WEN LI I SELECTED WORK 2014 - 2018
1 2 3 4 WATERS OF THE OCEAN
THE ON-STRUCTURE PUZZLE
THE GREENWAY
THE WATER PLAY
Type International I Water Feature I Corporate Phase Concept Design, Schematic Design Current Status Under Construction Landscape Architect SWA Group-LA Team James Garland, Wen Li, Shannon Hoff. Individual Contribution Lead designer in SD Phase, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015
Type Domestic I Landscape I Privately Owned Public Space Phases Involved Concept, Entitlement, SD, DD, CD Current Status Ongoing, Beginning of Construction Documents Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Xiaochi Tang. Individual Contribution Lead designer in all Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018
Type International I Landscape I Public Realm Phases Involved Concept, International Competition. Current Status Partially Built. Team Ning Deng, Wen Li, Ray Zhao, Grace Gao, Xinnan Xu, Mariel Fink, Judy Qu. Individual Contribution Team Captain, Concept brainstorm, 3D modeling, rendering coordinations, client communications, project coordinations, international travel. Media CAD, Rhino, Lumion, Photoshop Time 2017
Type International I Water Feature I Public Realm Phase Schematic Design, Construction Documents. Landscape Architect James Corner Field Operations Team Tom Yankelitis, Wen Li, Dolly Davis. Individual Contribution Main designer, work on site plan, finishes plan, grading plan, elevations, sections and construction details under instruction of project manager from Schematic Design to Construction Documents. Time 2014
Qingpu Xujing Convention Center, Shanghai, China
Page 3-7
Landmark II Wilshire Park & Amenity Deck, Los Angeles, California
Page 8-14
East Lake Greenway II, Wuhan, China
Page 15-16
Shelby Farms Park Patriot Lake Expansion, Memphis, TN
5 6 7 Page 17-19
AT SEA
CONCENTRATED INFINITY
A VERDANT OASIS
Type International I Landscape I Residential Phases Involved Concept, SD. Current Status Partially built, mostly under Construction Team Ning Deng, Wen Li, Jing Zhang, David Christensen. Individual Contribution Team captain, Lead designer, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2017
Type International I Water Feature I Commercial Architect Elkus Manfredi Architects Phase Concept, Schematic Design, Design Development. Team James Garland, Karen Adhikari, Wen Li, Andrew Boquiren. Individual Contribution Main designer in SD and DD Phases, concept brainstorm, form study, 3D modeling, renderings, detail drawings, mock-up inspection, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015
Type Domestic I Landscape I Privately Owned Public Space I Renovation Phases Involved Concept, SD, DD. Current Status Under Construction Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Muara Cavanaugh. Individual Contribution Lead designer in Concept and SD Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018
Rongxin Qinglong ARC Mansion - Exhibition Area, Hangzhou, China
Page 20-22
The Mall at Miami WorldCenter, Miami, FL
Page 23-25
Bunker Hill Steps Renovation, Los Angeles, California
Page 26-29
1
WL 4.7
WATERS OF THE OCEAN
Qingpu Xujing Convention Center, Shanghai, China
PL 5.80
FFE 5.32 WL 4.7 WL 5.25 PL 5.525 WL 5.25
WL 4.425
WL 4.7
FFE 5.32 WL 5.25
WL 4.425
WL 5.25
PL 5.525
FFE 5.32
WL 4.7 PL 5.80 WL 4.7
WL 4.7
WL 4.7
PL 4.975 WL 4.425
WL 5.25 WL 4.7 WL 4.7
SKL 5.575 PL 4.975 WL 5.25
FFE 5.32
WL 5.25
WL 5.25
SKL 5.575 WL 4.425 FFE 5.32
FFE 5.32 WL 5.25
PL 4.7
WL 5.25
WL 4.425
PL 4.975
WL 5.25
FFE 5.32
WL 4.7
FFE 5.32
Type International I Water Feature I Corporate Phase Concept Design, Schematic Design Current Status Under Construction Landscape Architect SWA Group-LA Team James Garland, Wen Li, Shannon Hoff. Individual Contribution Lead designer in SD Phase, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015 The Shanghai Qingpu Xujing Convention Center #3 site exists within a larger framework of the Qingpu District, characterized as an area in transition, from low density residential land to a highly urbanized commercial and transportational hub for metropolitan Shanghai. As a response to its emerging urban identity, the project occupies a significant role as the center of the greater Hongqiao financial hub. At the west end, commercial buildings and a hotel, nestled within an urban open plaza setting, serve to represent the needs of an urban lifestyle. Further east, the core of the project site is comprised of a series of buildings that amount to one singular flower/petal theme. By adstracting the significance of the flower as a life-giving force, THE OCEAN concept compliments and builds upon this idea by connecting the flower theme to another source of life, THE OCEAN. THE OCEAN acts as a metaphorical fountain of knowledge and youth, promoting an ocean of ideas, and engendering the free flow of thought and innovation by creating a series of different but unified sub-concepts: FALL, RIPPLE, GLIDE, and WAVE. THE OCEAN shapes and is shaped by its surroundings, creating a reflexive relationship with the buildings and landscape that surround it. The waters of the Ocean mix and weave, drawing strength from the project’s center, anchoring the site with a strong signature experience, simultaneously offering some variety in its for zones. The Ocean is alive with motion: Wave, Glide, Ripple and Fall.
Fall ç€‘ĺ¸ƒ As an abstracted waterfall, the landscape represents the rigorous and ceaseless activity necessary for innovative breakthroughs. The waters at the Fall zone are animated by free-falling water segments at each water terrace. The Falls are positioned to maximize and create sounds visual sub compositions. Each fall is allowed to create an elegant, glassy effect to better engage the scale and character of the space.
Site Photo (Under Construction)
PL 5.525
WL 4.425
FFE 5.32 WL 5.25
WL 5.25 FFE 5.32 PL 5.80 WL 4.7
WL 4.7
WL 4.7
3
WL 4.7
PL 4.975
4
Ripple 涟漪 Like the reverberations a new technology or idea can have globally, ripple symbolizes achievement and growth through hard work. The waters at the Ripple zone are animated with tall, internally illuminated jets. These jets create overlapping ripples in the water’s surface, which sparkling in the sunlight. At night, the pool is alive with sparkling, LED light emanating from inside the water jets.
Site Photo (Under Construction) PL 5.525
WL 4.425
FFE 5.32 WL 5.25
WL 5.25 FFE 5.32 PL 5.80 WL 4.7
WL 4.7
WL 4.7 WL 4.7
PL 4.975 WL 5.25
WL 5.25 SKL 5.575 WL 4.425 FFE 5.32
FFE 5.32 WL 5.25
PL 4.7
WL 5.25
5
6
Glide é?™ćľ Like water gliding across the landscape, ideas disperse into the collective consciousness in the same way, ushering in change and breathing like into its surroundings. The glide zone is animated by underwater terraces which reveal directional surfaces visible under the smooth water. These terraces are designed to catch the sunlight, transmitting lively, gliding reflections across the pool.
