rough folio

Page 1

So-Jung Lee 2006-2010

Georgia Institute of TechnologyB.S. in Architecture M. Arch Applicant



Architecture + Light & Water Play

02

Architecture + Events

06

Architecture / Well-being

18

Landscape mediating the Architecture & Natures

24

Reinterpreting

34

Boundaries within Urban Context

38

Edgewood Aquatic Center

Microcirculation Therapeutic Resort Center

Oconee River Environmental Resource Center

Trace, Recreate, String Installation

Peachtree Corridor | Street Design, Development, Accessibility

01


Conceptual Composite Drawing

02


Architecture + Light & Water Play As an antecedent to the Aquatic Center project, a short project focusing on water, light and body was assigned to study the relationships and interesting dialectics that could be created from them. The investigation of different sites of water and lighting as well as light models were recorded at different times of the day. The recordings were then selected to compose composite drawings to visualize a space that reflect the relationships and dialectics. For further experiment, they were transposed onto the site of the Aquatic Center project.

03


compositing the existing and composed space

recording of existing space

PURIFICATION

act or process of removing physical impurities; sky becomes the source of purity

TRANSLUCENCY

recording of composed space

transmitting light but causing sufficient diffusion to prevent perception of distinct images

MOVEMENT & FLOW

act or process of contiuing and falling

04

FILTERATION

act of letting light filter through a layer; act of spreading, passing and repeating


composite transposed onto site 05

each increment equals ten footsteps


Intrenchment Creek

Pedestrian Walkway Pedestrian Arrival Plaza

Circulation for Theater and Pool Users Circulation for Parterres and Entertainment Users

Existing Chemical Building Park Blvd. Crossing

Pedestrian Walkway

Residential Religious Building

Massing

Circulation for Workers and Scientists

Pedestrian Arrival Plaza

Dividers/Retention Walls

Circulation Secondary Circulation for Theater and Pool for Retention Pond and Entertainment for Workers a nd Scientists

06

Water


Architecture + Events making ways for users of places

07


EDGEWOOD

Aquatic Center Year Three. Prof. Akins Aqua Community Center will be sited in SE Atlanta, south of Grant Park, Zoo Atlanta and along the Beltline. Within this context there is a mixture of residential, public park space, creek that flows from SE direction. The aqua community center will become an interest to many new homeowners and community developers. The design will serve the community by introducing two swimming pools (competition and recreational), a theater, water garden, laboratory and a retention pond. the site will expose its natural landscape features, an exposed creek and filtration plant. The programs will be organized in a NW direction to blend with the direction of the existing chemical science building and filteration creek. Within the design there are retaining walls that gradually die into the earth, giving visitors interesting experiences through usage of light and water. These walls will also serve the site for structural purposes, water gardening, and as a shading device.

Final

Retention walls cutting into ground

Programs align to the direction of creek

Programs interact over gardens

Placement of programs

Programs interact over water Study Models

08

Site Plan


1. retention pond 2. auditorium 3. entrance/restaurant 4. outdoor cafe 5. bar/cafe 6. outdoor bar 7. public activity space 8. public reserved rooms 9. bridge 10. laboratory for scientists 11. greenhouse 12. existing chemical building 13. indoor hall 14. bathrooms 15. stairs & elevator 16. retaining wall

15 3

14

4

2

13

16 6 5

12

16 1

7 8

9 10 11

Ground Floor

6

7

9

5

3 4

2 11

1

1. outdoor leisurely pool 2. men’s locker 3. women’s locker 4. first aid room 5. office 6. main lobby 7. parking 8. outdoor garden 9. public outdoor space 10. laboratory for scientists 11. retaining wall

8 11

1st Floor

1. cantilevering competition pool 2. locker rooms 3. seatings 4. terrace/green roof

4 2 1 3

09

2nd Floor

Phsical Model


The structural walls will become a source of an object that is tangible to the users experiencing the Aquatic Center. People will be able to walk along and over the wall as well as observe the changes that occur throughout the site in different seasons, depending on how the walls interact with water and light. For structure to support a large cantilevering pool, gluelam, with the use of flitch beam, is used. Entertainment areas such as restaurants, bars, and social event rooms are spread out on the site in juxtaposition to the water garden for pleasurable views and interactions. The retention walls will control views, make ways for circulation, and act as a shading device.

