppliers in 12 Asian Countries, Indonesia
142 1 3 3 3 4 5 5 5 5 6
47
Thailand
116
Vietnam
1 3 3 3 3 4 4 5 5 5
Philippines
Singapore South Korea Pakistan
33
Malaysia
26
Taiwan
Singapore [VALUE]South Korea [VALUE]
55
Pakistan [VALUE]
47
Japan [VALUE] 14 8
Suppliers identified Š 2015 Dragon Sourcing. All rights reserved.
Failed phone screening 12
Passed phone screening
Japan China India
116 suppliers failed phone screening process Traders/importer only, not a manufacturer Manufacturing secondary components only, Unable to supply complete blood bag system.
8 6 29 9
Manufacturing (products) do not comply with ISO 3826 part 1, 2 & 3 Products not comply with CE marked as per medical devices directive
7 2 3
Only subsidiary or factory, Requested to contact parent Company or Parent company, requested to contact subsidiary special for blood bag. Contact details not valid/not responding
52
Suppliers already in contact directly with the client
Stopped making blood bags and/or Company shutdown
Š 2015 Dragon Sourcing. All rights reserved.
13
An RFI/RFP process was administered to filter out most capable suppliers, RFI/RFQ - Contact info Confidential DS Contact Person Email Tel number Mobile
Dragon Sourcing Mr Pankaj Tuteja pankaj.tuteja@dragonsourcing.com +91- 22- 26365009 + 91- 9867602535 COMPANY INFORMATION
Company Name Address Town Province Company Website
Contact detail information
Do you currently manufacture, or do you have experience of manufacturing blood packs?
Production information
If yes, What type of blood bags do you manufacture? Can you provide high quality transparent medical grade PVC film? Whole Blood collection Transfusion system
Do you offer following manufacturing process? Please provide answer with, • Yes • No
Disposable blood Optimal additive Needles Sample site Bags, Tubes & solutions manufacturing coupler, Filters. Ports
Base Label
Does your company do all production steps in house? If no, please elaborate. Type of machinery, • Fully Automatic • Semi-Automatic • Others Your outsourcing partner (material sub-contractor) comply to EN/ISO 3826- Part 1, 2 & 3? Your outsourcing partner comply to CE marked as Class IIb medical devices against EU Directive 93/42/EEC? Can your company design according to client's requirement?
CONTACT PERSON INFORMATION Contact Person Title Email Tel Fax Mobile phone This RFI/RFQ contains a total of 9 worksheets detailed below: 0. Introduction & Instructions: presentation of the objectives and timetable of the 1. Contact Information: General and contact information about your company. 2. Company Profile: Key business and financial information. 3. Production: Manufacturing capability, Production capacity, etc. 4. Quality Management: Information requested about Certification, Quality control etc.. 5. Factory Pictures: Please provide recent pictures of your factory. 6. RFQ: Request for quotation. Detailed specifications are showed in Annex 1 and Annex 2 © 2015 Dragon Sourcing. All rights reserved.
Equipment or Production line
Yes/No
Producer
Quantity
validated sterilization plant (typically steam autoclaves), Accurate solutions filling equipment, Please list production equipment you will use (others, please specify) labelling equipment Assembly lines (typically automated) Assembly lines (semi-automated) Do you have below certificates ? ISO 9001 Manufacturing QMS
ISO 14001
Quality Management
ISO13485 CE marked as Class IIb medical devices against EU Directive 93/42/EEC. EN/ISO 3826- Part 1: Plastic collapsible containers for human blood and blood components What international/domestic product certification do you have?
EN/ISO 3826- Part 2: – Graphic symbols for use on labels and instruction leaflets EN/ISO 3826- Part 3: – Blood bag systems with integrated features. Principles of EU Good Manufacturing Practice: EN ISO 13485 (Medical devicesQuality management systems) FDA Approved
7 suppliers responded to the RFI-RFQ
Identify Suppliers
Pre-screen suppliers
Analyse RFI/RFQ received
Administer RFI/RFQ
26 1 1 1 1
Singapore South Korean supplier submitted only the Company profile (RFI) & will submit RFQ during the OJEU tender process as they need contact the their outsourcing US partner for providing
19 1 1 1
8
South Korea
Pakistan
Leucodepletion filter
6
Japan
7
14
1 2
6 India 10
1
4
2 4
1 RFI-RFQ sent
Intend To Respond
Š 2015 Dragon Sourcing. All rights reserved.