WL 4.7
Site Photo (Under Construction)
PL 5.80
FFE 5.32
FFE 5.32 WL 4.7 WL 5.25 PL 5.525 WL 5.25
WL 4.425
WL 4.7
FFE 5.32 WL 5.25
WL 4.425
WL 5.25
PL 5.525
FFE 5.32
WL 4.7 PL 5.80 WL 4.7
WL 4.7
WL 4.7
PL 4.975 WL 4.425
WL 4.7
WL 5.25 WL 4.7 WL 4.7
SKL 5.575 PL 4.975 WL 5.25
FFE 5.32
WL 5.25
WL 5.25
SKL 5.575 WL 4.425 FFE 5.32
FFE 5.32
FFE 5.32 WL 5.25
PL 4.7
WL 4.425
PL 4.975
WL 5.25
WL 5.25
7
8
2
THE ON-STRUCTURE PUZZLE
Landmark II Wilshire Park & Amenity Deck, Los Angeles, California Type Domestic I Landscape I Privately Owned Public Space Phases Involved Concept, Entitlement, SD, DD, CD Current Status Ongoing, Beginning of Construction Documents Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Xiaochi Tang. Individual Contribution Lead designer in all Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018 The westside of Los Angeles has always been a desirable destination for businesses, visitors, and residents to “live, work, play”. The area is easily reached by vehicular and public transportation, and clusters of communities have formed within this area which is an easy drive to the ocean. The new Wilshire Park is a respite within the hustle and bustle of the heavily trafficked corridor. It will be a respite that will become a destination for people of all ages seeking unique experiences. This park expresses multiple overlapping narratives of history, culture and nature that are constant factors in Los Angeles. Within walking distance of Wilshire Park (Landmark II), the former Kuruvungna Springs site of the indigenous Tongva tribe can be found within the University High School campus. Such history should be treasured in Los Angeles, and will become one of the inspirations of the Wilshire Park concepts. Another inspiration is the geological formations of Los Angeles. The Lakewood Formation, as the dominant structural element in this area, is notable for its horizontal layers and has been called out in the wall design of the park. On the Ground Level, Wilshire Park offers 6 main programmed areas with seamless access to the larger urban context of West Los Angeles, with unique amenities that infuse it with character. • The Forest links the main pedestrian entrance and lead people to various amenities with meandering walkways, highland patios, and the unique geological walls that are protected by tree canopies for shade as well as lush plantings. • The Glade adjacent to the Forest, features the grand lawn, a stage with an iconic sculptural canopy and seating areas that bask the sunshine. • The Springs, featuring a koi pond and a modern water feature at the outdoor dining terrace, provides direct views of the park, or perhaps another opportunity to relax in tree canopies while watching activities all around. • The Entry Drive is the vehicular entrance from Granville Avenue, featuring a Jacaranda bosque to encourage cars to slow down. • The Drop-off Plaza is the grand entrance of the residential tower for both vehicular and pedestrian traffic from Granville Avenue, Wilshire Boulevard and Stoner Avenue, featuring a specimen tree in a custom white planters and green edges all around to encourage slow traffic. • The Garden Promenade serves as a formal landscape edge between the architectural plaza and the Wilshire Park with ample seating opportunities in a linear garden. On the Podium Level, the Amenity Deck offers 5 main programmed areas that offer ample opportunities for recreation and dining within landscape features that evoke the greater natural features of the West Los Angeles. The Amenity Deck is designed to accommodate all types of users – from a family friendly Pool Deck to a more calm Spa, for users who would like to enjoy a relatively private aura. With ample landscaped outdoor spaces programmed to be a Park Terrace, Outdoor Lounge, and an Outdoor Dining area, the defining characteristic of the amenity is to provide respite from the surrounding urbanization, from the heat of the sun, and from the hustle and bustle of the city. With every programmed area and landscape feature above, ample consideration will be given to material qualities, furniture selection, and a planting palette that evoke a unique sense of place. inserting a new strip system starting from buildings on the edge, shaping by social landscape and stretching into the circular agricultural fields.
CONCEPT DESIGN
ENTITLEMENT
Landmark II, Los Angeles, California
Landmark II, Los Angeles, California
Illustrative Plan / Entitlement - Oct. 24, 2016
The Springs
The Forest
The Springs
The Park Entrance
The Translucent Edge
The Glade
The Forest
Night View
0
10’
201
SCHEMATIC DESIGN
Enlargement - The Forest
Landmark II, Los Angeles, California
1 9 3
2
8 9 7
3
3 9
10
3 3
3
4 5
6
KEYNOTE LEGEND 1. Wilshire/Stoner Gateway 2. Sculptural Canopy at Gateway 3. ADA Ramp 4. Hedge 5. Bike Racks
Enlargement - The Glade
6. Gate 7. Sendimentary Stone Wall 8. Stairs 9. Forest Patio 10. Existing Vent
2 3
6
4 8 1
7 10
The new Wilshire Urban Park is conceived as a respite within the hustle and bustle of the Wilshire corridor. A respite that will become an iconic platform for groups of families, children and seniors seeking unique experiences. A park whose design expresses multiple narratives of history, culture and nature.
9
Lakewood Formation
Inspiration
KEYNOTE LEGEND
The dominant structural element in the area is the north-dipping Santa Monica– Hollywood–Raymond fault system, the southern boundary of the Transverse Ranges.
5-mile
5
1. Lawn 2. Stage 3. Sculptural Canopy at the Stage 4. Seat Wall 5. Park Walkway +
6. Koi Pond 7. Water Feature 8. Cafe Terrace 9. Garden Promenade 10. Interior Cafe
Enlargement - The Drop-off Plaza 3 2
Tongva Sacred Spring/California Historical Landmark University High School, Los Angeles
Los Angeles Geology
4
1 5
8
Recent Alluvium
9
6 7 Site
+
10
5-mile
5 miles radius
Oil fields near the site
Period
Formation
Holocene
Recent Alluvium
Pleistocene
Lakewood Formation
Jurrasic
Santa Monica Slate
Miocene
Topanga group Calabasas Formation Conejo Volcanics Topanga Fm.
KEYNOTE LEGEND 1. Hedge (24” to 30” Tall) 2. Tables and Chairs 3. Shrub Planting 4. Custom Bench 5. Lights flush with Ground
6. Water Feature 7. Bike Racks 8. Motor Court with Drop Off 9. Lobby 10. Edge of Hammerhead Firelane
SCHEMATIC DESIGN
VALUE ENGINEERING
Material Palette
Structural Coordination Sketches
Landmark II, Los Angeles, California
Specialty Concrete Paving Type A: Lithocrete w/ “wood” finish (Shaw & Sons equivalent)
Geological Walls:
Specialty Concrete Paving Type B: Lithocrete w/ “wood” finish (Shaw & Sons equivalent)
Layers of interpretive concrete walls of various layers of aggregates expressing the natural sedimentation occurring in the mountains and alluvial plains.
Material Palette
Landmark II, Los Angeles, California
Specialty Concrete Type C1 (light): Lithocrete ground acid finish (Shaw & Sons equivalent)
Specialty Concrete Type C2 (dark): Lithocrete ground acid finish (Shaw & Sons equivalent)
Specialty Concrete Type D: Lithocrete ground acid finish (Shaw & Sons equivalent)
DESIGN DEVELOPMENT
DD REVISION
DD Layout
DD Revision Layout
DD Grading
DD Revision Grading
Landmark II, Los Angeles, California
Landmark II, Los Angeles, California
DESIGN DEVELOPMENT
DD REVISION
DD Sections
DD Revision Sections
Landmark II, Los Angeles, California
Landmark II, Los Angeles, California
DESIGN DEVELOPMENT
DD REVISION
DD Details - Geological Wall
DD Revision Details - Geological Wall
Landmark II, Los Angeles, California
DD Rendering - The Forest - At Installation
Landmark II, Los Angeles, California
DD Rendering - The Forest - 5 Years Old
DD Rendering - Cafe Terrace - At Installation
DD Rendering - Cafe Terrace - 5 Years Old
3 THE GREENWAY
East Lake Greenway II, Wuhan, China
Type International I Landscape I Public Realm Phases Involved Concept, International Competition. Current Status Partially Built. Team Ning Deng, Wen Li, Ray Zhao, Grace Gao, Xinnan Xu, Mariel Fink, Judy Qu. Individual Contribution Team Captain, Concept brainstorm, 3D modeling, rendering coordinations, client communications, project coordinations, international travel. Media CAD, Rhino, Lumion, Photoshop Time 2017 As part of the design team for Wuhan East Lake Greenway I, we are glad to see how popular it has become. Greenway I attracts diverse users, such as bicyclists, electric scooter riders, families with strollers, and pedestrian tourists. However, the passenger flow volume has exceeded expectations and the linear armature is unable to maintain a well-organized slow traffic circulation. In the process of planning and designing Greenway II, it is essential to provide alternative spaces and further optimize the circulation in the slow traffic system by creating various layers of spaces - space for stay, extended space, great open space, etc. - along the greenway. The next phase of the greenway will be the greenway “plus� with unique identities and the capacity of satisfying all users from the neighbood, the city, the country, and beyond.
