ARCHPortfolio_xinlusun

Page 1


X I N LU S U N

Contact 3035 Whisperwood Dr. Ann Arbor, MI 48105

Education • University of Michigan Master of Architecture

09/2018-present

• Sanjiang University, Nanjing Bachelor Degree in Architecture

09/2013-06/2018

(734) 882-8606 xinlusun@umich.edu lumosmaxima_sun

Language

Mandarin native

English fluent

Skills AutodeskCAD SketchUp Rhino Revit Vray Grassohpper Photoshop Illustrator InDesign Premiere Pro Procreate

Certificate Autodesk Certified Professional: Revit Architecture Junior engineer of BIM.

Project Experience • Design of Modern Folk Art Center in Nanjing Confucius Temple

06/2016

• Nanjing Interior Design Competition

12/2016

Content

Activities & Events • Volunteer of the Nanjing Youth Olympic Games

06/2014-08/2014

Taicheng Museum | Nanjing, China

Participated in the process of passing the torch, discussed with seniors and improved teamwork skills

• Head of the Self-Discipline Committee of School of Architecture

2016

Folk Vocal Art Stage | Nanjing, China

Supervised the learning situation of junior students

• Teaching Assistant for Freshmen of School of Architecture

2015-2016

Supervised the architectural design foundation and campus life of freshmen.

City Hall | Burlington, Vermont

Internship Sinoma, China National Materials Group 07/2017-10/2017 Corporation Ltd. • Position: Summer intern • Department: Architecture team • Project: 1. Bayah 10,000 TPD cement plant 2. Saman cement plant 5000 TPD clinker project

Healing Watchtower | Experimental Other works | From artistic to practical


Taicheng Museum 2015/11 Nanjing, China Individual work

There is an obvious fault scarp (height difference) between the building base and the surroundings. The population of the old district on one side is mainly the old people and the children. The outline of the fault scarp is a pentagon, five sides and three angle relations: parallel, vertical and intersecting. The walls of two directions in the surroundings have parallel sides, which inspire me to think about dividing the base in accordance with the directions of the city walls. Give the wall-like materials onto the most outstanding mass in accordance with city walls while maintaining its own style.


Context Analysis

Primary Road

Secondary Road

Metroline

Building

Highway

Surrounding Context Nanjing is a city with pluralism, and the city wall, which

Current Condition

have been seriously reserved can date back to thousand years ago. She offers Nanjing a conspicuous texture —— bricks. Plus, from my perspective, a prudent temperament.

Jiming Temple

Yet, the brick doesn’t prevent my hometown from being

Sketch Vista

SITE

brisk. Jiming Temple, one of the most distinguished and efficacious temples in China, located at the west side of the place. For the sake this, the circulation around here is huge, letting more citizens to enjoy. There is an entrance of the city wall at the opposite side and some residential quarters beside. During the investigation, I noticed the lack of a public space for

Rd

Subway station

Zhongshan East

5-minute walkability zone

or

th

St

N

Ea

Rd

Zhongshan East

Bei’an Gate

n

st

g

jin

i Be

ay

ay mid-w

Rd

ha

rth St

Rd

gs

mid-w

th

on

Peac e No

or

Zh

Central Rd

N

Ea

St

n

g

jin

i Be

Bei’an Gate

ha

Central Rd

gs

Dragon

Zhongshan East

on

rth St

Rd

Zh

u TNL

d

R st

Peac e No

St

th

Ea

Bei’an Gate

or

ay

N

mid-w

n

g

jin

i Be

rth St

ha

Dragon

gs

e No

intriguing and worth expolring.

on

d

R st

Peac

It’s the complex given conditions that make this site

Zh

Xun’w

u TNL

u TNL

Central Rd

space for children and the elders to use.