Structural Diagrams

10

Restaurant looking out to water garden


Interior view from bar/restaurant

Cantilevering competition pool

11

Exploded Model


Section

View towards cantilevering pool

12

Physical Model


Section

View towards restaurants and retention pond

13

Physical Model






Existing Microcirculation Therapeutic Center

18


Architecture / Well-being

making integrative places and medicine that feed the soul

19


MICROCIRCULATION

Therapeutic Resort Center Professional Work. Schematic Design. The project is a further expansion to the existing Micirocirulation Therapy Centers that are located in Indonesia and Hong Kong. The resort center, located in south eastern part of Henan, China. With the area developing at a very fast rate with high density, it is an attractive spot to tourists as well as to residents and workers. Microcirculation Center will treat many patients with heart problems, drug addiction and aging issues. The therapy does not only treat patients but provide facilities that guide them to maintain wellness and healthy lifestyles. The therapy center is about bringing out the natural, healthy, clean, and restoring sentiments.

ay

ilw

ra

hig

hw

ay nd

la

rm

a ,f er

t

wa

ry,

ena

sc re,

en

gre

forest

u

leis

ind

ust

rial

l, ntia

side

l, re

cia mer

com

20

ura cult l

Site Context Map


io

lat

cu

cir

o icr

tic

eu

ap

er

h nT

ter

en

tC

or

s Re

M

Stepping Farmland

Pavilions and Bangalows

Bridging

21

Master Plan


Initial Concept Drawing

22

Choosing Farmland

Strips of Farmland

Segmenting and Stepping

Taking advantage of the existing site condition and features was the main design approach. The leisurely open land along the river provide excellent views of nature and make the project more affordable without having to excavate the land.

Land for Exercising and Pavilions

Placement of Pavilions and Bangalows


Stepping Farmland The purpose of stepped landscape is to accomodate physical needs of elderly patients and those with disability. Plants will be planted on land according to the height of their maximum growth; the taller plants will be planted along lower steps, shorter plants will be planted on taller, elevated steps.

Outdoor Pavilions & Bangalows The simple arrangement of pavilions will mainly provide exercising facilities such as for walking, jogging, biking, fishing, and playground for adults. Bangalows will also be situated for patients to stay while healing. Its close accessibility to these facilities will encourage them to enjoy outdoor spaces as well as for exercising.

23

Bridging (hospital & indoor facilities) The bridge will contain the primary indoor faciliites such as the hospital rooms, lounge, physio & gym, spa, indoor swimming facilities and rooms for conference, consultation, dietitian. It will bridge the outdoor pavilion and bangalows to the farmlands so the users of the bridge has easy access to the outdoor spaces provided.


Oconee River Site Condition

24


Landscape mediating the Architecture & Natures breaking the treshold between the nature and artifiical

25


OCONEE RIVER

Environmental Resource Center

Year Three. Professor Kean.

I was interested in ways in which artificial and nature merge together to make smooth transitions, such as between the earth, water, and architecture so that people would be able to interact easily in all spaces. In this project, I figured out the solution to this by planting a concrete walkway that gently slopes into the shoreline of the Oconnee River which continues and extends upwards from the water into the earth in every direction. The rays of concrete walkway continues from the concrete edge to the east of site. The Oconnee River Environmental Resource Center is located along the edge of Oconee River and is identified by four buildings that have different interactions with the earth and water. Each building, each having different function, is connected together by a ramp in juxposition to another.


Elevated Artist’s & Scientist’s Studio

Green Roof Production Building

Activity/conference Building

Sunken Exhibition


River front walk enters the river arrays of concrete walkway continues to act as a mediator and makes it a smooth transition between the river, earth, and into to the buildings.

