WEN LI I SELECTED WORK 2014 - 2018
1 2 3 4 WATERS OF THE OCEAN
THE ON-STRUCTURE PUZZLE
THE GREENWAY
THE WATER PLAY
Type International I Water Feature I Corporate Phase Concept Design, Schematic Design Current Status Under Construction Landscape Architect SWA Group-LA Team James Garland, Wen Li, Shannon Hoff. Individual Contribution Lead designer in SD Phase, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015
Type Domestic I Landscape I Privately Owned Public Space Phases Involved Concept, Entitlement, SD, DD, CD Current Status Ongoing, Beginning of Construction Documents Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Xiaochi Tang. Individual Contribution Lead designer in all Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018
Type International I Landscape I Public Realm Phases Involved Concept, International Competition. Current Status Partially Built. Team Ning Deng, Wen Li, Ray Zhao, Grace Gao, Xinnan Xu, Mariel Fink, Judy Qu. Individual Contribution Team Captain, Concept brainstorm, 3D modeling, rendering coordinations, client communications, project coordinations, international travel. Media CAD, Rhino, Lumion, Photoshop Time 2017
Type International I Water Feature I Public Realm Phase Schematic Design, Construction Documents. Landscape Architect James Corner Field Operations Team Tom Yankelitis, Wen Li, Dolly Davis. Individual Contribution Main designer, work on site plan, finishes plan, grading plan, elevations, sections and construction details under instruction of project manager from Schematic Design to Construction Documents. Time 2014
Qingpu Xujing Convention Center, Shanghai, China
Page 3-7
Landmark II Wilshire Park & Amenity Deck, Los Angeles, California
Page 8-14
East Lake Greenway II, Wuhan, China
Shelby Farms Park Patriot Lake Expansion, Memphis, TN
5 6 7 8 Page 15-16
Page 17-19
AT SEA
CONCENTRATED INFINITY
A VERDANT OASIS
HUANGPU SPECTACLE
Type International I Landscape I Residential Phases Involved Concept, SD. Current Status Partially built, mostly under Construction Team Ning Deng, Wen Li, Jing Zhang, David Christensen. Individual Contribution Team captain, Lead designer, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2017
Type International I Water Feature I Commercial Architect Elkus Manfredi Architects Phase Concept, Schematic Design, Design Development. Team James Garland, Karen Adhikari, Wen Li, Andrew Boquiren. Individual Contribution Main designer in SD and DD Phases, concept brainstorm, form study, 3D modeling, renderings, detail drawings, mock-up inspection, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015
Type Domestic I Landscape I Privately Owned Public Space I Renovation Phases Involved Concept, SD, DD. Current Status Under Construction Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Muara Cavanaugh. Individual Contribution Lead designer in Concept and SD Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018
Type International I Landscape I Corporate Phases Involved Concept. Expected to be Involved in All Phases. Current Status End of Concept Team Ying-yu Hung, Gerdo Aquino, Wen Li, Harriet Robertson, Joy Zou. Individual Contribution Team captain. Lead designer in Concept phase, Concept brainstorm, 3D modeling, renderings, client presentations, proposal coordinations, bidding, contract coordination&negotiation. Media CAD, Rhino, Lumion, Photoshop Time 2018
Rongxin Qinglong ARC Mansion - Exhibition Area, Hangzhou, China
Page 20-22
The Mall at Miami WorldCenter, Miami, FL
Page 23-25
Bunker Hill Steps Renovation, Los Angeles, California
Page 26-29
Huangpu Riverfront Commercial&Office&Parks, Shanghai, China
Page 30-33
1
WL 4.7
WATERS OF THE OCEAN
Qingpu Xujing Convention Center, Shanghai, China
PL 5.80
FFE 5.32 WL 4.7 WL 5.25 PL 5.525 WL 5.25
WL 4.425
WL 4.7
FFE 5.32 WL 5.25
WL 4.425
WL 5.25
PL 5.525
FFE 5.32
WL 4.7 PL 5.80 WL 4.7
WL 4.7
WL 4.7
PL 4.975 WL 4.425
WL 5.25 WL 4.7 WL 4.7
SKL 5.575 PL 4.975 WL 5.25
FFE 5.32
WL 5.25
WL 5.25
SKL 5.575 WL 4.425 FFE 5.32
FFE 5.32 WL 5.25
PL 4.7
WL 5.25
WL 4.425
PL 4.975
WL 5.25
FFE 5.32
WL 4.7
FFE 5.32
Type International I Water Feature I Corporate Phase Concept Design, Schematic Design Current Status Under Construction Landscape Architect SWA Group-LA Team James Garland, Wen Li, Shannon Hoff. Individual Contribution Lead designer in SD Phase, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015 The Shanghai Qingpu Xujing Convention Center #3 site exists within a larger framework of the Qingpu District, characterized as an area in transition, from low density residential land to a highly urbanized commercial and transportational hub for metropolitan Shanghai. As a response to its emerging urban identity, the project occupies a significant role as the center of the greater Hongqiao financial hub. At the west end, commercial buildings and a hotel, nestled within an urban open plaza setting, serve to represent the needs of an urban lifestyle. Further east, the core of the project site is comprised of a series of buildings that amount to one singular flower/petal theme. By adstracting the significance of the flower as a life-giving force, THE OCEAN concept compliments and builds upon this idea by connecting the flower theme to another source of life, THE OCEAN. THE OCEAN acts as a metaphorical fountain of knowledge and youth, promoting an ocean of ideas, and engendering the free flow of thought and innovation by creating a series of different but unified sub-concepts: FALL, RIPPLE, GLIDE, and WAVE. THE OCEAN shapes and is shaped by its surroundings, creating a reflexive relationship with the buildings and landscape that surround it. The waters of the Ocean mix and weave, drawing strength from the project’s center, anchoring the site with a strong signature experience, simultaneously offering some variety in its for zones. The Ocean is alive with motion: Wave, Glide, Ripple and Fall.
Fall ç€‘ĺ¸ƒ As an abstracted waterfall, the landscape represents the rigorous and ceaseless activity necessary for innovative breakthroughs. The waters at the Fall zone are animated by free-falling water segments at each water terrace. The Falls are positioned to maximize and create sounds visual sub compositions. Each fall is allowed to create an elegant, glassy effect to better engage the scale and character of the space.
