PORTFOLIO JIAYI XIA
2015-2021 Tel: +86 18818001120 +45 52829521 Email: diudiuxia10@gmail.com Shanghai/Copenhagen Spatial Design
/ CURRICULUM VITAE/
JIAYI XIA (SUMMER)
ACTIVITY
Date of Born: 10/01/1996 Tel: +86 18818001120 / +45 52829521 Email: diudiuxia10@gmail.com
2014.06
Organised department meetings, regularly (twice a month) held professional sharing sessions about cutting-edge Landscape theories and case studies
I dreamed to be a designer and started to learn drawing when I was young. The sense of accomplishment I got in the process of design and construction keep guiding me forward. I own the perspective of big scale with landscape backgroud, at the same time interested in dive into details of project. I'm exploring the democracy of design, how to use architecture as a way to improve life quality for normal people.
2015.12
Cooperated with volunteers from different universities, responsible for sorting and summarising the manuscripts
Guided 50 people in the museum, and gave interpretation of art exhibits The Royal Danish Academy - Architecture, Design, Conservation
Spatial Design
Master of Art
2019.09
Shanghai Institute of Technology
Landscape Architecture
Saint Louis
Bachelor of Engineering, outstanding graduate in 2017
HONORS
Ranked 5th/117 in grade (4.3%), GPA 3.7/5, average score 87/100
2016.12
One of the largest landscape architecture international competitions in China
Core modules: Ornamental Trees(90), Urban Park Design(91), Architectural Design on Landscape(90), Landscape Planning(91), Historic Relics Protection & Its Development(94), Landscape Architecture Construction Engineering(94)
As team leader, responsible for the task arrangement, made schedule and assigned tasks to different members.
East China University of Science and Technology
Designed questionnaire, coordinated 50 residents on the site to complete it to make conclusion of daily needs of facilities
Japanese
Core modules: Comprehensive Japanese, Japanese listening, Japanese conversation, Japanese extensive reading, Japan Overview, Japanese-Chinese Translation and Writing
Led the team to complete the design, made diagram, masters and section design.
Office for Urban Renewal
2015.11-2016.04
Shang Hai (International) Flower Expo the Future Gardener Exhibit, Platinum Award Responsible for landscape wall design, plants choosing and construction of the main scenes. Cooperated with team members, help organise and coordinate all work, such as task assignment, communicate with construction workers to make sure projects were finished within time limits
WORK EXPERIENCE
2014.11-2015.03
Analysed the historical building design of Lijiang city, made 3D models, helped improve the overall planning and design of Lijiang tourist town.
As vice-captain, responsible for the investigation, wrote a report of 3500 words
SKILLS Proficient in Adobe PhotoShop/ Auto Cad/ Sketch Up/ Adobe InDesign/ Adobe illustrator/ Rhino/ Lumion/ Microsoft Office Suite/ Hand drawing/ Model making Knowledge and experience in clay and plaster making, woodworking, metalworking machines Fluent in English (IELTS6.5)/ basic user in Japanese/ native speaker of Mandarin
Conducted industry analysis and research of Chengdu Erxian bridge heritage protection design, assisted to make diagrams and final presentation slides. Guided two interns to complete one-month internship and taught them to use basic software such as Autocad, Sketch up. Shanghai Lin Tongyan Li Guohao Engineering Consulting Co., Ltd. Landscape Architecture Intern Participated in road landscape design, including road billboards design and road construction design Involved in colour filling of the plan design for the Tencent Data Center
Shang Hai College Students' Winter Vacation Social Activities, Second Prize Investigated and studied commercialisation reformed ornament of Shikumen in Shanghai
Assistant Designer
Participated in the overall transformation design of Yan'an high School, including courtyard landscape design, interior design of multi-function classrooms, and building façade renovation, did construction drawing, involved in the project presentation, communicated with government and school assistants.
2016.12– 2017.01
Yuanye Award Landscape Architecture International Competition, Honorable Prize
Won second prize scholarship twice, third prize scholarship twice
Successfully completed the elective courses, obtained a certificate
2017.7~2019.7
Design Shanghai 2019, Booth personnel of Saint Louis Provided 4 days' service, guided 300 guests and introduced the brand history with products of
Core themes: Spatial Transformation, Privacy and Power, Re-designing: Spatial Elements of Extraordinary
2014.9~2017.7
Shang Hai K11 Art Museum, Guide Interpreter Provided 22 hours’ volunteer service, participated in the training for professional service
EDUCATION
2013.9~2017.7 Shanghai
LEPC ‘Youth Landscape Architecture: The Practice and Thinking, Volunteer Youth Landscape Architecture (YouthLA) is a non-profit organisation in China providing young landscape architects and students with a platform for learning and communicating.