26
The Great Lawn at the Peach Blossom Island
Vistor Center at the Peach Blossom Island Wuhan East Lake
Master Garden Entrance
Master Garden Lakefront
The Mirror Garden
The Greenway at the Mirror Garden
The Weaving Greenway
The Weaving Greenway at the Lily Pond
The Climbing Wall at the Peach Blossom Island
The Greenway at the Sports Park
Bird’s Eye View from the City
Photo by Wen Li
The Master Plan
4 THE WATER PLAY
Shelby Farms Park Patriot Lake Expansion, Memphis, TN Type International I Water Feature I Public Realm Phase Schematic Design, Construction Documents. Landscape Architect James Corner Field Operations Team Tom Yankelitis, Wen Li, Dolly Davis. Individual Contribution Main designer, work on site plan, finishes plan, grading plan, elevations, sections and construction details under instruction of project manager from Schematic Design to Construction Documents. Time 2014
REVISION
REVISION : NO.
DATE
DESCRIPTION
NO.
BY
X 23 1'-0" 1'-0" 1'-0"
X 22
12.5%
W 07 R 06
R 03 R 01
7 Elevation
LEGEND :
LEGEND
Scale 3/8" = 1'-0"
O
5'
10'
X 20 F 02 1'-0" 1'-0" 1'-0"
R 02
Drainage Grate
X 24
12 Elevation
Frothy Arch, From Core Through Stone
1 WATER TUNNEL
W 06
R 05
R 04
6 Elevation
Scale 3/8" = 1'-0"
O
Scale 3/8" = 1'-0"
5'
O
10'
5'
10'
5'
10'
SCHEDULE
KEY TYPE
2 .2 F3 W
1 .2 F3 W
5 WELLSPRING
Frothy arches, 10' spans From bored holes in boulders, 3 4 '' bore
2 WATERFALL GROTTO
1
19' weir length, 3 8 '' thick flow over the weir Water supplied through hole bored in boulders
3 JET FIELD
9
Smooth bore streams, 6'' diameter, 18''-48'' height NLC 075 Crystal Fountains
4 MISTING ROCKS 6 1 WF2.0
Smooth Bore Stream, Set Flush With Concrete Finish Floor EL.: +264.00
3
6 RIVER BED
1
Concrete Steps with Stainless Steel Handrail Finish Floor EL.: +266.00
WF
8 HAND PUMP
Equipment Vault Access Hatch, To Match Concrete Finish
5 Elevation
Sloped flows, Water supplied by Wellsprings 4'' deep water, average with 8'-0''
5.17630 Richter Spielgerate
T 11
T 10
T 09
3 .1 WF3
Rendered Concrete Finish with Small Smooth Stones Exposed
T 08
NO.
4 Elevation
LANDSCAPE ARCHITECT :
James Corner Field Operations
O
5'
10'
CONSULTANT TEAM :
2 .1 3 WF
X 19
F 05
F 02
F 06
X 07
Exposed Aggregate Concrete
1 3.0 WF
WC-01
Finish/Texture
Color
Boulders Throughout
Grout to match stone color
Natural
Varies
Walking Surface Throughout
Concrete to have integral waterproofing admixture
Non-slip
To Match Limestone
Rendered Concrete Finish with Small Smooth Stones Exposed
17
18
F 05
F 07
5'
DD,WL 03.03.2014
10' DRAWING NO.
Cone Nozzle, Set Flush In Stone
CHECKED
TY
SCALE
AS_SHOWN
X 19 X 17 F 04 X 15
X 06 X 09 X 11
X 18 F 03 X 13 X 21
F 02
W 06
X 16 X 14 X 12
10'
F 01
Shelb
500 Nor
PROJECT
X 10
2 Elevation
10 Elevation O Water arches
5'
WF-1.1
All Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner Field Operations. They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Corner Field Operations.
W 01 W 02
W 04
9 Elevation
W 01
W 02
10'
O
DESCRIP
DRAWING
W 04
W 01
W 03
DRAWING
1 Elevation
Scale 3/8" = 1'-0"
5'
10'
DATE
Fence surround Refer to landscape architect drawings
8 Elevation
Scale 3/8" = 1'-0"
O
W 03
5'
Wood bench Refer to landscape architects drawings
W 04
Bubbling geyser
O
10'
DRAWN
Water fall
WATER_FEATURE FINISH_PLAN
PAT
Scale 3/8" = 1'-0"
Scale 3/8" = 1'-0"
90% CONSTRUCTION DOCUMENTS
DESCRIPTION
DRAWING TITLE
Scale 1/4" = 1'-0"
O
16
SFP, PHASE 1 PATRIOT LAKE EXPANSION
DATE
1 Finish Plan North
13
15
PROJECT NAME
DRAWN
CLIENT :
5'
1'-0" 1'-0" 1'-0"
Limestone
Specifications
08 12
1'-0" 1'-0" 1'-0"
WS-01
Image
06 11
1'-0" 1'-0" 1'-0"
Location
05 10
1'-0" 1'-0" 1'-0"
Description
04
1'-6"
5 WELLSPRING
Frothy Bubbling Geyser From Core Cut Through Stone
WF Reference #
10'
5'-6"
09 14
5'
O
07
3'-2"
Cobblestone Paving
2 .0 WF3
6 RIVER BED
Stone Set Flush
FINISHES SCHEDULE
Stainless Steel Fence and Gate
5 WELLSPRING
7 CONE NOZZLES
03
Water Tank Access Hatch, To Match Concrete Finish
Stones Set Near Flush
02
O
1'-0" 1'-0" 1'-0"
01
LEGEND :
Scale 3/8" = 1'-0"
Scale 3/8" = 1'-0"
Shelby Farms Park Conservancy
500 North Pine Lake Drive, Memphis, TN 38134
Limestone Boulder, Typical
3 Elevation
11 Elevation
CLIENT :
Finish Floor EL.: +266.50
1'-0" 1'-0" 1'-0"
1'-0" 1'-0" 1'-0"
Mist Nozzle, Set Flush In Stone
3 WF3.0
475 Ten
F 07
% 4.9
Stone Set Flush
4 MIST ROCKS
Jam
CONSULT
X 18 Stone Set Near Flush
D
LANDSCA
Scale 3/8" = 1'-0"
475 Tenth Ave, 9th Floor New York, NY 10018
Wood Bench
6 RIVER BED
STAMP :
REVISION
Working Hand Pump Supplies Water Channel, Mounted To Boulder
Water Channel Recessed 1 2" Into Concrete
Slight angle toward river bed, Custom modified to break cone continuity
8 HAND PUMP
N
Scale 3/8" = 1'-0"
O
Frothy bubbling geyser Aerated column 12'' diameter 12'' height Supplied from bored holes in boulders
7 CONE NOZZLES 6 1
T 07
T 06
STAMP :
1
3 JET FIELD
1 3.1
5 WELL SPRING
FOR REVIEW & FILING NOT FOR CONSTRUCTION
Mist jets Sequential operation NFC-100 Crystal Fountains
T 05
T 04
T 03
T 02 X 01
1'-0" 1'-0" 1'-0"
Frothy Bubbling Geyser, From Core Through Stone
Finish Floor EL.: +263.50
Stainless Fence and Gate
QTY DESCRIPTION
1 WATER TUNNEL 10
1'-0" 1'-0" 1'-0"
4 .0 F3 W
2 WATER FALL GROTTO
Scale 3/8" = 1'-0"
5'
10'
O
5'
2 Elevation
10'
All Rights These dra Operations connection in whole o Operations
N
Scale 3/8" = 1'-0"
O
5'
10'
STAMP :
REVISION : NO.
