Lian Huat Company Documention and Measured Drawings

Page 1

METHODS OF DOCUMENTATION AND MEASURED DRAWING LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG TUTORS KOH JING HAO SANJEH KUMAR RAMAN

LIST OF MEMBERS

LIST OF MEMBERS

NO

STUDENT ID.

NO

LIST OF MEMBERS

STUDENT ID.

NAME OF MEMBERS 1

NG WEI YING ( SABRINA )

0313366

21

LEE JO YEE

0314880

2

TEH GIE ENG ( IVANKA )

0316179

22

LEE YAUE SHEN ( JASON )

0315381

3

AUGUSTINE CHEN KEEN HOE

0314175

23

LIEW CHUNG HOOI ( GABRIEL )

0314126

4

AZRIN BIN FAUZI

0317770

24

LINDA

0316925

5

BENARD CHIN TZE YONG

0313355

25

LING HUI SIM

0313855

6

BENNY TAN SHIOWEE

0315447

26

LOW YONG GING

0313679

7

BIBI AMEERAH PEERUN

0313939

27

LUCAS WONG KOK HOE

0309421

8

CARMEN CHEE CHA YI

0313893

28

LYDIA AMALINA BINTI FARIDAN

0308714

9

CHEONG SIEW YING

0314618

29

MEGAT KHAIRUR RASYAD

0320832

10

CHEW WOAN CHYIN

0310797

30

NAREAN A/L PUNITHARAJAH

0315746

11

CHIA WEI PINK

0316971

31

NICOLE HOOI YI TIEN

0313611

12

CHIANG KAH WAI

0311397

32

PHUA JING SERN

0314572

13

DANIEL ZAIN BIN MAZALAN

0313329

33

SEH YIH YIING

0318890

14

DIPTI GYA

0311390

34

SOO XIAO WEN

0314130

15

ERIC LAI YIEW HOW

0313843

35

TAN MING LONG

0311069

16

ESTHER LIM QIU QIU

0314322

36

TEOH HUI YU

0313701

17

HOW PEI NGOH

0316929

37

WONG VOON YIN

0315151

18

KIMBERLY ANN NGIENG PEI SING

0319306

38

YAP WEI TYNG

0314058

19

KOAY HUI MAY

0317986

39

YUAN KHAI SHIEN

0314818

20

LEE CHAER SHEAN

0313675


METHODS OF DOCUMENTATION AND MEASURED DRAWING LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG prepared by TEAM LIAN HUAT ( PENANG GROUP )

LIST OF DRAWING

LIST OF DRAWING

NO

DRAWING NO.

NO

LIST OF DRAWING

DRAWING NO.