2018.03
2019.9~2021.6 Copenhagen
The Youth Committee of College Academic Department, Excellent Student Member
INTERESTS Photography/ Music/ Film/ Cooking/Travelling
/APPETIZER Small Projects 2019-2020 Space Oddity Growing Château de Versailles — Salon De La Guerre
/Space Oddityerre
Mapping
Concept idea sketches
This corner piece is an investigation of the religious architecture of Vor Frue Kirke. It is a two faced threshold with more dimensions; the perfect and the imperfect. The strict seamless architecural artifacts represents the strong practice of architect C.F. Hansen as opposed to the rough surface with the trace of the ritual, the body, time and the sacred.
/Growing
/ Material Test /
Using different kinds of materials to test how the light come throngh with, then we can use this to design the density of the fabric in the exhibition.
Plastic
Tracing Paper
Non-Woven
Shining Fabric
/ Choice Of Machine /
Ceiling Projector
Telephone Projector
Cinema Machine
/ Exhibition /
/ Plan /
Ageing is a basic human condition: we all grow older. The process affects our physical and mental state; age-related functional impairments challenge our mobility and minor disabilities deteriorate with time. This project wants to create an abstract experience in the journey of life through the space separation of different lighting equipment and different materials.
Over Head Projector
/Château de Versailles — Salon De La Guerre
/ Site Mapping /
/ Design /
As the design intervention, I try to use some plants elements to show the reflection of the garden and use some exotic plants and animal for that time to shower the power of the emperor.
CONTENT
FRAME THE BEAUTY OF NATURE CREATE AN INTERACTIVE ART INSTALLATION IN IGNORDED NATURAL FOREST, XIXINAN, 2018
MIGRATORY CUBES MULTIFUNCTIONAL STAGE COULD BE RE-ASSAMBLED SERVE FOR THE COMMUNITY, COPENHAGEN, 2019
SKIRTING BOARD ON BUNKER FOCUS ON SPATIAL ELEMENT- SKIRTING BOARD TO CREATE FUNCTIONAL INDOOR SPACE , COPENHAGEN, 2020
THE DIALOGUE BETWEEN OLD AND NEW RETHINKING CITY DEVELOPMENT IN WENZHOU, A CITY IN CHINA, 2021
FROM 'MY' YARD TO 'OUR' PARK URBAN RENEWAL STATEGIES FOR OLD AND MIXED COMMUNITY SHANGHAI, 2015
FRAME THE BEAUTY OF NATURE Turenscape Academy & LWCircus ChinaLab 018 Landscape Design Methods Based On Social Practice Workshop Groupwork Project 2018.11 Adviser: Pedro Camarena (pcamarena@cic.unam.mx) Location: Xixinan, Anhui, China Type: Landscape Installation Introduction: / Create An Interactive Art Installation In Ignorded Natural Forest / Xixinan village is a historical village located in the southeast of Yellow Moutains. There is an island connected to the village is undeveloped and covered by natural ash forest. The main purpose of the project is to arouse the consciousness of the villagers and tourists about the natural forest and to protect it from cutting town. I tend to put several 'Red Frames' into the island to help people capture the beauty of the forest. The 'Red' frame leads people to explore the landscape carefully at chosen location where the forest background is like 'Black and White' chinese landscape painting. The comparison of color between red, black and white and the shape between regular and organic background help people to realize the unique and irreproducible feature of this ash natural forest.
9
STEP1. ENCOURAGE PEOPLE TO EXPLORE THE ISLAND
ROUTE ANALYSIS 6
CONCEPT IDEA
3
There is a bridge linking the village to the island. Firstly I would like to encourage villager to star explore the island by putting the red frame. The location of the hives are carefully chosen to make sure that people can easily notice them when passing the bridge. The material of the hives is collected from the local bamboo forest. The structure is inspired by the tranditional riverside ladders, local dwellings, river stepping stones and bee hives.
2
5
10
7
8
4
1
HUMAN BEING
NATURE
FIRST INSIGHT
1
HINESE ASH FORST
2
PAVILION
3
RIVERSIDE LADDERS
4
THE MIST
5
LOCAL DWELLINGS
6
BAMBOO ALLEY
7
WOODEN BRIDGE
8
BEE HIVES
9
STONE BRIDGE
10
RIVER STEPPING STONE
STRUCTURE DESIGN
BEE HIVE
CONSTRUCTION
INTERFACE DESIGN
MATERIAL
COMBINATION
DECORATION CURTAIN
The structure is inspired by tranditional bee hives. Then I try to start from a single unit to form a combination space and decorate it with different interface to encourage people stay in the forest and explore the beauty of nature.