DATE
DESCRIPTION
BY
LANDSCAP
Jame
475 Tenth
CONSULTA
LEGEND :
CLIENT :
Shelby
500 North
Water arches Water fall
5'-6"
Wood bench Refer to landscape architects drawings
PROJECT N
PAT
Fence surround Refer to landscape architect drawings
1'-6"
Bubbling geyser
DESCRIPTI
3'-2"
DRAWN DATE
2 Elevation
Scale 3/8" = 1'-0"
O
5'
10'
FOR REVIEW & FILING NOT FOR CONSTRUCTION STAMP :
33
DRAWING
1 Elevation
Scale 3/8" = 1'-0"
O
5'
10'
DRAWING
All Rights R These drawi Operations. connection w in whole or i Operations.
34
REVISION :
Boulder Schedule
150
26250 Triangular
20 50 72 72
3 13 30 30
550 2190 5250 5250
M M
6300
T 02
L
X 01
Y03
Y04
T 03
L
36
72
18
3150
48 36 30 36
72 48 22 72
25 12 3 18
4340 2100 600 3150
G12
12
36
72
18
3150
G13 G14
60 36
18 40
6 4
4 2
660 300
Riverbed Nozzle Boulders R01 48 36 15 R02 60 42 10 R03 40 36 12 R04 46 34 10 R05 48 48 12 R06 48 36 10
8 15 10 9 16 10
1360 2550 1750 1580 2800 1750
S
Tunnel Boulders T01 T02 66 48
30
28
M
T03
50
36
31
32
T04
70
30
33
40
T05 T06
36 72
30 40
28 34
9 57
T07
54
30
31
29
T08
60
30
29
30
T09
54
36
22
13
T10
58
42
25
35
T11
68
46
23
NOT USED 4970 Oval Flat bottom, core through at 60 degree angle for water effect 5650 Rectangular Flat bottom, core through at 60 degree angle for water effect 7020 Rectangular Flat bottom, core through at 60 degree angle for water effect 1530 Triangular Flat bottom 9920 Rectangular Flat bottom, core through at 60 degree angle for water effect 5090 Rectangular Flat bottom, core through at 60 degree angle for water effect 5290 Rectangular Flat bottom, core through at 60 degree angle for water effect 2240 Oval Flat bottom, core through at 60 degree angle for water effect 6170 Rectangular Flat bottom, core through at 60 degree angle for water effect 7290 Rectangular Flat bottom, core through at 60 degree angle for water effect
Y07 Y08 Y09
T 05
S
Y10
S
M
T 06
T 08
L
ALL UNLABELED BOULDERS IN THIS ZONE ARE "Y"
T 09
L
L
L
P G 07
S M
T 10
G1
G 05
1
G 13
G1
P
T 11
M
S L
G 01 (above)
M
L
L
G 04
2
L
Z
G 02
Z
Z Z
W 03 W 01 S
P
S
L
Z
P
L
Z
W 04
L
S
X 05
P
Z M
L
M
M
Z Z
M
S
L
X 21
S L
F 04 L
Z
P
M
R 02
L
M
P
L
M L
P
L
L
X 17
L
X 16 X 18
L
M
X 24 Number L(in)
X 23
L
L
L M P S Y
M L
Z
L
P
P
R 06
Oval Triangular Triangular Oval Rectangular Rectangular Rectangular Rectangular Rectangular Rectangular Rectangular Rectangular Triangular Triangular Rectangular Rectangular Pentagonal Pentagonal Oval Pentagonal Oval Rectangular Pentagonal
Extra large boulder Extra large boulder NOT USED Extra large boulder Adjacent to stair, Flat bottom, fit to stair Adjacent to stair, Flat bottom, fit to stair Adjacent to stair, Flat bottom, fit to stair Fit bottom to stone below Flat bottom Close fit to tread Close fit to tread Close fit to tread Close fit to tread Close fit to tread Close fit to tread Close fit to tread Close fit to tread Close fit to tread Close fit to tread Flat bottom Flat bottom Flat bottom Flat bottom Flat bottom
Approx. Approx. V(cf) W(lbs)
W(in)
H(in)
30 to 60
24 to 48
18 to 36
8 to 72
1310 to 10500
18 to 30
16 to 24
12 to 22
2 to 9
350 to 1600
30 to 72
24 to 40
6 to 15
3 to 25
QTY
61 53 33 38 50
8 to 16
8 to 16
8 to 18
0.3 to 3
50 to 470
6 to 18
6 to 15
3 to 4
0.1 to 1
10 to 110
26 to 57
19 to 45
15 to 18
8.9 to 13
1560 to 2250
Varies
440 to 4380
Wellspring geyser
0
Cleft rock over drainage trough
L
L
North
O
475 Tenth
CONSULTA
26
6.2
0
500 North Pine Lake Drive, Memphis, TN 38134
NO.
02
Note
09
05
06
O
12
13
16
17
18
LEGEND :
Shelby
500 North
BY
5%
Finish Floor (Varies) El: +266.50
5
5.2
LEGEND :
26
5%
PROJECT
PAT
DESCRIPT
Limestone boulders
CHECKED
TY
SCALE
AS_SHOWN
Wellspring geyser Flows onto riverbed
03.03.2014
DRAWN
Wellspring geyser Flows onto riverbed
1
WATER_FEATURE BOULDER_LAYOUT_PLAN
North
WF-1.3
DATE
3'' Grading Plan
DRAWING
Scale 1/4" = 1'-0"
O
5'
10'
DRAWING
REVISION : NO.
All Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner Field Operations. They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Corner Field Operations. Scale 3/4" = 1'-0"
5'
O
1'
DATE
DESCRIPTION
BY
All Rights R These draw Operations. connection in whole or Operations.
FOR REVIEW & FILING FOR REVIEW & FILING Start FOR CONSTRUCTION NOT FOR CONSTRUCTION 2 Section at River BedNOT Scale 3/4" = 1'-0"
2 Section at River Bed Start
1'
DESCRIPTION
00
11
Scale 3/4" = 1'-0"
5'
DATE
265.
15
DD,WL
DRAWING NO.