28

l a commandé le poisson et le riz. Je n’ai pas aimé le steak, amis le pain était bon. Ensuite nous avons fait une promenade sur la plage. L’eau était belle. Nous avons vu un écureuil. Après la promenade, nous avons eu soif. Nous sommes allés dans un café. J’ai bu une limonade et il a bu de l’eau.


street connection

pavement sloping into water

pavement on ground

pavement on roof

primary circulation secondary circulation

public space private space

green space

29



2nd & 3rd Floor

1st Floor

31

Ground Floor

Exploded Axon



physical model


Installation on Site

34


Reinterpreting

35


TRACE, RECREATE, STRING Installation | Year Four. Professor Dessault.

36

Because Georgia Tech is highly focused on engineering, a discipline researched and studied to achieve complex understanding of science and order, I wanted to provide an escape and opportunity for viewers to create differerent perspective of these systems of order. The site that I have studied has one hundred and twelve patents displayed that present the Mechanical Engineering departments’ achievements. The include devices and theories on mechanical engineering. I represented a contrasting image of the patent, that is displayed on the wall to complete my installation. I took rubbings of the patent plaques, then used sketch pencil to trace the mechanical drawing and reinterpret them as organic forms. To draw connection between the drawings and patents I stringed each drawing to the original patent drawing it was created from. The overlapping and stretching of countless number of strings created an intriguing space.


37


Aerial View of Peachtree Street

38


Boundaries within Urban Context

Rules and regulations accomodating the past, present and future

39


PEACHTREE CORRIDOR Street Design, Development, Accessibility | Year Four. Professor Green. Brookwood is located on the periphery of the core of Atlanta. The neighborhood sits between the major urban growth poles of Buckhead to the north and Midtown to the south. The Brookwood Alliance is comprised of the four neighborhoods of Ardmore Park, Brookwood Hills, Collier Hills and Collier Hills North combined with the commercial corridor of Peachtree Road. Peachtree Road serves as the spine of the community and acts as the major north-south point of access. On either side of this spine, the Alliance neighborhoods consist predominantly of single-family detached homes along with low rise multifamily developments. Peachtree is characterized by low to high rise office buildings interspersed with single story retail. The neighborhood experiences a large volume of vehicular traffic throughout the day, driven by large visitor and employment attractors and a lack of access infrastructure in the area. With few roads capable of distributing traffic, it ends up funneling down quiet residential streets. Land values in both Midtown and Buckhead have risen substantially over the last decade, putting serious development pressure on the Brookwood neighborhood. The recent economic downturn is seen as an opportunity to better define the future of the neighborhood. Our group was charged with engaging the community in their pursuit of a coherent vision of the future of their neighborhood. The intent is to take this vision and arm the community with a set of design strategies that can be used in implementing this vision.

ACCESSABILITY STUDY AREA

STREET DESIGN & DEVELOPMENT STUDY AREA



PE

AC H

TR

EE

RO AD

STREET DESIGN

Problem: The existing Right of Way on Peachtree Street/Road is 80 feet wide. It consists of six car lanes and a sidewalk on each side. There is no buffer between the fast moving traffic and pedestrians, as well as no bicycle infastructure or any type of vegetation.

Street Design Study Area

E

IL

TA

IN LT L

INT

ST AT E

BE

ER

75

RA

TE TA RS

AR

M

Peachtree Road is characterized predominantly by six lanes of high speed, motorized traffic. This character has degraded the street’s ability to adequately serve the needs of the local community. Rather than establishing a coherent framework for development to adhere to, Peachtree has seemingly repelled street-oriented development along its length. The street serves the needs of regional drivers at the cost of local users. It is a street battling for an identity, despite being bestowed with the most well know street names in the city.

85

TE

IN

Goals: Design a street that accommodates the needs of pedestrians, bicyclists, and transit users as well as drivers. Design a street that fosters the development of successful neighborhood-oriented retail. Design the public realm so that it can be implemented today but easily adapted to realize the ideal street in the future. Street Design Based on public surveys and meetings, an ideal streetscape was designed to be applied to the whole corridor. It includes wide sidewalks, off-street bike lanes, tree planting strips, onstreet parking, and a median with designated left turn lanes. The proposed right-of-way is 120 feet wide. After overlaying the 120 foot ROW over the existing Peachtree corridor, conflicts were found with some existing buildings. A strategy was developed to solve these conflicts until future development could allow the full realization of the ideal streetscape. A 70 foot section of the street was set as constant, providing for the median/left turn lane and four total travel lanes. Also considered non negotiable were minimum 5 foot sidewalk widths and the provision of bicycle infrastructure--either on or offstreet. Other elements of the streetscape were deemed flexible and could be sacrificed in areas where existing buildings prevented the realization of the ideal street. 42