TRIANGLES
FRAME
STEPPING STONES
INSTALLATION PROCESS 2.PREPARATION
1.SEARCH MATERIALS
CLOTHESLINE POLE
BAMBOO SCAFFOLD
BAMBOO BASKET
TRASH CAN DECORATION
Ask Residents For Bamboo
Purchase Iron Line In Grocery
Select Bamboo With Same Thickness
Cutting Based With Calculation
BAMBOO FOREST
LAUNDRY SITCK
LEAVES FILTER
STORAGE
Cutting Red Ribbon
Tie Red Ribbon
Fix In Top
Construction Testing
4.LOCATED
3.FIXATION
SHADED CEILING
STAIRS
According to the first sight of this village, we pick up six kinds of frame representing the structure of traditional bee hives, bridge and building. All these regular shapes will contrast with the organic shape of the tree branch.
LOCAL LIFE WITH BAMBOO
FENCE
CIRCLES
Fix In Bottom
Moving To The Site
FRAME THE BEAUTY OF NATURE When looking out of the frames, people would see different sides of the natural ash forest through different interfaces. On the other hand, people's activities are also become the part of this scenery. I hope the 'Frame' would becomes a new fun and communicative space to encourage people to re-explore the forest and capture its unique beauty.
MIGRATORY CUBES Postgraduate 1st Year Project Privacy & Power Individual Project 2019.9-2020.1 Adviser: Ane Pilegaard(apil@kadk.dk) Location: Blågårds Plads, Copenhagen, Denmark Type: Landscape Installation Introduction: / Multifunctional Stage Could Be Re-Assambled Serve For The Community / Koncertkirken (concert church) is situated centrally in the nørrebro district and right in the centre of blågårds plads. The so-called gang-related problems have received massive coverage in the media which unfortunately colours many people’s picture of the area around blågårds plads. The idea is that local residents should also use koncertkirken as a meeting place and a space to use for activities. But as the thickness of the facade and great effect of soundproofing sometimes the concert church was not attract lots of people into. Also on this plaza without too many shlters to prevent people from rains and winds. I would like to intruduce a cube system which could assamble by different situation like jazz festival and normal days to cater people kinds of needs. And by the process of cube migration, hope community could join together, narrow the boundary of people from different nations and races.
SITE ANALYSIS
1
HOW THE INFORMATION PRESENT ON THE SITE
Information Presenting On The Concert Church
2
Poster Column on Plaza
3
Signages and Posters of Stores
4
Posters on Library's Windows
3 1
2
4
On the site, the concert church is hidden on the public view, compared with the library, stores on the street and the poster column on the plaza. And because of the solid facade without windows, information presentation of the church is kind of introverted way, compared with the surrounding buildings with windows. As for the church, information of the concert becomes hard to get.
As for the information on the concert church which is hidden behind the wall, and put in very random way, almost all the posters were on the wall, paste directly on the old one. the pamphlets were on the reception and sill under the windows. there are also some sign to gudie people where is the restroom and somke outside.
Street Furnitures On The Plaza
Surrounding Restaurant And Food Price Food Price (dkk) 200 150
160
X 17
120 80
80
Course
Thailand Cuisine
Jazz Bar
Arabic Cuisine
Course
Drink
Course
Course
cider 50dkk ginger bear 54dkk pilsner 30dkk black lager 28dkk guld 67dkk ckili tripel 60dkk double Ipa 85dkk cuvee van de keizer 180dkk
marinated flank steak strips 99dkk Marinated chicken 99dkk Ahaaa mix 139dkk kubbeh 89dkk Falafel ret 89dkk Vegetarian ret 129dkk Ahaaa special 99dkk Halloumi salad 59dkk Avocado salad 59dkk Chicken salad 69dkk Mix salad yourself 79dkk
Pizza 99dkk Snacks 29-49dkk Linsesuppe 69dkk Quinoa Salad 89dkk Sandwich 79dkk choko mousse 39dkk squash cake 30dkk snickerskage 35dkk cheese cake 40dkk
Bear 36dkk Coffee 35dkk Jasmine or Oolong 45dkk Cocktails 105dkk red wine 80dkk white wine 75dkk
30 lowest Price
Pizza
Tempura 65-95dkk Goi Pla 85dkk Thai Spring Rolls 75dkk Satay Kylling Spyd 75dkk Hoi Yang 85dkk Thai Fish Cakes 85dkk Yam Bli Goui 85dkk Sum Dam 85-125dkk Drink
40
average Price
highest Price
X4
X 12 Food Price (dkk) 200
185
160 120 80 40
Drinks
66 28 lowest Price
average Price
highest Price
X 10
DESIGN STRATEGY
On the new stage, people palying the instrument which makes the mucis performance much visible by the public, on the other hands, inhance the function and the symble of the concert church. At the same time the other three street furniture increase people intimacy in this neighborhood.
