Work Samples Xiang zhao

Page 1

XIANG ZHAO

Work Samples 2016-2021 xzhao02@alumni.risd.edu


THRIVE IN SEA LEVEL RISE Concept model about surviving in sea level rise. Material : Laser Cut, Museum Boards, Acrylic Sheets


CONTENT - PROFESSIONAL WORK 1. SMITH HOUSES PLAYGROUND

- ACADEMIC WORK 4

Project Type: Playground Status: Construction Completed in 2020

2. LEARNING GARDEN

10

7. THE ARK

32

Memorial Landscape implicates the dangerous relationship between human beings and nature after an eco-terorrism. 16

Project Type: Roof Top Status: In Progress

4. OPEN SPACE REGENERATION

20

5. ADAM ST. LIBRARY

24

Project Type: Master Plan Status: In Progress

Project Type: Community Engagement Status: Completed in 2019

26

Rethink threshold between South End and South Boston, a meditation place at the end of Fort Point Channel.

Project Type: Urban Farm Status: Construction Documentation Completed in 2019

3. 4560 BROADWAY

6. LOSS PAVILLION

8. OTHER WORK

34


01

SMITH HOUSES PLAYGROUND PLAYGROUND FROM SKETCH TO BUILT

Project : Location: Client : Status : Role :

NYCHA Smith Houses Playground Manhattan, New York New York City Housing Authority Completed in 2020 Pattern Design, 3D Rendering, Photography Construction Documentation Medium : Handsketch, Rhino, Photoshop, AutoCAD

Site Photo (2017)

Site Photo (2017)

Concept Sketch (2017)

4

Playground Rendering (2017)


Material Plan

5


1"x 4"RPL DECKING BOARD, EASE ALL CORNERS & EDGES W/1/4" RADIUS, SEE 2"X4"ACQ TIMBER FRAMING SPECS FOR COLOR

2"X4"ACQ TIMBER FRAMING "

ENLARGEMENT DETAIL

2.5" SS TORX SCREWS, COUNTER SUNK, TYP. MIN. SPACING 2@ 18" FOR EACH MEMBER 1/4"X2" STAINLESS STEEL FLAT BAR WELDED TO MOUNTING PLATE GRIND ALL WELDS SMOOTH 1"X1" STAINLESS STEEL MOUNTING PLATE MECHANICALLY CONNECTED TO TIMBER FRAMING

02 L-903

22"

SECTION

SECTION SECTION

PARTIAL ELEVATION

6

25"

02 L-903

RPL Deck Detail

ELEVATION

SECTION E

1/4" MET

4" X 4" ACQ TIMBER POST 2"X4" ACQ TIMBER FRAMING FINISH GRADE, SEE PLAN

EXISTING CURB TO REMAIN EXISTING CURB TO REMAIN EXISTING PLANTING EXISTINGAREA CURBTO TOREMAIN REMAIN EXISTING PLANTING AREA TO REMAIN FULLY ENCLOSE PLATFORM ON ALL SIDES FULLY ENCLOSED BENCH ON BOTH DECKING RUNS PARALLEL TO LONG SIDES WITH 1"X4" BOARDS, EASE EDGERPL OF PLATFORM ALL CORNERS AND EDGES WITH 1/4" RADIUS, SEE SPECS FOR COLOR VERTICAL BOARDS ON FACE OF PLATFORM 3/16" GAP FINISHED GRADE, SEE PLAN BLEACHER ON ALL SIDES

3/16" MAX REVEAL

ELEVATION

1" x 1" RP EDGES W/

01 L-901

RPL SEATI

°

1" MIN

01 L-901

1" x 1" RPL BOARDS, EASE ALL CORNERS & EDGES W/1/4" RADIUS,BTW SEEEDGE SPECSOFFOR COLOR AND 4" SETBACK DECKING EXISTING TREE TRUNK SECTION ENGLARGEMENT 2"x4" ACQ TIMBER FRAMING 1/4" METAL RAILRPL PLATFORM BOARD, EASE 1"x4" ALL CORNERS & EDGES W/1/4" RPL SEATING PLATFORM RADIUS, SEE SPECS FOR COLOR ° 3 3 2.5"1 SS TORX SCREWS, COUNTER SUNK, TYP. MIN. SPACING 2@ 18" FOR EACH MEMBER