MAIN DRAWING 1

KEY PLAN, LOCATION PLAN, SITE PLAN, STREET ELEVATION

LHCO.001

21

DOOR SCHEDULE D11, DOOR SCHEDULE D12

LHCO.021

2

SITE SECTION

LHCO.002

22

DOOR SCHEDULE D13, DOOR SCHEDULE D14

LHCO.022

3

GROUND FLOOR PLAN

LHCO.003

23

DOOR SCHEDULE D15, DOOR SCHEDULE D16

LHCO.023

4

FIRST FLOOR PLAN

LHCO.004

24

DOOR SCHEDULE D17

LHCO.024

5

ROOF PLAN

LHCO.005

25

WINDOW SCHEDULE W1

LHCO.025

6

GROUND FLOOR REFLECTED CEILING PLAN

LHCO.006

26

WINDOW SCHEDULE W2, WINDOW SCHEDULE W3

LHCO.026

7

FIRST FLOOR REFLECTED CEILING PLAN

LHCO.007

27

WINDOW SCHEDULE W4

LHCO.027

8

FRONT ELEVATION

LHCO.008

28

WINDOW SCHEDULE W5

LHCO.028

9

SECTION Y1 - Y1

LHCO.009

29

WINDOW SCHEDULE AV1, WINDOW SCHEDULE AV2

LHCO.029

10

SECTION Y2 - Y2

LHCO.010

30

WINDOW SCHEDULE LW1, WINDOW SCHEDULE LW2

LHCO.030

11

SECTION X1 - X1, SECTION X2 - X2, SECTION X3 - X3

LHCO.011

31

WINDOW SCHEDULE LW3, WINDOW SCHEDULE LW4

LHCO.031

12

SECTION X4 - X4, SECTION X5 - X5, SECTION X6 - X6

LHCO.012

32

WINDOW SCHEDULE LW5, WINDOW SCHEDULE LW6

LHCO.032

13

SECTION X7 - X7, SECTION X8 - X8, SECTION X9 - X9

LHCO.013

33

WINDOW SCHEDULE FG1

LHCO.033

14

SECTION X10 - X10, SECTION X11 - X11

LHCO.014

34

STAIRCASE DETAILS SC

LHCO.034

15

EXPLODED ISOMETRIC

LHCO.015

35

JACK ROOF DETAILS R1

LHCO.035

16

DOOR SCHEDULE D1, DOOR SCHEDULE D2

LHCO.016

36

ARCH DETAILS AD1, ARCH DETAILS AD2

LHCO.036

17

DOOR SCHEDULE D3, DOOR SCHEDULE D4

LHCO.017

37

COLUMN DETAILS C1, C2, CERAMIC VENT BLOCK DETAILS VB

LHCO.037

18

DOOR SCHEDULE D5, DOOR SCHEDULE D6

LHCO.018

38

LATTICE SCREEN DETAILS GD 1 , GD 2

LHCO.038

19

DOOR SCHEDULE D7, DOOR SCHEDULE D8

LHCO.019

39

LATTICE SCREEN DETAILS GD 3 , GD 4, GD 5

LHCO.039

20

DOOR SCHEDULE D9, DOOR SCHEDULE D10

LHCO.020

40

TILE DETAILS 1, TILE DETAILS 2, TILE DETAILS 3

LHCO.040


JA LA N

NT RA

AM PB EL L

KI NG BU

H

BU H

BUC

KIN

T

GH

UL

AM

IA

N CA NN O

BU H

AC

LE B U

EE

KIM

M AR

N

TO

H

LO

RO

NG

M

AR

CH

LO

IM

RO

A AK

NG

H

N

UH

.L DR

TO

R CA

O V R A N

EB TL GA

LA

U

JA

AY EL

A

EH

AN

M

ON

H BU

AC

H

H U B E L

I EN

H

AK

EY

H

BU LE

BU

V AR

LE

RN CA

LE

N

N

SITE PLAN

LOCATION PLAN

SCALE N.T.S

UH

RL

N

KEY PLAN

LE B

BE

NG RO

E TZ

A

CA

Q

H HE AC

LO

TT FA

N

AH

LE BU H

H EH

AN

H

H BU

NG EO

O RV

B

LE

LE

L

RN

UH

NI

LE

CA

ME

VO

BU

A

CH

UH EB

RN

AR

I UL CH

N LA JA

Batu Maung

UH

T PI G RO N N

AR

LO

NG

BU

H

LE

HO

LE

O

LE Y

H BU LE

Barat Daya

SO

BE R

NG

KIM

RO

H

L JA

LO

LE BU

GA HA HB OO

I GA

Bayan Lepas

R

CH

NA

NT PI

LE BU HN

AN

N SU

AN

TA

AN

JA

U

Pulau Pinang

JAL

CL

PE

N G

N

SA

H

LA

JO

Seberang Perai

PA

BU

AIM

LI

AL

Air Itam

Balik Pulau

LE

RA

IM AN

T

NG

LE

George Town

SA

CH IN A

LE

H BU

Timur Laut

PE

LA

LE BU H

LE

LE BU HN GA HA HB OO

HC

AC

LE BU H

BU

CI

R

MA SJ ID

SA

LE

Tanjong Bungah

KE L IN G

PA

KA PI TA N

ON G

CH UL IA

QU EE N

TR A C IN LE B

UH

BU H

Batu Feringgi Teluk Bahang

LO R

LE

PE SA R

0

4

8

12KM

0

10 20

40M

SCALE 1 : 1200

SCALE 1 : 4000

GROUND FLOOR LEVEL : 0.000

ROAD LEVEL : -0.152

Lian Huat and CO

0

1

2

4M

STREET ELEVATION SCALE 1 : 75

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

KEY PLAN LOCATION PLAN SITE PLAN STREET ELEVATION

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

1 LHCO. 001 40


PE SA

RA

CL

AIM AN

LE BU HN GA H

AH BO O

T

N

KIM

VO

AR N R

RL

EY

H U B LE

CA

H HE AC

BE

H BU

UH

LE

LE B

N

SITE PLAN

0

10 20

40M

SCALE 1 : 1200

ROAD LEVEL

1

2

GROUND LEVEL

ROAD LEVEL

4

3

SITE SECTION SCALE 1 : 200

LEGENDS : 1

LIAN HUAT COMPANY

2

LEBUH CARNARVON

3

LEBUH CARNARVON

4

NEIGHBOURING BUILDING 0

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SITE SECTION

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

2

4

6

SHEET NO.