Winter
Spring
Winter
Spring ACTIVATE
Autumn
Summer
Autumn
Music Festival
Summer Music Festival
Step 1: Take off Stainless Steel Cable Take off the stainless steel cable which use to stable the installations.
I. Current Stages During Music Festival Step 2: Take Off The Pin And Safty Clip
During The Current Music Festival, People Now Use Very Simple Way To Make A Stage, Like Stand On The Carpet, On Easy Assembled Stage, Under Awning And Under Flag Banners. They Just Use Simple Way To Create A Feeling Of Space On The Ground Or Overhead.
Cause the stage is made of the cube putting together, it should be easy assemble so i design a node which can easily be take apart. Step 7: Take Off All The Cube And Start A New Circulation When on next year's music festival, the three outdoor furniture will be seperate again and start a new circulation.
X 25 on the carpet
on easy assembled stage
Under awning
Under flag banners
Step 3: Electric Crane The woker who work for this will be treat by the concert tickets during the music festival. And when after the music festival these cube will be take apart by electric crane.
Stage
Food Track
Pavilion
Poster Tower
X 25
II. Elements From The Concert Church There are some typical elements from the facade of the concert church, like archs, stairsteppings outline and rectangle shape. I would like pick the stair-steppings shapes to demonstrate the linking with the concert church.
Food Track
Food Track
X9
Pavilion
X 10
Poster Tower
X6
Step 5: Put Pin And Safty Clip On After using the pallet truck and pallet truck put these cube on the right place, volunteers can use their hands to pu the pin and make the safty clips on.
Pavilion
Church Facade
Step 4: Pallet Truck The woker who work for this will also be treat by the concert tickets during the music festival. And when after the music festival these cube will be move to the right place by pallet truck.
Step 6: Put On Stainless Steel Cable Put on the stainless steel cable to make the three installation much stable. Poster Tower
III. Test Of The Basic Assemble There are some typical elements from the facade of the concert church, like archs, stairsteppings outline and rectangle shape. I would like pick the stair-steppings shapes to demonstrate the linking with the concert church. Seat
Ceiling 1
Ceiling2
Pavilion Of Simple Joint
Pavilion Of Lap Joint
/ CUBE MIGRATION / Food Truck
Poster Tower
As for the design intervention, I want to design a multifuctional outdoor installation which can be assemble and seperate by community in different seasons, adapting to different occsions and activities. I choose cube, because they can be combined into various forms with adjustable. It will becomes some migratory cube moving around on this space, during the music festival in summer time, it will becomes stage to demonstrate the function and status of the concert church, which is also a proactive approach to express the information to public. When out of the music festival period, the cubes will be food tracks, poster tower and reading pavilion.
/ Design Plan And Elevation During Cube Migration / The cube migration sperate with normal days from jazz music festival. I would like to use this intervention, let more communities involved in this local event. On one way, it will develops the jazz music festival experience feeling to build a more professional and monument represent community spirit. The other way, people's activity at this site will also be extended by the other installation seperate by the stage.
Migratory uring Mu i Migratory uring Mu i
Food Truck
Migratory During Music Festival
Tower
uring FoodMigratory Truck Tower
Food Truck
e tival e tival
Mu i
e tival
Tower
Migratory Cube Plan 1:500
Pavilion
Pavilion Pavilion
Pavilion
Food Truck Tower
Migratory uring or al ay Migratory uring or al ay
Migratory uring or al ay
Migratory Cube Migratory Cube Elevation 1:500 Elevation 1:500
Migratory Cube Elevation 1:500
Migratory During Music Festival
Migratory During Normal Days
PERSPECTIVE VIEW DURING NORMAL DAYS
PERSPECTIVE VIEW DURING JAZZ FESTIVAL
The first part of the disassembled stage will be used for hanging concert church performance information and the announcement of community information.
The second part of that will be used as a food truck since here is a huge public plaza and meets a lot of people's need for drinks and snacks.
During the jazz festival, the cubes will be assembled into a stage by the festival organizer. The facade of the church serves as the background of the stage, and they have a similar composition. There is a connection between indoor and outdoor spaces. The stage can be regarded as the logo of the church during Jazz Festival.
The last part will be a pavilion severing for people on rainy days.
SKIRTING BOARD ON BUNKER Postgraduate 1st Year Project Re-designing: spatial elements of extraordinary Individual Project 2020.2-2020.6 Adviser: Natalie Koerner(nako@kadk.dk) Location: Teaterøen, Copenhagen, Denmark Type: Interior Renovation Introduction: / Focus On The Spatial Element- Skirting Board To Create Functional Indoor Space / Over the centuries, the city of copenhagen implemented several types of defense facilities. The bunker complex originally consisted of an additional eastern flank of 120 meters, which was demolished in 1980 with the construction of the water pu- rifying plant, lynetten. Today several of the buildings serve more as scenography than buildings the bunker included. As the situation and construction of the bunker, the walls are too thick to go through the electricity wire or tube. I would like to preserve the integrity of the wall and introduce the skirting board systems to hide these architecture infrustracture systems to help reoganization in the bunker building. At the same time, i want to explore the multifuction of the skirting board intergrate with indoors furnitures and reoganize the space in the bunker meets morden use.
