C
B
E
D
F
PURA VIDA SPA
COLUMBIA, MO
PURA VIDA SPA
4
5
6
A
Code Analysis: Building Code: 2009 IBC Zoning: x Use Group: A,B Construction Type: II-A Square Footage: 6, 458 S.F. - First Level 6, 458 S.F. - Second Level Total Sq. Footage: 12, 916 S.F. Total Occupants: 50 occupants per floor Building Height: 2 Stories, 42’ at roof peak Automatic Fire Suppression System: YES Fire Alarm System: YES Minimum Egress Width (Corridors, Stairs) of 44 inches: YES Minimum Door Width of 36 inches: YES Minimum Door Clearance (forward approach): YES Stairways: Riser height (inches-7 maximum): YES Tread Width (inches-11 minimum): YES Railings Handrails (36 inches) – at all changes in surface elevation YES Handrails continuous or extend 12” past final change in elevation Guardrails (42 inches) – anywhere people might fall YES Appropriate # of exits required Per Floor Remoteness of Exits (1/2 diagonal rule): YES No Dead End Conditions (20 feet): NO Elevator Provided and enclosed: YES Elevator meets all ADAAG Requirements for accessibility Plumbing Fixtures Toilet Rooms Per Floor Second Floor Mens: 3 Womens: 3 Lavatories / Sinks: Mens: 3 Womens: 3 Total Size of Mechanical Space: 114 sf .0088% of total building square footage
SHEET LIST
3
NO.
NAME FLOOR PLAN RCP ELEVATIONS SECTIONS WALL SECTIONS DETAIL PLANS TOILET ELEVATIONS DETAILS SCHEDULES AXON FIRE PROTECTION PLAN FURNITURE
2
A 101 A 120 A 201 A 301 A 302 A 401 A 420 A 501 A 601 A 901 G 101 I 101
Room name
ROOM TAG
101
1 A101
F
SIM CALLOUT HEAD
1 DOOR TAG
1t 1t
WINDOW TAG
0
View Name 1/8" = 1'-0"
FIRE EXTENGUISHER
VIEW TITLE
GRID HEAD 1i
WALL TAG
1
Ref
Ref
1 Ref 1
A101
ELEVATION MARK
FIRE PROTECTION LEGEND 1/2" = 1'-0"
1 Ref
2/7/2017 3:48:29 PM
1
FLOOR PLAN LEGEND 1/2" = 1'-0"
No.
Description
COVER SHEET Project number Date Drawn by Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
G 001 A
B
C
D
E
Date
F
B
C
D
E
F
6
A
A
B
C
A
B
C
72' - 11 1/2"
72' - 11 1/2" 06
06
06
04
1
1
1
06
1
01 D3
04
MASSAGE ROOM
005
A 420
A2
MASSAGE ROOM
004
6' - 10 1/2"
MECHANICAL ROOM
Waiting Room
3' - 4"
D1 A 420
D5
100
002
D3 04
D4
2
D5
2
D4 A 401
D4 D5
102C
SHOWER E4Elevation 2-d Bathroom
3' - 0"
A4
A 402 102A
No. 06
3' - 0"
Description
Date
2
Bathroom 102B
B4Elevation 2 - b
D2
06 Bathroom
01
Bathroom
1' - 7 1/2"