2 LHCO. 002 40

10M


LEGENDS :

DRAWING NAME DRAWING SHEET NO.

A1 1

1 FFL : 0.000 TIMBER

1

PAVEMENT

5

HALL 2

HALL 4

13

STOREROOM

2

FIVE FOOT WALKWAY

6

AIR WELL 2

10

AIR WELL 3

14

TOILET 2

3

HALL 1

7

TOILET 1

11

INACCESSIBLE STAIRCASE

15

INACCESSIBLE ROOM

4

AIR WELL 1

8

HALL 3

12

UTILITIES ROOM

9

TD1 40

SPACE NO. FINISH FLOOR LEVEL TILES FINISHING

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

GROUND FLOOR PLAN

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

3 LHCO. 003 40


LEGENDS :

A1 1

1 FFL : 0.000 TIMBER

1

PAVEMENT

5

ROOM 3

2

ROOM 1

6

3

ROOM 2

4

CORRIDOR 1

9

ROOM 5

13

KITCHEN

CORRIDOR 2

10

ROOM 6

14

TERRACE

7

ROOM 4

11

INACCESSIBLE STAIRCASE

15

CHIMNEY

8

CORRIDOR 3

12

CORRIDOR 4

16

BATHROOM

17

TOILET 2

DRAWING NAME DRAWING SHEET NO.

SPACE NO. FINISH FLOOR LEVEL TILES FINISHING

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

FIRST FLOOR PLAN

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

4 LHCO. 004 40


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LEGENDS :

DRAWING NAME DRAWING SHEET NO.

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

ROOF PLAN

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1 1

SHEET NO.

5 LHCO. 005 40


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LEGENDS :

1 TIMBER

FIVE FOOT WALKWAY

5

STAIRCASE

9

2

HALL 1

6

AIR WELL 2

3

AIR WELL 1

7

4

HALL 2

8

AIR WELL 3

13

STOREROOM

10

ROOM 6

14

INACCESSIBLE

HALL 3

11

UTILITIES ROOM

INACCESSIBLE

12

TOILET 2

DRAWING NAME DRAWING SHEET NO.

SPACE NO. MATERIAL

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

GROUND FLOOR REFLECTED CEILING PLAN

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1 1

1

SHEET NO.

6 LHCO. 006 40


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LEGENDS :

1 TIMBER

ROOM 1

5

AIR WELL 2

2

ROOM 2

6

CORRIDOR 3

3

AIR WELL 1

7

4

ROOM 3

8

9

ROOM 6

13

TERRACE

10

INACCESSIBLE

14

W.C

ROOM 4

11

AIR WELL 3

15

CHIMNEY

ROOM 5

12

KITCHEN

DRAWING NAME DRAWING SHEET NO.

SPACE NO. MATERIAL

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

FIRST FLOOR REFLECTED CEILING PLAN

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A1 1

1

SHEET NO.

7 LHCO. 007 40


2

1 5800

1696

SECOND ROOF LEVEL : +12.859

12859

7333

FIRST ROOF LEVEL : +11.164

3831

FIRST FLOOR LEVEL : +3.831

GROUND FLOOR LEVEL : 0.000

FRONT ELEVATION SCALE 1 : 50

0

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

FRONT ELEVATION

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

1

2

4M

SHEET NO.

08 LHCO. 008 40


LEGENDS :

1

FIVE FOOT WALKWAY

5

TO LOT 138

2

HALL 1

6

HALL 3

3

AIR WELL 1

7

4

HALL 2

8

9

UTILITIES ROOM

13

CORRIDOR 1

17

ROOM 4

21

KITCHEN

10

INACCESSBLE ROOM

14

ROOM 3

18

ROOM 5

22

W.C

HALL 4

11

ROOM 1

15

TO LOT 138

19

ROOM 6

INACCESSIBLE STAIRCASE

12

ROOM 2

16

CORRIDOR 2

20

CORRIDOR 4

DRAWING NAME DRAWING SHEET NO.

A1 1

1 FFL : 0.000 TIMBER

SPACE NO. FINISH FLOOR LEVEL TILES FINISHING

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SECTION Y1 - Y1

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

9 LHCO. 009 40


LEGENDS :

1

FIVE FOOT WALKWAY

5

BASIN

9

HALL 4

13

ROOM 2

17

INACCESSIBLE SPACE

2

HALL 1

6

TOILET

10

UTILITIES ROOM

14

ROOM 3

18

ROOM 5

3

AIR WELL 1

7

HALL 3

11

INACCESSIBLE ROOM

15

AIR WELL 2

19

ROOM 6

4

HALL 2

8

AIR WELL 3

12

ROOM 1

16

ROOM 4

20

KITCHEN

21

TERRACE

DRAWING NAME DRAWING SHEET NO.

