Tรถrtener strasse, 37, Dessa-Roร lau,
YASEEN JABR PORTFOLIO
jabryaseen20@gmail.com +4917636270054 https://www.facebook.com/yaseen. gabr.90
EDUCATION: 2019
Internship by LAVA Architekten, Berlin
2018 - 2020 MSc degree of Architecture at anhalt Hochschule, germany 2012 - 2017 BSc degree of Architecture Engineering, Mansoura university
WORKSHOPS & Awards: July 2019
LANGUAGES: ARABIC:
Mother-tongue
ENGLISH:
FLUENT
GERMAN:
GOOD
COMPUTER SKILLS:
BITTERFELD AMBER LAKE WATERFRONT DEVELOPMENT COMPETITION (1ST PRIZE)
DEC 2018
TU Delft workshop studying parametric architecture and design to robotic production methods
DEC 2017
Urban Lab Camp in tu Berrlin campus el Gouna
VECTORIAL SKILLS
AUTO CAD
MAY 2017 The role of CFD simulation techniques in architecture and urban design
3D MODELING
RHINO - 3DS MAX - REVIT ARCHITECTURE GRASSHOPPER
APRIL 2017 DAAD study visit scholarship studying social housing and rapid urban development
RENDERING:
V-RAY FOR 3DS MAX
IMAGE TREATMENT:
PHOTOSHOP - INDESIGN
HOBBIES AND INTERESTS: FOOTBALL
COOKING
MUSIC
PHOTOGRAPHY
TRAVELLING
LEARNING LANGUAGES
AUG 2016
The use of sustainable elements in future rural urbanism
MAY 2015
Teambuilding for team leaders (By Daad) Leading in time of change (By Daad)
JULY 2015
COMPARISON BETWEEN LEED AND BREAM ASSESSMENT FOR SCHOOLS
Oct 2014
Developing ret-hinterlands
Sept 2014
Introduction to scientific research workshop
May 2014
Sustainabily Story & Elements
ACADEMIC PROJECTS:
CONTENTS
2018 - 2019 100 Years of BAUHAUS pavilion 2016 - 2017 Mansoura culture centre Mansoura entrance redevelopment 2015 - 2016 INTERNATIONAL HOSPITAL PROJECT NEW DAMIETTA NEIGHBOUTHOOD RESIDENTIAL BUILDING DESIGN 2018 - 2019 100 Years of BAUHAUS pavilion 2016 - 2017 Mansoura culture centre Mansoura entrance redevelopment 2015 - 2016 International hospital project New damietta neighbouthood Residential building design 2014 - 2015 Sustainable school design Olympic stadium design Commercial tower design 2014 - 2015 Car gallery Villa design
REFRENCES Eng Sina Mostafavi (Research Coordinator, Manager at Robotic Building Lab by Tu Delft university) E-mail: S.Mostafavi@tudelft.nl Prof.Dr.Eng Sherif Sheta (Associate professor of Architecture, Mansoura University, Egypt) E-mail: sherifsheta@mans.edu.eg
ACADEMIC PROJECTS 01 AMBER LAKE WATERFRONT DEVELOPMENT 02 NEW CAPITAL CAIRO AIRPORT 03 100 YEARS OF BAUHAUS PAVILION 04 MANSOURA CONVENTION CENTRE 05 HOSPITAL PROJECT 06 PRIVATE HOUSE FACADE AND LANDSCAPE DESIGN 07 ENERGIE UND ZUKUNFTSSPEICHER
AMBER LAKE WATERFRONT
Conference
Bridge to Bitterfeld Water Housing Units
Hotel
Housing Blocks
Museum
center
Indoor Activity Centers
Holiday Homes
Hotel
Water Educational Facility
Ground Floor Plan
Facade details
Using cantilever terrace to protect from glare and over-heat in summer 1-Main Lobby 2- Waiting Area 3- Spa & iNDOOR POOL 4-KITCHEM 5-RESTAURANT 6-EVENT HALL 9-GYM
1St Floor Plan
Interactive foldable wooden panels
Northern Elevation 2nd Floor Plan
Western Elevation
Conceptual Visualisation
Airports are the first and the last impression about any city. So this airport is designed to be remarkable turning airport design concepts from functionality to be source of excitement help archieving the main aim of the new cpaital to be an international city attracting people from all-over the world to flourish the egyptian economy. The airport design is inspired from the green river of the city master plan to give life to the city as nile river give the birth of Egyptian civilization through ages.
NEW CAPITAL CAIRO AIRPORT
LOCATION
CIRCULATION ANALYSIS
The site is situated along the corridor between Cairo and the Red Sea, providing linkages to significant shipping routes. The city is bound to become a focal point of the Eastern Cairo region.
Accessibility
ENTERTAINMENT
The location is easily accessed through the national ring road and sueaz road and there will be a mtero station in the future near the airport location
-Having Green Court at the heart of the project =Healthier atmosphere + deeping Passenger Experience
DEPARTURE FLOOR PLAN +10 M
MEZZANINE FLOOR PLAN +5 M
ARRIVAL FLOOR PLAN ±0M
TECHNICAL FLOOR PLAN -4 M
DEPARTURE PLAN +10 M
MEZZANINE FLOOR PLAN +5 M
ARRIVAL FLOOR PLAN ± 0 M
TECHNICAL FLOOR PLAN -4 M
METRO DT. DEPT. ENT
SEC A-A
DEPARTURE CICULATION
SEC B-B
ARRIVAL CICULATION LUGGAGE CICULATION
BAUHAUS is well-know for using primary shapes like triangle, rectangle and circle. In this project the same approach is seeked but from different way of thinking using the modern tools like robotic design and fabrication that were not available when Bauhaus was initiated.
Dynamic
100 YEARS OF BAUHAUS A PAVILION OUT OF WOOD Tessellated Demi-Reciprocal Structure HOCHSCHULE ANHALT - WS18
Static
Infinity
RECIPROCAL UNITS OR FANS TRIANGULAR
SQUARE
HEXAGONAL
COMMON PATHS OF TYPICAL USERS
DESSAU-ROSSLAU
DIAMOND
Main ro
Bui
PATH 5ad - Mensa
Anhalt University ot H 6 Rob PATlding 4 -
In order to conmemorate the 100 years anniversary of the modern german Bauhaus School, the Dessau International Architecture Master students of Anhalt University design the following pavilion located in Dessau-Rosslau, Germany. The location of the proposed pavilion is close to the emblematic Bauhaus building and also to the campus of the university. The following research is based on the idea of the reciprocal timber structures as a contructive system and its applications. However the proposed system not correspond completely to the rules of a typical repricocal system, in terms of generative rules or elongation of the connecting members of the fans (units). Therefore, instead a demi-reciprocal approach is explored.
3 TH sa - g 4 A P en in M uild B
Typical users
ab
ic L
students tourists
g4
din
z lat
2 TH arp PA min
Central station
Se
-
il Bu
ROOF OF THE CHAPTER HOUSE AT LINCOLN CATHE-
SKETCHES OF GRILLAGE ASSEMBLIES BY LEONARDO
Bauhaus
LEONARDO DA VINCI’S PRO-
on
USER ANALYSIS art ROUTE 1
THE CONCEPT
architecture
STUDENTS
In 1923 Kandinsky proposed a universal correspondence between the three elementary shapes and the three primary colors. In the Bauhaus equation the dynamic triangle is inherently yellow, the static square is intrinsically red and the serene circle is naturally blue. This concept is reinterpretated assuming an equivalence with acute, right and obtuse angles, which lead to the morphology of how the demi-reciprocal structure was conceived. Morphology as the arrangement of structural members that form the reciprocal frame to create a particular three-dimensional configuration.
ROUTE 2-b
TRIANGULAR RECTANGLE
BRICK RECTANGLE
DIAMOND
PROFESSORS/ RESEARCHES USERS
Obtuse angle
part-time ROUTE 3
couple ROUTE 4 elderly
high-school
VISITORS
RECTANGLE
TRIANGULAR
Delaunay Triangulation
family
DESSAUERS
INITIAL IDEAS
Infinity
Bau
ROUTE 2-a
HEXAGONAL
Right angle
a H 4 Dess PAT haus -
1. Seminarplatz - Building 4 2. Seminarplatz - Building 4 3. Mensa - Building 4 4. Bauhaus - Dessau Main Station 5. Main road - Mensa 6. Building 4 - Robotic Lab
full-time
Acute angle
Static
FORM FINDING- BASE
Common paths
architecture
elementary-school
tourists
Dynamic
tati in S
a uM
g4
ildin
1 Bu PATHinarplatz Sem
APPLIANCE ON CURVED SURFACE
dessauers
ROUTE 5
Best approach for free form surfaces. Delaunay triangulation is chosen to apply the reciprocal structure for its potential to apply it to any free form surface and having different variations.
FORM FINDING ANALYSIS The process of choosing the best surface to apply the reciprocal structure based on the criteria of: - Maximum height - Minium displacement - Lightest weight
RECIPROCAL FRAMES ANALYSIS
The overall growth from baskets.
DOUBLE INTERLOCK
ANCHOR STUDY
a) Sharing a common rod
b) Endpoint-to-endpoint contact
CONNECTION TO THE GROUND
Wooden Member
MS Plate Fixing the MS Plate with bolts
Concrete Base
A
Detail A
c) T - joint contact
CONCEPTUAL VISUALIZATION
ROOF PLAN
SECTION 1
section 1
N
NORTH FACADE
section 2
WEST FACADE
SECTION 3
FINAL APPROACH PROTOTYPE
PROTOTYPE PICTURES
The project is highly inspired from how the water erose and formulate rocks‘ form and affect it. In the same way how the RIVER NILE affected the city‘s personality and culture.