Site Photo (Under Construction)
PL 5.525
WL 4.425
FFE 5.32 WL 5.25
WL 5.25 FFE 5.32 PL 5.80 WL 4.7
WL 4.7
WL 4.7
3
WL 4.7
PL 4.975
4
Glide é?™ćľ Like water gliding across the landscape, ideas disperse into the collective consciousness in the same way, ushering in change and breathing like into its surroundings. The glide zone is animated by underwater terraces which reveal directional surfaces visible under the smooth water. These terraces are designed to catch the sunlight, transmitting lively, gliding reflections across the pool.
Site Photo (Under Construction) PL 5.525
WL 4.425
FFE 5.32 WL 5.25
WL 5.25 FFE 5.32 PL 5.80 WL 4.7
WL 4.7
WL 4.7 WL 4.7
PL 4.975 WL 5.25
WL 5.25 SKL 5.575 WL 4.425 FFE 5.32
FFE 5.32 WL 5.25
PL 4.7
WL 5.25
5
6
Ripple 涟漪 Like the reverberations a new technology or idea can have globally, ripple symbolizes achievement and growth through hard work. The waters at the Ripple zone are animated with tall, internally illuminated jets. These jets create overlapping ripples in the water’s surface, which sparkling in the sunlight. At night, the pool is alive with sparkling, LED light emanating from inside the water jets.
WL 4.7
Site Photo (Under Construction)
PL 5.80
FFE 5.32
FFE 5.32 WL 4.7 WL 5.25 PL 5.525 WL 5.25
WL 4.425
WL 4.7
FFE 5.32 WL 5.25
WL 4.425
WL 5.25
PL 5.525
FFE 5.32
WL 4.7 PL 5.80 WL 4.7
WL 4.7
WL 4.7
PL 4.975 WL 4.425
WL 4.7
WL 5.25 WL 4.7 WL 4.7
SKL 5.575 PL 4.975 WL 5.25
FFE 5.32
WL 5.25
WL 5.25
SKL 5.575 WL 4.425 FFE 5.32
FFE 5.32
FFE 5.32 WL 5.25
PL 4.7
WL 4.425
PL 4.975
WL 5.25
WL 5.25
7
8
1000 WATERFALLS 千瀑玉琮
Qingpu Xujing Conventer Center, Shanghai, China Type International I Water Feature I Corporate Phase Concept Design, Schematic Design Current Status Under Construction Landscape Architect SWA Group-LA Team James Garland, Wen Li, Shannon Hoff, Margerie Bonnet. Individual Contribution Main designer in SD Phase, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop
7
Inspirational Image
Site Photo (Under Construction)
The monumental, centrally positioned fountain takes the form of a 琮, channeling water energy and symbolically distributing it out to the entire site. The ancient form of the 琮 signifies the Earth and the 8 elements, most importantly, water.
The foutain flows are ever in motion, like the currents of the Huangpu River, the tides of the Ocean, which infuse the City of Shanghai with grace and energy.
Site Photo (Under Construction)
Site Photo (Under Construction)
Rendering
3D Vignette The The The The
fountain creates a unique sculpture. sculptural form references natural waterfalls inventively and delightfully. tiny internal waterfalls are illuminated from within, to create a beautiful glowing figure. sculptural form is made from sleek stainless steel, coated in white, embodying the spirit of advancement.
Illustrative Plan 8
2
THE ON-STRUCTURE PUZZLE
Landmark II Wilshire Park & Amenity Deck, Los Angeles, California Type Domestic I Landscape I Privately Owned Public Space Phases Involved Concept, Entitlement, SD, DD, CD Current Status Ongoing, Beginning of Construction Documents Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Xiaochi Tang. Individual Contribution Lead designer in all Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018 The westside of Los Angeles has always been a desirable destination for businesses, visitors, and residents to “live, work, play”. The area is easily reached by vehicular and public transportation, and clusters of communities have formed within this area which is an easy drive to the ocean. The new Wilshire Park is a respite within the hustle and bustle of the heavily trafficked corridor. It will be a respite that will become a destination for people of all ages seeking unique experiences. This park expresses multiple overlapping narratives of history, culture and nature that are constant factors in Los Angeles. Within walking distance of Wilshire Park (Landmark II), the former Kuruvungna Springs site of the indigenous Tongva tribe can be found within the University High School campus. Such history should be treasured in Los Angeles, and will become one of the inspirations of the Wilshire Park concepts. Another inspiration is the geological formations of Los Angeles. The Lakewood Formation, as the dominant structural element in this area, is notable for its horizontal layers and has been called out in the wall design of the park. On the Ground Level, Wilshire Park offers 6 main programmed areas with seamless access to the larger urban context of West Los Angeles, with unique amenities that infuse it with character. • The Forest links the main pedestrian entrance and lead people to various amenities with meandering walkways, highland patios, and the unique geological walls that are protected by tree canopies for shade as well as lush plantings. • The Glade adjacent to the Forest, features the grand lawn, a stage with an iconic sculptural canopy and seating areas that bask the sunshine. • The Springs, featuring a koi pond and a modern water feature at the outdoor dining terrace, provides direct views of the park, or perhaps another opportunity to relax in tree canopies while watching activities all around. • The Entry Drive is the vehicular entrance from Granville Avenue, featuring a Jacaranda bosque to encourage cars to slow down. • The Drop-off Plaza is the grand entrance of the residential tower for both vehicular and pedestrian traffic from Granville Avenue, Wilshire Boulevard and Stoner Avenue, featuring a specimen tree in a custom white planters and green edges all around to encourage slow traffic. • The Garden Promenade serves as a formal landscape edge between the architectural plaza and the Wilshire Park with ample seating opportunities in a linear garden. On the Podium Level, the Amenity Deck offers 5 main programmed areas that offer ample opportunities for recreation and dining within landscape features that evoke the greater natural features of the West Los Angeles. The Amenity Deck is designed to accommodate all types of users – from a family friendly Pool Deck to a more calm Spa, for users who would like to enjoy a relatively private aura. With ample landscaped outdoor spaces programmed to be a Park Terrace, Outdoor Lounge, and an Outdoor Dining area, the defining characteristic of the amenity is to provide respite from the surrounding urbanization, from the heat of the sun, and from the hustle and bustle of the city. With every programmed area and landscape feature above, ample consideration will be given to material qualities, furniture selection, and a planting palette that evoke a unique sense of place. inserting a new strip system starting from buildings on the edge, shaping by social landscape and stretching into the circular agricultural fields.