A1 1

1 FFL : 0.000 TIMBER

SPACE NO. FINISH FLOOR LEVEL TILES FINISHING

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SECTION Y2 - Y2

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 100

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

10 LHCO. 010 40


KEY PLAN SCALE 1 : 500

SECTION X1 - X1

SECTION X2 - X2

SECTION X3 - X3

SCALE 1 : 50

SCALE 1 : 50

SCALE 1 : 50

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SECTION X1 - X1 SECTION X2 - X2 SECTION X3 - X3

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 50

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

11 LHCO. 011 40


KEY PLAN SCALE 1 : 500

SECTION X4 - X4

SECTION X5 - X5

SECTION X6 - X6

SCALE 1 : 50

SCALE 1 : 50

SCALE 1 : 50

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SECTION X4 - X4 SECTION X5 - X5 SECTION X6 - X6

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 50

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

12 LHCO. 012 40


KEY PLAN SCALE 1 : 500

SECTION X7 - X7

SECTION X8 - X8

SECTION X9 - X9

SCALE 1 : 50

SCALE 1 : 50

SCALE 1 : 50

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SECTION X7 - X7 SECTION X8 - X8 SECTION X9 - X9

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 50

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

13 LHCO. 013 40


KEY PLAN SCALE 1 : 500

SECTION X10 - X10

SECTION X11 - X11

SCALE 1 : 50

SCALE 1 : 50

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

SECTION X10 - X10 SECTION X11 - X11

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 50

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

14 LHCO. 014 40


EXPLODED ISOMETRIC N.T.S

LEGENDS :