MANSOURA CONVENTION CENTER
V 2ND FLOOR PLAN + 5 M
MASTER FLOOR PLAN ± 0
GALLERY
MAIN ENTRANCE
ADMINISTRATION ENTRANCE LIBRARY
MPU
HOTEL ENTRANCE
VIP ENTRANCE
GYM
RESTAURANT
BASEMENT FLOOR PLAN -3 M
REPETITIVE FLOOR PLAN LEVEL3 & 4 HOTEL FLOOR PLANS
LAYOUT
NORTHERN ELEVATION
WESTERN ELEVATION
MAIN SECTION
Using the main court for enhancing the opennes and the connectivity to the main lobbies that the user can access any section of the pject easily
SECTION 1-1
THEATRE 3D SECTION
Saving lives and easy and fast access from one hospital department is the main concern of the project. From this prespective, the project to take this from to fullfil all functions in perfect way.
GENERAL HOSPITAL PROJECT
GROUND FLOOR PLAN
1ST FLOOR PLAN
VIRCULATION ANALYSIS
REPETITIVE FLOOR PLAN REPETITIVE FLOOR PLAN
WOMEN WARD PLAN FIRST FLOOR PLAN
GROUND FLOOR PLAN
BASEMENT FLOOR PLAN
STRUCTURE
SERRVICE PATH PATIENTS’ PATH VISITORS PATH
TYPICAL WARDS PLAN
SECTION A-A
BASEMENT FLOOR PLAN
SECTION B-B
PRIVATE HOUSE PROJECT
EXTERIOR FACADE DESIGN
ENGLISH COURT DESIGN
ENERGIE UND ZUKUNFTSSPEICHER MATERIALLEGENDE
10
10
-
-
---
050_ v_b _00_
DR oh
5_AA _SC_ 23
EZ S_
25
105
22 11 5
1,403
02_0 1
2,90 5
_D T_ AA
2,50
19 5
70 5
72 7
75
22
7
3,81 4
16 3
1,44
R 16 ,6 wp2 01
R 18 ,388 Pj
AD B BE BK VK BRH LH
0 _0
oh 050_v_ C R 23_00_
RA-Öffnung_1 B61/H0,61 BRH915m= OK4.04m EZ
61
AA 5_ S_
b
C_ _S
DD
WANDURCHBRUCH
WD(Rohr) WANDDURCHBRUCH ROHR
23 ,1°
WP 1
A
DECKENDURCHBRUCH
DETAILVERWEIS EINFÜGENPUNKT CAD 100 x 100 cm SCHNITTFÜHRUNG
G
RD FD RFB FFB OK UK LR
ABSPERRSCHIEBER (Gas)
SB SICHTBETON ROHDECKE D DECKE FERTIGDECKE UZ UNTERZUG ROHFUßBODEN FERTIGFUSSBODEN W WAND OBERKANTE UNTERKANTE LUFTRAUM
BRW FME F30-F90 A+M RD T30-T90 FH BA RM
BRANDWAND FEUERMELDER BRANDSCHUTZKLASSE MECHANISCHE BEANSPRUCHUNG RAUCHSCHUTZ, -DICHTE TÜR TÜR MIT BRANDSCHUTZKLASSE FEUERHEMMEND BRANDABSCHNITT RAUCHMELDER
MASSBEZUG 4
01 T_ A_D
BODENDURCHBRUCH
BD
BRANDSCHUTZ:
ABGEHÄNGTE DECKE BODEN BODENEINLAUF BODENKANAL VORDERKANTE BRÜSTUNGSHÖHE LICHTE HÖHE
OKFF
5
39
OBERKANTE FERTIGFUßBODEN
UKFD
UNTERKANTE FERTIGDECKE
+ x.xx
GELÄNDEHÖHE
OKRF
UKRD
OBERKANTE ROHFUßBODEN
+- x.xx OBERKANTE FERTIGFUSSBODEN +- x.xx OBERKANTE ROHFUSSBODEN
UNTERKANTE ROHDECKE
+ x.xx OBERKANTE FERTIGDECKE + x.xx OBERKANTE ROHDECKE
OKFFB + - x.xx + - xxx.xx üNN HÖHE ÜBER NORMAL NULL
2 _0
HINWEISE
R 22 ,1 Pl 58
oh 050_v_ C R 23_00_ AA 5_ S_
1. ALLE MASSE SIND VOM AUFTRAGNEHMER VERANTWORTLICH ZU PRÜFEN UND AM BAU ZU NEHEMEN. MASSUNSTIMMIGKEITEN SIND DER BAULEITUNG VOR ARBEITSBEGINN ZU MELDEN. (VOB/B, §3.3)
b
C_ _S
2. ALLE MASSE BEZIEHEN SICH, SOWEIT NICHT ANDERS ANGEGEBEN AUF DEN ROHBAU OHNE PUTZ ODER BEKLEIDUNG. TÜR-, FENSTER, BRÜSTUNGS, STEINHÖHEN BEZIEHEN SICH AUF OBERKANTE FERTIGFUSSBODEN. FÜR DIE FLÄCHENBERECHNUNG DIENTEN DIE ROHBAUMASSE.
B3
3. DIESER PLAN GILT NUR IN VERBINDUNG MIT DEN ENTSPRECHENDEN SCHNITTEN, ANSICHTEN UND DETAILPLÄNEN DER ARCHITEKTEN UND FACHINGENIEURE.
A EZS_5_AA_
SC_2
4. FÜR DIE ABMESSUNGEN ALLER KONSTRUKTIVEN BAUTEILE GELTEN NUR DIE SCHAL- UND BEWEHRUNGSPLÄNE. 5. FÜR DEN ROHBAU SIND FOLGENDE UNTERLAGEN ZU BEACHTEN: STATIK MIT POSITIONSPLÄNEN, ARCHITEKTEN- UND FIRMENDETAILZEICHNUNGEN.
_f 1_00_050_v
6. FIRMENDETAILZEICHNUNGEN GELTEN NUR MIT DEM FREIGABEVERMERK DES ARCHITEKTEN. 7. AUSSPARUNGEN SIND NICHT VOLLSTÄNDIG DARGESTELLT, SIEHE HIERZU HAUSTECHNIK-/ STATIKPLÄNE. 8. DIE MASSE SIND IN FOLGENDER REIHENFOLGE ANGEGEBEN: BREITE/HÖHE (B/H) SOWIE BREITE/TIEFE/HÖHE (B/T/H).
WP1
23,1°
DECKENSCHLITZ
WD
3
2,15 1
2,90
17
50 8
8
2,11
22
1,42 8
25
050_ v_b
_00_
DR oh
5_AA _SC_ 23
EZ S_
6
R 19,445 Pk
01 T_ _D
3,38
Pi WP2
R 12,500 WP1
9
36 36 3
B4
3,417 3,081
mind. 0,5% Gefälle
WP1 Pj
der RR
Attika Dachkante EG Dachfläche
A
20
_SC_21_0 EZS_5_AA
6
10,21 1
B4.5
57
Dachkante EG Dachfläche
OKEG = +-0,00m = 108,00m üNN
PROJEKT
Pk
0_050_v_f
N
RA freie geometrische Fläche min. 0,5 m2
1.21 Lager Ungekühlt Fl.: 30,333 m² OKFF +0,00 m LH: +2,670 m
5
45
B3.5
23,1°
157 20
8,55 6
B2
5 ,47 14
WP1
WP1
WANDSCHLITZ
DS
B3
4,14 2
WP1
23,1°
11,5°
WP1
WS
1,447
11,5 ° WP1
5,542
---
WP1
11 ,5°
7,88
23
17 ,6° 7,60 5
10 3,40 10
20 1
1,43
WP 1
Ram pe 3,8 7% 13
23,1°
WP 1
R
AA
4
3,36
UKUZ +8,12
3
N
Pl
B4
OKEG = +-0,00m = 108,00m üNN
B5
PROJEKT
Energie und Zukunftsspeicher Heidelberg
Energie und Zukunftsspeicher Heidelberg Eppelheimer Straße 68-70 69123 Heidelberg
3
56 2
4
3
2,75
1,02
41
3,2 2
Nr.
1.22 Büro Lagerchef Fl.: 8,681 m² OKFF +0,00 m LH: +2,670 m
Außenanlagen
Technische Gebäudeaustrüstung
sbp schlaich bergermann partner Schwabstr. 43 70197 Stuttgart
A24 Landschaft Landschaftsarchitektur GmbH Köpenicker Str. 154 a 10997 Berlin
IB Schulz Ingenieurgesellschaft mbH Itterstraße 5a 69412 Eberbach
1 WP
A1 7
29.06.2017 Planerstellung
FACHPLANER
° 23,1
A5
B5.5
4,73
OKRD +0,50
Datum
A B
Saarbrücker Strasse 24 - Haus D 10405 Berlin B6
23 ,1°
WP 1
Änderung
wd
tw
wd
tw
04.05.2018 Aktualisierte Fundamentmittelpunkt Höhe, Tankinnendurchmesser, Wartungsteg, Hauptrohrhöhe, Rampe
wd
tw
D
07.09.2018 Größere HAR-Fläche, bearbeitete EG Toilettenanlage, Wartungstreppe zwischen den Aufzügen, Trennwände in Technik
wd
tw
E
18.04.2019 Aktualisierte Kühlbereiche, Brandschutz Anf., Eingänge Kontrolle, Tank Trapezblech Verkl., Porenbeton Wand, Bodeneinläufe
wd
tw
Außenanlagen
Technische Gebäudeaustrüstung
sbp schlaich bergermann partner Schwabstr. 43 70197 Stuttgart
A24 Landschaft Landschaftsarchitektur GmbH Köpenicker Str. 154 a 10997 Berlin
IB Schulz Ingenieurgesellschaft mbH Itterstraße 5a 69412 Eberbach
Änderungen
23,1°
gez. gep.