4 Section at Wellspring
1'
CLIENT :
2
90% CONSTRUCTION DOCUMENTS
DESCRIPTION
Drain to tank
Scale 3/4" = 1'-0"
NO.BY
DESCRIPTION
SFP, PHASE 1 PATRIOT LAKE EXPANSION
6'-7''
O
DATE
08
10
0
0 66.5
REVISION :
PROJECT NAME
Flexible hose connection from discharge to boulder stub
.00
266
07
04
14
DRAWING TITLE
4 Section at Wellspring
6.5
0
5.5
26
264.75
Shelby Farms Park Conservancy
26
0
5.0
26
Scale 1/4" = 1'-0"
Concrete pedestal supports
.50
4
26
CLIENT :
DATE
Drain to tank Concrete pedestal supports
5
264.5
Boulder Layout Plan
6'-7''
Jam
0
5
Limestone boulders
10'
LANDSCAP
6.0
0
264.2
Large general boulder size range, match to plan Medium general boulder size range, match to plan Large low profile boulder size range, match to plan Small general boulder size range, match to plan Small, thin for removable stone above equipment troughs 21 Retaining Boulders, maintain proper H to W ratio
Flexible hose connection from discharge to boulder stub
26
264.0
CONSULTANT TEAM :
Wellspring geyser
5'
0
475 Tenth Ave, 9th Floor New York, NY 10018
DRAWN
1
6.0
Finish Floor (Varies) El: +266.00 2%
LANDSCAPE ARCHITECT :
James Corner Field Operations
Cleft rock over drainage trough
M
26
5
P L
Finish Floor (Varies) El: +264.00
263.7
Limestone boulders
L
N STAMP :
265.75
03
Primary Plan Shape
Varies Varies Varies Varies Varies
Limestone boulders
S
S L
8290 3020 7660 2650 4290 2190 320 580 700 840 880 390 530 260 530 700 480 480 270 300 250 330 210
265.50
Finish Floor (Varies) El: +263.50
263.5
P
P
M
P
47 17 44 15 25 13 2 3 4 5 5 2 3 2 3 4 3 3 2 2 1 2 1
CL (True vertical)
L
P
Flat bottom, core through for water effect Flat bottom Flat bottom Flat bottom, notch to fit W01 NOT USED Flat bottom, core through for water effect Flat bottom, core through for water effect
CL (True vertical)
M M
Oval Triangular Triangular Pentagonal Rectangular Rectangular
265.25
STAMP :
REVISION :
X 22
M
L
X 15
W 07
R 03
Z
1'-6"
S
S
F 06
X 19
P M
Z M
3130 1750 1420 4610 2040 2800
FOR REVIEW & FILING NOT FOR CONSTRUCTION
01 W 06
L
M
1'-3''
M L M
L
S
L M
F 02
R 05
R 04
L
S
S
P
P
M
S
P
M
P P
1'-6"
M
Z
P
M
X 14
S
L
F 03
X 12
F 01
Z
S
M
L
S
Z
F 05
X 13
X 10
Z
M S
R 01 L
Z
X 11 Z
S
P
P
L
Z
X 20
L
P S
Z
M
P
Z
S
0
5.0
26
18 10 8 26 12 16
1'-3''
M
P
Z
Z
S
M
S F 07
X 04
S
M
8
X0
L
S M L
L
X0
S L
M M
Z
X 07
9
M
M
S
X 06
42
Wellspring Boulders W01 48 48 26 W02 60 32 18 W03 40 39 18 W04 56 38 31 W05 W06 40 36 14 W07 48 36 16 General Unique Boulders X01 88 60 30 X02 72 36 23 X03 X04 90 60 28 X05 48 24 44 X06 42 24 42 X07 36 20 30 X08 24 12 11 X09 24 24 10 X10 48 24 6 X11 60 23 6 X12 60 24 6 X13 36 18 6 X14 72 24 6 X15 36 24 6 X16 48 18 6 X17 48 24 6 X18 48 24 6 X19 48 24 6 X20 48 36 3 X21 60 24 3 X22 54 30 3 X23 36 30 3 X24 36 28 3
Z
5%
5%
5%
S
L
Core to allow cone nozzle Core to allow cone nozzle Core to allow cone nozzle Core to allow cone nozzle Core to allow cone nozzle Core to allow cone nozzle
0
S
Oval Rectangular Rectangular Rectangular Rectangular Rectangular
6.5
S
M S
G 14 (above)
G 03 W 02
T 07
G 08 G 09
G 10
G 06
M
ALL UNLABELED BOULDERS IN THIS ZONE ARE "Y"
5
L
72
36
24 24 18 12
Y06
S
M
48
24
Y05
T 04
S M
18
G08 G09 G10 G11
6.2
L
G06 G07
M L
L
26
S
26
S
L
L
26
S S
LEGEND :
0
S L
LEGEND :
3.5
L
S
P
X 02
Large Cantilevered stone, anchor to concrete base, cored for water supply, approximate 6 to 8-foot cantilever of narrow side of boulder Side boulder Side boulder Side boulder, conceals column behind Side boulder, conceals column, inside cut to fit, bearing on foundation, clipped at top of column Rectangular Side boulder, conceals column, inside cut to fit, bearing on foundation, clipped at top of column Triangular Side boulder, conceals column, inside cut to fit, bearing on foundation, clipped at top of column Oval Side boulder, conceals column behind Triangular Side Boulder Triangular Side boulder Rectangular Cladding on column, inside cut to fit, bearing on foundation, clipped at top of column Rectangular Cladding on column, inside cut to fit, bearing on foundation, clipped at top of column Rectangular Thin base stone in grotto area Oval Sits ontop of large boulder, bore through center, conceals anchor of large boulder Triangular Triangular Triangular Rectangular
26
L
30 36 40 30
5%
30
18 24 36 24
.75 263
L
265.50
L
5
Grotto Boulders G01 144 120 G02 G03 G04 G05
4.7
5780 Rectangular 2800 Rectangular 1580 Rectangular
26
33 16 9
D
264. 50
18 16 12
26 4.5 0 26 5.0 0 5.5 0 6.0 0
48 36 36
264.25
66 48 36
264.00
F05 F06 F07
5
1510 Oval 3620 Pentagonal
263.7
3160 Rectangular
9 21
26
18
263. 50
20 20 24
NO.
BY
00
30 30 36
DESCRIPTION
266.
52 48 60
REVISION
DATE
Core through to allow mist assembly, fit bottom to grade change Core through to allow mist assembly, fit bottom to grade change Core through to allow mist assembly Core through to allow mist assembly, fit bottom to grade change Core through to allow mist assembly Core through to allow mist assembly Core through and mounting holes for hand pump, notch bottom to fit basin
265.75
P
M
F02 F03 F04
S
NO.
Note
3790 Rectangular
.00
P
22
264
L L
Approx. Approx. Primary Plan V(cf) W(lbs) Shape
20
5
L
H(in)
3.7
W(in)
Mist Boulders F01 52 36
26
Number L(in)
5'
O
1'
5'
STAMP :
REVISION :
STAMP :
NO.
REVISION : NO.
Limestone opening centered over discharge pipe
DATE
DESCRIPTION
REVISION :
DATE
NO. BY
DESCRIPTION
DA
BY
Stone anchor 4 places minimum as required by structureal engineer
LEGEND :
CL (True vertical) Link seal
Wellspring geyser
Water discharge LANDSCAPE ARCHITECT :
LANDSCAPE ARCHITECT :
475 Tenth Ave, 9th Floor New York, NY 10018
475 Tenth Ave, 9th Floor New York, NY 10018
CONSULTANT TEAM :
CONSULTANT TEAM :
Limestone boulders James Corner Field Operations James Corner Field Operations Cleft rock over drainage trough
7" 10'-316
1'-4"
09
14 Concrete pedestal supports 10"
Drain to tank
Rendered concrete
BY
DESCRIPTION
Rendered concrete
DRAWN
Stone anchor 4 places minimum as required by structureal engineer
10
11
12
13
15
16
17
18
Feature stone support structure and footing as required by structural engineer
3 Section at River Bed End
Scale 3/4" = 1'-0" 1'
O
1 Section at River Bed Midpoint
Scale 3/4" = 1'-0"
5'
O
1'
DATE
03.03.2014
O
1'
CHECKED
TY
SCALE
DATE AS_SHOWN
WATER_FEATURE SECTIONS
1 Section at River Bed Midpoint DRAWING NO.
Scale 3/4" = 1'-0"
5'
Scale 3/4" = 1'-0"
5'
O
14
05 10
06 11
08 12
13
1'
15
Limestone boulder (beyond)
Limestone set into concrete near flush
Limestone set into concrete near flush
Scale 3/4" = 1'-0"
REVISION : NO. All RightsDATE Reserved
WF-3.0 5'
DRAWN
DD,WL 03.03.2014
DRAWING TITLE
DRAWING NO.