1

FIVE FOOT WALKWAY

14

CORRIDOR 1

2

HALL 1

15

ROOM 3

3

AIR WELL 1

16

CORRIDOR 2

4

HALL 2

17

ROOM 4

5

TOILET

18

CORRIDOR 3

6

STAIRCASE

19

ROOM 5

7

HALL 3

20

ROOM 6

8

HALL 4

21

CORRIDOR 4

9

INACCESSIBLE STAIRCASE

22

KITCHEN

10

UTILITIES ROOM

23

W.C

11

INACCESSIBLE ROOM

24

TERRACE

12

ROOM 1

25

INACCESSIBLE SPACE

13

ROOM 2

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

EXPLODED ISOMETRIC

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

15 LHCO. 015 40


2630

DOUBLE PANEL DOOR

SECTION

SCALE 1 : 25

SCALE 1 : 25

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

252

2480

EXPLODED ISOMETRIC

2480

D2

DOUBLE PANEL GLASS DOOR

2630

D1

597

1193

597 1193 1327

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

FRONT AND BACK ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

HALL 1

LOCATION

HALL 2

QUANTITY

1

QUANTITY

1

MATERIALS

ALUMINIUM, GLASS

MATERIALS

TIMBER

FINISHES

CLEAR COATING

FINISHES

BEIGE PAINT

NO OF GLAZING

3

NO OF GLAZING

0

ACCESSORIES

HINGES, DOOR HANDLES

ACCESSORIES

HINGES, METAL TOWER BOLTS, WOODEN HANDLES

FEATURES

DOUBLE PANEL DOOR

FEATURES

DOUBLE PANEL DOOR

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D1 DOOR SCHEDULE D2

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

16 LHCO. 016 40


2040

SINGLE PANEL DOOR

2005

D4

SINGLE PANEL DOOR

SECTION

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

123

2005

EXPLODED ISOMETRIC

2040

D3

650 720

650 720

FRONT AND BACK ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

TOILET 1

LOCATION

UTILITIES ROOM

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER

MATERIALS

TIMBER

FINISHES

PAINTED BLUE

FINISHES

PAINTED TURQUOISE

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

HINGES

ACCESSORIES

DOOR HANDLE, HINGES

FEATURES

SINGLE PANEL DOOR

FEATURES

SINGLE PANEL DOOR

CONDITIONS

DEFECTED

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D3 DOOR SCHEDULE D4

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

17 LHCO. 017 40


2320

DOUBLE PANEL DOOR

2240

D6

SINGLE PANEL DOOR

SECTION

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

145

2240

EXPLODED ISOMETRIC

2320

D5

606

1219 1290

1219 1530

ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

UTILITIES ROOM

LOCATION

UTILITIES ROOM

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER

MATERIALS

TIMBER

FINISHES

PAINTED TURQUOISE

FINISHES

PAINTED TURQUOISE

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

DOOR HANDLE, HINGES

ACCESSORIES

HINGES, METAL DOOR BOLTS, METAL BARREL BOLT LATCH, WOODEN HANDLES

FEATURES

SINGLE PANEL DOOR

FEATURES

DOUBLE PANEL DOOR

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D5 DOOR SCHEDULE D6

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

18 LHCO. 018 40


DOUBLE PANEL DOOR

D8

DOUBLE PANEL DOOR

2200 1986

557

D7

SECTION

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

45

1986

2200

557

EXPLODED ISOMETRIC

1036

296 450

450

1036

FRONT AND BACK ELEVATION

PLAN

FRONT AND BACK ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

ROOM 1

LOCATION

CORRIDOR 2

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER

MATERIALS

TIMBER

FINISHES

PAINTED BEIGE

FINISHES

PAINTED BEIGE

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

HINGES, METAL TOWER BOLTS

ACCESSORIES

HINGES, METAL LEVER HANDLE LOCK

FEATURES

DOUBLE PANEL DOOR

FEATURES

DOUBLE PANEL DOOR

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D7 DOOR SCHEDULE D8

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAHMAN

MEASURED BY

PENANG GROUP

SHEET NO.