27.11.2017 Angepasste Pläne Architektur
C
Statik / Tragwerk
Nr.
23,1°
WP1
WP1
B6
Datum
A
29.06.2017 Planerstellung
B
Änderung
gez. gep. wd
tw
27.11.2017 Aktualisierte Aufzüge, Polsterdampfanlage, Dachfenster, Rampe
wd
tw
C
04.05.2018 Aktualisierte Fundamentmittelpunkt Höhe, Tankinnendurchmesser, Wartungsteg, Hauptrohrhöhe, Rampe
wd
tw
D
07.09.2018 Größere HAR-Fläche, bearbeitete EG Toilettenanlage, Wartungstreppe zwischen den Aufzügen, Trennwände in Technik
wd
tw
E
18.04.2019 Neuer Technikraum, Brandschutz Anforderungen
wd
tw
16.07.2019 Vergabe und LV LPH5-WP2 Detailausschnitt Helixtreppe
wd
tw
I
31.07.2019 Vergabe Thermische Hülle LPH5-WP2
wd
tw
7
253
Planverfasser
gezeichnet von
6
7
8
9
10
11
Fluchttreppe 1
BRH 1,10m
Plannummer
EZS_5_AA_GR_01_00_050_v_g
erstellt am
geändert am
Originalplangröße
Maßstab
Index
01.07.2019
31.07.2019
DIN A0
1 : 50
I
4,48
10
3
4
5
6
7
8
OKFF +3,55
OKFF +1,78 9
10
11
12
Fluchttreppe 1
13
15
16
17
18
19
20
BRH 1,10m
1,347
9
OKRD +0,00
21
22
tw
H
31.07.2019 Vergabe Thermische Hülle LPH5-WP2
wd
tw
bzug Vora Grundriss 02 EG Dachfläche
23
24
25
26
27
28
29
30
31
32
33
Projektnummer
LPH5 WP2
253
Planverfasser
gezeichnet von
LAVA Berlin GmbH wd
286 Stg 16,1/32,5
%R 4,22
7
1,34
8
0_v_e
0_v_e
Datum / Unterschrift
14
BRH 1,10m
8
Datum / Unterschrift
tw
wd
ampe
Plannummer
EZS_5_AA_GR_02_00_050_v_h geprüft von
tw
erstellt am
geändert am
Originalplangröße
Maßstab
Index
01.07.2019
31.07.2019
DIN A0
1 : 50
H
Planfreigabe Entwurfsverfasser: Prof. Dipl. - Ing. Tobias Wallisser
Bauherr / Vertreter:
B
e Ramp 4.22%
Bauherr / Vertreter:
wd
Leistungsphase
2
C_22_00_05 EZS_5_BB_S
B
+108,00 m üNN = +/- 0,00m
C_22_00_05 EZS_5_BB_S
30
9
Entwurfsverfasser: Prof. Dipl. - Ing. Tobias Wallisser
08.05.2019 Vergabe Rohbau LPH5-WP2 07.06.2019 Vergabe Rohbau LPH5-WP2
Planbezeichnung
6
1
F G
7
1,23
1,235
OKFF +0,00
geprüft von
tw
Planfreigabe
Rundrohr Geländer Höhe 1100 mm Durchmesser Rundrohr 51 mm fvz und Dickschichtlakiert DB Eisengümmerfarbe
OKFF +0,00 OKRD -0,16
65 7
1,50
Projektnummer
LPH5 WP2
A3
20
Grundriss 01 EG Leistungsphase
7,10 6
bzug Vora
Planbezeichnung
LAVA Berlin GmbH wd 286 Stg 16,1/32,5
A4
11
30
2,40
9
53
5
H
A2
Luftraum
1,50
2 5
2,45
30 6
Fluchttüren lichtes Durchgangsmaß 0.9 m
3 1,02
4
tw
EG kante Dach fläche Dach
Freihalten eines RWGanges von mind. 1,20 m i.L.
3 1,02
3
tw
wd
6
6,52 13
2
wd
Dach zu Wartungszwecken begehbar
1 2,38
6 1,65
1
08.05.2019 Vergabe Rohbau LPH5-WP2 07.06.2019 Vergabe Rohbau LPH5-WP2
10 30
2,41 4
2
2 1,60
UKFD +2,67 OKFF +0,00 OKRD -0,16
F G
3,87% Rampe
2,37
7
56
5
Statik / Tragwerk
Stadtwerke Heidelberg GmbH Kurfürsten-Anlage 42-50 69115 Heidelberg
ARCHITEKT
R 18,101 WP2
Verglasung gekühlt, ohne Feuerwiderstand
B5.5 6
B5 7,24
31
B4.5
ARCHITEKT
6
BAUHERR
A6
R 16,601 WP1
1,02
12
23, 1° WP 1
23, 1° WP 1
Stadtwerke Heidelberg GmbH Kurfürsten-Anlage 42-50 69115 Heidelberg
°
1 WP
23,1
R 16,601 WP2
OKFF +4,04
10
5
7,36
R 18,101 WP2
UK=0.0 : Zusatzinfo S_00.00_HLS : Schachtnummer_Gewerk
36 5
656
11,5°
ampe
EZ S_
20 13 9
7
13 417 5
1,07
14
4,35
02_0 1 _D T_ AA
20 8 1 1,12 3
1,12 3
95 8
74 7
4,10
3,88 2
1,18 3,484
2,50 1,18 44 1 25 40
WP 1
51 3
050_ v_b
DR oh
5_AA _SC_ 23
_00_
30 99 9
63 9
30
1,01 4
2,81 6
Fluchtw eg unter Loo p
1,62 3 19 4 1,345
87 9
6,23 6
2,793
25
25
10 1
6 72 3
2,69
1,717
R 14 ,5 WP1 00
6,0 ° P1 W 11,5 °
11,5°
11,5°
WP1
21
WP1
WP1
23,1°
WP1
BD: Art des Durchbruchs 100/100: Lichte Maße
B3.5
Änderungen
70
8
LH: LICHTHÖHE in m DURCHBRUCHSTEMPEL
23,1°
591
Revisionsöffnung in Wand und Decke 60 x 60 cm
UKFD +2,30 OKFF +0,00 OKRD -0,16
10
475
fh P + FSA
rd DIN 18095
6
1,56
SICHTBETONFLÄCHEN - NORMALE ANFORDERUNG
ALLGEMEIN:
Ph
Sämtliche Wandaufbauten nichtbrennbar
Verzicht auf eigenständige RA ohne Brandschutztechnische Bedenken
3,33
4
49
54 8
25 6
1 WP
R 14 ,50 WP1 0
23 ,1°
15
11 ,5°
WP 1
,1° 23
1.20 Getränkekühler Fl.: 6,890 m² OKFF +0,00 m LH: +2,300 m
RAUMNUMMER RAUMNAME Fl.: FLÄCHE in m² OKFF OKFF in m
ABKÜRZUNGEN
R 0,670
Dach zu Wartungszwecken Begehbar
8
2,85
95
95
Türausschnitt 1200x2100mm
RB 1,12 / 2,257 LB 1,00/ 2,05
1
1
30 6
EZ 400V/2,0kW (Tiefkühlung), L=5000mmEZ 400V/4,0kW (Pluskühlung), L=5000mm
4 2,94
WP 1
15
3,87 %R
8
7,18
25
16 1
15 80 4 1,02 2,25 3 7 57 2
28 3
64 2
3
25 92 3 57
2,2 15 1
28 3
51 5
17 5
25
1,60 1,12 7
8
3,33
84 4 23 3
1,53 2
1,10
15
2,8 3 4 28 3 15
SICHTBETONFLÄCHEN - GERINGE ANFORDERUNG
SB2
2,37
A6
EZ
5,02
9
95
SB1
UKUZ +7,41
B1.5
SCHARNIERSEITE KIPPDREHFENSTER
RAUMSTEMPEL
FENSTERABMESSUNGEN
GRUNDSTÜCKGRENZE ABRISS ACHSEN VERDECKTE GEOMETRIE NEU BESTAND DRÜBERLIEGENDE GEOMETRIE
41 2
B2.5
1.19
2
Fluchttreppe 1 OKFF +0,00
BRH 1,1 0m
10
R 18,111 Pi
Dach zu Wartungszwecken begehbar
813
1,95
8
2,65
2,91
mm
d
RB 1,023/ 2,257 LB 90/ 2,05
45
Einfriedung aus Edelstahl Seilnetz Durchmesser Seil 1,5 und 2 mm MW 40-80mm eingespannt zwischen Helixträger und Rundrohr Duchmesser Rundrohr 51 mm
Anlieferung Personal
1,36 2
Zugangskontrolle Ein- / Ausgang + Fluchtweg 1,94 8
1.20
1,28 842 3,
Freihalten eines RWGanges von mind. 1,20 m i.L.
