JUNFENG HONG
PORTFOLIO
ARCHITECTURE 2009-2016
洪俊峰 2009-2016 作品集
resume 01 Working Experience
3D Printer House, Hollywood Hotel, Interlocking Chairs Design
02 Double Circulation
Film Cultrual Park
03 The Mountians
Urban complex design
04 Yang Shu pu Electric power plant rdevelopment 05 Hyperloop Station Design
Factory building reconstruction
Future transportation station design
06 other Works + Arts
JUNFENG HONG Adress Website E-mail Tel
3450 Sawtelle Blvd. Apt.259 Los Angeles, CA 90066 junfenghong.com junfengarch@gmail.com +1 (424) 343 4428
PROFESSIONAL EXPERIENCE 2011
2014
2015 - 2016
Hubei Tianmen City Urban Planning Administration Intern Responsibilities: Work in a team on a park planning project, Help drawing site plan in CAD. Shanghai Xian Dai Architecture Design Group Historic Building Conservation Institute Intern Responsibilities: Modeling, Checking regulatory requirements, Field measurement, Provide design ideas. M-Rad Architecture Project Designer Responsibilities: Architectural project design, developing solutions to technical and design problems following established standards. 3D model in Rhino and Revit, Prepares 2D and 3D presentation/ design drawings. Compiles data and performs elementary design computations.
EDUCATION 2014 - 2015
University of California, Los Angeles Master of Architecture II Suprastudio
2009 - 2014
Wuhan University of Technology, Wuhan Bachelor of Architecture
CAMPUS INVOLVEMENT 2009 - 2011
College News Association Vice department director Responsibilities: Find news in college, then write articles about it.Photography when needed.
SKILLS SUMMARY SOFTWARE
Revit, Rhino, Grasshopper, Maya, AutoCAD, Sketchup, Vray, Keyshot, Photoshop, Illustrator, Indesign, Premiere, After Effects and Microsoft office.
SKILLS
Professional drawings, Architectural animation, Concept Diagrams, Renderings, 3D model and Physic Model.
LANGUAGES
Mandarin, English.
description The project is a private villa design located in Malibu, the client is working in 3D printing related work. According to the customer's intention, we are trying to us concrete 3D printing as the main building material, and both shape and function should meet the needs of successful people in high-tech industry.
3dprint house Company: M-Rad Architcture Date: 2015/08/01-2016/02/01 Team Work
01
TYPICAL BRICK CONSTRUCTION
Layering
INVERTED ARCH
Compression Physics
TYPICAL CONCRETE CONSTRUCTION
Reinforced Strength
CATENARY PRINCIPLE
Minimal Surface Reduced Bending
ARCH CONSTRUCTION
Longspan Space
NEW CONCRETE CONSTRUCTION
Radial Wall Reduction in cost
3D PRINTED CONCRETE
3D Print concrete generation
The greatest feature of this project is the construction method. Different from conventional concrete construction, 3d print undoubtedly have a very big advantage on the curved surface generation. After analyzing the traditional curved surface construction methods, we made a further step on the existing
forms. Not only making use of the advantages of 3d printing, but also keep it similar to the traditional architectural forms, so that people will not fell unacceptable.
EXPANDING SITE CONDITION
CALIFORNIA STYLE
BETTER WAY OF LIVING FOR TODAY AND TOMORROW
The layout of the building mainly based on the terrain, and expanded along both side of the road. According to the needs of the owners, these palaces are divided into two main functional areas: Living and working. Then, we
combined classic California case study architecture spaces with our curved form, to make this building functions in the traditional way.
This design starts from combining with the terrain, taking two floors along the hill, and expansing around the middle of the road. The roof was raised to eliminate the feeling of heavy concrete. On the post-processing of the rendering, thinking about that the new material maight be difficult to accept by some customers, we made it like nostalgic style renderings.
This design starts from combining with the terrain, taking two floors along the hill, and expansing around the middle of the road. The roof was raised to eliminate the feeling of heavy concrete. On the post-processing of the rendering, thinking about that the new material maight be difficult to accept by some customers, we made it like nostalgic style renderings.
I am responsible for the form design, functional layout, 3D modeling and rendering in this project. This design starts from combining with the terrain, taking two floors along the hill, and expansing around the middle of the road. The roof was raised to eliminate the feeling of heavy concrete. On the post-processing of the rendering, thinking about that the new material maight be difficult to accept by some customers, we made it like nostalgic style renderings.
I am responsible for the form design, functional layout, 3D modeling and rendering in this project. This design starts from combining with the terrain, taking two floors along the hill, and expansing around the middle of the road. The roof was raised to eliminate the feeling of heavy concrete. On the post-processing of the rendering, thinking about that the new material maight be difficult to accept by some customers, we made it like nostalgic style renderings.