Xun’w

Xun’w

this command into my design and I plan to arrange a

Dragon

dwellers to communicate and practicing. Naturally, I put

Rd

Sharing bike post

Rd


Perspective Rendering

Massing Creation Diagram

Limitation of site

Divide the block according to the trend of city wall

Lift and descend

Minus and plus

Cut the volume or as a glass box

Invite sunlight to come inside


Atrium Rendering

Master Plan

Interior Slope Rendering


A 2

10 9 -3.500

-3.500

5

9

1. Storage 2. Viewing platform 3. Exhibition 4. Lounge 5. Restroom

1.500

9

3

3

4.500 ±0.000

3

-1.700

3.300

2

2

2

1 5

4

6

6. Hallway 7. VIP room 8. Information table 9. Office 10. VR room

8 7

Basement Floor Plan

Ground Floor Plan A

Program & Circulation Analysis

Lateral flow lines

Vertical flow lines

1. Storage 2. Viewing platform 3. Exhibition 4. Lounge 5. Cloakroom

Second Floor Plan

6. Hallway 7. VIP room 8. Information 9. Office 10. VR room

Exhibition space

Rest space

Office space

Open space


Perspective Rendering

Folk Vocal Art Stage 2016/06 Nanjing,China Individual work


Massing Creation Diagram Big stage and small stage

Connect with patio, like a moon gate

Add blocks for audience and crew

Intention to imitate Ma Tau Wall, a conventional decoration, seperate different functions clearly

Add blocks again, for the stage and exhibition space

Aiming to create a peaceful atomsphere

Interior Rendering


Partial Section 12

11

10

Alufer pendant

Built-in fitting Steel bracket

9

Alufer pendant Lateral keel

Granite plate

Steel bracket

8 7

Lateral keel 6 6 5 5

2

Insulation

1

Parapet Detail

3

Ground Floor Plan 1. Service table 2. Show 3. Baijustage 4. Make-up room 5. Exchange room 6. Property room

Granite plate Linear keel

Alufer pendant

13

Âą0.000

Built-in fitting

4

Alufer pendant 7. Conferenceroom 8. Staff lounge 9. Equipment room 10. Edit room 11. Sound studio 12. Dubbing room

13. Restroom 14. Normal odeum

Linear keel

Lateral keel 12

12

E - pendant

Granite plate

Lateral keel 14

Window Detail Insulation 6 5 5

Sealant

4 Reinforced concrete

13 5.700

Granite plate Insulation Linear keel

Linear keel Steel bracket

Steel bracket S - pendant Granite plate

S - pendant Built-in fitting

Lateral keel

Second Floor Plan

Wall Section Detail Wall Plan Detail


Main Floor Plan

Church Street Entrance

City Hall

Main Street

College Street

Entrance

2018/09 Burlington, Vermont Individual work 0

St Paul Street

Council Chamber Perspective This institution studio starts from two E-words: Egalitarian and Equanimity which have several synonyms that is clamness, serenity and tranquilty. Thus, I hope to bring such tone to this romantic historical block in Burlington. The Burlington City has an old city hall already but right now the city has a debate for a more usable City Hall plaza and since it was built in 1928, with its neo-Classical and Georgian Revival style, the elevation on Church St. should be considered carefully. In this project, I separate civic function and administrative office into two massing, box and form. Box is more public and has clean plan while form is more dramatic and I hope, it could be a focus of the city hall park. Also, the Council Chamber on the first floor is more flexible than the one in the old building and it's welcoming anyone go through and pass by.

1. City Clerk 2. City Attorney 3. Cty Manager 4. Secretary's Office 5. Restroom 6. Mayor's Office 7. Conference Room 8. City Departments Open Working Space 9. Meeting Room 10. Media Support 11. Enclosed Offices 12. Administrative Open Working Space 13. Auditorium

0

Reference Floor Plan

10

20

30

40

A

B 10

5

11

5

5

11

5

11 9

15.000’

11

1

30.000’

2

15.000’

11

9

45.000’

11

3 5 5

4

6

30.000’