The 120 foot ideal streetscape 60/60 ft. Streescape

The first variable in the narrowing streetscape strategy: Sidewalk widths in excess of 5 feet. Sidewalks can be added along with redevelopment the most easily of all elements. 60/60 ft. Streescape - 50/50 ft Streetscape

The 100 foot streetscape to be implemented where needed 50/50 ft. Streescape

The second variable in the narrowing streetscape strategy: Off- street bicycle paths shift to on-street bicycle lanes. Parallel parking is removed to make way for the bicycle lanes. A 5 foot striped buffer is retained for bicycle safety.

50/50 ft. Streescape - 45/45 ft Streetscape

The 90 foot streetscape to be implemented where needed 45/45 ft. Streescape

The third variable in the narrowing streetscape strategy: Street tree planting strips. 43

45/45 ft. Streescape - 40/40 ft Streetscape

The 80 foot streetscape to be implemented where needed 40/40 ft. Streescape


44


The final step in the street design process was to apply the streetscape and strategy of implementation to the entire stretch of Peachtree Street/ maintains all existing current curb cuts

First Half of the Corridor | Final Ideal Design

Future redevelopment is shown along with the realization of the full street plan. Curb cuts are reduced to ease the flow of traffic and increase pedestrian safety

First Half of the Corridor | Final Existing Design

45

First Half of the Corridor | Existing Streetscape


46


The final step in the street design process was to apply the streetscape and strategy of implementation to the entire stretch of Peachtree Street/ maintains all existing current curb cuts

Second Half of the Corridor | Final Ideal Design

Future redevelopment is shown along with the realization of the full street plan. Curb cuts are reduced to ease the flow of traffic and increase pedestrian safety

Second Half of the Corridor | Final Existing Design

47

Second Half of the Corridor | Existing Streetscape


PE

AC H

TR EE

RO AD

DEVELOPMENT

Development Study Area

E

IL

LT L

INT

IN

A RT

ST AT E

BE

ER

75

RA

A

M

I

TE TA

RS

E NT

85

Loud concerns have been raised over an appropriate transition from the high activity, high desnity Peachtree corridor into the lower density, quiet residential neighborhoods. This stark juxtaposition has also given rise to concern over the form of development along Peachtree street. Brookwood has a character not unlike many neighborhoods that sit peripheral to urban cores along major arterial streets. Existing development rights combined with the pressure of urban growth has led to a precarious situation where neighborhood residents are worried about future redevelopment rather than excited by the benefits it will bring. We aimed at exploring future scenarios where the corridor developed into a truly urban place while be respectful of a low density residential context. Goals: Our strategy strives to satisfy the needs of developers and residents of Brookwood alliance. In order to implement the concepts derived from the precedents and to retain the existing FAR to maintain development rights we came up with a unique solution to the regulation of development which reinforces the vision of an urban oasis. Current Building Height Regulation Existing height plane regulations can be ineffective at regulating height adjacent to single family development. Currently the same height regulation is applied regardless of adjacent residential context and they do not address exposure to light and air along Peachtree Road. The height plane regulations are regulated by the depth of the parcel rather than through some type of comprehensive height plan. Solution: Development Prototypes Brookwood Development Regulations include Single-Family Protection Zone, Vertical Development Zones 1 & II. Single-Family Protection Zone is applicable to any parcel, or portion of a parcel that is zoned commercial. Single-Family Protection Zone measures parallel from the minimum rear setback line, extending an additional 100 feet into the parcel. The minmum rear setback is 40 feet, 20 feet of which is requried to be a planted buffer. There is a maximum building height of 38 feet under this regulation.