Don’t Intend to respond 15
Only RFI Received
RFI-RFQ received
China
Location of the suppliers responded to the RFI-RFQ #
Supplier name
City
Province
Website
1
XXX
XXX
Sichuan
XXX
2
XXX
XXX
Shandong
XXX
3
XXX
XXX
Guangdong
XXX
4
XXX
XXX
Jiangsu
XXX
Heilongjiang
Jilin Liaoning Xinjiang
Shanxi
Ningxia Qinghai
Beijing Tianjin Hebei
Inner Mongolia
Gansu
Gansu
Shaanxi
Shandong Jiangsu
Henan Anhui
Xizang Sichuan Sichuan
Shanghai
Hubei
Zhejiang Jiangxi
Hunan Guizhou Yunan
Guangxi
Fujian
Guangdong Hong Kong
© 2015 Dragon Sourcing. All rights reserved.
16
Taiwan
Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
17
- Logistics Process: DDP Price Calculation - From FOB China & India to DDP Europe destination.
Loading on container on manufacturing site
EXW Price
Container transportation to China sea port Shanghai & Indian sea port Nhava Sheva . Export documents expenses, transportation & other taxes
FOB Price
Sea freight from China & India FOB port to XXX in Europe.
XXX port handling cost & terminal charges
Additional fees (BAF & CAF)
Clearance Charges Port Security, etc.
Insurance cost based on the CFR value.
Loading cost on truck Haulage cost to final destination
Fuel taxes Port Infrastructure Import duty fees
DDP Price
Handling & loading of the container on the vessel
Chinese & Indian suppliers quotation © 2015 Dragon Sourcing. All rights reserved.
18
Delivered price until client warehouse
Supplier with highest annual saving was about € 6 million Highest Annual Saving
Country
Supplier
Product #
Client Current Supplier DDP Supplier Annual Supplier Annual Price DDP spend saving (+/-) (Euro/System) (Euro/system) Based on 20 FCL'
# DSCN/BB24 China
Total annual saving € 6.06 M # DSCN/BB30
China
# DSCN/BB28
China
China India India
Euro
1.7 M
Figure 2
€ 3.02
xxx
Figure 3 Figure 4 Figure 1 Figure 3 Figure 4 Figure 1 Figure 2 Figure 3
# DSCN/BB27
Figure 1
# DSIN/BB26 Total annual saving € 0.19 M
Systems (units)
€ 2.60
Total annual saving € 0.24 M
Total annual saving € 0.18 M # DSIN/BB31
20'
Client annual spend
Figure 1
Figure 2 Total annual saving € 3.91 M
Euro (Millions) Euro (Millions)
Client annual volumes
Figure 4 Figure 2 Figure 4 Figure 1
C O N F I D E N T I A L
C O N F I D E N T I A L
€ 0.21 € 0.23 € 2.03 € 1.47 € 0.25 € 0.16 € -1.77 € -1.49 0.04 0.20 € -4.90 € -8.03 € 0.18 € -16.33
xxx
C O N F I D E N T I A L
xxx 1.7 M xxx xxx xxx 1.7 M xxx xxx xxx 1.7 M xxx xxx 1.7 M
Figure 1
€ -10.22
Figure 2
€ -11.62
xxx
Figure 4
€ 0.19
xxx
© 2015 Dragon Sourcing. All rights reserved.
19
xxx
C O N F I D E N T I A L
Supplier with highest annual saving for the ancillary system was € 1.3 million Highest Annual Saving Country
Supplier
Product #
Supplier DDP Price Supplier Annual (Euro/System) spend 20'
# DSCN/BB24
© 2015 Dragon Sourcing. All rights reserved.
China
Total annual saving € 0.63 M
# DSCN/BB30 China
Total annual saving € 0.36 M
# DSCN/BB28 China
Total annual saving € 1.30 M
# DSIN/BB31 India
Total annual saving € 0.024 M
Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 11 Figure 13 Figure 14 Figure 1 Figure 3 Figure 5 Figure 7 Figure 8 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 11 Figure 13 Figure 14 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6
C O N F I D E N T I A L
Euro
C O N F I D E N T I A L
20
Supplier Annual Client Current DDP saving (Euro/system)
€ € € € € € € € € € € € € € € € € € € € € € € € € € € € € € € € €
Euro
21,795 15,621 15,621 25,769 25,131 64,722 71,014 54,951 49,832 238,528 49,622 20,960 6,625 23,488 163,215 143,297 30,534 24,487 25,901 52,220 26,394 153,818 170,604 170,604 92,880 462,338 93,956 8,145 (4,455) (4,455) (32,264) 16,227 (130,759)
20'
C O N F I D E N T I A L
Client annual volumes
Client annual spend
Systems (units) 6,000 xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx 6,000 xxx xxx xxx xxx 6,000 xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx 6,000 xxx xxx xxx xxx xxx
Euro
C O N F I D E N T I A L
Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
21
Balance Score card used to rank the suppliers
90 80 70
80 5 4
12
77
77
75
5 3 8
5 5 6
5 4
60
50
19
18
64
62
Average RFI scoring: 69 from 100
12
5 2 4
19
19
4 3 4
21
21 25
28
27
10
24
25
20
Submitted only RFI
3
40 30
48
18
19
18
15
16
13
10
11
11
9
# DSCN/BB24
# DSCN/BB30
# DSIN/BB31
# DSCN/BB28
# DSCN/BB27
# DSIN/BB26
# DSSK/BB25
China
China
India
China
China
India
South korea
0
Business information
Production India
© 2015 Dragon Sourcing. All rights reserved.