1' - 8" 1' - 6"
103A
D2
103B
3' - 0"
SAUNA
008
007
7' - 11"
13' - 0 1/2"
POOL
6' - 0"
WELLNESS ROOM
02
B1 A 402 ADA Bathroom
DN
FITNESS ROOM 001
1' - 8"
D4
Elevation 2 - a
2
1' - 5 1/2" 9' - 5"
8' - 3"
A 420
Elevation 2 - c
D2 18' - 0"
D2
-a
102 8' - 3 1/2"
D2 D2
3
Woman's Bathroom 4 A5Elevation
D4
105
16' - 5"
CLASSROOM
8' - 6" D1
104
3' - 0" 3' - 0"
1' - 6"
ADA Bathroom
D2
103C
05
8' - 3 1/2"
8' - 3"
D4
06
9' - 5"
Men's Bathroom 103
15' - 3 1/2"
D3
D1 D3
90' - 6 1/2"
15' - 1 1/2"
Elevation 6 - a
D3
10' - 2 1/2"
12' - 0"
10' - 2 1/2"
90' - 6 1/2"
-
Elevation 5 - a
-
84' - 5 1/2"
4
D3
COLUMBIA, MO
PURA VIDA SPA
5
01
1' - 8"
D4
D4
2
1' - 5 1/2"
02 02
01
03
05
05
06
04
04
8' -7 " 1/2
66' - 10"
A
B
66' - 10"
C
A
B
C
FLOOR PLAN 1
Project number Date
2/7/2017 2:50:37 PM
Drawn by
LEVEL 1 A2 1/8" = 1'-0"
LEVEL 2 D2 1/8" = 1'-0"
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 101 A
B
C
D
E
F
-
-
-
-
B
C
D
E
F
6
A
A
B
C
A
B
C
P-1
P-2
FS-1
1
1
1
R-1
1
4
LIGHTING FIRST FLOOR LEGEND 1/4" = 1'-0"
COLUMBIA, MO
T-2
PURA VIDA SPA
5
T-3
S
S SS
S SS
S S
No.
Description
Date
R-1
S
S
2
2
FS-1
S
S
S S
3
S
SS
S
T-1
2
2
S S
S
S S
S
S
S
S
S
SS
S
S
S
S
S
P-1
2
S
S
S
T-5
A
B
LIGHTING SECOND FLOOR 1/4" = 1'-0"
C
A
B
C
1
RCP
A2
LEVEL 2 1/8" = 1'-0"
D2
Project number
LEVEL 1 1/8" = 1'-0"
Date Drawn by
2/7/2017 2:50:49 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyrica Bartlett
A 120 A
B
C
D
E
F
B
C
D
E
F
6
A
1
COLUMBIA, MO
4
PURA VIDA SPA
5
2
ROOF 20' - 0"
Description
Date
3
No.
2
LEVEL 2 10' - 0"
A2
East 1/4" = 1'-0"
ELEVATIONS
1
Project number Date Drawn by
2/7/2017 2:50:58 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 201 A
B
C
D
E
F
B
C
D
E
F
6
A
1
COLUMBIA, MO
4
PURA VIDA SPA
5
2
---
Description
Date
3
No.
LEVEL 2 10' - 0"
---
A1 A 302
LEVEL 1 0' - 0"
2
--GROUND
A2
LEVEL -3' - 0"
Section 1/4" = 1'-0"
SECTIONS
1
Project number Date Drawn by
2/7/2017 2:51:04 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 301 A
B
C
D
E
F
A
B
C
D
E
F
6
Roof
Flashing
Aluminum Window Head ---
Flashing
4
Aluminum Window Sill
Brick
Oak Flooring
3/4" Plywood Sheating
LEVEL 2 10' - 0"
COLUMBIA, MO
PURA VIDA SPA
5
Flashing
---
Insulation
2X10 Beam System
Insulation
Brick
3
Air Space Flashing
Vapor Barrier 3 1/2" Insulation 5/8" Gypsum Board 1/2" Anchor Bolt
No.