19 LHCO. 019 40


DOUBLE LATTICE GRILL DOOR

DOUBLE PANEL DOOR

2200 1986

557

D10

SECTION

SCALE 1 : 25

SCALE 1 : 25

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

1986

557

EXPLODED ISOMETRIC

2200

D9

296 450

450

1036

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

FRONT AND BACK ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

CORRIDOR 3

LOCATION

ROOM 4

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER, METAL

MATERIALS

TIMBER

FINISHES

PAINTED BEIGE

FINISHES

PAINTED BEIGE

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

HINGES, METAL BARREL BOLTS LATCH

ACCESSORIES

HINGES, METAL TOWER BOLTS, METAL LEVER HANDLE LOCK

FEATURES

DOUBLE LATTICE GRILL DOOR

FEATURES

DOUBLE PANEL DOOR

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D9 DOOR SCHEDULE D10

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

20 LHCO. 020 40


DOUBLE PANEL DOOR

DOUBLE PANEL DOOR

2305 2154

605

D12

SECTION

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

2155

605

EXPLODED ISOMETRIC

2305

D11

402 586

586 1384

FRONT AND BACK ELEVATION

PLAN

FRONT AND BACK ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

CORRIDOR 3, ROOM 5

LOCATION

ROOM 6

QUANTITY

2

QUANTITY

2

MATERIALS

TIMBER

MATERIALS

TIMBER

FINISHES

PAINTED BEIGE

FINISHES

PAINTED BEIGE

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

HINGES, METAL TOWER BOLTS

ACCESSORIES

HINGES, METAL TOWER BOLTS, METAL LEVER HANDLE LOCK

FEATURES

DOUBLE PANEL DOOR

FEATURES

DOUBLE PANEL DOOR

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D11 DOOR SCHEDULE D12

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

21 LHCO. 021 40


D14

SINGLE PANEL DOOR

2390 2057 1930

260

SINGLE PANEL DOOR

SECTION

SCALE 1 : 25

SCALE 1 : 25

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

130

2057

1930

260

EXPLODED ISOMETRIC

2390

D13

853 966

760 853 966

ELEVATION

PLAN

FRONT AND BACK ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

KITCHEN

LOCATION

TERRACE

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER, METAL

MATERIALS

TIMBER, GLASS

FINISHES

VARNISH COATING

FINISHES

VARNISH COATING

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

HINGES, WOODEN PANELS, METAL DOOR KNOB

ACCESSORIES

LOUVERED DOOR VENT, LOUVERED GLASS, HINGES

FEATURES

SINGLE PANEL DOOR

FEATURES

SINGLE PANEL DOOR

CONDITIONS

INTACT

CONDITIONS

DEFECTED

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D13 DOOR SCHEDULE D14

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

22 LHCO. 022 40


SINGLE PANEL DOOR

SINGLE PANEL DOOR

2028

2420

273

D16

SECTION

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

143

2028

273

EXPLODED ISOMETRIC

2420

D15

656 760

656 760

ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

KITCHEN

LOCATION

BATHROOM

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER

MATERIALS

METAL

FINISHES

-

FINISHES

VARNISH COATING

NO OF GLAZING

0

NO OF GLAZING

0

ACCESSORIES

LOUVERED DOOR VENT, HINGES

ACCESSORIES

HINGES, AIR VENT

FEATURES

SINGLE PANEL DOOR

FEATURES

SINGLE PANEL DOOR

CONDITIONS

DEFECTED

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D15 DOOR SCHEDULE D16

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

23 LHCO. 023 40


D17

SINGLE PANEL DOOR

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

TOILET 2

QUANTITY

1

MATERIALS

METAL

FINISHES

VARNISH COATING

NO OF GLAZING

0

ACCESSORIES

HINGES

FEATURES

SINGLE PANEL DOOR

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

DOOR SCHEDULE D17

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

24 LHCO. 024 40


W1

ADJUSTABLE LOUVRE WINDOW

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

HALL 1

QUANTITY

1

MATERIALS

ALUMINUIM, GLASS

FINISHES

POWDER COATING

NO OF GLAZING

4

ACCESSORIES

-

FEATURES

FIX WINDOWS

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE W1

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

25 LHCO. 025 40


W3

DOUBLE LEAF CASEMENT WINDOW

313

1655

340

DOUBLE LEAF CASEMENT WINDOW

810

120

GROUND LEVEL

SECTION

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

120

1655

340

EXPLODED ISOMETRIC

313

128 988

128 810

W2

988 GROUND LEVEL

ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

HALL 2

LOCATION

HALL 3

QUANTITY

1

QUANTITY

2

MATERIALS

TIMBER AND GLASS

MATERIALS

TIMBER AND GLASS

FINISHES

PAINTED WHITE

FINISHES

PAINTED TURQUOISE

NO OF GLAZING

5

NO OF GLAZING

17

ACCESSORIES

-

ACCESSORIES

HINGES

FEATURES

DOUBLE LEAF CASEMENT WINDOW

FEATURES

DOUBLE LEAF CASEMENT WINDOW

CONDITIONS

DEFECTED : MISSING LEAF

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE W2 WINDOW SCHEDULE W3

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

26 LHCO. 026 40


W4

DOUBLE LEAF CASEMENT WINDOW AWNING WINDOW

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

ROOM 1

QUANTITY

1

MATERIALS

METAL, GLASS

FINISHES

-

NO OF GLAZING

70

ACCESSORIES

HINGES, HANDLE LOCKS

FEATURES

DOUBLE LEAF CASEMENT WINDOW, AWNING WINDOW ON TOP

CONDITIONS

INTACT BUT RUSTED FRAME

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

27 LHCO. 027 40


W5

DOUBLE LEAF CASEMENT WINDOW & AWNING WINDOW