SKIRTING BOARD ANALYSIS
SITE
I did the analysis of the skirting board in the bunker, including the material, hight and texture. The exploading drawing shows clearly the interior space and relation with the skirting board.
/ ARCHITECTURE INFRASTRUCTURE INGREDIENTS /
COLUMN RADIATORS
LIGHTING SYSTEM
CLOSETOOL
ELECTRICITY BOX
SINK
WALL SOCKET
FLOOR DRAIN
2
WATER
3
ELECTRICITY
1
TEMPERATURE
EXHIBITION
STORAGE
1:50 PLAN DRAWING
EXHIBITION
OFFICE
SWITCH TOILET EXHIBITION
RECEPTION
ENTRANCE
2
EXPOSURE
CEILING
FLOOR
3
1
SKIRTING BOARD (WALL)
CUPBOARD
COVER
PLAN DRAWING WITH FUNCTIONAL DIVISION / ARCHITECTURE INFRASTRUCTURE OGANIZATIONS / EXPOSURE / COVER
This drawing shows functional division and the plan as an art gallery. Because of lack of sunlight and limitation of space, I transfer it as an art gallery with a storage, office, toilet and reception.
SECTION PERSPECTIVE AND DETAILS process model to show indoor spcaes
SECTION PERSPECTIVE AFTER RENEWAL I select two main sections, which shows different functional partitions and construction details of different height skirting boards Spatial element-detail and material
Spatial element-detail and material
1:50
12.0
750.0
HANDEL
WOOD PANNEL 12.0
170.0
10.0 170.0
Light Trough Led Bulb
Grout Solid Hardwood
Ceramic Tiles
Steel quick clips Foam Pad
Wood Panel
Latex Portland Cement Mortar
Poly Vapor Barriers Wood Structure
1:10
1:5
1:5
1:10
Spatial element-detail and material CAP
HOT WATER PIPE
COLD WATER PIPE
RADIATOR
WOOD STRUCTURE
1:10 HALF ROUND PANEL
Solid Hardwood
1:50
Steel quick clips Foam Pad Poly Vapor Barriers
DETAILS OF SKIRTING BOARD 1:5
DETAILS
The isometric drawing shows different layers of the skirting board 1:50 and the radiator which hidden behind the skirting board.
THE DIALOGUE BETWEEN OLD AND NEW Postgraduate 2st Year Project Thesis Individual Project 2021.2-2021.6 Adviser: Nicholas Thomas Lee(nlee@kglakademi.dk) Location: Xinyu, Whenzhou, China Type: Landscape and Buildings Renovation Introduction: / Rethinking city development in Wenzhou, a city in China / Urban village is a very important issue in China’s urban development. The project, The Dialogue Between Old And New, Rethinking city development in Wenzhou, a city in China, deals with establishing a better relationship of the old and new in urbanization. The project aims to make old urban village more attractive, improve the function of the community, using more sustainable ways to transform the urban villages in China. This project is located in Wenzhou, China, covering an area of 5,000 square meters. It involves the transformation of extra floors, which have been informally added to existing apartment buildings by local residents into a continuous roof garden system, and introduce roof planting garden and community activities spaces to connect the whole community. This modest way of urban renewal is also a criticism of the government's current strategy, which involves the demolition of urban villages.
BIRD VIEW AFTER INTERVENTION 1:30 12 buildings were connected by bridges after the intervention, central will activate 1:300 the whole part. the whole garden including two parts, one Bird viewthe after theplaza intervention is a central public space with a children's playground, workshop, public meeting rooms. The outer circle will be a continuous roof planting garden.
RENOVATION STRATEGY OG BUILDINGS DESIGN LOGIC LEARNT FROM TRADITIONAL VERNACULAR STUDY
Structures
Wall&Roof
STEP.1
STEP.4
This drawing shows the state of the building when it was newly built in 2000. At this time, there were no metal cages on the facade, and people had just moved here from the old villages. There are not so many stores on the first floor. People use the first floor as a living room to meet guests.
After the removal of the excess structure, the remaining column and beam structure becomes the first layer of the design strategy.Like beams and columns in traditional vernacular buildings, they serve as the skeleton of the entire space.The next step is to design walls and ceilings on the basis of this structure.