2
Rolltor
Vertikale Geländerstäbe Befestigung am Helix-Träger gemäß Statik
1,7 1 5
95
2.2.3
UKUZ +8,12
1.0 Wassertank Fl.: 490,874 m² OKFF +0,00 m LH: +25,170 m
03
Saarbrücker Strasse 24 - Haus D 10405 Berlin
RB 1,023/ 2,257 LB 90/ 2,05
1.21 3
RA-Öffnung_3 B70/H1,29 BRH90m=
Fassadenrinne
OKFF +0,00
3,23 4
2.2.2
WP1
23,1 °
7. AUSSPARUNGEN SIND NICHT VOLLSTÄNDIG DARGESTELLT, SIEHE HIERZU HAUSTECHNIK-/ STATIKPLÄNE.
UKFD +2,67 OKFF +0,00 OKRD -0,16
3
1,12
21
7
5,00
WP1
Vertikale Geländerstäbe Befestigung unsichtbar unterhalb der Betonsteinplatten
2,86 2
R 18,650 WP2
7
5
17
6
23,1°
22
1.23 Anlieferung Fl.: 25,624 m² OKFF +0,00 m LH: +2,670 m
56
11
Fluchttüren lichtes Durchgangsmaß 0.9 m Tür mit P, FSA, FSA über BMZ angesteuert
5
7
1,54
23,1° WP1
95 Fluchttüren lichtes Durchgangsmaß 1.5 m
AA_D T_02_
GRIFFSEITE
LINIEN:
416
Pg
,062 R 13 P1 W
55
1,22
° 23,1
Stahltür mit eingepanntem Edelstahl Seilnetz CARL STAHL Durchmesser Seil 1,5 und 2 mm Tank Trapezblech X-TREND MW 40-80mm 35/207 mm
R 12,000 Pg
5
Außenmaß 2900x2700 mm lichte Höhe 2100
10
95
Helix-Träger
5,34
B1
11,5 °
Metallfassade als Einzäunung Luftdurchspült
2
9
---
FACHPLANER
23 ,1°
WP 1
1 WP
Öffentlicher Zugang Helix- Treppe
483
07
6. FIRMENDETAILZEICHNUNGEN GELTEN NUR MIT DEM FREIGABEVERMERK DES ARCHITEKTEN.
9
75
UKFD +2,59 OKFF +0,00 OKRD -0,16
58
UKFD +2,59 OKFF +0,00 OKRD -0,16
6
76 3
FEUERWEHRAUFZUG
ÖFFNUNGSRICHTUNGEN FENSTER
1.18
RB 95/ 2,00 LB 77/ 1,80
fh
WP1
B2
-
5. FÜR DEN ROHBAU SIND FOLGENDE UNTERLAGEN ZU BEACHTEN: STATIK MIT POSITIONSPLÄNEN, ARCHITEKTEN- UND FIRMENDETAILZEICHNUNGEN.
BAUHERR
23,1°
WP1
Öffentlicher Zugang 30
° 11,5 WP1
23,1°
6
AA_D T_01_
TÜR NUMMER ROH BREITE/ HÖHE LICHTE BREITE/ HÖHE BRANDSCHUTZVERHALTEN
Eppelheimer Straße 68-70 69123 Heidelberg
,5° 11 1 WP
,650 R 18 2 WP
1.1 Zugang Personal Fl.: 147,787 m² OKFF +0,00 m LH: +3,000 m
UKUZ +7,10
B2.5
4. FÜR DIE ABMESSUNGEN ALLER KONSTRUKTIVEN BAUTEILE GELTEN NUR DIE SCHAL- UND BEWEHRUNGSPLÄNE. 050_v_f
10
WP 1
+108,00 m ü.NN = +/- 0,00m
1,49
SC_21_00_
5
°
1 WP
23,1 23 ,1°
°
1 WP
23,1
95
OKEG
10
---
2. ALLE MASSE BEZIEHEN SICH, SOWEIT NICHT ANDERS ANGEGEBEN AUF DEN ROHBAU OHNE PUTZ ODER BEKLEIDUNG. TÜR-, FENSTER, BRÜSTUNGS, STEINHÖHEN BEZIEHEN SICH AUF OBERKANTE FERTIGFUSSBODEN. FÜR DIE FLÄCHENBERECHNUNG DIENTEN DIE ROHBAUMASSE.
FWA
F90 - ANFORDERUNG
2.2.4
2.2.1
EZS_5_AA_DT_01_14_020_v_a
1,94
,9 0 WP1
A
29
67
Kühlzellen aus StahlsandwichKonstruktion mit sfl Dämmung ohne brandschutztechn. Bedenken, Verzicht auf eigene RA ohne brandschutztechn. Bedenken
4,10
1 WP
-
1. ALLE MASSE SIND VOM AUFTRAGNEHMER VERANTWORTLICH ZU PRÜFEN UND AM BAU ZU NEHEMEN. MASSUNSTIMMIGKEITEN SIND DER BAULEITUNG VOR ARBEITSBEGINN ZU MELDEN. (VOB/B, §3.3)
6
30
Section name
P1 W
TERRASENDIELEN HOLZ
UZ UK +x.xx UNTERKANTE UNTERZUG
3
2
OKFF +4,04
14
1
95
WP1
2 5,70
5
59
95
usschnitt m Türa 00m 1200x21
ung söffn ke Dec Revision d und in Wan x 60 cm 60
2,91
2,75
2,60
2.2 Polsterdampfanlage Fl.: 11,624 m² OKFF +4,038 m LH: +3,500 m
WP1
G
TERRASENDIELEN STEIN
SCHAUMGLAS
MERKSTEIN, HINWEISSÄULE
11,0°
20,0°
TRÄNENBLECH
DURCHBRÜCHE:
A5
WP1
MAUERWERK
KIES
UKUZ +6,98
95 2
8. DIE MASSE SIND IN FOLGENDER REIHENFOLGE ANGEGEBEN: BREITE/HÖHE (B/H) SOWIE BREITE/TIEFE/HÖHE (B/T/H).
10
UKUZ +8,12
ERDE GEWACHSEN
FLUCHTTÜR
Kalzip Dach
A1
UKFD +2,67 OKFF +0,00 OKRD -0,16
1.14 Korridor Fl.: 15,995 m² OKFF +0,00 m LH: +2,670 m
-
B1.5
fh FSA
1,47 3
° 2,5
° 3,0
3. DIESER PLAN GILT NUR IN VERBINDUNG MIT DEN ENTSPRECHENDEN SCHNITTEN, ANSICHTEN UND DETAILPLÄNEN DER ARCHITEKTEN UND FACHINGENIEURE.
EZS_5_AA_
51
+ x.xx OBERKANTE FERTIGDECKE + x.xx OBERKANTE ROHDECKE
7,51
Regenrinne Dach über Eingang
Aufstellraum der Kühlzellen automatisch gelöscht, RA über Dachentlüfter mit min. 0,5m2 freiem geometrischen Querschnitt, Aufstellraum aus jeder Kühlzelle über Deckenklappe 60/60 erreichbar
2,95
4 1,86
5 mm 1,12 2800x2800 aß mm Außenm e 2100 Höh lichte
d
1.34
R 18 WP ,650 2
25
1,01
1.17
RB 95/ 2,00 LB 77/ 1,80
11,5°
Fluchttüren lichtes Durchgangsmaß mind. 1,20 m Abströmöffnung
Öffentlicher Zugang
AA
UNTERKANTE ROHDECKE
UKUZ +8,13
ESTRICH
PERIMETERDÄMMUNG GITTERROST
x.xx / x.xx
UKUZ +7,02
1,60 5
WP 1
B1
Übergang Helixträger zu gebogener Wand
RB 1,123/ 2,257 LB 1,00/ 2,05
52 7
Regenrinne Dach bei gebogener Mauer
14
2,835
Fassade gem. Detailplanung Fassadenplanung
0--12 01_1 _DT_
+- x.xx OBERKANTE FERTIGFUSSBODEN +- x.xx OBERKANTE ROHFUSSBODEN
F90
10,0°
EG Plan + Schnitte Achse 14-0
° 30,0 WP1
Gefälle RR folgt der Rampe bis auf OKFF 0.00m
OKFFB + - x.xx + - xxx.xx üNN HÖHE ÜBER NORMAL NULL
GELÄNDEHÖHE
7 3,13
10
1,123
193
Fassadenrinne
0_050_v_f
2,50
9
79
527
WP1
25
7
10
EITE ANKES - AUSSENS
51
58
5
67
WP1
WP1
WP1
5
1,60
1,20
1,20
1,52
WP1
95
A _SC_21_0 EZS_5_AA
LB 1,20/ 2,20
8
5,48
P
DER WAND DES WASSERT WP1
UKRD
OBERKANTE ROHFUßBODEN
A4
P2 Nordachse (0) WP1+W
A2
+111,505 m
Tür unverriegelbar
1.01B
LB 1,20/ 2,20
23,1°
1.01A
306
11,5°
R 13,062 ZUM RAND
UKFD +2,67 OKFF +0,00 OKRD -0,16
Brücke Stützsäulen
11,5°
UKFD +2,59
12,5000 ZUM RAND DER WAND DES WASSERTANKES - INNENSEITE WP1
UNTERKANTE FERTIGDECKE
OKRF
WP1
nbr+d
HINWEISE
10
23,1°
WP1
11,5°
TK-Türen ohne Feuerwiderstand
BRANDWAND FEUERMELDER BRANDSCHUTZKLASSE MECHANISCHE BEANSPRUCHUNG RAUCHSCHUTZ, -DICHTE TÜR TÜR MIT BRANDSCHUTZKLASSE FEUERHEMMEND BRANDABSCHNITT RAUCHMELDER
5
19
+ x.xx
1,19 Tiefkühler Fl.: 7,150 m² OKFF +0,00 m LH: +2,500 m
2,60
20
WP2