CONCEPT DESIGN
ENTITLEMENT
Landmark II, Los Angeles, California
Landmark II, Los Angeles, California
Illustrative Plan / Entitlement - Oct. 24, 2016
The Springs
The Forest
The Springs
The Park Entrance
The Translucent Edge
The Glade
The Forest
Night View
0
10’
201
SCHEMATIC DESIGN
Enlargement - The Forest
Landmark II, Los Angeles, California
1 9 3
2
8 9 7
3
3 9
10
3 3
3
4 5
6
KEYNOTE LEGEND 1. Wilshire/Stoner Gateway 2. Sculptural Canopy at Gateway 3. ADA Ramp 4. Hedge 5. Bike Racks
Enlargement - The Glade
6. Gate 7. Sendimentary Stone Wall 8. Stairs 9. Forest Patio 10. Existing Vent
2 3
6
4 8 1
7 10
The new Wilshire Urban Park is conceived as a respite within the hustle and bustle of the Wilshire corridor. A respite that will become an iconic platform for groups of families, children and seniors seeking unique experiences. A park whose design expresses multiple narratives of history, culture and nature.
9
Lakewood Formation
Inspiration
KEYNOTE LEGEND
The dominant structural element in the area is the north-dipping Santa Monica– Hollywood–Raymond fault system, the southern boundary of the Transverse Ranges.
5-mile
5
1. Lawn 2. Stage 3. Sculptural Canopy at the Stage 4. Seat Wall 5. Park Walkway +
6. Koi Pond 7. Water Feature 8. Cafe Terrace 9. Garden Promenade 10. Interior Cafe
Enlargement - The Drop-off Plaza 3 2
Tongva Sacred Spring/California Historical Landmark University High School, Los Angeles
Los Angeles Geology
4
1 5
8
Recent Alluvium
9
6 7 Site
+
10
5-mile
5 miles radius
Oil fields near the site
Period
Formation
Holocene
Recent Alluvium
Pleistocene
Lakewood Formation
Jurrasic
Santa Monica Slate
Miocene
Topanga group Calabasas Formation Conejo Volcanics Topanga Fm.
KEYNOTE LEGEND 1. Hedge (24” to 30” Tall) 2. Tables and Chairs 3. Shrub Planting 4. Custom Bench 5. Lights flush with Ground
6. Water Feature 7. Bike Racks 8. Motor Court with Drop Off 9. Lobby 10. Edge of Hammerhead Firelane
SCHEMATIC DESIGN
VALUE ENGINEERING
Material Palette
Structural Coordination Sketches
Landmark II, Los Angeles, California
Specialty Concrete Paving Type A: Lithocrete w/ “wood” finish (Shaw & Sons equivalent)
Geological Walls:
Specialty Concrete Paving Type B: Lithocrete w/ “wood” finish (Shaw & Sons equivalent)
Layers of interpretive concrete walls of various layers of aggregates expressing the natural sedimentation occurring in the mountains and alluvial plains.
Material Palette
Landmark II, Los Angeles, California
Specialty Concrete Type C1 (light): Lithocrete ground acid finish (Shaw & Sons equivalent)
Specialty Concrete Type C2 (dark): Lithocrete ground acid finish (Shaw & Sons equivalent)
Specialty Concrete Type D: Lithocrete ground acid finish (Shaw & Sons equivalent)
DESIGN DEVELOPMENT
DD REVISION
DD Layout
DD Revision Layout
DD Grading
DD Revision Grading
Landmark II, Los Angeles, California
Landmark II, Los Angeles, California
DESIGN DEVELOPMENT
DD REVISION
DD Sections
DD Revision Sections
Landmark II, Los Angeles, California
Landmark II, Los Angeles, California
DESIGN DEVELOPMENT
DD REVISION
DD Details - Geological Wall
DD Revision Details - Geological Wall
Landmark II, Los Angeles, California
DD Rendering - The Forest - At Installation
Landmark II, Los Angeles, California
DD Rendering - The Forest - 5 Years Old
DD Rendering - Cafe Terrace - At Installation
DD Rendering - Cafe Terrace - 5 Years Old
3 THE GREENWAY
East Lake Greenway II, Wuhan, China
Type International I Landscape I Public Realm Phases Involved Concept, International Competition. Current Status Partially Built. Team Ning Deng, Wen Li, Ray Zhao, Grace Gao, Xinnan Xu, Mariel Fink, Judy Qu. Individual Contribution Team Captain, Concept brainstorm, 3D modeling, rendering coordinations, client communications, project coordinations, international travel. Media CAD, Rhino, Lumion, Photoshop Time 2017 As part of the design team for Wuhan East Lake Greenway I, we are glad to see how popular it has become. Greenway I attracts diverse users, such as bicyclists, electric scooter riders, families with strollers, and pedestrian tourists. However, the passenger flow volume has exceeded expectations and the linear armature is unable to maintain a well-organized slow traffic circulation. In the process of planning and designing Greenway II, it is essential to provide alternative spaces and further optimize the circulation in the slow traffic system by creating various layers of spaces - space for stay, extended space, great open space, etc. - along the greenway. The next phase of the greenway will be the greenway “plus� with unique identities and the capacity of satisfying all users from the neighbood, the city, the country, and beyond.
26
The Great Lawn at the Peach Blossom Island
Vistor Center at the Peach Blossom Island The Master Garden Inspiration: Stone Spring
Master Garden Entrance
Master Garden Lakefront
The Mirror Garden
The Greenway at the Mirror Garden
The Weaving Greenway
The Weaving Greenway at the Lily Pond
The Climbing Wall at the Peach Blossom Island
The Greenway at the Sports Park
Bird’s Eye View from the City
The Master Plan
4 THE WATER PLAY
Shelby Farms Park Patriot Lake Expansion, Memphis, TN Type International I Water Feature I Public Realm Phase Schematic Design, Construction Documents. Landscape Architect James Corner Field Operations Team Tom Yankelitis, Wen Li, Dolly Davis. Individual Contribution Main designer, work on site plan, finishes plan, grading plan, elevations, sections and construction details under instruction of project manager from Schematic Design to Construction Documents. Time 2014
REVISION NO.