Traces Of Daily Life
STEP.2
STEP.5
This picture shows that since 2010, people have gradually added construction on the basis of four floors. At the same time, the facade of the building has become richer. Metal cages have been added to the facade, and the informal additions now have balconies.
The next step is to fill the structure with walls and ceilings (the green part), because the structure is two floors, the first floor as the main planting space and part of the indoor space for residential activities in the building, or storage of agricultural utensils.Two floors are connected by stairs, and the second floor will hold some planting boxes. The blue part is the third layer, where traces of people's lives, such as planted areas, will change over time in the future.
WenLiang Yan,"Kitchen" 1920 Three main spatial elements can be extracted from the painting "Kitchen". The first layer is the structure of beams and columns, the second layer is the wall and the ceiling, and the last layer is the traces of people's daily use of the space. I want to learn the 3 layers of spaces from the painting, and using it at my design. In my design, the first layer is the structure of the building and second layers is filled in panels, the third floor may change with people's daily use. In this project, the retaining beam-column structure of the added floors, which it is a fixed frame. What I need to design is fill in the structure and how to create different spaces.
STEP.3
STEP.6
This picture shows the design strategy for the building, removing walls and ceilings of addition floors, removing accessories such as doors and windows, leaving only the structure of the columns and beams of the added floors.
The last picture shows the state of the roof garden in 2030, gradually covered with plants, where people work and take activities here, and the community becomes more vibrant because of the roof garden.
PERSPECTIVE SHOWS 3 LAYERS OF SPACES oof SECTION arden er e tive e tion 1:30
While learning from the vernacular traditional buildings, the intervention also adapts the language of spaces, which vividly shows column is the first layer, the wall and floors combine seconds, and the last the daily trace of daily use is third layers. there has a sky window to access the rooftop from the building inside. a rainwater collection system also be introduced.
PERSPECTIVE WITH DETAIL DESIGN 3 MOMENTS ON THE ROOF PLANTING GARDEN The three scenes visually show how the roof garden is used by residents in theirs daily life.
The main planting area on the roof is raised 45cm to allow the roots of the plants to grow better. The sky window is the entrance to the garden from the interior of the building. The irrigation system is connected to the pipes downstairs to provide water to the plants during non-rainy seasons.
This picture shows the second floor of the roof garden, where one side is the planting box, and the other side is set with seating for people to rest. Rainwater collected by the eaves which will be stored. You can see people using roof beams to dry fish.
Details of planting box 1:10
This space also shows 3 layers of design logic, second layer is the wall which could be diversity used as a window and sitting area for taking a rest and communication area of the residents.
Details of sitting area 1:10
FROM 'MY' YARD TO 'OUR' PARK Academic 3Rd Year Project Individual Project 2015.9-2015.11 Adviser: Xiaoshaung Li (lxs_sit@163.com) Location: Shanghai, China Area: 13ha Introduction:
/ Urban Renewal Stategies For Old And Mixed Community / New Village ( 工 人 新 村 ) refers to urban housing project built in 1950s to the late 1990s and it is the most typical ' built environment' of shanghai. it somehow indicates the lack of public space, service facility and a mix of locals outsiders. the project intends to form an interconnecting open space system providing sports courts, communicative space, productive field and boxes. this new open space system comes from the contribution of 'private' yard and aim to become 'public park' to involve all the community to enjoy it.
1900
1910
1920
1930
1940
1950
1960
1970
1980
During 1949 to 1965, with the development of industry, new village as a symbol of socialism. Most of them located near factory with basic facilities.
New village first introduced in shanghai in 1919, built as a complement of factory for workers. Which had a strong political significance for the working class.
2000
2010
Third Stage: Trend Fading Away In City Center Occur In Suburb
Second Stage: Blowout Of New Village In Shanghai Center
First Stage: Introduction Of New Village
1990
During 1979 to 1990, the trend which happened in city center was gradually fade away, instead new village occuring in suburb where new factories move to there at the same time.
book ism group incident policy about new village neighbor the site
1902
1910
《Garden Cities of To-morrow》
Anarchist communism about the site
1910s White Birch Society The group emphasized idealism, humanism and individualism. One of the originator saneatsu mushanokōji present the new village idea.
1919
1919
1949
1966-1976
1978
New Village Idea Introduced In China
May Fourth Movement
People Republic Of China Formed
Cultural Revolution
Reform and Opening
A sociopolitical movement in China from 1966 until 1976. The movement paralyzed China politically and negatively affected both the economy and society of the country to a significant degree.