CHECKED
TY
5'
1'
O
5'
6" 6" 6"
STAMP :
SCALE
AS_SHOWN
2 Section
FOR REVIEW & FILING NOT FOR CONSTRUCTION
WATER_FEATURE SECTIONS
FOR REVIEW & FILING NOT FOR CONSTRUCTION N
2 Section
Scale 3/4" = 1'-0"
O
Scale 3/4" = 1'-0"
1'
5'
O
1'
5'
STAMP :
STAMP :
STAMP :
WF-3.0
LANDSCAPE ARCHITECT :
James Corner Field Operations
AllBY Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner These Field drawing, concepts, designs and ideas are the property of James Corner Field Operations. They may not be copied, reproduced, disclosed to others or used Operations. in They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were connection prepared, with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Cornerin Field whole or in part, without the prior written authorization of James Corner Field Operations. Operations. DESCRIPTION
475 Tenth Ave, 9th Floor New York, NY 10018
2 Section
LEGEND :
6"
FOR REVIEW & FILING NOT FOR CONSTRUCTION
2 Section at River Bed Start
PROJECT NAME
DRAWING TITLE
3 Section at River Bed End
09
07
04
DESCRIPTION 90% CONSTRUCTION DOCUMENTS 90% CONSTRUCTION DOCUMENTS
DD,WL
Link seal Water discharge
02
03
6"
01
08
PROJECT NAME
REVISION : DESCRIPTION
500 North Pine Lake Drive, Memphis, TN 38134
6'-7''
06
6"
05
16 17 18 at Wellspring 4 Section Scale 3/4" = 1'-0" SFP, PHASE 1 SFP, PHASE 1 O 1' PATRIOT LAKE EXPANSION PATRIOT LAKE EXPANSION
10" 10"
07
04
Shelby Farms Park Conservancy
6"
02
03
2'-9"
1'-6"
01
Limestone boulder
6"
10"
60°
500 North Pine Lake Drive, Memphis, TN 38134
Cone nozzle, recessed flush
Cone nozzle, recessed flush
Rendered concrete
Flexible hose connection from discharge to boulder stub
CLIENT :
6"
1'-6" 1" 2'-716
1'-10''
Shelby Farms Park Conservancy
Limestone boulder
DATE
Limestone boulder (beyond)
Limestone boulder Notched to fit
Limestone boulder Notched to fit
Rendered concrete
NO.
Mist plume (beyond)
Removable stone CLIENT :
2%
Limestone opening centered over discharge pipe
LEGEND :
Mist plume (beyond)
Limestone boulder
Rendered concrete
Perimeter fence
Perimeter fence Limestone boulders
Limestone set into concrete Limestone boulders Near flush
60°
Limestone set into concrete Near flush
Wood bench
1'-3''
9" 8'-916
Wood bench
Cone nozzle Recessed flush
Wellspring geyser Flows onto riverbed
Limestone "boulder" cladding
Perimeter fence Cone nozzle Recessed flush
7'-981"
Perimeter fence
LEGEND :
Limestone boulders LEGEND :
Perimeter fence
CONSULTANT TEAM :
Scale 3/4" = 1'-0"
O
1'
5'
7" 10'-316
Perimeter fence
Limestone boulder
Cone nozzle Recessed flush
Removable stone
475 Tenth Ave, 9th Floor New York, NY 10018
Perimeter fence
CONSULTANT TEAM :
Limestone boulders
01
Cone nozzle, recessed flush
Mist plume
03
Limestone boulder
CLIENT :
10" 10"
Shelby Farms Park Conservancy 01
CLIENT :
60°
1" 2'-716
60°
Rendered concrete
Removable stone
02
03 09
2'-0"
14
Flexible hose connection from discharge to boulder stub
1'-3''
1'-6"
FOR REVIEW & FILING NOT FOR CONSTRUCTION
O
1'
5'
DESCRIPTION DRAWN
Drain to tank
Scale 3/4" = 1'-0" 1'
Concrete pedestal supports 5'
Scale 3/4" = 1'-0"
LANDSCAPE ARCHITECT :
James Corner Field Operations 475 Tenth Ave, 9th Floor New York, NY 10018 CONSULTANT TEAM :
1'
FOR REVIEW & FILING NOT FOR CONSTRUCTION
2 Section at River Bed Start Scale 3/4" = 1'-0"
5'
O
1'
5'
STAMP :
DRAWING TITLE
DRAWN
13
17
18
Bench
Bench
1 Section
DRAWING NO.
Scale 3/4" = 1'-0"
O
1'
5'
18
Hand pump
DRAWING TITLE
Rendered concrete
1/2'' Recessed
1 Section at River Bed Midpoint
CHECKED
TY
SCALE
AS_SHOWN
WATER_FEATURE SECTIONS
WF-3.2
All Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner Field Operations. They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Corner Field Operations.
DRAWING NO.
Scale 3/4" = 1'-0"
O
1'
5'
03.03.2014
CHECKED
TY
SCALE
AS_SHOWN
WATER_FEATURE SECTIONS
3 Section
3 Section
Scale 3/4" = 1'-0"
O
1'
O
1'
Rendered concrete
04 Rendered concrete
03
09
14
06
08
10
11
12
13
15
16
17
18
SFP, PHASE 1 PATRIOT LAKE EXPANSION PAT
DESCRIPTION DRAWN
Rendered concrete
DRAWING TITLE
O
1'
03.03.2014
CHECKED
TY
SCALE
DATE AS_SHOWN
WATER_FEATURE SECTIONS
DRAWN
DRAWING T
1 Section
DRAWING NO.
O
All Rights Reserved All Rights Re 5' These drawing, concepts, designs and ideas are the property of James CornerThese Field drawin Operations. They may not be copied, reproduced, disclosed to others or usedOperations. in T connection with any work other than the specified project for which they wereconnection prepared, w in whole or in part, without the prior written authorization of James Corner Field in whole or in Operations. Operations.
Scale 3/4" = 1'-0"
5'
PROJECT N
DESCRIPTI 90% CONSTRUCTION DOCUMENTS
DD,WL
DATE
1/2'' Recessed channel in rendered concrete
Scale 3/4" = 1'-0"
5'
05
PROJECT NAME
1 Section
Scale 3/4" = 1'-0"
5'
02 notched to fit 07 Limestone boulder
Rendered concrete
1/2'' Recessed channel in rendered concrete
Shelby
500 North
01
Limestone boulder notched to fit
WF-3.0
All Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner Field Rendered concrete Operations. They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Corner Field Operations.