D
LEGEND :
Water arches Water fall
5'-6"
Wood bench Refer to landscape architects drawings Fence surround Refer to landscape architect drawings
3'-2"
1'-6"
Bubbling geyser
2 Elevation
N
Scale 3/8" = 1'-0"
O
5'
10'
STAMP :
REVISION : NO.
DATE
DESCRIPTION
BY
LANDSCAP
Jame
475 Tenth
CONSULTA
LEGEND :
CLIENT :
Shelby
500 North
Water arches Water fall
5'-6"
Wood bench Refer to landscape architects drawings
PROJECT N
PAT
Fence surround Refer to landscape architect drawings
1'-6"
Bubbling geyser
DESCRIPTI
3'-2"
DRAWN DATE
2 Elevation
Scale 3/8" = 1'-0"
O
5'
10'
FOR REVIEW & FILING NOT FOR CONSTRUCTION STAMP :
33
DRAWING
1 Elevation
Scale 3/8" = 1'-0"
O
5'
10'
DRAWING
All Rights R These drawi Operations. connection w in whole or i Operations.
34
REVISION : NO.
REVISION :
DATE
NO.BY
DESCRIPTION
LEGEND :
CL (True vertical)
LEGEND :
Limestone boulders Limestone boulders
Limestone boulders Cleft rock over drainage trough
Wellspring geyser Flows onto riverbed
1'-6"
Wellspring geyser Flows onto riverbed
Flexible hose connection from discharge to boulder stub
Flexible hose connection from discharge to boulder stub
1'-3''
1'-3''
BY
Wellspring geyser
Limestone boulders
1'-6"
DESCRIPTION
CL (True vertical)
Wellspring geyser
Cleft rock over drainage trough
DATE
REVISION :
6'-7''
6'-7''
Drain to tank Concrete pedestal supports
NO.
DATE
DESCRIPTION
BY
Drain to tank Concrete pedestal supports
4 Section at Wellspring
4 Section at Wellspring
Scale 3/4" = 1'-0"
O
2 Section at River Bed Start
Scale 3/4" = 1'-0"
1'
5'
O
FOR REVIEW & FILING FOR REVIEW & FILING Start FOR CONSTRUCTION NOT FOR CONSTRUCTION 2 Section at River BedNOT Scale 3/4" = 1'-0"
Scale 3/4" = 1'-0"
1'
5'
O
1'
5'
O
1'
5'
STAMP :
REVISION :
STAMP :
NO.
REVISION : NO.
Limestone opening centered over discharge pipe
DATE
DESCRIPTION
REVISION :
DATE
NO. BY
DESCRIPTION
DA
BY
Stone anchor 4 places minimum as required by structureal engineer
LEGEND :
CL (True vertical) Link seal
Wellspring geyser
Water discharge LANDSCAPE ARCHITECT :
LANDSCAPE ARCHITECT :
475 Tenth Ave, 9th Floor New York, NY 10018
475 Tenth Ave, 9th Floor New York, NY 10018
CONSULTANT TEAM :
CONSULTANT TEAM :
Limestone boulders James Corner Field Operations James Corner Field Operations Cleft rock over drainage trough
7" 10'-316
1'-4"
09
14 Concrete pedestal supports 10"
Drain to tank
Rendered concrete
BY
DESCRIPTION
Rendered concrete
DRAWN
Stone anchor 4 places minimum as required by structureal engineer
10
11
12
13
15
16
17
18
Feature stone support structure and footing as required by structural engineer
3 Section at River Bed End
Scale 3/4" = 1'-0" 1'
O
1 Section at River Bed Midpoint
Scale 3/4" = 1'-0"
5'
O
1'
DATE
03.03.2014
O
1'
CHECKED
TY
SCALE
DATE AS_SHOWN
WATER_FEATURE SECTIONS
1 Section at River Bed Midpoint DRAWING NO.
Scale 3/4" = 1'-0"
5'
Scale 3/4" = 1'-0"
5'
O
14
05 10
06 11
08 12
13
1'
15
Limestone boulder (beyond)
Limestone set into concrete near flush
Limestone set into concrete near flush
Scale 3/4" = 1'-0"
REVISION : NO. All RightsDATE Reserved
WF-3.0 5'
DRAWN
DD,WL 03.03.2014
DRAWING TITLE
DRAWING NO.
CHECKED
TY
5'
1'
O
5'
6" 6" 6"
STAMP :
SCALE
AS_SHOWN
2 Section
FOR REVIEW & FILING NOT FOR CONSTRUCTION
WATER_FEATURE SECTIONS
FOR REVIEW & FILING NOT FOR CONSTRUCTION N
2 Section
Scale 3/4" = 1'-0"
O
Scale 3/4" = 1'-0"
1'
5'
O
1'
5'
STAMP :
STAMP :
STAMP :
WF-3.0
LANDSCAPE ARCHITECT :
James Corner Field Operations
AllBY Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner These Field drawing, concepts, designs and ideas are the property of James Corner Field Operations. They may not be copied, reproduced, disclosed to others or used Operations. in They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were connection prepared, with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Cornerin Field whole or in part, without the prior written authorization of James Corner Field Operations. Operations. DESCRIPTION
475 Tenth Ave, 9th Floor New York, NY 10018
2 Section
LEGEND :
6"
FOR REVIEW & FILING NOT FOR CONSTRUCTION
2 Section at River Bed Start
PROJECT NAME
DRAWING TITLE
3 Section at River Bed End
09
07
04
DESCRIPTION 90% CONSTRUCTION DOCUMENTS 90% CONSTRUCTION DOCUMENTS
DD,WL
Link seal Water discharge
02
03
6"
01
08
PROJECT NAME
REVISION : DESCRIPTION
500 North Pine Lake Drive, Memphis, TN 38134
6'-7''
06
6"
05
16 17 18 at Wellspring 4 Section Scale 3/4" = 1'-0" SFP, PHASE 1 SFP, PHASE 1 O 1' PATRIOT LAKE EXPANSION PATRIOT LAKE EXPANSION
10" 10"
07
04
Shelby Farms Park Conservancy
6"
02
03
2'-9"
1'-6"
01
Limestone boulder
6"
10"
60°
500 North Pine Lake Drive, Memphis, TN 38134
Cone nozzle, recessed flush
Cone nozzle, recessed flush
Rendered concrete
Flexible hose connection from discharge to boulder stub
CLIENT :
6"
1'-6" 1" 2'-716
1'-10''
Shelby Farms Park Conservancy
Limestone boulder
DATE
Limestone boulder (beyond)
Limestone boulder Notched to fit
Limestone boulder Notched to fit
Rendered concrete
NO.