I am responsible for the form design, functional layout, 3D modeling and rendering in this project. This design starts from combining with the terrain, taking two floors along the hill, and expansing around the middle of the road. The roof was raised to eliminate the feeling of heavy concrete. On the post-processing of the rendering, thinking about that the new material maight be difficult to accept by some customers, we made it like nostalgic style renderings.
Introduction With the development of the portable devices and the network, people tend to prefer watching movies whenever and wherever possible. Compared to watch the film in the cinema, independent show began to pop up. As designing the Film cultural industry park, we should encourage the new froms, giving the the people who brings film industry with new vitality more help. Therefore, places for independent film show were added in this design and the leisure place also provides a display of movie. Rapid adoption and leisure places were combined to create a business atmosphere. Different places in order to better interpret the functional requirements of the industrial park.
Film Cultrual Industry park Design Double Circulation Project type: Architecture Design Location: Luoshi Road, Wuhan, China Tutor: Wang Fatang, Wuhan University of Tech. Junior, Solo work Date: 2011/11/01-2012/01/01
02
Commercial
Residential
Residential
Residential
Campus
The site is located in the Jiedaokou business center, with Wuhan University campus on the south and facing Xiongchu Avenue on the west. Accroding to the building orientation sequence, the site happened to be right in theintersection of the mechanism of north and south. This two direction formed an angle about 30 degrees. Consequently, this design attempts to form a combination of these two mechanisms unite so that the conflict can be resolved. On the other hand, the openning of the site is located in the middle of the street, which breaks a continuous sequence of commercial
atmosphere. Meanwhile, according to the mission statement, the average storey of the industrial park is 1-2 floors, which will be far lower than the story of the surrounding buildings. Thus, in this design, the industrial park entrance is designed as a relaxation area, so that people from continuous business activities can spun off temporarily, and relieve their fatigue.
Screen Commercial
Seats
Dark room
Traditional theater
Screen
Dark room Seats
Independent Film Display Component
Traditional cinema consists of three parts: The screen, the seats and a dark room. In the design of IIndependent Film Display Component, these three parts are redefined with architectural language and simplied into single elements.
We provide a lot of independent space for independent film makers. They are Interspersed inside the commercial area. Creating a film culture atmosphere in these business areas. Also providing opportunities for their own businesses.
Shop
property management Restaurant
Parking
Sunken Plaza
Green Space
Shop
Office Building
Theater
COURT YARD
Projection Room
1 Promoting Touch
2 Touch
3
Only Sight
4 Short Distance
5
Medium distance
6 Long Distance
7 Blocked
Display
Bearing wall
A screen in the bottom of the platform, whith Draws on the form of WTO-day class, although they can not do for a long time watching, but can be used to draw attention to the people through it, giving opportunity to the propaganda of films and creating atmosphere. Pedestal design provides seat matching with the screen.
Seat
The construction of platform creating different space between bulidings. Continuous transformation of the spatial sequence echoes the film's characteristics. Control the relationship between the independent screenings and commercial regions by varying degrees of blocking.
A variety of activities that occur under the platform
Show
Rest
Stay Pass
Watch shop
Wait communicate
3
4 3
1
4
9
2
3
10
1 1
8
11
5
5
6
7 7
7
5
1
Restaurant
4
Cafe
7
Property Office
2
Theater
5
Office
8
Kitchen
6
Meeting Room
9
Underground Garage Exit
3
Tea Bar
5
6
10 Underground Garage Entrance 11 Showroom
The middle of the square as the underground garage entrances, underground garage in order to open the closed environment, while creating a more convenient passage way.
It is a pocket park in the daytime. Break in continuous street facade commercial layout, with a green image to attract people to stay. In the evening it acted as a autonomous screening place, also works for attractive people.
Independent Film Display Components in commercial area.
Introduction This is a design of a large commercial and residential complex located between the Green hill in the campus and Main Street of the city. For its unique geographical environment, the design seeks to use ramps and indented green platform to extend the Greenland to the inside of the building, and further spread to the city environment. The complex is formed by two towers, which appeared like two "mountains". Two towers were placed with the function of hotel rooms and offices. Podium set up shopping malls, convention centers and public recreation space. Interpenetration between these spaces and links, not only conducive to the communication, but also help for the fire evacuation.
Urban complex design The Mountians
Task: Architecture Design Location: Xiongchu Avenue, Wuhan, China Tutor: Liu Wei, Wuhan University of Tech. Senior, Solo work Date: 2013/09/01-2013/11/01
03
Base located at the crossroads of the city center area. On it's back there is the green mountain of the campus, and all of other directions are in the busy city atmosphere. In this design, I hope to have all the function of an urban complex, at the same time, I want to introduce the green mountain environment into the building. So that people can relieve their stress in the stressful city life. Which also providing a better environment for offices and accommodations. The functional requirements of the building is mainly divided into three parts: hotel, conference center and business district.