Hand pump
Shelby Farms Park Conservancy
500 North Pine Lake Drive, Memphis, TN 38134
90% CONSTRUCTION DOCUMENTS Limestone boulder
DD,WL
DATE
90% CONSTRUCTION DOCUMENTS
03.03.2014
DESCRIPTION
08 12
16
DD,WL
DATE
4 Section at Wellspring O
06 11
15
SFP, PHASE 1/2'' Recessed 1 PATRIOT LAKE EXPANSION
Scale 3/4" = 1'-0"
6'-7''
O
05 10
13
17
SFP, PHASE 1 PATRIOT LAKE EXPANSION
Limestone boulder
PROJECT NAME
3 Section at River Bed End
STAMP :
2 Section
07
04
08 12
PROJECT NAME
500 North Pine Lake Drive, Memphis, TN 38134
Rendered concrete
06 11
1141"
Wellspring geyser Flows onto riverbed
07 05
10
921"
Cleft rock over drainage trough
Feature stone support structure and footing as required by structural engineer
04
15 recessed 16 Mist nozzle, Flush
Mist nozzle, recessed Flush
1141"
2'-9"
Limestone boulders 6"
02plume Mist 09 14
Limestone boulders
921"
1'-4"
CLIENT :
500 North Pine Lake Drive, Memphis, TN 38134
CL (True vertical) Rendered concrete
35
CONSULTA
Shelby Farms Park Conservancy
Perimeter fence 1'-6"
LANDSCAP
475 Tenth
CONSULTANT TEAM : CLIENT :
Wellspring geyser 2%
LANDSCAPE ARCHITECT :
475 Tenth Ave, 9th Floor New York, NY 10018
James Corner Field Operations Jame
James Corner Field Operations
Wood bench Limestone set into concrete Near flush
LEGEND :
60°
1" 2'-716
60°
1'-10''
Rendered concrete
LANDSCAPE ARCHITECT :
Perimeter fence
7'-981"
9" 8'-916
Limestone "boulder" cladding
1'
WF-3.1
DRAWING N
36
5 AT SEA
Rongxin Qinglong ARC Mansion - Exhibition Area, Hangzhou, China Type International I Landscape I Residential Phases Involved Concept, SD. Current Status Partially built, mostly under Construction Team Ning Deng, Wen Li, Jing Zhang, David Christensen. Individual Contribution Team captain, Lead designer, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2017 Life with super yachts is as amazing as everyday is a holiday at sea. The Qinglong high end residential provides users unique residential landscape experience by design with the inspirations from “ocean“ and “super yachts“ and organizing the space in carefully considered hierarchy. Node spaces are themed with “sailing“, “outdoor living room“, “sports at ‘sea’“, “family time plaza“ and “the private harbors“, expressing a high end, modern and delicate living style. The vision of the landscape design is to provide the residents a luxury living experience everyday as if they own the most fancy super yachts.
Exhibition Area 隐 秀 路
7#
3# 2#
河 余
路
杭
院
塘
学
1#
Exhibition Area: Sailing
10 18 14 16 7
9
17
21 14 12
11 13
15
分区标注 10 19
1. 展示区入口拱门 2. 入口广场 3. VIP停车位 4. 竹林 5. “海浪”种植 6. 地形种植 7. 步道 8. 种植 9. 镂空“帆” 10. 种植池 11. 灌木缓冲带 12. 镜面/脉冲波浪水池 13. 雕塑叠水 14. 造浪室 15. 下沉休息平台 16. 圆形种植与景观石 17. 竹 18. 图案铺装 19. 种植 20. 通道 21. 安全护栏
19
20
10
9
2 7 1
8 5
3 6 4
Exhibition Area: Children’s Sea
1 10
2 3
WATER PLAY
3
戏水
“LAWN“ PLAY 游戏草地
4 6
“SAND” PLAY 玩“沙”
11
2 12
5
7
10
3
2
3
分区标注
13 8
8
9
1. 人居馆出入口 2. 步道 3. “海浪”坐墙 4. “海星”喷泉 5. “海螺”爬构 6. 活动草坪 7. 休闲吧台 8. 入户平台 9. 后场至样板房通道 10. 参观结束返回通道 11. 种植 12. 地形种植 13. 灌木种植
BUILT PHOTO
6
CONCENTRATED INFINITY
The Mall at Miami WorldCenter, Miami, FL
Type International I Water Feature I Commercial Architect Elkus Manfredi Architects Phase Concept, Schematic Design, Design Development. Team James Garland, Karen Adhikari, Wen Li, Andrew Boquiren. Individual Contribution Main designer in SD and DD Phases, concept brainstorm, form study, 3D modeling, renderings, detail drawings, mock-up inspection, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015
64'-4"
26'-4''
11'-8''
26'-4''
1 W-120
Removable panel over discharge trough
1'-6" 221"
Stone bench Marble finish (See Architect's specifications)
1" Operating water depth
20'-1''
Weir stone
4"
8" 1 2"
"
421"
1'-6
Fixed stone paver
1'-6"
Weir
WL 13.75'
15 " 6 1'-8 1
10" 3"
Fixed stone paver WL 13.50'
1" 4 2'- 2
Atrium paving Not in Fluidity's scape See Architect's drawings
WL 13.25'
1" 2 2'- 2 5'-421"
4'-1141"
3" 5'-04
5"
HP of Plaza EL.: +13.33'
6"
2 Transverse Section
30'-4"
WL 13.38'
WL 13.13'
WL 12.75'
2 W-120
Scale 1" = 1'-0"
0
1'
5'
6"
FFE 12.50'
1'-4"
1'-4"
6" 1 W-130
Discharge trough
Incidental water collection trough Drawn by Civil Engineer
LED light fixture (Typ. 11 per side)
WL 15.58' WL 11.71'
3 W-120
Waterproofing membrane Mortar
Double weir
WL 13.00'
8"
Fixed stone paver
1 W-151
Fixed stone panel
4" Operating water depth
1'-6
"
Fixed vertical stone panel
741" Operating water depth
Removable stone over supply trough
Stone wall Marble finish (See Architect's specifications) Stainless steel support Stainless steel supply trough Waterproofing membrane
Atrium paving Not in Fluidity's scope See Architect's drawings
4 W-150
1 W-150
Concrete 1 2"
Fixed stone paver
100 GALLERIA OFFIC
2 W-130
6"
Removable stone paver
Removable pavers under bench
200 East Long L Suite 300 Bloomfield Hills,
3"
Bench
Custom-profile stone Waterproofing membrane
Mortar
Mortar
LED light fixture
Bridge paving Not in Fluidity's scope See Architects drawings
Waterproofing membrane Junction box
Anti-vortex cover plate over 8'' drain
| 248.827.4600
200 East Long Lake Rd. Suite 300 Bloomfield Hills, MI 48304
ELKUS
Incidental water collection trough (See Civil Engineer's drawings)
To tank 100 GALLERIA OFFICENTRE | SUITE 427 | SOUTHFIELD, MI 48034
[address
BOSTON
Water collection trough
1'-541"
ELKUS | MANFREDI ARCHITECTS [address] 25 DRYDOCK AVENUE
1 Longitudinal Section Scale 1" = 1'-0"
BOSTON MASSACHUSETTS 02210
0
1'
5'
wenli
[tel] 617-426-1300
1 Atrium Fountain Finishes Plan Scale 1/2" = 1'-0"
0
5'
10'
wenli
North
Midnight Grey Flamed finish Granite of America
Mesabi Black Thermal finish ColdSpring Granite White Marble Architects Specification Nero Absolute Flamed finish ColdSpring Granite
Charcoal Black Diamond 200 finish ColdSpring Granite Charcoal Black Thermal finish ColdSpring Granite Mesabi Black Diamond 10 finish ColdSpring Granite
21
Lake Superior Green Polished finish ColdSpring Granite
22
Double weir
Stone bench Marble finish (See Architect's specifications)
WL 13.38'
1'-6"
N.E. 1ST AVENUE
1" Operating water depth
1 --
Removable panel over discharge trough
Fixed vertical weir stone 1 4"
Stone floor
Stone floor
221"
WL 15.58'
1 2"
1'-6"
Bridge railing wall Marble finish
WL 13.50'
Stone over supply trough
Atrium Fountain Tank