104

°

133°

4"

104

4"

4"

8"

25"

R4"

ENLARGEMENT DETAIL 3/16"

1" x 1" RPL BOARDS, EASE ALL CORNERS & EDGES WITH 1/4" RADIUS, SEE SPECS FOR COLOR RPL DECKING BOARD

R4"

1 4" LIP

R1' -6

4"x4" ACQ TIMBER FRAMING 1" x 1" RPL BOARDS, EASE ALL CORNERS & EDGES WITH 1/4" RADIUS, SEE SPECS FOR COLOR 2.5"SS TORX SCREWS, COUNTER SUNK, TYP. MIN. SPACING 2@18" FOR EACH MEMBER 2.5" SS TORX SCREWS, COUNTER SUNK, TYP. 1"x4" RPL BOARDS, EASE ALL CORNER MIN. &SPACING 2@ 18" FOR EACH MEMBER W/1/4" RADIUS, SEE SPES FOR COLOR 1/4"X2" STAINLESS STEEL FLAT BAR WELDED TO 5"SS TORX SCREWS, COUNTER MOUNTING PLATE GRIND ALL WELDS SMOOTH SUNK, TYP. MIN. SPACING 1@18" FOR EACH MEMBER 1"X1" STAINLESS STEEL MOUNTING PLATE MECHANICALLY CONNECTED TO TIMBER FRAMING

8"

1/4"

22"

2"X4" ACQ

EXISTING EXISTING P

FULLY ENCL SIDES WITH ALL CORNE RADIUS, SE

3/16" GAP BLEACHER O SIDES


Project Completion Photo (2020)

7


Project Completion Photo (2020)

8


Project Completion Photo (2020)

9


Public School 312K Learning Garden Brooklyn, New York New York City School Construction Authority In Progress Precast Concrete Design, 3D Rendering, Presentation Preparation Construction Documentation Medium : Rhino, Photoshop, AutoCAD

LEARNING GARDEN URBAN FARM

A

02

Project : Location: Client : Status : Role :

Orchard Restroom

Food Pavilion

Stepped Seating Flower Garden

Storage Room

Picnic Lawn

Public School 312K

Green House

Vegetation Area

A' Rendering Plan

10


Flower Garden

Metal Edge Detail

Orchard with Stepped Seating

Stepped Seating Dertail

Section A-A’

11


Precast Concrete Bench

B-7

B-1

B-5

Precast Concrete Bench Detail

B-3

B-6

B-4

B-5

Precast Concrete Bench Module

Planting

12

Seating

Playing

B-2

B-7


Precast Concrete Bench Schedule

13


Precast Concrete Bench Rendering ( Credit to Grain Collective)

14


Flower Garden with Lawn Rendering ( Credit to Grain Collective)

15


03

Project : 4560 Broadway Roof Top Location: Manhattan, New York Client : Forgarty Finger Status : In Progress Role : Concept Design, 3D Rendering, Presentation Preparation Construction Documentation Medium : Rhino, Photoshop, AutoCAD. Indesign

4560 BROADWAY ROOF TOP

Sunset Bench

BBQ. Area

Sloped Lawn Dinning Area Lawn Area Study 1

Cinema Area Projection Wall

Seating Plarform

Bar Table Daybed Lounge Area Roof Rendering Plan

16


Cinema Area View

Lawn Area Study 2

Lawn Area Study 3

Lawn Area Study 4

Aerial View

17


Seating Platform

Yoga Lawn

Stepped Seating

Terrace Option-1 View

18

Stone Seating Rock Garden

Stepped Seating

Water Feature

Water Feature Movable Table with chairs

Timber Deck

Terrace Rendering Plan option-1

Yoga Lawn

Terrace Rendering Plan option-2

Terrace Rendering Plan option-3

Terrace Option-2 View


Terrace Option-3 View

19


04

OPEN SPACE REGENERATION MASTER PLAN

Project : NYCHA OPEN SPACE MASTER PLAN Location: Multiple Locations Client : New York City Housing Authority Status : In Progress Role : Concept Design, Hand Sketch, Site Analyses Medium : IPad Pro