Green communication platform A r i s e a n d g r e e n i n g t h e n o i s y 1 s t f l o o r, u s e i t a s a communication platform. which can provide additional space for outdoor meeting area.
The building is located between the city's main street and green spaces in the school, then how to use the good green landscape, also to prevent contamination of the city into the green environment? This is the most important issue in the design.
Extend
The green hill in the south suggest to the meaning of "mountains". Extend the mountain range, we get two peaks, and then cut it with the control line of the site, there is the volume modeling of the building. Control the curve of the "mountain" to open the "valley" toward the green campus, steep "cliff" facing the city streets, in order to get the sight of good green landscape, and also to prevent the contamination of the city into the green environment.
The Building contains complex functional form, divided into two parts, academic and commercial, on the whole. Requirements based on the mission statement, its specific distribution is as follows:
Second entrance of Convention Center
Light Well
Green Platforms
The hotel entrance
Conference Center Entrance
Cut-through Passage
Cut-through Passage
1. Market 12
9
2. Fire Lane
8
5
15 6
3
3. Kitchen
5 12
1
2
4. Shop
7
5. Business
13 14
4
6. Washhouse
11
7. Switching Room 8. Storeroom 9. Reception Office 10. Service Counter
1st Floor Plan
11. Restaurant 19
19
19
19 19
19
19
19
19
19
19
21 24
19
19
19
19
19
19
19
12. W.C.
21
19 21
21
19
13. Service Counter
22 20
16
14. Hall
20
15. Guard
18 23
17
12
23
23
27
23
16. Multi-Function Room 17. CafĂŠ
23
18.Meal Preparation 19. Hotel Room
2nd Floor Plan
20. Courtyard 21. Medium Meeting Room 19
19 19 19
19
19
19
19
19
19
19
19 21
26
21
21
22. Meeting hall
21
23. Small Meeting Room
26 20
26
24. Room Service
26 25
25
12
25
25. Office
28 25
25
27
26. Deluxe Suite 25
25
12
27. Equipment Room 3rd Floor Plan
28. Roof Garden
use plants to cut off the sight In the area facing the campus buildings, plants for soft partition. The purpose of the meeting is to strengthen the region's privacy without destroying the continuity of green.
roof Garden The roof garden is scattered distribution on each plane of the building is one of the features of this design. The purpose is to allow the people of each region can be exposed to green areas in order to achieve maximum results. Way of the roof construction is shown below.
Introduction Throughout its history, the Yang Shu Pu Electric Power Plant has provided power services, which have been vital to the economic growth and success of the City of Shanghai. Today, according to the requirements of owners, it is prepared to be transformed into a Creative Industry Park. The 213 Mu power plant site, will now become a strategic showcase of sustainable development through re-purposing and responsible use of the land along the shores of Shanghai Huang Pu River. This is one of the projects I have participated in when working as an assistant architect. In this project, DLR Group provided the upper plan and our company charges a specific part of the design. What I am doing is historic building data measurement and modeling, design of the commercial Street and Tower Feasibility Study.
Internship project Yang Shu Pu Electric Power Plant Redevelopment Project: Architecture Renovation Design Location: Yangshupu, Shanghai, China Tutor: Hua Ke, Shanghai Xian Dai Design Group Internship work Date: 2013/07/01-2012/08/20
04
Historical Development
Wu Jiao Chang Commercial district
Fu Xing Dao Commercial district
International Fashion Center
Site Riverside Industrial Park Ren Lian Lu Commercial district
Intellectual Property Park Riverside Technology Office Area Oriental Fisherman's Wharf Museology leisure area
From 1929 onwards, Yangshupu power station has made tremendous contributions on the development of Shanghai. For a long period of time, its power generation capacity was most great in China, and also a leader in the world. During nearly a hundred years of time, Yangshupu power stations witnessed China's development, and in a series of major historical events it also played an important role: once was occupied by Japan, after the liberation it was part destroyed by Taiwan as their primary target, and so on ... Today, due to energy reform Yangshupu gradually fade into history, but his humanistic values ​​did not disappear. Therefore, in Yangshupu
plant transformation is not just keep the building materials, and more importantly, as a continuation of history exist. So, in this project, what matters is how to continue its humanistic spirit.
overall plan
The key master planning criteria is to integrate the redevelopment with the current municipal plan for vehicular traffic circulation through the Yang Pu neighborhood. • The proposed ingress and egress are strategically placed to link with the City roads from the north (Gui Yang Road) and the west (An Pu Road). • The placement of 4 development zones compliments the expected flow of vehicular and pedestrian traffic to and from the site to facilitates the best use of land in its urban context - between the traffic along the Yang Pu Road and the the Huang Pu River. • The internal vehicular roadway is bent and curved at the two ingress points to mediate drive-through traffic that may adversely impact the safety and cohesiveness of the overall development. • The proposal satisfies the criteria estanblished by city planners – by integrating the adjacent roadways with the redevelopment site.