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

ROOM 4

QUANTITY

1

MATERIALS

TIMBER, GLASS, METAL

FINISHES

PAINTED BEIGE

NO OF GLAZING

26

ACCESSORIES

HINGES, HANDLE LOCKS

FEATURES

DOUBLE LEAF CASEMENT WINDOW

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE W5

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

28 LHCO. 028 40


AV2

WOODEN AIR VENT

110

METAL BARS AIR VENT

1142 1334

EXPLODED ISOMETRIC

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

447

PLAN

447

EXPLODED ISOMETRIC

1142 110

4494

1334

4494

AV1

GROUND LEVEL

GROUND LEVEL

ELEVATION

SECTION

ELEVATION

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

HALL 3

LOCATION

ROOM 5

QUANTITY

1

QUANTITY

5

MATERIALS

TIMBER, METAL

MATERIALS

TIMBER

FINISHES

PAINTED GREEN

FINISHES

PAINTED BEIGE

NO OF GLAZING

-

NO OF GLAZING

-

ACCESSORIES

METAL BARS

ACCESSORIES

ORNAMENT

FEATURES

METAL BARS AIR VENT

FEATURES

ORNAMENTAL AIR VENT

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE AV1 WINDOW SCHEDULE AV2

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

29 LHCO. 029 40


LW2

ADJUSTABLE LOUVRED WINDOW

135

1036

FIXED LOUVRED WINDOWS WITH GLASS PANELS

1410

92

GROUND LEVEL

SECTION

SCALE 1 : 25

SCALE 1 : 25

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

92

140

1036

EXPLODED ISOMETRIC

730 730

825

1410

LW1

825

GROUND LEVEL

ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

ROOM 4

LOCATION

ROOM 5

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER, GLASS

MATERIALS

TIMBER, ALUMINIUM

FINISHES

PAINTED BEIGE

FINISHES

PAINTED WHITE

NO OF GLAZING

6

NO OF GLAZING

7

ACCESSORIES

-

ACCESSORIES

ADJUSTING TAB, BLADE HOLDER

FEATURES

FIX LOUVRED WINDOWS, FIX GLASSES

FEATURES

ADJUSTABLE LOUVRED WINDOW

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE LW1 WINDOW SCHEDULE LW2

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

30 LHCO. 030 40


LW4

FIXED LOUVRED WINDOW

1015

ADJUSTABLE LOUVRED WINDOW

2596

100

GROUND LEVEL

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

342

365

388

100

90

880

SECTION

1015

EXPLODED ISOMETRIC

2774 342

365

388

2774 2596

LW3

GROUND LEVEL

ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

ROOM 6

LOCATION

ROOM 6

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER, ALUMINIUM

MATERIALS

TIMBER

FINISHES

PAINTED BEIGE

FINISHES

PAINTED BEIGE

NO OF GLAZING

-

NO OF GLAZING

-

ACCESSORIES

ADJUSTING TAB, BLADE HOLDER

ACCESSORIES

-

FEATURES

ADJUSTABLE LOUVRED WINDOWS

FEATURES

FIXED LOUVRED WINDOWS

CONDITIONS

DEFECTED : MISSING BLADES

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE LW3 WINDOW SCHEDULE LW4

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

31 LHCO. 031 40


460

FIXED LOUVRE WINDOW

390

LW6

ADJUSTABLE LOUVRED WINDOWS WITH FIXED GLASSES

2020

245

GROUND LEVEL

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

390

SECTION

460

EXPLODED ISOMETRIC

483 245

1070 2020

LW5

483 1070

GROUND LEVEL

ELEVATION

PLAN

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

SCALE 1 : 25

LOCATION

KITCHEN

LOCATION

TOILET 2

QUANTITY

1

QUANTITY

1

MATERIALS

TIMBER, GLASS, ALUMINIUM

MATERIALS

TIMBER, GLASS

FINISHES

PAINTED BEIGE

FINISHES

PAINTED WHITE

NO OF GLAZING

24

NO OF GLAZING

10

ACCESSORIES

ADJUSTING TAB, BLADE HOLDER

ACCESSORIES

-

FEATURES

ADJUSTABLE LOUVRED WINDOWS, FIXED GLASSES

FEATURES

FIXED LOUVERED WINDOWS

CONDITIONS

INTACT

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE LW5 WINDOW SCHEDULE LW6

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

32 LHCO. 032 40


FG1

FIXED GLASSES WINDOWS

EXPLODED ISOMETRIC

SECTION

SCALE 1 : 25

SCALE 1 : 25

ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

LOCATION

ROOM 5

QUANTITY

1

MATERIALS

TIMBER, GLASS

FINISHES

SHELLACKED

NO OF GLAZING

26

ACCESSORIES

-

FEATURES

FIXED GLASSES WINDOWS

CONDITIONS

INTACT

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

WINDOW SCHEDULE FG1

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 25

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

33 LHCO. 033 40


7095

SC

705

697

1300

CARVING DETAIL

PLAN 79

SCALE 1 : 30

MORTISE TENON JOINT

TREAD

STRING

RISER BOARD

LANDING NEWEL

FIRST FLOOR

STORE

GROUND FLOOR

OPEN STRING

FRONT AND REAR ELEVATION SCALE 1 : 30

CONCRETE SLAB BALUSTER GROUND FLOOR

TIMBER STAIRCASE AND CARVING DETAILS 185

480

925

240

N.T.S

165

GROUND FLOOR

SIDE ELEVATION

110

SCALE 1 : 30

PROJECT TITLE

\Users\ericlai\Desktop\imgres.jpg LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

STAIRCASE DETAIL

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

34 LHCO. 034 40


R1

JACK ROOF DETAIL SCALE 1 : 25

JACK ROOF EXPLODED ISOMETRIC N.T.S

PLAN SCALE 1 : 25

8MM THK ASBESTOS ROOFING SHEET

SKYLIGHT TIMBER LOUVER FRAME TIMBER LOUVER

TIMBER BATTEN

JACK TRUSS FRONT ELEVATION

JACK TRUSS SIDE ELEVATION TIMBER PURLIN

SCALE 1 : 25

SCALE 1 : 25 GABLE WALL

8MM THK ASBESTOS ROOFING SHEET 40MM X 40MM TIMBER BATTEN GALVANIZED ROOFING NAIL 104MM X 50MM TIMBER PURLIN

JACK TRUSS REAR ELEVATION SCALE 1 : 25

PROJECT TITLE

\Users\ericlai\Desktop\imgres.jpg LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