48

Vertical Development Zone I applies to all commercially zoned parcels adjacent to a “Single Family Protection Zone.” The setbacks of this zone is measured from the centerline of Peachtree Street. It sets appropriate maximum and minimum height to the bases and pedestals. To establish a constant street wall, the ground floor is to be built to side property lines. This regulations also deals with providing easy access and reducing visual impact of parking decks that face residentially zoned properties. Vertical Development Zone II is applicable to a “Low Density Protection Zone.” Like that of VDZI all setbacks are measured from the centerline of Peachtree Street and all active uses are required along all ground floor levels adjacent to the public streets. It establishes a constant street wall, provide easy access and reduce visual impact of parking decks facing residentially zoned properties. Maximum and minimum height is set to the bases and pedestals. The maximum height will be higher than that of VDZI because of the area’s potential to grow more in density.


Single Family Protection Zone Vertical Development Zone I (lower intensity) Vertical Development Zone II (higher intensity)

49

Single Family Protection Zone

Single Family Protection Zone

Vertical Development Zone I (lower intensity)

Vertical Development Zone I (lower intensity)

Vertical Development Zone II (higher intensity)

Vertical Development Zone II (higher intensity)


Vertical development atop a building base. For appropriate development and to maintain existing FAR along Peachtree Corridor we decided to use vertical development on base to meet the goals. As of now the buildings are lower in height but wide which block light and air from reaching Peachtree Street and single-family homes. By making the vertical development taller and slender, it will acqure the same realizable square footage but decrease building mass relative to Peachtree Street and single-family homes. Height and width of the vertical developments are a tradeoff for this design evolution.

Height Plane

Office Height Plane

Height: 225’ max

Rear Setback: 30 ’-50’

Retail Parking

Rear Setback: 30 ’-50’ Height: 225’ max

Existing Development Zone I: Office

Existing Development Zone II: Office

Height Plane

Height Plane Height: 225’ max Rear Setback: 30’-50’ Height: 225’ max Rear Setback: 30 ’-50’

Existing Development Zone I: Residential

Existing Development Zone II: Residential VD Width: 110’-150’ max VD Separation: VD Front 40’-80’ min Setback: 10’-40’ min

VD Width: 80’-110’ max

VD SideSetback: 20’-40’ min VD Separation: 40’-80’ min

VD Front Setback: 10’-40’ min

Height: 225’-300’ max

Height: 225’-300’ max

Pedestal Height: 30’-60’ max Base Height 24’ min/ 45-72’ max

VD Front Setback: 10’-40’ min

Existing Development Build-out

Pedestal Height: 30’-60’ max Base Height 24’ min/ 45-72’ max

VD Width: 80’-110’ max VD Side Setback: 20’-40’ min VD Front Setback: 10’-40’ min

VD Separation: 40’-80’ min VD Width: 70’-100’ max

VDSeparation: 40’-80’ min

VD Side Setback: 20’-40’ min

Pedestal Height: 30’-60’ max

Height: 225’-300’ max Base Height 24’ min/ 45-72’ max Pedestal Height: 24’-48’ max

Base Height 24’ min/ 45-72’ max VD Front Setback: 10’-40’ min

Height: 225’-300’ max


Height: 225’ max Rear Setback: 30 ’-50’

Height: 225’ max

Height Plane

Rear Setback: 30’-50’

Height: Height: 225’225’ maxmax

Setback: RearRear Setback: 30’-50’ 30’-50’ Height: 225’ max

Rear Setback: 30’-50’

VD Width: 110’-150’ max VD Separation: VD Front 40’-80’ min Setback: 10’-40’ min VD Width: 80’-110’ max

VD SideSetback: 20’-40’ min VD Separation: 40’-80’ min

Residential

VD Front Setback: 10’-40’ min

Height: 225’-300’ max

Height: 225’-300’ max

Separation

Pedestal Height: 30’-60’ max Base Height 24’ min/ 45-72’ max

VD Front Setback: 10’-40’ min

Longer, slenderer and deeper office blocks

Pedestal Height: 30’-60’ max

Retail Parking

Base Height 24’ min/ 45-72’ max

Proposed Vertical Development Zone I: Office

Proposed Vertical Development Zone II: Office

VD Width: 80’-110’ max VD Side Setback: 20’-40’ min VD Front Setback: 10’-40’ min