Mist plume (beyond)
Removable stone CLIENT :
2%
Limestone opening centered over discharge pipe
LEGEND :
Mist plume (beyond)
Limestone boulder
Rendered concrete
Perimeter fence
Perimeter fence Limestone boulders
Limestone set into concrete Limestone boulders Near flush
60°
Limestone set into concrete Near flush
Wood bench
1'-3''
9" 8'-916
Wood bench
Cone nozzle Recessed flush
Wellspring geyser Flows onto riverbed
Limestone "boulder" cladding
Perimeter fence Cone nozzle Recessed flush
7'-981"
Perimeter fence
LEGEND :
Limestone boulders LEGEND :
Perimeter fence
CONSULTANT TEAM :
Scale 3/4" = 1'-0"
O
1'
5'
7" 10'-316
Perimeter fence
Limestone boulder
Cone nozzle Recessed flush
Removable stone
475 Tenth Ave, 9th Floor New York, NY 10018
Perimeter fence
CONSULTANT TEAM :
Limestone boulders
01
Cone nozzle, recessed flush
Mist plume
03
Limestone boulder
CLIENT :
10" 10"
Shelby Farms Park Conservancy 01
CLIENT :
60°
1" 2'-716
60°
Rendered concrete
Removable stone
02
03 09
2'-0"
14
Flexible hose connection from discharge to boulder stub
1'-3''
1'-6"
FOR REVIEW & FILING NOT FOR CONSTRUCTION
O
1'
5'
DESCRIPTION DRAWN
Drain to tank
Scale 3/4" = 1'-0" 1'
Concrete pedestal supports 5'
Scale 3/4" = 1'-0"
LANDSCAPE ARCHITECT :
James Corner Field Operations 475 Tenth Ave, 9th Floor New York, NY 10018 CONSULTANT TEAM :
1'
FOR REVIEW & FILING NOT FOR CONSTRUCTION
2 Section at River Bed Start Scale 3/4" = 1'-0"
5'
O
1'
5'
STAMP :
DRAWING TITLE
DRAWN
13
17
18
Bench
Bench
1 Section
DRAWING NO.
Scale 3/4" = 1'-0"
O
1'
5'
18
Hand pump
DRAWING TITLE
Rendered concrete
1/2'' Recessed
1 Section at River Bed Midpoint
CHECKED
TY
SCALE
AS_SHOWN
WATER_FEATURE SECTIONS
WF-3.2
All Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner Field Operations. They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Corner Field Operations.
DRAWING NO.
Scale 3/4" = 1'-0"
O
1'
5'
03.03.2014
CHECKED
TY
SCALE
AS_SHOWN
WATER_FEATURE SECTIONS
3 Section
3 Section
Scale 3/4" = 1'-0"
O
1'
O
1'
Rendered concrete
04 Rendered concrete
03
09
14
06
08
10
11
12
13
15
16
17
18
SFP, PHASE 1 PATRIOT LAKE EXPANSION PAT
DESCRIPTION DRAWN
Rendered concrete
DRAWING TITLE
O
1'
03.03.2014
CHECKED
TY
SCALE
DATE AS_SHOWN
WATER_FEATURE SECTIONS
DRAWN
DRAWING T
1 Section
DRAWING NO.
O
All Rights Reserved All Rights Re 5' These drawing, concepts, designs and ideas are the property of James CornerThese Field drawin Operations. They may not be copied, reproduced, disclosed to others or usedOperations. in T connection with any work other than the specified project for which they wereconnection prepared, w in whole or in part, without the prior written authorization of James Corner Field in whole or in Operations. Operations.
Scale 3/4" = 1'-0"
5'
PROJECT N
DESCRIPTI 90% CONSTRUCTION DOCUMENTS
DD,WL
DATE
1/2'' Recessed channel in rendered concrete
Scale 3/4" = 1'-0"
5'
05
PROJECT NAME
1 Section
Scale 3/4" = 1'-0"
5'
02 notched to fit 07 Limestone boulder
Rendered concrete
1/2'' Recessed channel in rendered concrete
Shelby
500 North
01
Limestone boulder notched to fit
WF-3.0
All Rights Reserved These drawing, concepts, designs and ideas are the property of James Corner Field Rendered concrete Operations. They may not be copied, reproduced, disclosed to others or used in connection with any work other than the specified project for which they were prepared, in whole or in part, without the prior written authorization of James Corner Field Operations.
Hand pump
Shelby Farms Park Conservancy
500 North Pine Lake Drive, Memphis, TN 38134
90% CONSTRUCTION DOCUMENTS Limestone boulder
DD,WL
DATE
90% CONSTRUCTION DOCUMENTS
03.03.2014
DESCRIPTION
08 12
16
DD,WL
DATE
4 Section at Wellspring O
06 11
15
SFP, PHASE 1/2'' Recessed 1 PATRIOT LAKE EXPANSION
Scale 3/4" = 1'-0"
6'-7''
O
05 10
13
17
SFP, PHASE 1 PATRIOT LAKE EXPANSION
Limestone boulder
PROJECT NAME
3 Section at River Bed End
STAMP :
2 Section
07
04
08 12
PROJECT NAME
500 North Pine Lake Drive, Memphis, TN 38134
Rendered concrete
06 11
1141"
Wellspring geyser Flows onto riverbed
07 05
10
921"
Cleft rock over drainage trough
Feature stone support structure and footing as required by structural engineer
04
15 recessed 16 Mist nozzle, Flush
Mist nozzle, recessed Flush
1141"
2'-9"
Limestone boulders 6"
02plume Mist 09 14
Limestone boulders
921"
1'-4"
CLIENT :
500 North Pine Lake Drive, Memphis, TN 38134
CL (True vertical) Rendered concrete
35
CONSULTA
Shelby Farms Park Conservancy
Perimeter fence 1'-6"
LANDSCAP
475 Tenth
CONSULTANT TEAM : CLIENT :
Wellspring geyser 2%
LANDSCAPE ARCHITECT :
475 Tenth Ave, 9th Floor New York, NY 10018
James Corner Field Operations Jame
James Corner Field Operations
Wood bench Limestone set into concrete Near flush
LEGEND :
60°
1" 2'-716
60°
1'-10''
Rendered concrete
LANDSCAPE ARCHITECT :
Perimeter fence
7'-981"
9" 8'-916
Limestone "boulder" cladding
1'
WF-3.1
DRAWING N
36
5 AT SEA
Rongxin Qinglong ARC Mansion - Exhibition Area, Hangzhou, China Type International I Landscape I Residential Phases Involved Concept, SD. Current Status Partially built, mostly under Construction Team Ning Deng, Wen Li, Jing Zhang, David Christensen. Individual Contribution Team captain, Lead designer, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2017 Life with super yachts is as amazing as everyday is a holiday at sea. The Qinglong high end residential provides users unique residential landscape experience by design with the inspirations from “ocean“ and “super yachts“ and organizing the space in carefully considered hierarchy. Node spaces are themed with “sailing“, “outdoor living room“, “sports at ‘sea’“, “family time plaza“ and “the private harbors“, expressing a high end, modern and delicate living style. The vision of the landscape design is to provide the residents a luxury living experience everyday as if they own the most fancy super yachts.