PLay Court

Fitness Circuit

Passive Green 1( South Beach) Gateway Plaza

Community Garden

0-5 Playground

5-12 Playground

Central Green

Fitness Circuit

Skate Park

Passive Green 2( South Beach)

Destination Playground

Vacant Baseball Court ( South Beach)

20

Adventure Playground

Bocce Court

Volleyball Court

Basketball Court

Master Plan Sketch Sample (South Beach, Staten Island)

Gateway Plaza


Sketch of Adventure Playground

21


Sketch of Community Center Entrance

22


Sketch of Fitness Circuit

23


05

ADAM ST. LIBRARY COMMUNITY ENGAGEMENT

Hand Sketch of Dumbo

24

Project : Adam Street Library Community Engagement Location: Brooklyn, New York Client : Brooklyn Public Library Status : Completed in 2019 Role : Hand Sketch, Community Outreach Medium : Marker, Color Pencil


Survey from Kids

Family Day Outreach

Communicate with residents in the neighborhood

25


06

26

LOSS PAVILION

REBUILD THRESHOLD IN BOSTON

Advanced Studio Part II at Rhode Island School of Design Time : Sep.- Dec. 2016 Place : Boston, MA, USA Duration : 6 Weeks Instructor : Kathryn Foley, Yugon Kim Collaborator : Individual Work


SITE CONDITION Sound

Spatial Recognition

Site

Site

DOWNTOWN BOSTON

50 ft

SITE SITE 25 ft

14 ft

FORT POINT CHANNEL

HIGHWAY

SOUTH END RAILWAY

SITE

27

SOUTH BOSTON

——— CONSTRUCTION THRESHOLD LOSS PAVILION

27


DESIGN INTENTION AND PROCESS DOWNTOWN BOSTON SOUTH END

SOUTH BOSTON

Invisible and non-accessible spot.

Threshold to create accessibility on site

Site disturbance from highway and railway

Highway

Sound Railway Site

28

Threshold to generate an attractive spot

Strengthen spatial recognition on site

Highway

Spatial Recognition Railway Site


HIGHWAY

Sky Aperture to block the chaos from highway

RAILWAY

River Aperture to block the chaos from railway

HIGH TIDE LOW TIDE

Water Walkway to provide meditation space

29


wa y

DESIGN RESULT

Entrance on the road side

Traveler S

3

Hig h

treet

I-9

Upland

iver

Salt Panne

Bas

sR

Salt Meadow

Low Marsh

+25.00 ft +23.00 ft

+7.00 ft

+1.00 ft

Rai

lwa

y

+17.00 ft

Water Walkway

Water Walkway Diagram

River Aperture Sky Aperture

W 4th

Stree

t

Site Plan

30

View from the deck inside


View from the Walkway inside

31


07

THE ARK

CENTRAL PARK MEMORIAL

ICONOLAST Competetion - Redesign Central Park Time : Oct. 2018 Place : New York, NY, USA Duration : 3 Weeks Collaborator : Individual Work

After the eco-terrorism, Jacqueline Kennedy Onassis Reservoir was chosen as the site location for the Memorial Lanscape.

Development from a cage to guardance Endless Path

Armed with the power of wave

Jacqueline Kennedy Onassis Reservoir

The Ark

Transform into the Ark of Nature

Site Plan

32

Design Intention


Perspective

33


08

OTHER WORK THE MAZE

A workshop aimming to construct a structure that has a dynamic interaction with its surrounding environment. The Maze uses its specific material properties to built a connection witht the forest.

THRES

"Seen is different from feeling feeling. People would have d walk around the structure.

Line

34


JEWELRY DESIGN

SHOLD CONSTRUCTION

g". We used blind-mind in the construction to create threshold different feeling about line, surface and volumen when they

Surface

A triangle series design of jewelry was done during my study in RISD. I want to use triangle to create a sharp but soft feeling.

Volume

35


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.