Zhou Zuoren published 《the spirits of new villages》 focusing on people’s lives
1927
1949
Nationalist Government in Nanjing
Shanghai Government Founded
1990
1980 Number Of New Village Increased In Suburb
Marketization Of Residential Production
2017
1927
1950
Shanghai As The Economic Center
Was identified as Sports and Leisure Town
Shanghai Workers' Housing Construction Committee
Population increased, three kinds of new villages were built: ● Workers in factories built together ● Government built for workers ● The real estate for sale
Constructed a large number of workers' houses
1919
1951
Longhua New Village
Caoyang New Village Completed
2005
2015
Sea Bay Town Established
The Highest Aging Rate In Fengxian District
The first new village in Shanghai.
1979
Fengxin Township
1953
San Diego Villa was built
new named from people's commune of xinhai
1986
1936
2009
1984
People's Commune Of Xinhai Was Built
2015 Sea Court Community was built
1982
2008
Fengxin No.1 No.2 New Village Were Built
Fengxin No.1 Community Were Rebuilt
1982
SITE LOCATION
Fengxin No.1 New Village Local population vs. Migrant population
Population Aging Rate
WHAT IS 'NEW VILLAGE' ?
18% 82%
37% 63%
City Center
Industrial Structure Ratio
55% 35% 10% first
Fengxian District Site
local population (12374 people) migrant population (20587 people) total population (32961 people)
aging population (5932 people)
second
third
proportion industrial structure ratio
the other population (27029 people) total population (32961 people)
Fengxin No.2 New Village
New village is a historical product of a specific period in China and firstly was built for workers. There were three stages in new village's development, first introduced in 1919, then blowout during 1936 and finally fading away in city center, after 1979 as the development of real estate and moved to surbub with factories. Firstly it represented the advance of socialist system as a award for excellent workers. Nowadays, the old "new village" with no elevator which also means low rents appealling migrant workers. At the same time, young generation won't choice to live here again, leaving with lots elder peopel who still live in today's "new village". With the development of economic, "new village" becomes a symbol of old residential area.
MAPPING THE EXITING OPEN SPACE SYSTEM AND FUCTIONS
TYPICAL RESIDENT UNIT EXTENSION
WALL
BUILDING
EXTENSION
1.1m
WALL
1.1m
BUILDING 2.2m
8m
Shaded Lobby
7-10m
Shaded Lobby
2.4m
2.4m
Warehouse
Stairs
Extension Living Room
Independent Building
2.2m
NO.1 NEW VILLAGE
NO.2 NEW VILLAGE
The building is two-story. the private yard is used for vegetable planting. some private yard has extensions to put their tools.
The no2 new village has more organic combination with two-story and three-story buildings. they all have extensions occupying the semi-open space as the laundry and storage place.
OPEN SPACE
ROAD AND FACILITY Area Comparison
Road Density 20% 22%
33%
36%
78%
31%
Area Comparison
61% 39%
City Peddlers Retail Store Chess And Cards Room Shower Room Repair Shop Laundry Green Space Semi Open Space Private Space Extension
Road Density 9%
22% 78%
City Peddlers Retail Store Chess And Cards Room Shower Room
Open Space 0M
10M
20M
50M
Repair Shop Laundry
Semi Open Space
Carriage-Way(5M)
Private Space
Walk Road(2.5M) Boundary
Boundary
Three kinds of spaces in no.1 new village have balanced proportion. But no.2 new village has no big open spaces for daily activity.
No.1 village has higher road density than no2 village. And no.2 village has more equipment facility than no1 village.
STRATEGY 1 ZIP THE COMMUNITY POSITIVELY DEFINEING SEMI OPEN SPACE FOR MAXIMUM FUNCTIONALITY
RECONFIGURATION OF UNDERUTILIZED SEMI OPEN SPACE It shows four steps to positively define semi-open space system by relocating houses, rearrange the extensions and open the bounding wall in several neighbors to create seamless walking and active area for their daily activities.
Because of the organic form of the building, the no.2 Village has no centralized open spaces for activities. To solving this problem, i would like to provide a semi-open system that coming from the contribution of certain part of dweller's private yard. The semi-open system seamless walking area, various activity space and also link people together.