Oak Flooring Earthwork
Description
Date
LEVEL 1 0' - 0"
Vapor Barrier 2" Rigid Insulation
Footing
Gravel ---
Reinforcing Bar
GROUND LEVEL -3' - 0"
2
Key Steel Rebar
Drainage Pipe
WALL SECTIONS 1
Project number
A1
Date
Section 2 1" = 1'-0"
Drawn by
2/7/2017 2:51:09 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 302 A
B
C
D
E
F
A
B
C
D
E
F
PGB
PGB
6
PGB PGB Tile for Shower
Tile
Tile Tile
2' - 9 1/2"
3' - 4 1/2"
3' - 0" 1' - 5"
Elevation 1 - b 3/8" = 1'-0"
D5
Elevation 1 - c 3/8" = 1'-0"
LEVEL 2 10' - 0"
E5
Elevation 1 - d 3/8" = 1'-0"
4' - 0"
PGB
PGB
PGB PBG
Tile Tile
6' - 8" 2' - 9"
4' - 10"
5' - 5 1/2"
1' - 5"
2' - 1 1/2"
4' - 0"
4' - 3" 1' - 5"
2' - 1 1/2"
1' - 5"
4
Tile
Tile
LEVEL 2 10' - 0"
0' - 0"
LEVEL 2 10' - 0"
LEVEL 2 10' - 0"
LEVEL 2 10' - 0"
COLUMBIA, MO
B5
5' - 6"
5' - 5"
5' - 6"
3' - 0"
4' - 3"
5' - 6"
4' - 9 1/2"
3' - 11"
4' - 0"
Elevation 1 - a 3/8" = 1'-0"
LEVEL 2 10' - 0"
PURA VIDA SPA
5
LEVEL 2 10' - 0"
0' - 0"
LEVEL 2 10' - 0"
A5
3' - 0"
1' - 6"
2' - 9 1/2"
2' - 10"
5' - 6"
7' - 0"
Tile
1' - 6"
A4
Elevation 2 - a 3/8" = 1'-0"
B4
Elevation 2 - b 3/8" = 1'-0"
D4
Elevation 2 - c 3/8" = 1'-0"
E4
Elevation 2 - d 3/8" = 1'-0"
Description
Date
0' - 8 1/2"
3
No.
22' - 9"
6' - 11 1/2"
1' - 5 1/2"
Woman's Bathroom
1' - 7 1/2"
ADA Bathroom
102
102C
D4 D4
D4
2
06
Bathroom
Bathroom
102A
102B
1' - 6"
D2 1' - 6"
1' - 7 1/2"
0' - 7"
3' - 0"
3' - 6"
0' - 7"
1' - 7 1/2"
0' - 7"
1' - 6"
1' - 5 1/2"
TOILET ELEVATIONS
3' - 0"
1' - 5 1/2"
5' - 1" 2' - 5 1/2" 3' - 0"
D2
1
Project number Date
2/7/2017 2:51:14 PM
Drawn by
B1
A
B
Checked by
DETAIL - WOMEN'S BATHROOM 3/8" = 1'-0"
C
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 402 D
E
F
B
C
D
E
F
6
A
Stucco
Elevation 4 - a 1/2" = 1'-0"
LEVEL 2 10' - 0"
D5
Elevation 6 - a 1/2" = 1'-0"
4
A5
LEVEL 2 10' - 0"
COLUMBIA, MO
0' - 4"
1' - 5"
PURA VIDA SPA
7' - 0"
6' - 5"
5
8' - 0"
8' - 6"
Tile
Stucco
Description
Date
3
No.
1' - 11 1/2"
0' - 4"
4' - 4"
8' - 0"
4' - 10"
LEVEL 1 0' - 0"
2
A2
Tile
Elevation 5 - a 1/2" = 1'-0"
INTERIOR ELEVATIONS 1
Project number Date Drawn by
2/7/2017 2:51:18 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 420 A
B
C
D
E
F
B
C
D
E
F
Description
Date
2
3
No.