VD Separation: 40’-80’ min VD Width: 70’-100’ max

Pushed back office blocks , and pulled up retail blocks

VDSeparation: 40’-80’ min

Height: 225’-300’ max

VD Side Setback: 20’-40’ min

Pedestal Height: 30’-60’ max

Height: 225’-300’ max Base Height 24’ min/ 45-72’ max Pedestal Height: 24’-48’ max

Base Height 24’ min/ 45-72’ max VD Front Setback: 10’-40’ min

Final Result

Proposed Vertical Development Zone I: Residential

Proposed VerticalDevelopment Zone II: Residential

Proposed Development Build-out

Vertical Development Width: 80’-110’ max Vertical Development Vertical Development Side Separation: 40’-80’ min Setback: 20’-40’ min Vertical Development Width: Vertical Development Width: 80’-110’ 80’-110’ maxmax Vertical Development Front Vertical Development Vertical Development SideSide Setback: 10’-40’ min Setback: 20’-40’ Setback: 20’-40’ min min

Vertical Development Separation: 40’-80’ min

ent Width: Vertical Development Side max Setback: 20’-40’ min Vertical Development Vertical Development Separation: 40’-80’ Separation: 40’-80’ min min

ment Width: t Width: max

Height: Vertical Development Side Vertical Development Side 225’-300’ Setback: 20’-40’ Setback: 20’-40’ min min max

Vertical Development Separation: 40’-80’ min

t Width:

Height: Height: 225’-300’ 225’-300’ maxmax Vertical Development Side Setback: 20’-40’ min Base Height 24’ min/ 45-72’ max

Vertical Development Front Setback: 10’-40’ min

Height: 225’-300’ max Height BaseBase Height 24’ min/ 45-72’ 24’ min/ 45-72’ maxmax

Vertical Development rtical Development FrontFront Setback: 10’-40’ Setback: 10’-40’ min min

rtical Development Front Setback: 10’-40’ min

Base Height 24’ min/ 45-72’ max

Vertical Development Vertical Development Separation: 40’-80’ Separation: 40’-80’ min min

Vertical Development Width: Vertical Development Vertical Development FrontFront 80’-110’ max Setback: 10’-40’ Setback: 10’-40’ min min Vertical Development Vertical Development Side Separation: 40’-80’ min Setback: 20’-40’ min

Vertical Development Front Setback: 10’-40’ min

Base Height 24’ min/ 45-72’ max

Height: 225’-300’ max

Height: Height: 225’-300’ max 225’-300’ maxHeight: Pedestal 30’-60’ max

Pedestal Height: Pedestal Height: Height: 30’-60’ 30’-60’ maxmax 225’-300’ max

Height BaseBase Height 24’ min/ 45-72’ 24’ min/ 45-72’ maxmax Pedestal Height: 30’-60’ max

Base Height 24’ min/ 45-72’ max


Property Line Vertical Development Zone I

Vertical Development Zone I

No Build Zone

Single-Family Residential

1 to 1

3.1 to 1

300’ (Max.)

Existing Grade

Tower 60’ (Max.) 25’ (Min.)

Base

35’ 1 to 1

3.1 to 1

300’ (Max.) 20% parcel width (Min.)

Tower Base 35’

Tower Base

60’ (Max.) 25’ (Min.)

20’ 40’ (Min.)

20’ (Min.) Base

20% parcel width (Min.)

Tower

Variation 1: Single Family Protection Zone: Sky Exposure Plane at back of parcel is measured from Residentially zoned parcel, regardless of adjacency. Towers: Only front 50% of base area can be used for tower construction. Only towers can break Sky Exposure Plane. FAR:

7.0 where 50% must be in base.

20’ 40’ (Min.)

20’ (Min.)

Variation 2:

6 x half ROW width (Max.) Tower 1 x half ROW width (Max.) .5 x half ROW width (Min.)

Base

5.7 to 1

1 to 1

6 x half ROW width (Max.) Tower Base

Base

Tower

Single Family Protection Zone: Based on base height with a minimum distance from a residential property regard less of adjacency.

Variation 2:

5.7 to 1

1 to 1

1 x half ROW width (Max.) .5 x half ROW width (Min.)

Single Family Protection Zone: Based on base height with a minimum distance from a residential property regard less of adjacency.