Verzicht auf eigenständige RA ohne Brandschutztechnische Bedenken
OBERKANTE FERTIGFUßBODEN
1
ng fnu söf Decke vision d Re nd un cm 60 in Wa 60 x
95
° 11,5
WP1
Sämtliche Wandaufbauten nichtbrennbar
5,798
13
BRW FME F30-F90 A+M RD T30-T90 FH BA RM
nbr+d
nbr+d
11,0°
Dach zu Wartungszwecken begehbar
69
Tankwand durchgehend nbr gedämmt, Schutzebene Trapezblech nbr
1,96
MASSBEZUG OKFF
UKFD
UKFD +2,30 OKFF +0,00 OKRD -0,16
TK-Türen ohne Feuerwiderstand
6
ABSPERRSCHIEBER (Gas)
SB SICHTBETON ROHDECKE D DECKE FERTIGDECKE UZ UNTERZUG ROHFUßBODEN FERTIGFUSSBODEN W WAND OBERKANTE UNTERKANTE LUFTRAUM
F90
Gitterrost auf Revisionsebene OKFF +4,04
5
4
1,73
nbr+d
2.1.3
2.1 HAR 2.1.2 Fl.: 46,858 m² OKFF +4,038 m LH: +3,500 m
FWA 2
nbr+d
1,65
8
SCHNITTFÜHRUNG
60
685
Metallfassade Überdacht Gedämmt
2.1.4
F90
BD DD 270/240 S_02.02
SAND
GRÜNFLÄCHE
xxx RB xxx/ xxx LB xxx/ xxx xxx
UKUZ +6,92
2.1.1
Steigleiter mit Rückenschutz
F90
VOLLHOLZ
KAPPILIARBRECHENDE SCHICHT
F90 - A
6,22 1 UKUZ +7,12 UKUZ +7,34
UKUZ +6,98
RA-Öffnung Inst.-Schacht mit min. 1m2 freien geometrischen Querschnitt, angesteuert von der BMZ und manuell öffenbar
FWA 1
RA Öffnungsflügel
25
ABDICHTUNG
PORENBETON DÄMMSTOFF
STAHLBETON
BESCHRIFTUNGSSYMBOLE
EZS_5_AA_DT_01_14_020_v_a
Installationsschacht automatisch gelöscht
OKRD -0,16
1,65
1,65 2,80
Feuerwehrleiter
Ausbildung der Fahrschachtwände oberhalb des EG allein fb ohne brandschutztechnische Bedenken
F90
A3
1,65
BD DD 270/260 S_02.03
fb+d+VN
BD DD 270/240 S_02.01
25
2,04
10
23 C_ _S
4
10
10
1,44
R 13 ,30 WP1 0
2
AA 5_ S_
b
RD FD RFB FFB OK UK LR
25
Feuerwehrleiter
DETAILVERWEIS
4
1,50
2.01
RB 78/ 2,08 LB 70/ 2,00
F90
BRANDSCHUTZ:
ABGEHÄNGTE DECKE BODEN BODENEINLAUF BODENKANAL VORDERKANTE BRÜSTUNGSHÖHE LICHTE HÖHE
1
59
mm
2,75 95
9
2 _0
°
R 18,350 WP2
306
84
AD B BE BK VK BRH LH
188
3
EZ
d
20
5 1,43
,950 R 18 WP2
39
3 1,25
25
EINFÜGENPUNKT CAD 100 x 100 cm
G
9
77
2,95
4
1,96
10 0 x310 5 28 00 mm 1,12 nmaß 2100 he Außete Hö lich
hnitt m ssc Türau 2100m 1200x
01 T_ _D
b
C_ _S
1,65
7
UKUZ +6,98
UKUZ +7,12
6
1,50 78
9
8
7
2,91
AA 5_ S_
1.16
RB 95/ 2,00 LB 77/ 1,80
,5 11 1 WP
R 15 ,9 WP 50 1
13
AA
oh 050_v_ C R 23_00_ EZ
7
71 10
10
52
,650 R 18 P2 W
oh 050_v_ C R _00_
UKFD +2,30 OKFF +0,00 OKRD -0,16
5
11 ,5°
WP 1
DECKENDURCHBRUCH
WD(Rohr) WANDDURCHBRUCH ROHR
1,36
5
4
95
2
BODENDURCHBRUCH
DD
WANDURCHBRUCH
ALLGEMEIN:
9
61
WP 1+ WP
1 WP
4
,1 3
P1
,1° 23
16
W P1 W
0 ,31 18 R WP2
BD
DECKENSCHLITZ
WD
54
g un e ffn sö De ck ion d vis un cm Re and x 60 W in 60 1
59
2,75 95 schnitt m 0m raus 10 Tü 00 x2 12
7
° 6,0 ° 2,5
1.0 Wassertank Fl.: 490,874 m² OKFF +0,00 m LH: +25,170 m
TK-Türen ohne Feuerwiderstand
WANDSCHLITZ
DS
0 _0
10
Kühlzellen aus StahlsandwichKonstruktion mit sfl Dämmung ohne brandschutztechn. Bedenken, Verzicht auf eigene RA ohne brandschutztechn. Bedenken
3
,7 2
° 3,0
11,5 ° WP1
01 T_ _D
80
2,92
24,0° WP2
16
R 18 WP ,310 2
5
1,42
WS
3
5
OKFF +4,04 Tür unverriegelbar
2,80
P1 W
ABKÜRZUNGEN
d
10
8,0°
314,5°
UK=0.0 : Zusatzinfo S_00.00_HLS : Schachtnummer_Gewerk
GRUNDSTÜCKGRENZE ABRISS ACHSEN VERDECKTE GEOMETRIE NEU BESTAND DRÜBERLIEGENDE GEOMETRIE
1.18 Milch-Molkereiprodukte Fl.: 8,250 m² OKFF +0,00 m LH: +2,300 m
RB 95/ 2,00 LB 77/ 1,80
20
WP2
AA
1.15
3,00
TK-Türen ohne Feuerwiderstand
80 1,04
4
2,11
2,95
1,
1 WP
5,89 7
AA_D T_01_
UKFD +2,30 OKFF +0,00 OKRD -0,16
5
1,42
22,0°
1.6 Flur Fl.: 67,860 m² OKFF +0,00 m LH: +2,670 m
07
10
° 5,5
BD: Art des Durchbruchs 100/100: Lichte Maße
4
Ram pe
UKUZ +6,98
7
2,08
LINIEN:
Kühlzellen aus StahlsandwichKonstruktion mit sfl Dämmung ohne brandschutztechn. Bedenken, Verzicht auf eigene RA ohne brandschutztechn. Bedenken
3,40
10
20
23,1 °
WP 1
Zugangskontrolle Eingang
2,8 4 9
AA_D T_01_
d
45 6
2
1
LH: LICHTHÖHE in m DURCHBRUCHSTEMPEL
MERKSTEIN, HINWEISSÄULE
60
1.14
37 Tü 12 raus 95 00 sc x2 hn 10 itt 0m m
SICHTBETONFLÄCHEN - NORMALE ANFORDERUNG
59
RB 95/ 2,00 LB 77/ 1,80
95 2,81
SICHTBETONFLÄCHEN - GERINGE ANFORDERUNG
SB2
DURCHBRÜCHE:
10
10
20
P1 W
68 3
mm 0 40 x3 00 mm 29 00 aß 21 nm e ße Höh Au hte 3 lic 27
3,2 5 2
° 3,0
-
2,65
TK-Türen ohne Feuerwiderstand
,310 R 18 WP2
° 2,5
Zugangskontrolle BF und Fluchtweg
1.05
RB 1,023/ 2,257 LB 90/ 2,05
fh P + FSA
20,0° WP1 1.11 Aufzug Personal Fl.: 7,000 m² OKFF -1,50 m LH: +4,600 m
58
SB1
15
RAUMNUMMER RAUMNAME Fl.: FLÄCHE in m² OKFF OKFF in m
80 1,04
5
1
2,46 6
35
51
25
7
43
FD
1,33
RB 773/ 2,047 LB 65/ 2,05
RAUMSTEMPEL
FENSTERABMESSUNGEN
7 1,24
4,038-3,1=0,938 RA Öffnungsflügel 3,1678-3,1=0,0678 2.02
b
2
44
44
FD
28 3
35 2
1.13
RB 1,123/ 2,257 LB 1,00/ 2,05
59 1
1.17 Gemüse Fl.: 9,350 m² OKFF +0,00 m LH: +2,300 m
Re Wanvisio ns 60 d un öffn x 60 d De ung cm ck e
Kühlzellen aus StahlsandwichKonstruktion mit sfl Dämmung Au ohne brandschutztechn. licht ßenm Bedenken, Verzicht auf eigene e Hö aß RA ohne brandschutztechn. he 3000 21 x3 00 60 Bedenken mm 0 m m
10
KIPPDREHFENSTER
v_
1,62
1,18 29
6
81 1
39
Bereich mit Sprinkler
1.9 Wartungsschacht Fl.: 7,159 m² OKFF +0,00 m LH: +3,100 m
1,50 1
°
1 WP
5_
2,50
88
2,35 1 2,64
5
2,72
30
10,0°
P2 Nordachse (0) WP1+W
° 30,0 WP1
Fluchttüren lichtes Durchgangsmaß 0.9 m Tür mit P, FSA, FSA über BMZ angesteuert, unverriegelbar
UKFD +2,30 OKFF +0,00 OKRD -0,16
19,0
+4,04 OKRD
UKUZ +6,98
UKUZ +7,12
SCHARNIERSEITE
00
2,69
35
3
39
rd DIN 18095 P + FSA
1.26
RB 923/ 2,257 LB 80/ 2,05
1.10 Aufzug Besucher Fl.: 7,000 m² OKFF -1,50 m LH: +4,600 m
1
Tür mit P, FSA, FSA über BMZ angesteuert
30
1,50
WP1