COLUMBIA, MO
4
PURA VIDA SPA
5
6
A
1
3D View 3
DETAILS
1
Project number Date Drawn by
2/7/2017 3:43:26 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 501 A
B
C
D
E
F
A
B
C
D
E
F
DOOR AND FRAME SCHEDULE DOOR TYPE
4 7 6 6 2
W
H
6' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
C A A B
ELEV
6' - 6" 6' - 8" 6' - 8" 6' - 8" 6' - 8"
FRAME ELEV MATL
MATL
Aluminum SCW SCW SCW
Aluminum HM HM Aluminum
HD SET
3 1 1 2
FIRE RATING
NOTES
1 1/2 HR
A
WINDOW SCHEDULE COUNT
W
H
01 02 03 04 05 06
4 3 1 5 6 9
6' - 4" 5' - 0" 20' - 0" 11' - 0" 5' - 0" 8' - 0"
B
C
CC
NOTES
5
TYPE
DOOR LEGEND 1/2" = 1'-0"
4' - 0" 4' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0"
LIGHTING SCHEDULE
4
Type Mark
Type
Count
A-1
Ambien
6
FS-1 P-1 P-2 R-1 T-1 T-2 T-3 T-4 T-5
Fire Exit Pendant Pendant Recessed Troffer Troffer Troffer Troffer Troffer
5 7 1 154 11 4 11 4 2
Wattage
9W 9W 13 W 13 W 30 W 30 W 34 W 13 W
Manufacturer
Comments
Visa Lighting Milwaukee WI USA (800-788-VISA) Cooper Lighting Fire Exit Sign Litecontrol Cooper Industries, Inc. Cooper Lighting Cooper Industries, Inc. Cooper Industries, Inc. Cooper Industries, Inc. Cooper Industries, Inc. Cooper Industries, Inc.
01
02
03
06
04
05
No.
WINDOW LEGEND 1/4" = 1'-0"
3
COLUMBIA, MO
D1 D2 D3 D4 D5
COUNT
PURA VIDA SPA
6
NO.
Description
Date
ROOM SCHEDULE
1
2
NO.
NAME
FLOOR FINISH
BASE FINISH
100 102 102A 102B 102C 103 103A 103B 103C 104 105 003
Waiting Room Woman's Bathroom Bathroom Bathroom ADA Bathroom Men's Bathroom Bathroom Bathroom ADA Bathroom WELLNESS ROOM CLASSROOM MASSAGE ROOM
TIL TIL TIL TIL TIL TIL TIL TIL TIL WOOD CARPET TIL
TIL TIL TIL TIL TIL TIL TIL TIL TIL VIN VIN TIL
004
MASSAGE ROOM
TIL
TIL
005
MASSAGE ROOM
TIL
TIL
001 006
FITNESS ROOM MASSAGE ROOM
CARPET TIL
VIN TIL
007 008 002
SAUNA POOL MECHANICAL ROOM
STONE STONE CARPET
TIL TIL VIN
NORTH PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB PGB PGB TIL/STUCC O TIL/STUCC O TIL/STUCC O PGB TIL/STUCC O TIL TIL PGB
SOUTH
EAST
WEST
CEILING FINISH
HEIGHT
STO TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB PGB PGB TIL/STUCCO
PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB PGB PGB TIL/STUCCO
TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB TIL/PGB PGB PGB TIL/STUCCO
TIL/STUCCO
TIL/STUCCO
TIL/STUCCO
10' - 0"
TIL/STUCCO
TIL/STUCCO
TIL/STUCCO
10' - 0"
PGB TIL/STUCCO
PGB TIL/STUCCO
PGB TIL/STUCCO
10' - 0" 0' - 0"
TIL TIL PGB
TIL TIL PGB
TIL TIL PGB
ACT ACT ACT ACT ACT ACT ACT ACT
ACT
NOTES
10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
W1
W2
W3
WALL TYPE 1/2" = 1'-0"
SCHEDULES
10' - 0" 10' - 0" 10' - 0"
Project number Date Drawn by
2/7/2017 3:43:47 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 601 A
B
C
D
E
F
B
C
D
E
F
6
A
4
WALLS AND WINDOWS
COLUMBIA, MO
PURA VIDA SPA
5
ROOF
BEAM SYSTEM UPPER FLOOR
3
No.