421"
Weir stone Atrium paving Not in Fluidity's scope See Architect's drawings
Fixed stone paver
10"
Fixed stone panel
Mortar WL 13.75' 1 2"
Removable panel over discharge trough 3"
Waterproofing membrane
8"
Discharge trough
Weir
3 --
2: Linear Fountains
Incidental water collection trough (See Civil Engineer's drawings)
1: Atrium Fountains
Stone bench Marble finish 1"
2 Detail at Discharge Trough
2"
R3"
1"
23 4"
Scale 3" = 1'-0"
R3 1" 4
0
6"
1'
2"
3: Boat Fountain
2 --
221" Operating water depth
Double weir
4 Enlarged Plan at Corner Scale 3" = 1'-0"
0
1'
6"
2"
1 2" Operating water depth
6"
Removable stone panel over water collection trough
Fixed stone Marble finish (See Architect's specifications)
1"
2"
Stone wall Marble finish (See Architect's specifications) Fixed stone panel
2"
R2"
Stainless steel support
Fixed stone panel Fixed stone panel
Stainless steel discharge box
Mortar
Concrete
Waterproofing membrane
Waterproofing membrane
Waterproofing membrane Incidental water collection trough Drawn by Civil Engineer
2" Mortar 2"
121"
121"
Fixed stone paver 2"
Fixed vertical stone panel
121"
Smooth water flow over stone panel
Bridge paving Not in Fluidity's scope (See Architect's drawings)
1 2"
100 GALLERIA OFFICENTRE | SUITE 427 | SOUTHFIELD, MI 48034 | 248.827.4600
Fixed stone panel 200 East Long Lake Rd. Suite 300 Bloomfield Hills, MI 48304
ELKUS | MANFREDI ARCHITECTS [address] 25 DRYDOCK AVENUE BOSTON MASSACHUSETTS 02210
Stainless steel support
3 Detail at Smooth Flow
[tel] 617-426-1300
Waterproofing membrane
Scale 3" = 1'-0"
0
6"
1'
1 Site Plan
Scale 1/16" = 1'-0"
LED light fixture
1 Detail at Waterfall wenli
Scale 3" = 1'-0"
0
6"
0
5' 10'
andrew boquiren
North
1'
Incidental water collection trough (See Civil Engineer's drawings) Waterfall beyond Top of Bench EL.: +14.00'
Top of Curb EL.: +13.00'
East Endpoint Fountain Polished Green Granite Free Waterfall
1"
Stone bench Marble finish (See Architect's specifications)
Stone bench end piece Marble finish (See Architect's specifications)
Central Linear Fountain Polished Black Granite Smooth, Quick Overflows
West Endpoint Fountain Polished Bronze Granite Grooved, Slow Overflow
Side-wall LED light fixture
Anti-vortex cover plate Top of Plaza EL.: +12.50' 2-port junction box
4 Front Elevation at Opening
1"
Scale 3" = 1'-0"
0
6"
1' Custom-profile stone
Top of Bench EL.: +14.00' Stone bench Marble finish (See Architect's specifications)
Side-wall LED light fixture Fixed vertical stone panel Mortar Waterproofing membrane
Water stairs
Top of Curb EL.: +13.00'
2 Horizontal Section at Trough
Bottom of Curb EL.: +12.00'
Scale 3" = 1'-0"
0
6"
1'
Top of Stone EL.: +11.75' Custom-profile stone Top of Water Stair EL.: +11.71'
3 Interior Elevation at Opening Scale 3" = 1'-0"
0
6"
1' Removable stone paver overwater collection trough Atrium paving Not in Fluidity's scope See Architect's drawings
6"
1 4"
7"
R1
R2" 9" 1'-716
6"
3"
3" 34
2"
1'-0"
"
121"
Custom-profile stone
100 GALLERIA OFFICENTRE | SUITE 427 | SOUTHFIELD, MI 48034 | 248.827.4600
Fixed stone panel
Stone Bench End Piece
1" 200 East Long Lake Rd. Suite 300 Bloomfield Hills, MI 48304
Mortar
Waterproofing membrane
ELKUS | MANFREDI ARCHITECTS [address] 25 DRYDOCK AVENUE BOSTON MASSACHUSETTS 02210
wenli
To tank
23
Interior View Stone Bench End Piece
1'-581"
[tel] 617-426-1300
1 Detail - Water Collection Trough Scale 3" = 1'-0"
0
6"
1'
24
7
A VERDANT OASIS
Bunker Hill Steps Renovation, Los Angeles, California
Type Domestic I Landscape I Privately Owned Public Space I Renovation Phases Involved Concept, SD, DD. Current Status Under Construction Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Muara Cavanaugh. Individual Contribution Lead designer in Concept and SD Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018 The Bunker Hill Steps, were originally designed by landscape architect Lawrence Halprin and completed in 1990. Under new ownership, SWA is updating the planting palette and adding customized planter pots to breathe in a new life to this iconic stairway. The stairway is punctuated by a series of terraces and landings containing small cafes, shops, and dining areas, to emulate streetlife stacked vertically. An escalator on the west side ensures the pedestrian route is accessible to all. The massive concrete staircase provides a pedestrian route from Bunker Hill to the Los Angeles Central Library. During the weekdays the staircase is a valuable passageway for office workers in Downtown Los Angeles. 26
Existing Conditions
Proposed Landscape
Planter Pot Layout Plan
26
3D Print Pots
Pot Module Studies ’’
8’-8’’
8’-7
’’
5’-0
’’
5’-5
10’-5’’
8’-0’’
’’
6’-8
’’
6’-8 ’’
7’-2
#1
30’’
’’
7’-2
#2
40’’
#3
50’’
#4
50’’
#5 60’’
Pot Cluster Studies
26
Mock Up / Construction Status
26
1000 WATERFALLS 千瀑玉琮
Qingpu Xujing Conventer Center, Shanghai, China Type International I Water Feature I Corporate Phase Concept Design, Schematic Design Current Status Under Construction Landscape Architect SWA Group-LA Team James Garland, Wen Li, Shannon Hoff, Margerie Bonnet. Individual Contribution Main designer in SD Phase, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop
7
Inspirational Image
Site Photo (Under Construction)
The monumental, centrally positioned fountain takes the form of a 琮, channeling water energy and symbolically distributing it out to the entire site. The ancient form of the 琮 signifies the Earth and the 8 elements, most importantly, water.
The foutain flows are ever in motion, like the currents of the Huangpu River, the tides of the Ocean, which infuse the City of Shanghai with grace and energy.
Site Photo (Under Construction)
Site Photo (Under Construction)
Rendering
3D Vignette The The The The
fountain creates a unique sculpture. sculptural form references natural waterfalls inventively and delightfully. tiny internal waterfalls are illuminated from within, to create a beautiful glowing figure. sculptural form is made from sleek stainless steel, coated in white, embodying the spirit of advancement.
Illustrative Plan 8
CHICAGO NAVY PIER Chicago, IL
Type Domestic I Landscape I Public Realm Phase Construction Administration Assignment Use Rhino to build an accurate model for contractors. Time 2015
44