Base stations located within Yang Shu Pu Electric Power Plant , under the East Bund Riverside development area, south of the Huangpu River, the east side has been built Shanghai International Fashion Center, its future commercial development has an important influence on the base, north of the old-fashioned way multilayer Yang Shu Pu living space. The site occupies an area of 141,984.00 square meters, the area along the quay length of about 320 meters. It also has a moderate distance to the nearby bussiness district, and just within the Industrial Park Development Zone along the sequence.
Steam room
Switch Room
Substation building
Pumping Station
The large chimney
Team Design Area Entrance of the Park: 1. Steam room, Shanghai outstanding historic buildings, Yangpu District, cultural relics protection units. Protection class: 4 2. Switch Room 3.Substation building,Shanghai outstanding historic buildings, Yangpu District, cultural relics protection units. Protection class: 4 4. Pumping Station, Shanghai outstanding historic buildings, Yangpu District, cultural relics protection units. Protection class: 4 5. The large chimney
Main Task: As the area closest to the east industrial park, the most important task of buildings in our design range is to use its geographic adventage to attract the consumers, in order to achieve business goals.
Function zoning arrangement
Commercial street facade design Design of the entrance commercial faรงade is part of my work, the most important part of the renovation is to coordination with the original building and also be attractive. For different commercial form, I have made different projects: The first projects applies for boutique commercial facades, windows using Mondrian-style split and the leading to the museum entrance is guiding by a promenade. The second projects is for open commercial facades, windows using regular segmentation, and the leading to the museum entrance marked with arches.
Sightseeing Tower Design Sightseeing Tower is the symbol of the entire complex. It made use of the excellent location and rugged old structure of the chimney. However, the inner space of the tower space cannot meet the demand of the traffic. So the traffic space was put outside of the tower to become part of the tourism system.
Lightning rod Sightseeing Platform
Emergency Staircase
Panoramic Lift
The Chimney
Entrance
In order to meet the functional requirements as power stations, three sections of buildings are closed to each other, resulting in a lighting problem. To solve this problem, we stretch parts of the buildings on either side to the intermediate, so that these building will be opened for light. At the same time, the effective use of the high-level space of the large-span factory can creat a unique visual effect.
In the remodeling of historic buildings, you can "repair as the old", which means completely restored to its historical appearance, or you can create a comprehensive type, make it as a new building. However, the former is too conservative, the old form is unable to meet existing needs; the latter are too radical, the new building will lack history interdependence and become a "rootless tree".
The program will open the center of the building, effectively improve the lighting area, while the entire complex as a clearinghouse: Young plant in the business district and adjacent to the business district and flow in the intersection here, the project in the various functional areas of abortion in this at the intersection. This will be dispersed throughout the base of each function together. When functional arrangement, considering the spatial shape of each region, in order to adapt the business model arrangements,
pay attention to the size of the space combined.
Interior Reconstruction Analysis:
Trying to retain some of the existing plant large space, but the space is too monotonous, lack of business climate, and space utilization is too low. Therefore, the original steam turbine platform to be deformed to break
the traditional triangular elements for restructuring, in the formation of a rich interior space, but will be used to plant the interior space to the maximum extent.
The facade of the building have a historic beauty, so we retained most of the facade as the original form. But the problem is that it's no so attractive as a commercial building. Therefore, part of the facade is covered with glasses, breaking the monotony sequence of the original atmosphere. In addition, the construction of pipelines and other external components have an industrial feelling, so we keep all of them.
Introduction Hyperloop is a unique transportation technology based on centuries-old pneumatic tube principles. This is my work in the spring quarter. In this quarter, our mian task is to design proposals for the Hyperloop System. By extacting program data from the previous quarters, we are trying to create architecturally significant designs for the complex as a whole. In our scenario, based on geographic location and urban development form the base of the analysis, with emphasis on promoting the role of the station for regional economic development. Meanwhile hyperloop as a new means of transport, their usage requirements of the building in the form of the existing building will be very different form. Therefore, in this design, trying to find the best match of this architectural form of transportation, but it and passenger activities closely together.