Tankwand durchgehend nbr gedämmt, Schutzebene Trapezblech nbr
11,0°
WP1
1.36
RB 1,323/ 2,257 LB 1,20/ 2,05
fh+rd P + FSA
1,73 5
in
FEUERWEHRAUFZUG
ÖFFNUNGSRICHTUNGEN FENSTER GRIFFSEITE
4,22%
WP1
2
2,19
16
FWA
TÜR NUMMER ROH BREITE/ HÖHE LICHTE BREITE/ HÖHE BRANDSCHUTZVERHALTEN
UZ UK +x.xx UNTERKANTE UNTERZUG
3
2,85 1
10,0°
8
FLUCHTTÜR
Zwischen Tragwerk und OK Decke (Kühlung) wird ein besprinklerbarer Raum von mind. 30-45 cm benötigt
2,00
1
WP1
Aufzug 15-1
9
F90 - ANFORDERUNG
xxx RB xxx/ xxx LB xxx/ xxx xxx
0 Aufzug 1-0 1,0°
Schnittebene Grundriss: 1.50m
+110,404 m
11,0°
0_
9
1,32
G
1,48
5
2,15
UKFD +2,67 OKFF +0,00 OKRD -0,16
RB 1,123/ 2,257 LB 1,00/ 2,05
rd DIN 18095
1,12 3
TERRASENDIELEN HOLZ
x.xx / x.xx 40 6
1,15 5
5
1,07
11,0°
EG Plan + Schnitte Achse 14-0
9
fh+rd P + FSA
1,488
1.11
RB 1,123/ 2,257 LB 1,00/ 2,05
TERRASENDIELEN STEIN
SCHAUMGLAS
3,87% Rampe
OKRD +2,82
WP1
TRÄNENBLECH
F90 - A
1.16 Fleisch Fl.: 9,010 m² OKFF +0,00 m LH: +2,300 m
20
1.12
MAUERWERK
KIES
_0
82
62 7
86
6
RB 1,323/ 2,257 LB 1,20/ 2,05
Fluchttüren lichtes Durchgangsmaß 0.9 m
5 1,41
4
19
2,62 1
fh -
fh -
20
WD 118/224 UK=-0.16 01.02 Fortnutzung des FWA 2 im Brandfall für die begleitende Selbstrettung 2,799 mobileingeschränkter Personen
ERDE GEWACHSEN
01
6
9
9
1,21
1.29
RB 1,023/ 2,257 LB 90/ 2,05
1.06
RB 1,123/ 2,257 LB 1,00/ 2,05
9
33
FWA 2
DD 270/260 S_01.03
FWA 1
1.32
2
8
6
0
3
2 1,1
1,22
1,50 6
Oberlicht
DD 270/240 S_01.02
PERIMETERDÄMMUNG GITTERROST
T_ _D
25
3
3
3,62
1,62
6
1.3 WC BF Unisex Fl.: 6,575 m² OKFF +0,00 m LH: +2,670 m
2,03
5
fh -
28 3
6,19
1,25
1,03 1
1.27
RB 1,123/ 2,257 LB 1,00/ 2,05
Fluchttüren lichtes Durchgangsmaß 1.2 m
UKFD +2,59 OKFF +0,00 OKRD -0,16
ESTRICH
AA
7
1,62
3
54 8
15
28 3
7
97
DD 270/240 S_01.01
T90RS
GRÜNFLÄCHE
G
BESCHRIFTUNGSSYMBOLE
5,28 8
RA freie geometrische Fläche 0,5 m2
OKRD -1,50
Installationsschacht automatisch gelöscht, dichter und nbr Abschluss zwischen HAR und Installationsschacht siehe Brandschutz
d
T90RS
WD 118/224 UK=-0.16 01.01
3 6
5
RB 823/ 2,207 LB 70/ 2,00
RB 723/ 2,047 LB 60/ 2,00
OKRD -1,50
30
Feuerwehrleiter
RB 723/ 2,047 LB 60/ 2,00
1.15 Spülraum/ Umschlagplatz Fl.: 20,086 m² OKFF +0,00 m LH: +2,670 m
DÄMMSTOFF
EG Plan + Schnitte Achse 14-0
5_
3,02
9
13
3
1,02
1
7
1,24
Steigleiter mit Rückenschutz
2,93
1.09
1.23
2,80
Feuerwehrleiter
25
1.24
Tür unverriegelbar
25
2
SAND
S_ EZ
9
1,02
UKFD +2,59
497
823
189
1,65
T30RS P
4
1,50
30
Oberlicht
3,00 2,75
25
4
3,01
39 2
VOLLHOLZ
KAPPILIARBRECHENDE SCHICHT
0_v_e
8
2 2,79
1
4
1,59
EZS_5_AA_DT_01_16_020_v_a
14
1.07
RB 1,623/ 2,257 LB 1,50/ 2,05
1,61
1.3.0
G
1,65
Tür mit P, FSA, FSA über BMZ angesteuert
1,37
UKFD +2,67 OKFF +0,00
OKRD -0,16
30
13
9
66
30
?
3,9 Böschungswand gemäß9 6 Landschaftsplanung
7
99 30
fh+rd
tweg ch op Flu ter Lo un
30
1.28
RB 1,023/ 2,257 LB 90/ 2,05
3
1,75
314,5°
EG Plan + Schnitte Achse 14-0
t Oberlich
Tür mit P, FSA, FSA über BMZ angesteuert, keine Brandschutztechnischen Bedenken gegen Öffnung entgegen der RW-Richtung
63
OKFF +0,00 OKRD -0,16
1.24 SIBEL Fl.: 4,301 m² OKFF +0,00 m LH: +2,670 m
1.5 BMA Fl.: 1,885 m² OKFF +0,00 m LH: +2,670 m
1,00
3
1,62UKFD +2,67
31
Tür mit P, FSA, FSA über BMZ angesteuert
2,89
RA freie geometrische Fläche 0,5 m2 4
44
1,62 3 2,39 9
ABDICHTUNG
PORENBETON
B
8
Bodeneinlauf
P
OKFF +0,00
38 4
1.10
fh+rd P
Bodeneinlauf
MATERIALLEGENDE
STAHLBETON
C_22_00_05 EZS_5_BB_S
0_v_e
9
5,40
5,19
1.31
1.12 Aufzugsvorraum Fl.: 13,858 m² OKFF +0,00 m LH: +2,670 m
RB 1,623/ 2,257 LB 1,50/ 2,05
RB 1,623/ 2,257 LB 1,50/ 2,05
Schnittebene Grundriss: 1.50m
Böschungswand gemäß Landschaftsplanung
1.30
Aufzug 1-0
UKRD +2,67 OKFF +0,00 OKRD -0,16
9
11,49
1.26 BOS_Funk Fl.: 1,502 m² OKFF +0,00 m LH: +2,670 m
15
1
30
Fluchttüren lichtes Durchgangsmaß 1.2 m
RB 1,623/ 2,257 LB 1,50/ 2,05
Böschungswand gemäß Landschaftsplanung
1.25 HV SV Netz Fl.: 2,621 m² OKFF +0,00 m LH: +2,670 m
0
Aufzug 15-1
2,40
2,39 9
P
1.7 Aufzugsvorraum Fl.: 15,491 m² OKFF +0,00 m LH: +2,670 m
Hauptrohre
B
C_22_00_05 EZS_5_BB_S
1.8 HAR Fl.: 29,664 m² OKFF +0,00 m LH: +2,670 m
Böschungswand gemäß Landschaftsplanung
+108,00
Fluchttüren lichtes Durchgangsmaß 1.2 m
Böschungswand gemäß Landschaftsplanung
Datum / Unterschrift
Datum / Unterschrift
MATERIALLEGENDE
B
C_22_00_05 EZS_5_BB_S
0
0_v_e
1
Aufzug 1-0
Wendel 2 Aufzug 15-1
OKFF +23,09
OKFF +24,86
MATERIALLEGENDE
STAHLBETON
ABDICHTUNG
VOLLHOLZ
STAHLBETON
ABDICHTUNG
PORENBETON
KAPPILIARBRECHENDE SCHICHT
SAND
PORENBETON
KAPPILIARBRECHENDE SCHICHT
DÄMMSTOFF
GRÜNFLÄCHE
ESTRICH
DÄMMSTOFF
GRÜNFLÄCHE
ESTRICH
PERIMETERDÄMMUNG
ERDE GEWACHSEN
MAUERWERK
PERIMETERDÄMMUNG
ERDE GEWACHSEN
MAUERWERK
GITTERROST
KIES
GITTERROST
KIES
TRÄNENBLECH
TERRASENDIELEN STEIN
SCHAUMGLAS
TERRASENDIELEN HOLZ
BESCHRIFTUNGSSYMBOLE
GRIFFSEITE
SB1
SICHTBETONFLÄCHEN - GERINGE ANFORDERUNG
SB2
SICHTBETONFLÄCHEN - NORMALE ANFORDERUNG
A4
A5
Wassertank Innenseite
B1
BODENDURCHBRUCH
DD
DECKENDURCHBRUCH
WANDURCHBRUCH
WD(Rohr) WANDDURCHBRUCH ROHR
OKFF +46,17
B1.5
AD B BE BK VK BRH LH
B2
B1
OKFF +55,06
Seilnetz
OKFF +54,67
UKFD
Kronenträger
B2.5
+ x.xx
OKFF +55,09
09_0 7
Sonnenschutz Sombrero
Barschirm r = 11,5m
ng
2,531
25,425
B4 2,465
Kronenträger
Grundriss 09 OG Dachterrasse +51,958
2,346
B5 2,329
B5.5 1,816
B6 1,79
Wassertank Außenseite Wassertank Innenseite
Windschutz Dachterrasse BH 1,80 m
ABSPERRSCHIEBER (Gas)
SB SICHTBETON ROHDECKE D DECKE FERTIGDECKE UZ UNTERZUG ROHFUßBODEN FERTIGFUSSBODEN W WAND OBERKANTE UNTERKANTE LUFTRAUM