12

7

A B

5 5

8

13 8

5 10 15 20 25 30


Interior Perspective

Department Office

Community Room Hall

Working Space

Department Hall

Connection between lobby and chamber

To the administrative offices


Circulation

A-A Section

Fourth Floor

Department Office

Meeting

Third Floor

Lobby

Second Floor

Meeting

Council Chamber

B-B Section

First Floor

Auditorium

Administrtive Meeting

Administrtive Office Ground Floor Double High Space Vertical Circulation

Lobby

Media

Public Service


West Elevation


Perspective

Healing Watchtower 2017/11 Individual work

The diagram above demonstrate 46 kinds of invisible killers

The truth is, it's difficult for be abled to find some public

around our life—— psychological problems. With the rapid

space to carry out activities not to metion the disabled

development of industry and technology, human beings

group. Thus, I plan to save some space for everyone

under tremendous pressure have been suffering from these

in my design to promote the further development of

diseases. According to some investigations, the disabled

society.

people are more susceptible towards these problems. In my opinion, it has something to do with their isolation.

Specialized block

Load-carrying members

Skin

Explosive View


Partially Sectioned Perspective

Watchtower is on the land, for future need, the boxes underwater wil be built as an extension of function. Each boxes can be a shield and a secret garden. Watchtower means union and group, meanwhile, boxes in the water represent isolation. They are designed to be a space with joy that more people can be attracted. Therefore, boxes in the water would be an other way to accumulate people, broaden people's social circle.

Master Plan

0

10

20

30 40

Tidal Energy Generating Unit Eccentric blade tidal power plant is a vertical axis power plant, The tidal energy captured by the blade device is converted into rotational mechanical energy, which is connected to the drive wheel through a rotating shaft to convert the obtained mechanical energy into electrical energy. 7 8 9 10 11 12 13

1 2 3 4 5 6

1. Blade track 2. Retractable blade 3. The main blade 4. Guide shaft 5. Connection board 6. Fixed bracket 7. The main blade 8. Retractable blade 9. Roller wheel 10. Guide block 11. Fixed rod 12. Shaft 13. Drive wheel

13-15th plan Animal therapy & Cooperation 10-12th plan Exercise

7-9th plan Painting & Focus

4-6th plan Sole to Group

BIRD HARTHCERY DANCE ROOM

DANCE ROOM

STUDIO PLAY ROOM

1-3th plan Sharing

A-A Section


Floor Plan 13.500

3

5

7

6

-4.500

1

18.000

4

Âą0.000

4th Plan

5

Pubic Space & Underwater 1. Platform 2. Service Room 3. Preparation Space 4. Foyer 5. Restroom

10

10

6th Plan

36.000

10

11

31.500

10

1st Plan

7th Plan

8th Plan

9th Plan

12 4.500

49.500

5

12

13

40.500

45.000

14 14

12

Painting and Focus 10. Studio 11. Exhibition

5th Plan

27.000

Sole to Group

6. Game Space 7. Meditation Chamber 8. Exchange Space 9. Play Room

22.500

9

2

-1st Plan

Plan Function

9

8

2nd Plan

10th Plan

11st Plan

12nd Plan

Exercise

12. Gymnasium 13. Yoga 14. Dance Room

Animal therapy & Cooperation 15. Bird Hatchery 16. Bird Hatchery 17. Reference Room 18. Observation Unit

54.000

5

5

15

58.500

18

17

9.000

3rd Plan

63.000

16

13rd Plan

14th Plan

15th Plan


Space Type C B A 4-5-6 Floors Game

A

B

C

D

E

F

F E D 7-8-9 Floors Painting 10-11-12 Floors Exercise I H G G

H

I

J

K

L

13-14-15 Floors Animal Therapy

L K J


Other Works 2013-2019

A3 | Watercolor, Wannan | 2015

Animation | Maya | 2018

Representation | New Familiar | 2019

Teamwork with Ruxin Xie

Teamwork with Yining Yuan, Jiawei Yao

https://www.youtube.com/ watch?v=oEAkeuzIJ1A

Commercial Complex | 2016

1:25 | Detail Modeling | 2014

1:20 | Detail of a Housing Design | 2017


Sans limites.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.