Exhibition Area 隐 秀 路
7#
3# 2#
河 余
路
杭
院
塘
学
1#
Exhibition Area: Sailing
10 18 14 16 7
9
17
21 14 12
11 13
15
分区标注 10 19
1. 展示区入口拱门 2. 入口广场 3. VIP停车位 4. 竹林 5. “海浪”种植 6. 地形种植 7. 步道 8. 种植 9. 镂空“帆” 10. 种植池 11. 灌木缓冲带 12. 镜面/脉冲波浪水池 13. 雕塑叠水 14. 造浪室 15. 下沉休息平台 16. 圆形种植与景观石 17. 竹 18. 图案铺装 19. 种植 20. 通道 21. 安全护栏
19
20
10
9
2 7 1
8 5
3 6 4
Exhibition Area: Children’s Sea
1 10
2 3
WATER PLAY
3
戏水
“LAWN“ PLAY 游戏草地
4 6
“SAND” PLAY 玩“沙”
11
2 12
5
7
10
3
2
3
分区标注
13 8
8
9
1. 人居馆出入口 2. 步道 3. “海浪”坐墙 4. “海星”喷泉 5. “海螺”爬构 6. 活动草坪 7. 休闲吧台 8. 入户平台 9. 后场至样板房通道 10. 参观结束返回通道 11. 种植 12. 地形种植 13. 灌木种植
BUILT PHOTO
6
CONCENTRATED INFINITY
The Mall at Miami WorldCenter, Miami, FL
Type International I Water Feature I Commercial Architect Elkus Manfredi Architects Phase Concept, Schematic Design, Design Development. Team James Garland, Karen Adhikari, Wen Li, Andrew Boquiren. Individual Contribution Main designer in SD and DD Phases, concept brainstorm, form study, 3D modeling, renderings, detail drawings, mock-up inspection, project coordinations. Media CAD, Illustrator, Rhino, Maxwell, Photoshop Time 2014-2015
64'-4"
26'-4''
11'-8''
26'-4''
1 W-120
Removable panel over discharge trough
1'-6" 221"
Stone bench Marble finish (See Architect's specifications)
1" Operating water depth
20'-1''
Weir stone
4"
8" 1 2"
"
421"
1'-6
Fixed stone paver
1'-6"
Weir
WL 13.75'
15 " 6 1'-8 1
10" 3"
Fixed stone paver WL 13.50'
1" 4 2'- 2
Atrium paving Not in Fluidity's scape See Architect's drawings
WL 13.25'
1" 2 2'- 2 5'-421"
4'-1141"
3" 5'-04
5"
HP of Plaza EL.: +13.33'
6"
2 Transverse Section
30'-4"
WL 13.38'
WL 13.13'
WL 12.75'
2 W-120
Scale 1" = 1'-0"
0
1'
5'
6"
FFE 12.50'
1'-4"
1'-4"
6" 1 W-130
Discharge trough
Incidental water collection trough Drawn by Civil Engineer
LED light fixture (Typ. 11 per side)
WL 15.58' WL 11.71'
3 W-120
Waterproofing membrane Mortar
Double weir
WL 13.00'
8"
Fixed stone paver
1 W-151
Fixed stone panel
4" Operating water depth
1'-6
"
Fixed vertical stone panel
741" Operating water depth
Removable stone over supply trough
Stone wall Marble finish (See Architect's specifications) Stainless steel support Stainless steel supply trough Waterproofing membrane
Atrium paving Not in Fluidity's scope See Architect's drawings
4 W-150
1 W-150
Concrete 1 2"
Fixed stone paver
100 GALLERIA OFFIC
2 W-130
6"
Removable stone paver
Removable pavers under bench
200 East Long L Suite 300 Bloomfield Hills,
3"
Bench
Custom-profile stone Waterproofing membrane
Mortar
Mortar
LED light fixture
Bridge paving Not in Fluidity's scope See Architects drawings
Waterproofing membrane Junction box
Anti-vortex cover plate over 8'' drain
| 248.827.4600
200 East Long Lake Rd. Suite 300 Bloomfield Hills, MI 48304
ELKUS
Incidental water collection trough (See Civil Engineer's drawings)
To tank 100 GALLERIA OFFICENTRE | SUITE 427 | SOUTHFIELD, MI 48034
[address
BOSTON
Water collection trough
1'-541"
ELKUS | MANFREDI ARCHITECTS [address] 25 DRYDOCK AVENUE
1 Longitudinal Section Scale 1" = 1'-0"
BOSTON MASSACHUSETTS 02210
0
1'
5'
wenli
[tel] 617-426-1300
1 Atrium Fountain Finishes Plan Scale 1/2" = 1'-0"
0
5'
10'
wenli
North
Midnight Grey Flamed finish Granite of America
Mesabi Black Thermal finish ColdSpring Granite White Marble Architects Specification Nero Absolute Flamed finish ColdSpring Granite
Charcoal Black Diamond 200 finish ColdSpring Granite Charcoal Black Thermal finish ColdSpring Granite Mesabi Black Diamond 10 finish ColdSpring Granite
21
Lake Superior Green Polished finish ColdSpring Granite
22
Double weir
Stone bench Marble finish (See Architect's specifications)
WL 13.38'
1'-6"
N.E. 1ST AVENUE
1" Operating water depth
1 --
Removable panel over discharge trough
Fixed vertical weir stone 1 4"
Stone floor
Stone floor
221"
WL 15.58'
1 2"
1'-6"
Bridge railing wall Marble finish
WL 13.50'
Stone over supply trough
Atrium Fountain Tank
421"
Weir stone Atrium paving Not in Fluidity's scope See Architect's drawings
Fixed stone paver
10"
Fixed stone panel
Mortar WL 13.75' 1 2"
Removable panel over discharge trough 3"
Waterproofing membrane
8"
Discharge trough
Weir
3 --
2: Linear Fountains
Incidental water collection trough (See Civil Engineer's drawings)
1: Atrium Fountains
Stone bench Marble finish 1"
2 Detail at Discharge Trough
2"
R3"
1"
23 4"
Scale 3" = 1'-0"
R3 1" 4
0
6"
1'
2"
3: Boat Fountain
2 --
221" Operating water depth
Double weir
4 Enlarged Plan at Corner Scale 3" = 1'-0"
0
1'
6"
2"
1 2" Operating water depth
6"
Removable stone panel over water collection trough
Fixed stone Marble finish (See Architect's specifications)
1"
2"
Stone wall Marble finish (See Architect's specifications) Fixed stone panel
2"
R2"
Stainless steel support
Fixed stone panel Fixed stone panel
Stainless steel discharge box
Mortar
Concrete
Waterproofing membrane
Waterproofing membrane
Waterproofing membrane Incidental water collection trough Drawn by Civil Engineer
2" Mortar 2"
121"
121"
Fixed stone paver 2"