BRW FME F30-F90 A+M RD T30-T90 FH BA RM
BRANDWAND FEUERMELDER BRANDSCHUTZKLASSE MECHANISCHE BEANSPRUCHUNG RAUCHSCHUTZ, -DICHTE TÜR TÜR MIT BRANDSCHUTZKLASSE FEUERHEMMEND BRANDABSCHNITT RAUCHMELDER
Wartungssteg Umlauf Technikebene
Wetterschutzgitter Fläche 1.73m2 Öffnungsfläche 0,865m2
Bodenklappe mit FallLeiter als Zugang zum Wartungssteg und Erster Rettungsweg Technikgeschoss
Kronenträger Trapezblechverkleidung
OBERKANTE FERTIGFUßBODEN UNTERKANTE FERTIGDECKE
OKRF
UKRD
OBERKANTE ROHFUßBODEN
+- x.xx OBERKANTE FERTIGFUSSBODEN +- x.xx OBERKANTE ROHFUSSBODEN
UNTERKANTE ROHDECKE
+ x.xx OBERKANTE FERTIGDECKE + x.xx OBERKANTE ROHDECKE
A
OKFF +14,21
_SC_21_0 EZS_5_AA
Wetterschutzgitter Fläche 1.73m2 Öffnungsfläche 0,865m2 Kronenträger
Bodenklappe mit FallLeiter als Zugang zum Wartungssteg und Erster Rettungsweg Technikgeschoss
Wartungssteg Umlauf Technikebene
Windschutz Glasbrüstung BH 1.80 m
DECKENSCHLITZ
DD
WD
WANDURCHBRUCH
WD(Rohr) WANDDURCHBRUCH ROHR
BODENDURCHBRUCH
BD
DECKENDURCHBRUCH
DETAILVERWEIS EINFÜGENPUNKT CAD 100 x 100 cm SCHNITTFÜHRUNG
G
AD B BE BK VK BRH LH
ABSPERRSCHIEBER (Gas)
BRANDSCHUTZ:
ABGEHÄNGTE DECKE BODEN BODENEINLAUF BODENKANAL VORDERKANTE BRÜSTUNGSHÖHE LICHTE HÖHE
RD FD RFB FFB OK UK LR
SB SICHTBETON ROHDECKE D DECKE FERTIGDECKE UZ UNTERZUG ROHFUßBODEN FERTIGFUSSBODEN W WAND OBERKANTE UNTERKANTE LUFTRAUM
BRW FME F30-F90 A+M RD T30-T90 FH BA RM
BRANDWAND FEUERMELDER BRANDSCHUTZKLASSE MECHANISCHE BEANSPRUCHUNG RAUCHSCHUTZ, -DICHTE TÜR TÜR MIT BRANDSCHUTZKLASSE FEUERHEMMEND BRANDABSCHNITT RAUCHMELDER
MASSBEZUG OKFF
Grundriss 05 OG +38,298
OBERKANTE FERTIGFUßBODEN
UKFD
UNTERKANTE FERTIGDECKE
+ x.xx
GELÄNDEHÖHE
OKRF
UKRD
OBERKANTE ROHFUßBODEN
+- x.xx OBERKANTE FERTIGFUSSBODEN +- x.xx OBERKANTE ROHFUSSBODEN
UNTERKANTE ROHDECKE
+ x.xx OBERKANTE FERTIGDECKE + x.xx OBERKANTE ROHDECKE
OKFFB + - x.xx + - xxx.xx üNN HÖHE ÜBER NORMAL NULL
HINWEISE 1. ALLE MASSE SIND VOM AUFTRAGNEHMER VERANTWORTLICH ZU PRÜFEN UND AM BAU ZU NEHEMEN. MASSUNSTIMMIGKEITEN SIND DER BAULEITUNG VOR ARBEITSBEGINN ZU MELDEN. (VOB/B, §3.3)
2. ALLE MASSE BEZIEHEN SICH, SOWEIT NICHT ANDERS ANGEGEBEN AUF DEN ROHBAU OHNE PUTZ ODER BEKLEIDUNG. TÜR-, FENSTER, BRÜSTUNGS, STEINHÖHEN BEZIEHEN SICH AUF OBERKANTE FERTIGFUSSBODEN. FÜR DIE FLÄCHENBERECHNUNG DIENTEN DIE ROHBAUMASSE.
2. ALLE MASSE BEZIEHEN SICH, SOWEIT NICHT ANDERS ANGEGEBEN AUF DEN ROHBAU OHNE PUTZ ODER BEKLEIDUNG. TÜR-, FENSTER, BRÜSTUNGS, STEINHÖHEN BEZIEHEN SICH AUF OBERKANTE FERTIGFUSSBODEN. FÜR DIE FLÄCHENBERECHNUNG DIENTEN DIE ROHBAUMASSE.
3. DIESER PLAN GILT NUR IN VERBINDUNG MIT DEN ENTSPRECHENDEN SCHNITTEN, ANSICHTEN UND DETAILPLÄNEN DER ARCHITEKTEN UND FACHINGENIEURE.
3. DIESER PLAN GILT NUR IN VERBINDUNG MIT DEN ENTSPRECHENDEN SCHNITTEN, ANSICHTEN UND DETAILPLÄNEN DER ARCHITEKTEN UND FACHINGENIEURE. 4. FÜR DIE ABMESSUNGEN ALLER KONSTRUKTIVEN BAUTEILE GELTEN NUR DIE SCHAL- UND BEWEHRUNGSPLÄNE.
5. FÜR DEN ROHBAU SIND FOLGENDE UNTERLAGEN ZU BEACHTEN: STATIK MIT POSITIONSPLÄNEN, ARCHITEKTEN- UND FIRMENDETAILZEICHNUNGEN.
5. FÜR DEN ROHBAU SIND FOLGENDE UNTERLAGEN ZU BEACHTEN: STATIK MIT POSITIONSPLÄNEN, ARCHITEKTEN- UND FIRMENDETAILZEICHNUNGEN.
6. FIRMENDETAILZEICHNUNGEN GELTEN NUR MIT DEM FREIGABEVERMERK DES ARCHITEKTEN.
6. FIRMENDETAILZEICHNUNGEN GELTEN NUR MIT DEM FREIGABEVERMERK DES ARCHITEKTEN. 7. AUSSPARUNGEN SIND NICHT VOLLSTÄNDIG DARGESTELLT, SIEHE HIERZU HAUSTECHNIK-/ STATIKPLÄNE. 8. DIE MASSE SIND IN FOLGENDER REIHENFOLGE ANGEGEBEN: BREITE/HÖHE (B/H) SOWIE BREITE/TIEFE/HÖHE (B/T/H).
56,258
56,258
WP2 OKFF +55,36
B3
OKFF +51,96 B4
Sonnenschutz Sombrero
WP1
B3.5
Grundriss 04 OG Halbtank +24,581
5
Grundriss 04 OG Halbtank +24,581
OKFF +12,43
1,20
Fortlauf Fluchttrepp e1
OKFF +35,52
WANDSCHLITZ
DS
1. ALLE MASSE SIND VOM AUFTRAGNEHMER VERANTWORTLICH ZU PRÜFEN UND AM BAU ZU NEHEMEN. MASSUNSTIMMIGKEITEN SIND DER BAULEITUNG VOR ARBEITSBEGINN ZU MELDEN. (VOB/B, §3.3)
OKFF +46,17
B4.5
12,27
0_050_v_f
Gastronomie Schirme r = 3m
N
N B5
OKFF +10,65
OKEG = +-0,00m = 108,00m üNN
OKEG = +-0,00m = 108,00m üNN
PROJEKT
PROJEKT
Energie und Zukunftsspeicher Heidelberg Eppelheimer Straße 68-70 69123 Heidelberg
B4.5
OKFF +37,29
B5.5
Statik / Tragwerk A1
Außenanlagen
sbp schlaich bergermann partner Schwabstr. 43 70197 Stuttgart
A5 B5.5
HAR Raum / TGA-Leitungen /Polsterdampfanlage/ Aufstellort Kühlaggregate
Brücke zum AdViva Gebäude
Technische Gebäudeaustrüstung
A24 Landschaft Landschaftsarchitektur GmbH Köpenicker Str. 154 a 10997 Berlin
IB Schulz Ingenieurgesellschaft mbH Itterstraße 5a 69412 Eberbach
Bauteil Anlieferung/ Dienende Bereiche
Brücke zum AdViva Gebäude
Nr.
OKFF +45,44
Datum
Änderung
18.04.2019 Planerstellung
wd
tw
07.06.2019 Vergabe und LV LPH5-WP2
wd
tw
C
31.07.2019 Vergabe Thermische Hülle LPH5-WP2
wd
tw
BRH 1,1m
Grundriss 02 EG Dachfläche +3,10
Bauteil Öffentlicher Zugang zum Gebäude
+0,00 OKFF = 108.0 m ü.NN
OKFF +7,10
A2
Saarbrücker Strasse 24 - Haus D 10405 Berlin
Bauteil Anlieferung/ Dienende Bereiche Grundriss 02 EG Dachfläche +3,10
Anlieferung
Grundriss 01 EG +0
+0,00 OKFF = 108.0 m ü.NN
OKRD +0,67 = 108.665 m ü.NN
Statik / Tragwerk
Außenanlagen
Technische Gebäudeaustrüstung
sbp schlaich bergermann partner Schwabstr. 43 70197 Stuttgart
A24 Landschaft Landschaftsarchitektur GmbH Köpenicker Str. 154 a 10997 Berlin
IB Schulz Ingenieurgesellschaft mbH Itterstraße 5a 69412 Eberbach
Änderungen
Anlieferung
gez. gep.