poD+
Hyperloop Station Design Task: Future transportation station design Location: Boyle Heights, LA, USA Tutor: Graig Hoogetts, Marta Nowak, David Ross Team member:Yafei Zhang March II, Team Work Date: 2015/04/01-2015/06/20
05
2
1
STATION DESIGN CAPSULE PART CARTAGE IN AND OUT
STATION DESIGN CAPSULE PART CARTAGE IN AND OUT
SmartScreen
DEPARTURE Cartage comes into the outer shell
DEPARTURE Cartage comes into the outer shell
ARRIVAL Cartage comes out of the outer shell
ARRIVAL Cartage comes out of the outer shell
OUTBOUND Cartage separates to three parts
OUTBOUND Cartage separates to three parts
3
4
STATION DESIGN CAPSULE PART CARTAGE IN AND OUT
Engine cover
TURBINE EXPLOSIVE VIEW
Rotating axis
Blades
Capusule outer shell DEPARTURE Cartage comes into the outer shell
ARRIVAL Cartage comes out of the outer shell
OUTBOUND Cartage separates to three parts
Motor shell
BACKGROUND INFORMATION
POD
Screen
Body Surport
Storage
Cartridge
Maglev power
Seat Component
+
Campsule Shell
Before the group design, we chose cartraige as the way of boarding. In this manner, campusle consists of two parts: the shell and independence seat(which we called POD). In hyperloop workflow, after arriving, shell always remain in the vacuum environment. Independent seats send passengers to the platform. Subsequently, after the departure passengers boarded on independent seat, they returned to the shell, and then campusle departures. In the subsequent station design, we want to take advantage of this feature. In this scenario, we have seen some merit of the independent seats: After dispersed, the seats require a smaller turning radius; the passengers can aboard more freely. Meanwhile, the seats can send different passenger to different places.
YPERLOOP Hyperloop Studio - Suprastudio
10’
Easy to load/unload
2’ 6’’
Great flexibility Minimum turning radius
2 Emergency Exit 1 Translation
Translation
Crucial Technical Requirements:
3 Slide Out
1 Translation
Translation Unloading
2 Emergency Exit 3 Slide Out
4 Sink Down
4 5 6 7
Slide In
5 Sink Down Translation
Sink Down Sink Down Rotate Translation
Translation
6 Rotate
Translation
7 Translation Loading
The figure above shows the flow inside the station. In last semester's design, we try to design the station into a most compact form, because the station is located near the center city. Therefore, in this semester, compared to other groups, our Hyperloop system only need to take up a small area of the entire site. So how to use the rest area? We want to make the station to meet the transportation requirements, at the same time, utilization the characteristics of the station, to solve some local problems. When analysising of the site, we learned that the base located between downtown LA and Boyle Heights. Interestingly, this place is close to the heart of the city, but it is very poor. downtown's land and PROPOSAL
human resources are already saturated, but just across the river, boyle heights is rich of land and human resources. So we have every reason to believe that, in 10 years, when hyperloop is completed, the city center is very likely to expansion towards boyle heights, and our site will be a great commercial area.
PROPOSAL
PROPOSAL
Subtitle 10pt
PROPOSAL
Subtitle 10pt
Arrival Platform Exit Arrival Platform
BUSINESS Arrival Platform
Airlock
Departure Platform
COMMERCIAL
BUSINESS Arrival Platform
Exit
Airlock Airlock
Departure Platform
Airlock
Entrance
COMMERCIAL
Departure Platform
Departure Platform
Entrance
20,763ft²
20,763ft²
YPERLOOP Hyperloop Studio - Suprastudio
FORM GENERATION
FORM GENERATION
FORM GENERATION
YPERLOOP
FORM GENERATION
FORM GENERATION
Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
The design of the form starting from the way tubes get into the site. According to preliminary analysis, the best way of the tubes to enter is in the middle of the base, which dividing the site into two parts. Depending on the requirements of the station, the two parts are used as depar ture and arrival areas. Then according to the different needs of these two par ts, we put different commercial facilities in them. YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
Operating Process
Pod ParkingP
Pod ParkingP
Stores
Stores
pod Parking
pod Parking
At the station interior design, in order to create a space more suitable for the pods, we used the structure as the left figure. The peripheral of the cylindrical is made of mesh steel columns, a large number of shops and other load are located inside the cylinder. When the pods came to edge of the cylinder, it stoped, so that people are free to enjoy the shopping process. when leaving the cylinder, they can get in their pods again.
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
PLAN ANALYSIS
YPERLOOP Hyperloop Studio - Suprastudio
Section 1-1
Arrival Platform Meeting Room
YPERLOOP
Aitlock
Hyperloop Studio - Suprastudio
Section 3-3 Reception Room
Elevators
Transfer Platform
Shopping Center Departure Platform
Under Ground Parking
YPERLOOP Hyperloop Studio - Suprastudio
Drop off
YPERLOOP
Transfer Platform
Hyperloop Studio - Suprastudio
Purchase Tickets
YPERLOOP
Tubes
YPERLOOP
Departure Platform
Hyperloop Studio - Suprastudio
Arrival
Story board of the station
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
Hyperloop Studio - Suprastudio
Green Terrace
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
Meeting Room
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
YPERLOOP Hyperloop Studio - Suprastudio
Designer M-Rad LLC 5707 W Jefferson Blvd Los Angeles, 90016 matthew@m-rad.com 323.202.0950
Project Hi Point Saturn
Contact
other Drawings
2 A301
403A
403D
C6. 1N
---
404E
404D 404-K
DW REF.