Towers: Variation 2: height and area Tower based on allowable volume. Single Family Zone: (900000 cubicProtection feet) Based on base height with a minimum from a Sky Only distance towers can break residentialPlane. property regard Exposure less of adjacency.

Towers: Tower height and area based on allowable volume. (900000 cubic feet) Only towers can break Sky Exposure Plane.

FAR: Towers:7.0 total. Tower height and area based on allowable volume. (900000 cubic feet)

FAR:

7.0 total.

Only towers can break Sky Exposure Plane. base height (Max.) 20’ (Min.) Base

52

20’ (Min.) Tower

base height (Max.) 20’ (Min.)

20’ (Min.)

Diagram: Commercial and Single Family BROOKWOOD ALLIANCE PLAN

Diagram: Commercial and Single Family BROOKWOOD ALLIANCE PLAN

FAR: 7.0 total.


Property Line

Property Line Vertical Development Zone I

Vertical Development Zone II

No Build Zone

No Build Zone

Multi-Family Residential Commerical

Variation 1: Single-Family Residential

3.1 to 1

1 to Grade 1 Existing

300’ (Max.)

Tower 60’ (Max.) 25’ (Min.)

Base

60’

3.1 to 1

1 to 1 Tower Base

60’

Base

20% parcel width (Min.) 60’ (Max.) 25’ (Min.)

Tower

20’ (Min.)

300’ (Max.)

20’ (Min.)

20% parcel width (Min.)

Variation 1:

Existing Grade

Sky Exposure Plane stops Multi-Family Protection Zone: after 50% of parcel length is Sky Exposure Plane at reached. back of parcel is measured from multi-family/commercial Towers: parcel, regardless of Only front 50% of base adjacency. area can be used for tower construction. Sky Exposure Plane stops after 50% of parcel length is Only towers can break Sky reached. Exposure Plane.

Multi-Family Protection Zone: Sky Exposure Plane at back of parcel is measured from multi-family/ commercial parcel, regardless of adjacency. Sky Exposure Plane stops after 50% of parcel length is reached.

Towers: FAR: Only front 50% of base 7.0 where 50% must be in area can be used for tower base. construction.

Towers: Only front 50% of base area can be used for tower construction. Only towers can break Sky Exposure Plane.

Only towers can break Sky Exposure Plane.

Tower

Base

Multi-Family Protection Zone: Sky Exposure Plane at back of parcel is measured from multi-family/commercial parcel, regardless of adjacency. Variation 1:

FAR:

FAR:

7.0 where 50% must be in base.

7.0 where 50% must be in base.

20’ (Min.)

20’ (Min.)

Variation 2: Multi-Family Protection Zone: Based on base height with a minimum distance from multifamily/commercial parcel regardless of adjacency.

Variation 2:

5.7 to 1

1 to 1

6 x half ROW width (Max.)

Tower 1 x half ROW width (Max.) .5 x half ROW width (Min.)

Base 5.7 to 1

1 to 1

6 x half ROW width (Max.)

Tower Base Base

Tower

1 x half ROW width (Max.) .5 x half ROW width (Min.)

Multi-Family Protection Zone: Based on base height with a minimum distance from multi-family/commercial parcel regardless of adjacency. Sky Exposure Plane stops after 50% of parcel length is reached.

Variation 2: Sky Exposure Plane stops after 50% of parcel length is Multi-Family Protection Zone: reached. Based on base height with a minimum distance from multiTowers: family/commercial parcel Tower height and area regardless of adjacency. based on allowable volume. (900000 cubic feet) Sky Exposure Plane stops after 50% of parcel length is Only towers can break Sky reached. Exposure Plane.

Towers: Tower height and area based on allowable volume. (900,000 cubic feet) Only towers can break Sky Exposure Plane.

Towers: FAR: Tower height and area 7.0 total. based on allowable volume. (900000 cubic feet)

FAR:

base height (Max.) 20’ (Min.) Base

Tower

7.0 total.

Only towers can break Sky Exposure Plane. FAR: 7.0 total.

base height (Max.) 20’ (Min.)