A B
Helix-Treppe
FACHPLANER Steigleiter mit Rückenschutz
3,10
Änderungen
Stadtwerke Heidelberg GmbH Kurfürsten-Anlage 42-50 69115 Heidelberg
ARCHITEKT
Wassertank nicht Architektengewerk
Krone
B6
Grundriss 03 OG Regelgeschoss +12,311
Wassertank nicht Architektengewerk
FACHPLANER
OKFF +8,88
OKFF +39,07
Brücke für Rohrleitungen nicht Architektengewerk
Saarbrücker Strasse 24 - Haus D 10405 Berlin
B6
Energie und Zukunftsspeicher Heidelberg Eppelheimer Straße 68-70 69123 Heidelberg
Grundriss 03 OG Regelgeschoss +12,311
BAUHERR
ARCHITEKT
6
B5
Helix-Treppe
Stadtwerke Heidelberg GmbH Kurfürsten-Anlage 42-50 69115 Heidelberg
9,211
BAUHERR
A6
6,30
12
Nr. L
3,10
OKFF +51,96 +159,96 m üNN
21,481
Dachterrasse B4
3,90
A
WS
B3.5
OKFF +33,74
_SC_21_0 EZS_5_AA
UK=0.0 : Zusatzinfo S_00.00_HLS : Schachtnummer_Gewerk
ABKÜRZUNGEN
Grundriss 06 OG Technik +42,29
8. DIE MASSE SIND IN FOLGENDER REIHENFOLGE ANGEGEBEN: BREITE/HÖHE (B/H) SOWIE BREITE/TIEFE/HÖHE (B/T/H).
13
BD: Art des Durchbruchs 100/100: Lichte Maße
GRUNDSTÜCKGRENZE ABRISS ACHSEN VERDECKTE GEOMETRIE NEU BESTAND DRÜBERLIEGENDE GEOMETRIE
Trapezblechverkleidung
7. AUSSPARUNGEN SIND NICHT VOLLSTÄNDIG DARGESTELLT, SIEHE HIERZU HAUSTECHNIK-/ STATIKPLÄNE.
B2.5
LH: LICHTHÖHE in m DURCHBRUCHSTEMPEL
ALLGEMEIN:
Grundriss 05 OG +38,298
4. FÜR DIE ABMESSUNGEN ALLER KONSTRUKTIVEN BAUTEILE GELTEN NUR DIE SCHAL- UND BEWEHRUNGSPLÄNE. 0_050_v_f
SICHTBETONFLÄCHEN - NORMALE ANFORDERUNG
LINIEN:
Grundriss 07 OG Veranstaltung +46,17
Grundriss 06 OG Technik +42,29
OKFFB + - x.xx + - xxx.xx üNN HÖHE ÜBER NORMAL NULL
GELÄNDEHÖHE
SICHTBETONFLÄCHEN - GERINGE ANFORDERUNG
SB2
MERKSTEIN, HINWEISSÄULE
Grundriss 08 OG Mezzanine +49,04
Sonneschutz Sombrero Finales Podest Helix-Treppe
RAUMNUMMER RAUMNAME Fl.: FLÄCHE in m² OKFF OKFF in m
DURCHBRÜCHE:
Lamellenfenster
Zugang zum Dampfaustritt
SCHARNIERSEITE KIPPDREHFENSTER
RAUMSTEMPEL
FENSTERABMESSUNGEN
SB1
Grundriss 09 OG Dachterrasse +51,958
Krone
SCHNITTFÜHRUNG
G
GRIFFSEITE
UZ UK +x.xx UNTERKANTE UNTERZUG
Grundriss 10 OG Dachmembrane +54,42
Zugang Dachterrasse über Erweiterung der Fluchttreppe 1
Kronenträger
FEUERWEHRAUFZUG
ÖFFNUNGSRICHTUNGEN FENSTER
FLUCHTTÜR
x.xx / x.xx
Grundriss 08 OG Mezzanine +49,04
Sonneschutz Sombrero
TÜR NUMMER ROH BREITE/ HÖHE LICHTE BREITE/ HÖHE BRANDSCHUTZVERHALTEN
5,312
Barschirm
Bar Tresen
FWA
F90 - ANFORDERUNG
xxx RB xxx/ xxx LB xxx/ xxx xxx
Wendel
Seilnetz
Lamellenfenster Seilnetz
B4.5
HINWEISE
Windschutz Glasbrüstung BH 1.80 m
B3
_D T_ AA
Einga
2,255
B3.5
BRANDSCHUTZ: RD FD RFB FFB OK UK LR
Austritt Dachfläche +163,09 m üNN
2,263
B3
Grundriss 07 OG Veranstaltung +46,17
ABGEHÄNGTE DECKE BODEN BODENEINLAUF BODENKANAL VORDERKANTE BRÜSTUNGSHÖHE LICHTE HÖHE
OKFF
4
B1.5
Zugang Windschutz Dachterrasse Dachterrasse
MASSBEZUG
Krone
OKFF +15,98
B2
Grundriss 10 OG Dachmembrane +54,42
EINFÜGENPUNKT CAD 100 x 100 cm
ALLGEMEIN:
A6
1,661
B2.5
Krone Windschutz Dachterrasse BH 1,80 m
DETAILVERWEIS
1,655
Aufzüge
ABKÜRZUNGEN
-
A1
BD
DECKENSCHLITZ
WD
GRUNDSTÜCKGRENZE ABRISS ACHSEN VERDECKTE GEOMETRIE NEU BESTAND DRÜBERLIEGENDE GEOMETRIE
OKFF +46,17
OKFF +31,96
WANDSCHLITZ
DS
3,575 RA-Öffnung Inst. Schacht
Krone
UK=0.0 : Zusatzinfo S_00.00_HLS : Schachtnummer_Gewerk
WS
OKFF +17,76
A2
14
3,288
13,979
Barschirm 11,422
LINIEN:
OKFF +51,96
OKFF +30,19
2,273
B2
13,717
OKFF +51,96
Luftraum Sicht auf Revisionsebene 07 Veranstaltung/ Fassadenreinigung
Wassertank OKFF +46,17 Außenseite
2,493
B1.5
2,87
A3
0
Inst. Schacht
3,88
Austritt Aufzüge
2,507
Speiseaufzug zwischen Ebene 07 und 09
Krone
BD: Art des Durchbruchs 100/100: Lichte Maße
DURCHBRÜCHE:
Windschutz Glasbrüstung BH 1.80 m
Aufzüge
LH: LICHTHÖHE in m DURCHBRUCHSTEMPEL
MERKSTEIN, HINWEISSÄULE
OKFF +51,96
Zugang Dachterrasse
B1
2,918
3
2,261
Windschutz Dachterrasse BH 1,80 m
RAUMNUMMER RAUMNAME Fl.: FLÄCHE in m² OKFF OKFF in m
Wassertank Außenseite Wassertank Innenseite
3,88
Austritt Aufzüge
14,009
KIPPDREHFENSTER RAUMSTEMPEL
FENSTERABMESSUNGEN
UZ UK +x.xx UNTERKANTE UNTERZUG
Dach für Wartungszwecke begehbar
OKFF +28,41
314,5°
TERRASENDIELEN HOLZ
F90 - A
A4
3,992
x.xx / x.xx
1 37,522
17,709
OKFF +56,26 +164,26 m üNN
Windschutz Glasbrüstung BH 1.80 m
freiem
A3
SCHARNIERSEITE
2,462
FEUERWEHRAUFZUG
ÖFFNUNGSRICHTUNGEN FENSTER
2,462
TÜR NUMMER ROH BREITE/ HÖHE LICHTE BREITE/ HÖHE BRANDSCHUTZVERHALTEN FLUCHTTÜR
1m2 mit min. Inst.-Schacht RA-Öffnung Querschnitt, und gemetrischenvon der BMZ angesteuert öffenbar manuell
15
TERRASENDIELEN STEIN
SCHAUMGLAS
2,87
FWA
F90 - ANFORDERUNG
xxx RB xxx/ xxx LB xxx/ xxx xxx
TRÄNENBLECH
BESCHRIFTUNGSSYMBOLE
2,918
F90 - A
OKFF +21,31 OKFF +26,64
VOLLHOLZ SAND
+0,00 OKFF = 108.0 m ü.NN
Datum
Änderung
gez. gep.
31.07.2019 Vergabe Thermische Hülle LPH5-WP2
sb
Grundriss 01 EG +0
A4
11
OKFF +40,84
7 A3
bzug Vora Grundriss 10 OG Dachmembrane
OKFF +42,62
OKFF +44,40
8
B
C_22_00_05 EZS_5_BB_S
9
1 : 100
Projektnummer
Plannummer
LPH5 WP2
253
EZS_5_AA_GR_10_00_050_v_c
Planverfasser
gezeichnet von
Schnitt BB M1_100 1 : 100
Leistungsphase
Projektnummer
LPH5 WP2
253
geprüft von
Planverfasser
gezeichnet von
tw
LAVA Berlin GmbH sb
erstellt am
geändert am
Originalplangröße
Maßstab
Index
erstellt am
geändert am
18.04.2019
31.07.2019
DIN A0
1 : 50
C
31.07.2019
31.07.2019
Entwurfsverfasser: Prof. Dipl. - Ing. Tobias Wallisser
Datum / Unterschrift
Plannummer
EZS_5_AA_GR_01_00_050_v_l geprüft von
tw Originalplangröße
Planfreigabe
Planfreigabe 10
Schnitt AA M1_100
Leistungsphase
LAVA Berlin GmbH wd
OKFF +46,17
zug orab Schnitt AA und BB 1_100 V Planbezeichnung
Planbezeichnung
OKFF +5,33
Bauherr / Vertreter:
Datum / Unterschrift
Entwurfsverfasser: Prof. Dipl. - Ing. Tobias Wallisser
Datum / Unterschrift
Bauherr / Vertreter:
Datum / Unterschrift
Maßstab
Index
1 : 100
L
tw
0_v_e
THANKS Tรถrtener strasse, 37, Dessa-Roร lau,
YASEEN JABR PORTFOLIO
jabryaseen20@gmail.com +4917636270054 https://www.facebook.com/yaseen. gabr.90