DW REF.
405-K
405C
36' - 0"
405.1
05
W/D
405-B1
15' - 6"
15' - 6"
410A
C6. 1N
405D
W/D
410D
19' - 0"
405E
405.2
A402 03
405B
405-BR1
408.1
410J
408.2
407.1
407.2
405-L
410E
410.3
19' - 0"
02 04
410.1
410-K
404-BR1
404F
W/D
DW REF.
10' - 1 1/2"
410-L
410B
404B
404-B1
404C
404A 410C
404.2
A1203 A301 A901 A902
14' - 9 1/2"
14' - 9 1/2"
404-L
1 2 3
C6. 1N
405A
406A
410-B2
410-B1
---
11' - 10 1/2"
C6. 1N
408A
C6. 1N
W/D ? 406-B2
409D
409A
25' - 7"
C6. 1N
406D 406H
407-B1
406.4
407C
REF.
406-BR2
406E
407F 407G
408-B1
W/D
407B
407E
408G
409-B1
406J
Location 406K
12' - 0 1/2"
9' - 6 1/2"
406-BR3
407H
10' - 3"
408H
10' - 3"
408-BR2
407-BR1
408.4
408.3
406.5
12' - 2"
408-BR1
DN
409-BR1
409.2
406-L
17' - 4"
17' - 4"
400C
1500 Hi Point St, Los Angeles, CA 90035
10' - 11"
12' - 8"
407-B2
408-B2
406F
409B
408D
408B
407D
W/D
REF.
DW REF.
408E 408C
409.1
REF. DW
10' - 7"
409.3
406B
407-K
408F
409E
Date
409-K
409C
409F
Description
406-BR1
25' - 1"
408-K
409-L
Revisions No.
407-L
408-L
410K
W/D
NOT FOR CONSTRUCTION
406G
406-B1
406C
16' - 4 1/2"
406.3
410.2
407A
410H
410G 410F
410-BR2
21' - 9 1/2"
410-BR1
407.4
407-BR2
407.3
406.2
406.1
PARTIAL FOURTH FLOOR PLAN SOUTH
406.6
PARTIAL FOURTH FLOOR PLAN SOUTH 1 3/16" = 1'-0"
A217 2016/2/23 13:35:28
detail B02
R - ROOF R01 - Waterproof membrane R02 - Protection board R03 - Rigid insulation R04 - Self adhered membrane R05 - Plywood sheathing R06 - Wood battens to provide roof slope R07 - Wood roof framing R08 - Air space for installations R09 - Acoustic and/or thermal insulation R10 - Hanging rod, suspension clip and metallic rail R11 - Gypsum sheathing R12 - Pure white painting R13 - Metal cap
EXTERIOR R01
R02
R03
R04
R05
R06
R07
R13
Designer
M-Rad LLC 5707 W Jefferson Blvd Los Angeles, 90016 matthew@m-rad.com 323.202.0950
Project Hi Point Saturn
Contact
SF - STUCCO FACADE
R08
R09
R10
R11
R12
SF01
SF05
SF02
SF06
SF03
SF07
SF04
SF08 SF09
INTERIOR
detail B01
SF01 - Pure white painting SF02 - Gypsum sheathing SF03 - Plywood sheathing SF04 - Wood framing + thermal insulation SF05 - Plywood sheathing SF06 - 2 layers of water resistant barrier SF07 - Self-Furring lath nailed vertical and horizontal SF08 - Cement plaster base coat SF09 - Finish coat cement
detail B03 EXTERIOR S01
S02
S03
S04
S05
S06
S07
S13
S14
S01
S02
S03
S04
S05
S06
S07
S13
I - INTERIOR WALLS I01 - Pure white painting I02 - Gypsum sheathing I03 - Wood walls framing + acoustic insulation S14
S - SLAB S01 - Hardwood flooring S02 - Plywood or chipboard S03 - Acoustic or thermal insulation S04 - Acoustic batten S05 - Acoustic absorbing membrane S06 - Plywood subfloor S07 - Wood framing S08 - Air space for installations S09 - Hanging rod, suspension clip and metallic rail S10 - Acoustic insulation S11 - Gypsum sheathing S12 - Pure white painting S13 - Skirting board S14 - Perimeter seal or resilient flanking strip
S08
S09
S10
S11
S12
S08
I01
I01
I02
I02
S09
S10
S11
S12
S - SLAB S01 - Hardwood flooring S02 - Plywood or chipboard S03 - Acoustic or thermal insulation S04 - Acoustic batten S05 - Acoustic absorbing membrane S06 - Plywood subfloor S07 - Wood framing S08 - Air space for installations S09 - Hanging rod, suspension clip and metallic rail S10 - Acoustic insulation S11 - Gypsum sheathing S12 - Pure white painting S13 - Skirting board S14 - Perimeter seal or resilient flanking strip
I03
NOT FOR CONSTRUCTION Revisions No.