Description
Date
BEAM SYSTEM LOWER FLOOR
2
COLUMNS AND FRAMING
CONCRETE SLAB
CONCRETE FOUNDATION AND FOOTING
AXON
1
Project number Date Drawn by
2/7/2017 3:44:13 PM
Checked by
B1
A
AXON
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
A 901 B
C
D
E
F
B
C
D
E
F
6
A
A
B
C
A W1
C
W1
W1
W1 W1
4
W1
1
1
1
1
COLUMBIA, MO
PURA VIDA SPA
5
W1
B
W3
W3 W3
W3
W2
W2
W2
21' - 3"
F
W3
W3
3
W2
W3 A 420
D3
Elevation 5 - a
5' - 11"
-
-
No.
A2 W3
Description
Date
W2 W2 F
W3
W2
F
F
F
W2
30' - 0"
W1
2
W1
2
2' - 10"
W2
W2
2
W2 1 HR FIRE RATING
1 HR FIRE RATING
10' - 8"
2 HR FIRE RATING
2 HR FIRE RATING W2
W2 W2
21' - 6"
FURTHEST PATH OF TRAVEL: 52'-6" F W3
25 '
-4
FURTHEST PATH OF TRAVEL: 114 '
F
F
1/2 "
2
W2
W2
DN
2
F
W2
W2 W2 W2
W1
A
W1
B
FIRE PROTECTION PLAN
W1
C
A
B
C
1
Project number Date Drawn by
2/7/2017 3:48:43 PM
Checked by
A1
FIRE PROTECTION-MAIN 1/8" = 1'-0"
A
D1
B
C
D
FIRE PROTECTION-LOWER LEVEL 1/8" = 1'-0"
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
G 101 E
F
A
B B
D
C
E A
C-2
F B
C
6
A
C
C-1
T-2
M-1
B-1
1
1
CB-2
S-1
L-2
L-2 MASSAGE ROOM
4
003
MECHANICAL ROOM
CB-2
L-2
MASSAGE ROOM
MASSAGE ROOM
004
005
CB-2
Waiting Room
D-1
CB-2
002
M-1
M-1
T-1
S-1
C-3
100
C-2
TR-1
C-1
M-1 S-1
CB-1
FD-1
C-1
CB-1
S-1 B-1 CB-2
L-1
S-1
COLUMBIA, MO
1
PURA VIDA SPA
5
1
ADA Bathroom
Woman's Bathroom 102C 102
CLASSROOM 105
2
2
EX-1
2
2
Bathroom Bathroom
LB-1
102A
M-1
102B
DN
L-2
FITNESS ROOM 001
3
C-2
EX-1
T-2
TR-1
Bathroom
Bathroom
103A
103B
No.
Description
Date
WELLNESS ROOM
C-1
C-1
104
C-1 POOL
SAUNA
008
007
LB-1
C-1
T-1
L-1
Men's Bathroom
ADA Bathroom
103
103C
B-1
C-2
FIRST FLOOR FURNITURE LEGEND 1/4" = 1'-0"
C-3
A
B
C
A
B
C
2
C-1
A2
C-2
LEVEL 1 - FURNITURE 1/8" = 1'-0"
D2
LEVEL 2 - FURNITURE 1/8" = 1'-0"
FURNITURE SCHEDULE
T-1
Level Level 2 Level 2 Level 2 Level 2 Level 2 Level 2 Level 2
1
CB-1
L-1
Type Mark C-3 C-1 C-2 T-1 CB-1 L-1 B-1
Type
Room Name
Chair Chair Sofa Table Cabinet Locker Bench
100 100 100 100 100 102,103 102, 103
Manufacturer Steelcase Haworth Haworth
Count
FURNITURE
Comments
1 5 1 2 2 16 2
Project number Date Drawn by
2/7/2017 3:48:57 PM
Checked by
Project Number 2/13/2015 Yaneli Avila Lyria Bartlett
B-1
I 101
SECOND FLOOR FURNITURE LEGEND 1/4" = 1'-0"
A
B
C
D
E
F