Quality system 22
RFQ
Cooperation
Corporate Responsibility
Agenda 1.
Introduction & Project Objectives
2.
Approach & Schedule
3.
Demand Analysis
4.
Supply Markey Survey
5.
Price analysis
6.
Supplier Assessment
7.
Supplier Profile Example
Š 2015 Dragon Sourcing. All rights reserved.
23
• Section: Business Information COMPANY INFORMATION Company Name
RFI Score
80
RFI Ranking
1
Willing to offer DDP price
Yes
Payment terms
30 days from invoice
BUSINESS INFORMATION
DSCN/BB24
Address
XXX
City
XXX
Province
XXX
Company Website
XXX CONTACT PERSON INFORMATION
Contact Person
Turnover Million in Euro
Percentage of turnover distributed to: (%)
2015 (till date)
2014
2013
Domestic
Europe
U.S.
Rest of the world
Customers
Industry
Country
% of sales
XXX
Medical
China
8%
XXX
Medical
China
7%
XXX
Medical
Cuba
6%
XXX
Medical
Germany
5%
XXX
Medical
China
3%
XXX
Title
Marketing Manager
XXX
Tel
XXX
Fax
XXX
Mobile phone
XXX
Top 5 Customers?
BUSINESS INFORMATION
Year Founded Nature of the Company Company type (manufacture, trader)
1994 Private Manufacture
Registration Capital (Euro) Total Employees Main production items
Ever exported any of these items
Factory size (m²) Years of export experience Subsidiary in Europe, Australia & New Zealand Have Account Manager able to communicate effectively in English
© 2015 Dragon Sourcing. All rights reserved.
Yes
Secondary components like needles, sample site coupler,etc.
Yes
Tes
CORPORATE RESPONSIBILITY & POLICIES
Export License Participated directly in the "OJEU"
Whole Blood Bag Ancillary Blood System Systems
Policies your organization hold. (Yes/No)
24
Health & Safety Policy
Yes
Environmental Policy
Yes
Quality Policy
Yes
CSR (Corporate Social Responsibility)
Yes
• Section: Quality Control QUALITY CONTROL Certified with ISO 9001 ISO 14001 Manufacturing QMS ISO13485 Others CE marked as Class IIb medical devices EN/ISO 3826- Part 1: EN/ISO 3826- Part 2 International/domestic product certification EN/ISO 3826- Part 3 Principles of EU GMP: EN ISO 13485 FDA Approved Test UV-visible range spectrophotometer Total organic carbon analyzer High performance liquid chromatography Quality control equipment in-house Electronic analytical balance Automatic optical rotation centrifugal machine mould Incubator Have daily in line quality inspection Type of inspection for finished goods Performance achieve on average in out going quality measures Internal rule for advising time of quality claim Research and development department in-house Accept 3rd party QC Contract Management: Attend the Supplier Liaison Meetings Contract Management: Attend the Framework Review Meetings Test company do with an external supplier Have testing methodology of EN ISO 3826 parts 1 and 3 for the specific chemical, biological and physical tests that must be carried out to validate the production process and batches of blood bags. Š 2015 Dragon Sourcing. All rights reserved. 25
Yes / No
Date of Certificate
Certifying Org.
• Section: Factory Pictures Factory overview from outside
Office
Raw Material/Finished Goods warehouse
Production Floor
Production Floor
Accurate solutions filling equipment
Assembly lines (semi-automated)
Assembly Floor
R&D/Lab
© 2015 Dragon Sourcing. All rights reserved.
26
Page 5 - 5
In summary, a savings potential of 25%
Whole Blood Collection Systems including Leucodepletion Filters,
Identified suppliers with annual savings of € 6 million
Ancillary Blood Processing Systems
Identified suppliers with annual savings of € 1.3 million
Potential Savings
Savings from both Chinese & Indian
© 2015 Dragon Sourcing. All rights reserved.