INTERIOR
Description
SF - STUCCO FACADE
SF10
SF01 - Pure white painting SF02 - Gypsum sheathing SF03 - Plywood sheathing SF04 - Wood framing + thermal insulation SF05 - Plywood sheathing SF06 - 2 layers of water resistant barrier SF07 - Self-Furring lath nailed vertical and horizontal SF08 - Cement plaster base coat SF09 - Finish coat cement SF10 - Aluminium window (see window schedules)
SF01
SF05
SF02
SF06
SF03
SF07
SF04
SF08 SF09
Location
B02
B01
1500 Hi Point St, Los Angeles, CA 90035
B03
WALL SECTIONS EXTERIOR
1
Detail 02 1" = 1'-0"
A902
24" 12"
48"
2016/2/23 13:35:51
Date
Designer
M-Rad LLC 5707 W Jefferson Blvd Los Angeles, 90016 matthew@m-rad.com 323.202.0950
Project Hi Point Saturn
BS - BASEMENT SLAB BS01 - Hardwood flooring BS02 - Plywood or chipboard BS03 - Thermal insulation BS04 - Acoustic absorbing membrane BS05 - Acoustic batten BS06 - Perimeter seal or resilient flanking strip BS07 - Skirting board BS08 - Waterproof membrane BS09 - Hardwood flooring for exterior BS10 - Batten for flooring BS11 - Mortar bed for slope BS12 - Concrete slab
detail C01
Contact
detail C02 BS - BASEMENT SLAB
INTERIOR
EXTERIOR SF01
SF05
SF02
SF06
SF03
SF07
SF04
EXTERIOR
SF08
SF09
BS01
BS02
BS03
BS04
BS05
BS06
BS07 BS08
BS09
BS10
BS11
BS08
BS09
BS10
BS13
BS14
BS11
BS01 - Hardwood flooring BS02 - Plywood or chipboard BS03 - Thermal insulation BS04 - Acoustic absorbing membrane BS05 - Acoustic batten BS06 - Perimeter seal or resilient flanking strip BS07 - Skirting board BS08 - Waterproof membrane BS09 - Hardwood flooring for exterior BS10 - Batten for flooring BS11 - Mortar bed for slope BS12 - Concrete slab BS13 - Cap hardwood BS14 - Black gravel
SF - STUCCO FACADE SF01 - Pure white painting SF02 - Gypsum sheathing SF03 - Plywood sheathing SF04 - Wood framing + thermal insulation SF05 - Plywood sheathing SF06 - 2 layers of water resistant barrier SF07 - Self-Furring lath nailed vertical and horizontal SF08 - Cement plaster base coat SF09 - Finish coat cement SF10 - Aluminium window (see window schedules)
BW - BASEMENT WALL BW01 - Concrete wall BW02 - Damp proofing BW03 - Drainage membrane BW04 - Geotextile BW05 - Granular drainage fill BW06 - Drainage pipe
BW01
BW02 BS12
BS12 BW03
BW04
INTERIOR
INTERIOR
TERRAIN
detail C03
INTERIOR BW01
BW02
BW01 - Concrete wall BW02 - Damp proofing BW03 - Drainage membrane BW04 - Geotextile BW05 - Granular drainage fill BW06 - Drainage pipe
BW04
BF01
BF02
NOT FOR CONSTRUCTION
BW - BASEMENT WALL
BW03
BF03
BW05
BW06
BW04
Revisions No.
Description
Date
BF - BASEMANT FLOORING BF01 - Concrete slab finishing BF02 - Granular fill coat BF03 - Perimeter seal or resilient flanking strip
Location 1500 Hi Point St, Los Angeles, CA 90035
TERRAIN
1
Detail 03 1 1/2" = 1'-0"
16" 8"
32"
Designer
C01
M-Rad LLC 5707 W Jefferson Blvd Los Angeles, 90016 matthew@m-rad.com 323.202.0950
DETAIL 03
C02 C03
Project Hi Point Saturn
Contact
A1203 2016/2/23 13:35:53
DEEP LEG RUNNER UNDERSIDE OF DECK ABOVE CONT ACOUSTIC SEALANT HOLD STUDS FROM DEEP LEG RUNNER, DO NOT FASTEN GYP BD OR STUDS TO DEEP LEG RUNNER
CELING W.O.