Fixed vertical stone panel
121"
Smooth water flow over stone panel
Bridge paving Not in Fluidity's scope (See Architect's drawings)
1 2"
100 GALLERIA OFFICENTRE | SUITE 427 | SOUTHFIELD, MI 48034 | 248.827.4600
Fixed stone panel 200 East Long Lake Rd. Suite 300 Bloomfield Hills, MI 48304
ELKUS | MANFREDI ARCHITECTS [address] 25 DRYDOCK AVENUE BOSTON MASSACHUSETTS 02210
Stainless steel support
3 Detail at Smooth Flow
[tel] 617-426-1300
Waterproofing membrane
Scale 3" = 1'-0"
0
6"
1'
1 Site Plan
Scale 1/16" = 1'-0"
LED light fixture
1 Detail at Waterfall wenli
Scale 3" = 1'-0"
0
6"
0
5' 10'
andrew boquiren
North
1'
Incidental water collection trough (See Civil Engineer's drawings) Waterfall beyond Top of Bench EL.: +14.00'
Top of Curb EL.: +13.00'
East Endpoint Fountain Polished Green Granite Free Waterfall
1"
Stone bench Marble finish (See Architect's specifications)
Stone bench end piece Marble finish (See Architect's specifications)
Central Linear Fountain Polished Black Granite Smooth, Quick Overflows
West Endpoint Fountain Polished Bronze Granite Grooved, Slow Overflow
Side-wall LED light fixture
Anti-vortex cover plate Top of Plaza EL.: +12.50' 2-port junction box
4 Front Elevation at Opening
1"
Scale 3" = 1'-0"
0
6"
1' Custom-profile stone
Top of Bench EL.: +14.00' Stone bench Marble finish (See Architect's specifications)
Side-wall LED light fixture Fixed vertical stone panel Mortar Waterproofing membrane
Water stairs
Top of Curb EL.: +13.00'
2 Horizontal Section at Trough
Bottom of Curb EL.: +12.00'
Scale 3" = 1'-0"
0
6"
1'
Top of Stone EL.: +11.75' Custom-profile stone Top of Water Stair EL.: +11.71'
3 Interior Elevation at Opening Scale 3" = 1'-0"
0
6"
1' Removable stone paver overwater collection trough Atrium paving Not in Fluidity's scope See Architect's drawings
6"
1 4"
7"
R1
R2" 9" 1'-716
6"
3"
3" 34
2"
1'-0"
"
121"
Custom-profile stone
100 GALLERIA OFFICENTRE | SUITE 427 | SOUTHFIELD, MI 48034 | 248.827.4600
Fixed stone panel
Stone Bench End Piece
1" 200 East Long Lake Rd. Suite 300 Bloomfield Hills, MI 48304
Mortar
Waterproofing membrane
ELKUS | MANFREDI ARCHITECTS [address] 25 DRYDOCK AVENUE BOSTON MASSACHUSETTS 02210
wenli
To tank
23
Interior View Stone Bench End Piece
1'-581"
[tel] 617-426-1300
1 Detail - Water Collection Trough Scale 3" = 1'-0"
0
6"
1'
24
7
A VERDANT OASIS
Bunker Hill Steps Renovation, Los Angeles, California
Type Domestic I Landscape I Privately Owned Public Space I Renovation Phases Involved Concept, SD, DD. Current Status Under Construction Team Ying-yu Hung, Gerdo Aquino, Wen Li, Jeremy Klemic, George Kutnar, Muara Cavanaugh. Individual Contribution Lead designer in Concept and SD Phases, Concept brainstorm, 3D modeling, renderings, client communications, project coordinations. Media CAD, Rhino, Lumion, Photoshop Time 2016-2018 The Bunker Hill Steps, were originally designed by landscape architect Lawrence Halprin and completed in 1990. Under new ownership, SWA is updating the planting palette and adding customized planter pots to breathe in a new life to this iconic stairway. The stairway is punctuated by a series of terraces and landings containing small cafes, shops, and dining areas, to emulate streetlife stacked vertically. An escalator on the west side ensures the pedestrian route is accessible to all. The massive concrete staircase provides a pedestrian route from Bunker Hill to the Los Angeles Central Library. During the weekdays the staircase is a valuable passageway for office workers in Downtown Los Angeles. 26
Existing Conditions
Proposed Landscape
Planter Pot Layout Plan
26
3D Print Pots
Pot Module Studies ’’
8’-8’’
8’-7
’’
5’-0
’’
5’-5
10’-5’’
8’-0’’
’’
6’-8
’’
6’-8 ’’
7’-2
#1
30’’
’’
7’-2
#2
40’’
#3
50’’
#4
50’’
#5 60’’
Pot Cluster Studies
26
Mock Up / Construction Status
26
HUANGPU 浦江幻景
SPECTACLE
8
HUANGPU SPECTACLE
Huangpu Riverfront Commercial&Office&Parks, Shanghai, China
Type International I Landscape I Corporate Phases Involved Concept. Expected to be Involved in All Phases. Current Status End of Concept Team Ying-yu Hung, Gerdo Aquino, Wen Li, Harriet Robertson, Joy Zou. Individual Contribution Team captain. Lead designer in Concept phase, Concept brainstorm, 3D modeling, renderings, client presentations, proposal coordinations, bidding, contract coordination&negotiation. Media CAD, Rhino, Lumion, Photoshop Time 2018 Huangpu Spectacle threads together three development sites along the Huangpu River to celebrate the urban spaces in between. Using a ‘jewelry box analogy’ the plazas and gardens are compartmentalized to display grand plaza entrances and discrete pockets of discovery. Sunken Gardens lure in curious pedestrians to vibrant and playful destinations. Green roofs offer a serene environment with panoramic views. The integrity and diversity of these spaces are distilled through separation, however their strong visual language reframes them as the ‘spectacle’ of the neighborhood.