JACK ROOF DETAILS

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

35 LHCO. 035 40


2288

2288

2288

1449

1048 401

ARCH DETAIL 1

1449

AD1

5457

521

FRONT ELEVATION

REAR ELEVATION

SECTION

ISOMETRIC

SCALE 1 : 40

SCALE 1 : 40

SCALE 1 : 40

SCALE 1 : 40

2393

2393

2393

1334

736 598

ARCH DETAIL 2

1334

AD2

5457

5418

5414

580

FRONT ELEVATION

REAR ELEVATION

SECTION

ISOMETRIC

SCALE 1 : 40

SCALE 1 : 40

SCALE 1 : 40

SCALE 1 : 40

PROJECT TITLE

\Users\ericlai\Desktop\imgres.jpg LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

ARCH DETAIL AD1 ARCH DETAIL AD2

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1:40

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

LHCO. 036

SHEET NO.

36 40


VB

COLUMN DETAIL 1 , COLUMN DETAIL 2

VENT BLOCK DETAIL

EXPLODED ISOMETRIC SCALE 1 : 10

FRONT ELEVATION

PLAN

SCALE 1 : 25

SCALE 1 : 25

320

C

320

FRONT ELEVATION SCALE 1 : 5

ISOMETRIC SCALE 1 : 5

SIDE ELEVATION

EXPLODED ISOMETRIC

SCALE 1 : 25

SCALE 1 : 25

REAR ELEVATION SCALE 1 : 5

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

COLUMN DETAIL C1 COLUMN DETAIL C2 VENT BLOCK DETAIL VB

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

AS SHOWN

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

LHCO. 037

SHEET NO.

37 40


LATTICE 2 DETAIL

1006

620

GD2

719

LATTICE 1 DETAIL

1113

GD1

4071 4206 2242 2441

FRONT ELEVATION

FRONT ELEVATION

SCALE 1 : 15

SCALE 1 : 15

ISOMETRIC

ISOMETRIC

SCALE 1 : 15

SCALE 1 : 15

EXPLODED ISOMETRIC

EXPLODED ISOMETRIC

SCALE 1 : 15

SCALE 1 : 15

PROJECT TITLE

LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

LATTICE SCREEN DETAIL GD1 LATTICE SCREEN DETAIL GD2

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 15

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

38 LHCO. 038

40


GD5

530

LATTICE 5 DETAIL

422

LATTICE 4 DETAIL

551

GD4

660

LATTICE 3 DETAIL

530

735

GD3

2248 2734 2342

1012

2864

1334

FRONT ELEVATION

FRONT ELEVATION

FRONT ELEVATION

SCALE 1 : 15

SCALE 1 : 15

SCALE 1 : 15

ISOMETRIC

ISOMETRIC

ISOMETRIC

SCALE 1 : 15

SCALE 1 : 15

SCALE 1 : 15

EXPLODED ISOMETRIC

EXPLODED ISOMETRIC

EXPLODED ISOMETRIC

SCALE 1 : 15

SCALE 1 : 15

SCALE 1 : 15

PROJECT TITLE

LIAN HUAT COMPANY.

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

DRAWING NO.

DRAWING TITLE

LATTICE SCREEN DETAIL GD3 LATTICE SCREEN DETAIL GD4 LATTICE SCREEN DETAIL GD5

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1 : 15

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

LHCO. 039

SHEET NO.

39 40


2 DT2

TYPE A ( OLIVE GREEN & IVORY ) SCALE 1 : 5

PROJECT TITLE

\Users\ericlai\Desktop\imgres.jpg LIAN HUAT COMPANY

ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG

5 DT1

CLAY TILES ARRANGEMENT 3 SCALE 1 : 5

200 200

200

4 DT1

SCALE 1 : 5

200

200

SCALE 1 : 5

3 DT3

CLAY TILES ARRANGEMENT 2

TYPE B ( OLIVE GREEN & IVORY ) SCALE 1 : 5

200

CLAY TILES ARRANGEMENT 1

1 DT1

200

6 DT2

200

TYPE C ( OLIVE GREEN & IVORY ) SCALE 1 : 5

7 DT3

SCALE 1 : 5

DRAWING NO.

DRAWING TITLE

TILES DETAIL 1 TILES DETAIL 2 TILES DETAIL 3

TYPE D( OLIVE GREEN & IVORY )

STARTING DATE

19-01-2015

DATE

02-03-2015

SCALE

1:5

DRAWN BY

PENANG GROUP

CHECKED BY

KOH JING HAO & SANJEH KUMAR RAMAN

MEASURED BY

PENANG GROUP

SHEET NO.

40 LHCO. 040 40


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.