A Design Method of Campus Stadium-Xutian Huang

Page 1


BREAKNG COCONO INTO BUTTERFLY

The Campus Stadium Design

/ MARCH. 2021 (SECOND SEMESTER IN SENNIOR YEAR)

From an urban perspective, different types of gymnasiums have different radiation ranges. This is not only a sports venue provided by the school for students, but also for the citizens, providing a public space for the citizens. The stadium is a building facing the city and needs to be marked. Currently, Campus has only one football field and a few basketball and badminton courts, lacking public space and closed venues. For the teachers and students in Campus of Chongqing University, it is very important to build a multifunctional gymnasium in Campus.

INSTITUTION

Assistant Prof. Wang Xuesong (E-MAIL: Wang723123@126.com)

CHONGQING UNIVERSITY

SELECTED PERSONAL WORKS FROM A GROUP ACADEMIC WORK SHAPINGBA,CHONGQING,CHINA

CONCEPT DEVELOPMENT

Provide a multi-functional activity space for teachers and students.

It is open at ordinary times and provides a competition venue to campus space.

People can perform multiple activities at the same time.

Provide more public space for students and communication space for people.

The earth-covered buildings greatly increased the green area and land utilization.

More space is used, and soil covering increases land utilization.

The original small gardens of the residents were expanded. Meet the sports needs of residents and trigger the vitality of neighboring areas.

Floor area ratio: 1,4 Greening rate: 33.5%

Total land area: 9962 m2

Total floor area: 14024 m3

Athlete room area: 400m2

Equipment room area: 300m2

News media room area: 265m2

Sports training hall area: 960 m2

Event technical room area: 110m2

Sports competition hall area: 3425m2

Competition management room area: 320m2

Number of spectator seats in the competition hall: 4534

ARCHITECTURE PERFORMANCE

Architectural form deliberation process

FUNCTION&SUSTAINABLE ANALYSIS

Ground floor 4600mm

VIP rest area and the audience rest area have different entry and evacuation flow lines respectively, and are connected to the stands.

-1st floor -4000mm

Athletes rooms, staff rooms, and logistics room shave different entry and evacuation flow lines, and are connected to the infield space.

-2rd floor -7500mm

Basketball training hall, fitness center, student and community activity center, and auxiliary equipment functions.

ZONING&STREAMLINES

FUNCTIONAL ZONE

Seat partition

Seat number

Evacuation time

EVACUATION LINE

Evacuation exit

Exit width

The number of people passing per minute

SCENE PERFORMANCE

DETAIL

Pressed aluminum repair track

Compressed stone fiberboard

waterproof

steel plate

Three-way adjustable spherical support element

Tighten the pointed screw

Connecting flange

Pipe

Electrochromic glass Streamlined stiffener support

In order to achieve better light and space effects, fragmented mosaic treatments are made, and the surface adopts electrochromic glass according to the sunlight and indoor needs, which changes in variety. In addition, the undulating streamer-like landscape is used to dissolve the height difference, forming an open facade to generate gray space and green space. The sunken courtyard surrounding the competition hall emphasizes the floating feeling of the main hall.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.