26
E04-4/E04-5
海
E06-2
空
The Marine Vista
The Sky Spectacles
海洋全景
苍穹幻象
E08-1
陆 The Terrestrial Magnificence 陆地奇观
Sculptural / Contrast / Vista
Unique / Magnificent / Interaction
Exalted / Unconventional / Timeless
雕塑感 / 对比 / 远景
独特 / 绚丽 / 互动
尊贵 / 别致 / 历久弥新
E06-1 Public Green Space
Forest Glade 林间空地
London Plane Grove Walkway / 梧桐林道 Park View Patio / 风景露台
10 E04-4为公共绿地。北临滨江公园,南接7-1公共绿地,为处于地块高楼大 厦间的绿心。定位为商务休闲运动公园,是未来在场地内工作的员工与市民 进行积极互动的场所。
7
14
8 12
9
1 公园入口小广场
8 休息台阶
2 梧桐林
9 瑜伽草地
3 活动草地
10 微地形山丘
4 户外乒乓球、象棋
11 野餐林
5 太极林
12 迷你高尔夫
6 户外健身
13 休息花林
7 垃圾回收站、公厕
14 商业外摆
11
6 3 5 2
Picnic Bosque / 野餐林
4 13 1
Amphitheater Yoga Lawn / 瑜伽草地
Central Lawn in Park / 公园中央草地
Huangpu River 黄浦江
Mirror Sculpture 镜面雕塑 Mini golf 迷你高尔夫
Aurora Plaza 北极光广场
Amphitheater/Yoga 休息阶梯/瑜伽
Amphitheater/Yoga 休息阶梯/瑜伽
Retail Outdoor Deck 商业外摆
Aurora Plaza 北极光广场
Picnic Forest 午餐林 Flexible Lawn 草地
Mirror Sculpture 镜面雕塑
Mini golf 迷你高尔夫 Riverfront Green Space 滨江绿带 Amphitheater/Yoga 休息阶梯/瑜伽
Flexible Lawn 草地
Primary Walkway in Park / 公园慢行主干道
Planter with Benches 花池坐凳
Trash Station 垃圾回收站及公厕 Jogging Track 慢跑道 Flowering Trees 开花乔木
Ping Pong/Chess 户外乒乓/象棋 Park Entry Plaza 公园入口小广场 Taichi Bosque 太极林
Greenway to River 往滨江绿道
Planter with Benches 花池坐凳 Park Entry Plaza 公园入口小广场 Ping Pong/Chess 户外乒乓/象棋
Taichi Bosque 太极林
Jogging Track 慢跑道
To 4-4 往4-4地块
7-1 Public Green Space 7-1公共绿地
E06-2
Aurora Borealis 北极光 1 灯光构筑物 2
2 水庭 3 绿庭
1
4 绿篱、坐凳、地面灯带
3
5 水景结合种植与天窗 1 4
1
5
CHICAGO NAVY PIER Chicago, IL
Type Domestic I Landscape I Public Realm Phase Construction Administration Assignment Use Rhino to build an accurate model for contractors. Time 2015
44
HOLY FAMILY CHURCH Pasadena, California
Type Domestic I Landscape Team Ying-yu Hung, Wen Li. Individual Contribution Creating illustrative planting plan and renderings with accurate plants. Media CAD, Illustrator, Photoshop Time 2017
OC AC
AC
AL AC
OC
MC
AL EF
AL OC
EG
DF
EG TL SC SA
SA
AH
(E) HA HA
SC
SL
CO SI
HA
EM
T3 HA
AL
AL
OC
EC
AH SL AH
SL
SS
CD
SC HA
SC HA
SC SI
SC CO
CO
SL
PH
T2
HA
SL
PH
HA
HA
AC
(E)
AC
YR YR
T3 YR
SC
SC
CO
CC AH
(E)
T1
SL
SL
CC
CP
SS AL YR
EM
YR
AB
AS
YR YR
HA HA
SC SS
HA
AY CP BF
SC
OC
OC AC LA
AC
CP
SC
TL
AC OC
AC
AC
T1
YR AH
AL
AC
YR
AF EA
AH
(E)
OC
EM
AL AL AL
AH AH AH
SA SA
AC
AL
T3
BF
SS (E)
MC
AL
EC EC
AS
AC LA
LC
AY
T2
SL
SL
(E)
CC
AC
(E)
AD
SS
AY
LL
AC
AC
AD
(E) AD
SL
HA
SL
(E)
OC MC
AF
AB
AB
EM
EA
AG
(E)
EA
CO
AH
BF AF
EC
LL
AH
OC
AB
LL AB
CC
AC
AY
AD
OC AC
AC
AL
AL
OC
AD
AY VL
EF
AL
LA
AD
AS
EC
PH
SS
SL
AC
AC
SC SC SC T2 EC EM LL SL
TL
SC
MC
EF LC
EG
EI SL
SC
EM EI
SL
SC CO
LL
CC
CC
AL
AH
LL
LL EC
AH
OC
AL
SS
SC AH
OC
EI T3
LL
AL
MC
EG LL
PH
TL
T1 SC
EF
MC
CD
LL
LL
SC SC
SA
LL
EI
SC
EI
(E)
LC
LC
LA
SA EG
SS AL
LC (E)
AC OC
46