STEP 1 STRATEGY DESIGN
Existing conditions. Low space utilization,without enough space for daily activities. Carriage-Way(5M) Sun Quilt Square
Sun Quilt Square
Walk Road(2.5M) Semi Open Space
PROBLEM Outdoor Livingroom
pingpong square
Outdoor Livingroom
1Pingpong
Main Avenue
2
0M 10M
Basket -Ball Square
Square
20M
Island
Without Connection
50M
Sun Quilt Square
STEP 2 Sun Quilt Square
Ping Pong Square
Sun Quilt Square Badminton Square
Badminton Square
3
Open some clusters or use some semi open spaces for relocating the moving houses. Carriage-Way(5M) Alley(2.5M) Semi-Open Corridor House To Be Relocated
Basket -Ball Square
Relocated House
ONE DISTRICT Before
After
Outdoor Livingroom
Main Avenue Badminton Square & Mini Volleyball Playground Sun Quilt Square & Children Playground Pingpong Square & Chess Playground Outdoor Livingroom
STEP 3
Basketball & Parking Lot Relocated House
Redefine new access routes to increase permeability and functional spaces. Carriage-Way(5M) Walk Road(2.5M) Main Avenue House To Be Relocated
VARIETY OF ACTIVITY
Redefined Walk Road
AREA COMPARISON
6100
1525
15000
2300
9 7 6
14000
4
2740
13400
Before
2000 1500 2000 8
After
1000 5
22%
3 2
78%
33% 67%
1
Basketball & Parking Lot
Badminton Square & Mini Volleyball Playground
Pingpong Square & Chess Playground
Sun Quilt Square & Children Playground
STEP 4
2
3
Main Avenue Badminton Square & Mini Volleyball Playground Sun Quilt Square & Children Playground Pingpong Square & Chess Playground Outdoor Livingroom Basketball & Parking Lot Relocated House
section 1
Private Space
Relocated houses and put open spaces resources together. Create a new semi open space system with kinds of new functions.
SECTION 1
Outdoor Livingroom
Semi Open Space
section 2
section 3
STRATEGY2 LET US PLANT AND PRODUCT TOGETHER CREATE COMMUNITY PRODUCTIVE PROCESS
COMMUNITY PRODUCTIVE PROCESS
One issue of the 'new village' is that there are lots of low-income people. This strategy aims to form a productive loop that can provide additional income for the community and also involve people to the productive process. The 'planting box' would become a place support the productive process and connect people together to have both economic and social benefit.
This productive process welcome all the membership in the community to join in. In this system, different people would take responsible for certain steps from nursery, planting, storage, selling to co-cooking and compost. The planting field is in the middle of community and other process will happens in the 'planting box' utilizing the existing empty space along the community main road.
COMPOSTING ROOM
SEED NURSERY
STRATEGY DESIGN
STEP1 ingredient: Branch Leaves,Kitchen waste (without meat)
Compositing Box 1M X 1M X 1.2M Manpower:3-5 People Time Costing: More Than Half Years
Nursery Shelf 0.9m x 3m x 1.6m Polybag Nursery Polybag 20cm x 20cm Manpower:4-6 people Time costing:3 months
COMMUNICATION & CO-COOKING SPACE
Community Food Cooking Salon Borrowed Outdoor Restuarant Students Outdoor Activity Spaces
0.9m x 3m x 1.6m
Community Store
Sapling nursery Spaces:6m x 16m Manpower:4-6 people Time costing:8-9 months
0M 10M
20M
50M
Store Room
6 months later Solid
Planting Module
Seed Nursery
STEP3 1-2 weeks transfer to another compost bin
for Polybag Nursery
PLANTING FIELD
Planting Field
STEP2 mixed all together
Strawberry
Community & Co-Cooking Space Composting Room
SHARED PLANTING BOX
COMPOSITE COMPONENT
COMMUNITY STORE
STORE ROOM
Waved Plate
Wood Strawberry Box
Brick
Community Store
Seed Nursery
4500mm
3000mm
Goods Shelf 1.2m x 3m x 1.6m
Store Shelf 0.9m x 3m x 1.6m 4000mm
Glass
Farming Point System
4000mm
Stainless Steel
Store Room Weathering Steel
The basic module is based on the frame of stainless steel, and people could use different kinds of basic material such as bricks, waved plates, woods, glasses, weathering steels with numbers to make combination with several functions.
working 1h = 100points 100points = 1kg production
Communication & Co-Cooking Space ELDER
Composting Room
ONLINE STORE
Duty:grow Seedlings Pruning Expelling Parasite
CHILDREN
Duty: Vacational Social Practice
ADULT
Duty:transport Picking Collection
MASTER PLAN MASTER PLAN AFTER RENEWAL Envisioning a total addition of about 9500m2 of productive area for 850 households on site, and about 11% to the addition semi-open space for their daily life.
FROM MY PRIVATE YARD TO OUR FRIENDLY AND PRODUCTIVE GARDEN
Here people could assign a certain area of land for planting or hlep others for growing plants, the volunteers work for community would count the working hours for 'working points'. When it comes to the season of harvest, 'working points' could use to change foods.
FROM MY PRIVATE YARD TO OUR SAFE AND ACTIVE PLAYGROUND
Seed Nursery Community Store Store Room Community & Co-Cooking Space Composting Room
The main avenue is easy access to differents functional open spaces, at the same time there are lots of outdoor living room next the main avenue for diverse needs.
Main Avenue Badminton Square & Mini Volleyball Playground Sun Quilt Square & Children Playground Pingpong Square & Chess Playground Outdoor Livingroom Basketball & Parking Lot
0M
10M
20M
50M