53

Diagram: Commercial and Multi-Family BROOKWOOD ALLIANCE PLAN

Diagram: Commercial and Multi-Family BROOKWOOD ALLIANCE PLAN

Proposed Built-out Profile


ACCESSIBILITY Based on Survey Results, Meeting Discussions and Site Evidence, we have determined that overall Brookwood has poor accessibility. Traffic is not effectivley managed by the existing infrastructure and it will be difficult for the existing infrastructure to accommodate future development. The quality of the pedestrian environment is low thus discouraging the viability of walking. Also, few households can reach desirable destinations in a short walk. There is poor overall vehicular connectivity, leading to increased congestion on Peachtree Road and on neighborhood strreets. Finally, access to mass transit is poor, providing no viable alternative for commuting. Problem The problem of vehicular congestion in the neighborhood owes itself mainly to a lack of accessibility. Accessibility can be increased in three ways: By increasing the capacity of the existing network, by increasing the amount of connectivity in the existing network, or by adding alternative means of transport other than driving. As we have seen, the street design strategy provides for the addition of a transit corridor runing down Peacht ree Road in the future. The addition of the Beltline will also add the ability to shift trips away from driving. This section is focused on identifying and categorizing potential future connections should the opportunity arise to make them a reality.

s2

p2

s2

Goals: Design Peachtree Street to accommodate transit if desired in the future. Create a database to track all proposed improvements to pedestrian and vehicular street infrastructure. Explore all possible options for improvements in neighborhood accessibility.

s1

p2

All Possible Connections Code

Location

a1

South Colonial Homes

a2

South Colonial Homes

a3

Colonial Homes

a4

Biscayne Dr

a5

Peachtree Park

a6

Tulast

a7

Bennet Street

a8

Spadling Street

a9

Peachtree Valley

s1

Golf Course

s2

Tanyard Creek

s3

Tanyard Creek

s4

Tanyard Creek

s5

Tanyard Creek

s6

Colonial Homes

s7

Peachtree Memorial

s8

Tanyard Creek

s9

Junction Ave

s10

Demorest Ave

s12

Peachtree Hills

s13

SouthEast-Creek

s14

Tanyard Creek

s15

Tanyard Creek

s16

Tanyard Creek

s17

Peachtree Valley

s18

Spadling

s19

Peachtree Valley

s20

Peachtree Valley

s21

Brattons St

s22

Ardmore Sq

s23

Ardmore Sq

s24

Ardmore Pl

s25

26th/25th St

s26

I-85/Peachtree St

s27

Palisade Road

p1

Beltline

p2

Golf Course/ Nside Dr

p3

Tanyard Creek

s1

Path Network Brookwood Studio Proposal Beltline/Connect Atlanta Studies Proposed Paths Proposed Streets Proposed Connections


s10

s9

s5 s8 s3 s4

s3

s6

s7

s11

s2 s14

s9

s5

a4

a3

a2

s13

s15

p3

s8

a1

a5

s3a

s14

a6

s4

s6

s7

s17

a7

s16

s11

a8

s3

s18

s2

s12

a9

s14a

s20 p1

s19

a3

a2

a4 s15

a1

s13 p3

a5 s14

a6

s27

s16

s17

a7 a8

s18 s23

s21

s12

a9

s20

s22

p1

s19

s24

s25

s27 s26

s23

s21

s22

s24

s25

s26



In the end, there remains a great dddeal of work to be done in order to secure the future of Brookwood according to the vision that the community has put forth. The studio team believes that this project has been successful in garnering some general agreement over the basic strategies that should be employed when moving forward in this process. As opposed to the assumption that residential and commerical property owners cannot see eye to eye, we have uncovered a middle ground. By recognizing the realities of what can and cannot be done given the existing physical context and regulatory framework, we can begin to build the framework for the future based on a foundation of reality. Moving forward, the concepts proposed by this studio should be utilized in the formation of an overlay district or a new set of zoning classifications for the neighborhood. Whatever road the community decides to take, we must reiterate once more the central strategies proposed over these many pages. -Design Peachtree to accommodate the needs of all users today while allowing for incremental enhancement in the future. -Regulate the form of devleopment in a manner that is straighforward, fair, and responsive to context -Consider the needs of future generations while exploring all possible oppotunities for increasing accessibility.




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.