1 minute read
$108 Million to Improve Disaster Preparedness for Flood-prone Districts of Assam
The World Bank has approved a $108 million loan to help the northeastern Indian state of Assam improve disaster preparedness and enhance flood forecasting. The project will benefit around 6 million people and is part of a larger $500 million investment program for Assam.
The Assam Integrated River Basin Management Project will help the state reduce vulnerability to floods and river erosion by building green infrastructure in the Beki and Buridehing river basins, protecting around 100,000 people. The Project will also help strengthen the state’s response to disasters through improved flood forecasting and accurate early warning systems, including through mobile alerts. The Project will provide safer evacuation and shelter facilities including access to climate-resilient flood shelters to at least 10,000 people. The project will also help government agencies
The Project will:
• Build green infrastructure in river basins of Beki and Buridehing to reduce flooding and erosion
• Improve flood forecasting & early warning systems.
• Provide flood shelters for at least 10,000 people to respond faster during crisis with upgraded state and district emergency operational centers.
The Project will support Assam tackle the immediate challenges of floods and erosion while also helping manage its complex river systems. The Brahmaputra River system is the economic lifeline of Assam, and a critical part of the state’s rich natural resources and cultural heritage. But flooding, riverbank erosion, sedimentation and loss of biodiversity have significant economic and environmental impacts on the state, leading to loss of livelihoods for its people.
"The 2022 floods adversely impacted millions of people in Assam. This project will build on Assam’s disaster risk management approach thus contributing to climateresilient growth while protecting lives and property for the people of Assam."
The $108 million loan from the International Bank of Reconstruction and Development (IBRD) has a maturity of 11.5 years and a grace period of 4 years.