SECTION @ HEAD PLAN VIEW COLD FORMED METAL STUDS @ 16" O.C. 2 LAYER 5/8" GYP BD TYPE "X". USE CEMENT BOARD IN TOILET ROOMS OR WHEN BACKING TILE.
FINISH AS SCHEDULED
SECTION @ SILL ACOUSTICAL INSULATION WHERE OCCURS. SEE PARTITION SYMBOL FOR ACOUSTICALL WALL DESIGNATION. COLD FORMED METAL TRACK
0' - 2" AIR GAP
CONT. ACOUSTIC SEALANT
3
PARTITION TYPE C - COMMON WALL 3" = 1'-0" NOT FOR CONSTRUCTION
DEEP LEG RUNNER
DEEP LEG RUNNER
UNDERSIDE OF DECK ABOVE
UNDERSIDE OF DECK ABOVE
Revisions
3/4"
3/4"
No. CONT ACOUSTIC SEALANT
Description
Date
CONT ACOUSTIC SEALANT
HOLD STUDS FROM DEEP LEG RUNNER, DO NOT FASTEN GYP BD OR STUDS TO DEEP LEG RUNNER
HOLD STUDS FROM DEEP LEG RUNNER, DO NOT FASTEN GYP BD OR STUDS TO DEEP LEG RUNNER
CELING W.O.
CELING W.O.
SECTION @ HEAD
SECTION @ HEAD
PLAN VIEW
PLAN VIEW
COLD FORMED METAL STUDS @ 16" O.C.
COLD FORMED METAL STUDS @ 16" O.C.
2 LAYER 5/8" GYP BD TYPE "X". USE CEMENT BOARD IN TOILET ROOMS OR WHEN BACKING TILE.
1 LAYER 5/8" GYP BD TYPE "X". USE CEMENT BOARD IN TOILET ROOMS OR WHEN BACKING TILE
FINISH AS SCHEDULED
FINISH AS SCHEDULED
SECTION @ SILL
SECTION @ SILL
ACOUSTICAL INSULATION WHERE OCCURS. SEE PARTITION SYMBOL FOR ACOUSTICALL WALL DESIGNATION.
ACOUSTICAL INSULATION WHERE OCCURS. SEE PARTITION SYMBOL FOR ACOUSTICALL WALL DESIGNATION.
COLD FORMED METAL TRACK
COLD FORMED METAL TRACK
CONT. ACOUSTIC SEALANT
CONT. ACOUSTIC SEALANT
SYMBOL KEY
STUD SIZE 1: 1 5/8" 2: 2 1/2" 3: 3 5/8" 4: 4" 6: 6" 7: 7/8" HAT
HEAD OF WALL CONDITION 1: EXTEND GYP TO UOS 2: EXTEND GYP TO 6" ABOVE CEILING 3: EXTEND GYP TO UNDERSIDE OF CEILING 4: WALL HEIGHT AS SHOWN IN INTERIOR ELEVATIONS 5: OUTER LAYERS OF GYP BD TO 6" ABV CEILING 6: EXTEND GYP BD TO MIN 6" ABV CEILING, DIAGONAL BRACE ABV CEILING HEIGHT 7: EXTEND ONE SIDE OF GYP BD TO UNDERSIDE OF DECK/SLAB 8: SPOT ELEVATION AS INDICATED ON PLAN
PARTITION TYPE A = 1 LAY GYP BD OVER HAT CHANNEL B = 1 LAY GYP BD OVER STUD C = 1 LAY GYP BD EACH SIDE OVER STUD D = 2 LAY GYP BD EACH SIDE OVER STUD E = 1 LAY GYP BD 1 SIDE, 1 LAY SWL: CH STUD F = 2 LAY GYP BD 1 SIDE, 1 LAY SWL: CH STUD G = CMU
Location 1500 Hi Point St, Los Angeles, CA 90035
B4.1 1hr PARTITION RATINGS N: NON-RATED 1: 1 HOUR RATED FIRE BARRIER 2: 2 HOUR RATED FIRE BARRIER 3: 3 HOUR RATED FIRE BARRIER 4: 4 HOUR RATED FIRE BARRIER A: ACOUSTIC RATED PARTITION
PARTITION TYPES 2
PARTITION TYPE B 3" = 1'-0"
1
PARTITION TYPE A 3" = 1'-0"
T200 2016/2/23 13:36:06
other works ancient architecture measurement
Location: Hongan, Hubei, China Tutor: Guo Jian Teammember: Sunli, Zhang Fengwei Time: 4weeks Type: Teamwork/ Research Role: Team leader, Site plan, facade, moldeling, and parts of the detail drawing
other works photography
other works computer graphics
other works fine art
other works Animation http://www.youtube.com/c/JunfengHongUCLA
Summer studio
winter studio
winter Tech
Spring Tech
E-MAIL: junfengarch@gmail.com TEL: +1-(424)-343-4428