Denver Art Center Comprehensive Studio 609, 2014 Vakil, Nilou & Nichols, Denton Dong, Yi & Yu, Ran
Final
Tectonic Details
Diagrams
Parti
Site Strategies
CIRCULATION
Third Level
Second Level
Loading Dock Level
Ground Level
Vertical Staff Visitor Artwork
Horizontal
01
07
Basement Level
09
Staff Visitor Artwork Staff Entry
11
Visitor Entry
Artwork Entry
13
Site Strategies
Trafic Pressure & Narrow Sidewalk Site Culture Denver’s Art District on Santa Fe is a unique, nationally known art and cultural district with over 60 galleries, restaurants and shops located a few short blocks from downtown Denver, Colorado. The Art District opens its doors freely to lively crowds for popular events such as the First Friday Art Walk, held every first Friday of the month, and Preview Night, a more intimate gathering held every third Friday of the month.
01
?
02
15 Degree Entrance
Two Outdoor Galleries Opmize Urban/ Mountain Views Urban View - NE
15 Degree
15 Degree
03
Mountian View - SW
04
Thesis
Collage
DESIGN PROCESS Brise-soleil en verre pour façade,SAHEL
Museum ≠ Exhibition Museum = Experience + Inspiration + Create your own artwork Digital Exhibitions and Workshop
Building Skin
Interactive Landscape
Blaffer Museum, NY by WORKac
Small Size ≠ Single-function Small Size = Multi-function
Local Material Corten Steel and Concrete
Multi-Function Areas
Our site at the corner of 7th St. and Santa Fe located in the Denver Art Distract embraces most creative arts environments sourcing from mix culture of Mexican, American Indian, Hispanics, etc. Walking along the Santa Fe Street, various urban arts and street arts re? late to unique characters of this city and illustrate creativity of local residence. Therefore, we decide to design a community space to expand art literacy by collecting, storing, and exhibiting local arts; to create an interactive platform allowing citizens and visitors to participate. This interaction focuses on not only contents of exhibition, but also architecture itself. This could be achieved by structure, building skin, variable spaces, and physical environment design. The size limitation of our site requests rooms for multi-function, which helps to reduce building footprint, and also open to public event. 15 Degree
15 Degree
Fast Traffic, Narrow Sidewalk enhancement, consideration of views, fast traffic, 15 Degree Angle sidewalk, Entrance Releaselocal Preesure materials, texture, and Climate should be conBeyond cultural narrow Landscape Design tained as design criteria. We provide sustainable technology as optional solution. Exterior design is also a significant portion in this project. We strive to release the pressure from narrow sidewalk with landscape reform, bringing in visual protection and comfortable pedestrian outdoor space.
05
+
06
Parti Parti 1
07
Parti 2
Parti 3
08
STRUCTURE
Diagrams
Wide Modular Concrete Joint System
USERS CIRCULATION 1
A
POINT 1
B
CIRCULATION
EGRESS POINT 1 STUDIO (LEVEL 3)
EGRESS LENGH = 88’ (< 150’MAX WITHOUT SPRINKLER)
POINT 2 STUDIO (LEVEL 2)
EGRESS LENGH = 62’ (< 150’MAX WITHOUT SPRINKLER)
Third Level
POINT 3 STORAGE (BASEMENT)
EGRESS LENGH = 95’ (< 150’MAX WITHOUT SPRINKLER)
Storage Office
POINT 2
Second Level Staff Visitor Artwork
USERS CIRCULATION 2
Ground Level
HVAC
Vertical Staff
LEVEL 3
Visitor
Company Name :: Street Name, Suite Number :: City, State Zip Code :: MONTH DD, YYYY ::
Loading Dock Level
Artwork LEVEL 2
Horizontal
LOADING DECK
Staff
LEVEL 1
Visitor Artwork
BASEMENT
Staff Entry Visitor Entry Artwork Entry
Staff Visitor
HVAC INTAKE SUPPLY AIR
::
Artwork
HVAC SUPPLY
PROJECT TITLE ::
Basement Level
POINT 3
01
09
10
Tectonic Details
A5 B6
A4
A3
A2
B5 1' 2" Tall Fall Protection Finish Layer Protecting Water Prove Sheet Below
Finish Layer Protecting Water Prove Sheet Below
Water Prove Sheet Rigid Insulation in slope of 1/4" per feet, with Minimum Thickness at 6"
Rain Drain
Water Prove Sheet Rigid Insulation in slope of 1/4" per feet, with Minimum Thickness at 6"
Level 4 45' - 0"
Roofing Membrane
Level 4 45' - 0"
Concrete Roof Deck Vapor Barrier 1" Sheething 6" Rigid Insulation Between Studs 6" Steel Studs 2" Back Venting of GFRC Panel Allows Drying by Means of Air Movement and Vapour Diffusion
HVAC 5/8" Playwood
3" GRFC Panel
Hanging Track Lighting
1/2" Gap Between Panels 2" Steel Panel Holder
5/8" Wallboard
Sprinkler System
1/2" Gap Between Panels 3" GRFC Panels
1" (25mm) Insulating VE1-2M Glass Curtain Wall Sample Performance Data: Transittance (Visible Light 70% ; Solar Energy 33% ; U-V 10%) Reflectance (Visible Light-Exterior 11% ; Visible Light-Interior 12% ; Solar Energy 31%) NFRC U-Value (Winter 0.29 Btu/(hr*sqft*F) ; Summer 0.26 Btu/(hr*sqft*F)) Shading Coefficient (SC) 0.44 Relative Heat Gain 91 Btu/(hr*sqft*F) Solar Heat Gain Coefficient (SHGC) 0.38 LSG 1.84
5/8" Playwood 5/8" Wallboard Drainage Plane
2" Steel Panel Holder Drainage Plane
Flashing with drip edge
Flashing with drip edge
6" Insulation
5/8" Floor Wood Finishing
5/8" Drywall 2 5/8" Wood Block 3/8" Wood Ceiling Planks
0' - 3 7/32"
Level 3 Plan 30' - 0"
Level 3 Plan 30' - 0"
3' Glass Louver System
Recessed Downlight 6 1/2" Structure Mullion Insulating Glass Unit 1" (25mm) Insulating VE1-2M Glass Curtain Wall 3' Glass Louver System
Fiber Glass Concrete Wall Plywood
5/8" Drywall
Acoustic Panel
5/8" Plywood 3" Metal Stud Recessed Downlight
Acoustic Ceiling System
Acoustic Ceiling System
1" Concrete Finish 4" Concret Floor
Level 2 Plan 15' - 0"
Level 2 Plan 15' - 0"
3" Wood Seating
Recessed Downlight Concrete
5/8" Drywall D=8" Roof Light
Vapor Barrier
5/8" Drywall
6" Rigid Insulating Panel Vapor Barrier 1" Sheething 6" Rigid Insulation Between Studs
1" Sheething
5/8" Plywood 3" Metal Stud
Recessed Downlight
1' *1' Ventilation Supply Pipe
Suspended Peetle Kill Pine Wood Ceiling System
1/2' *1' Ventilation Supply Pipe
6" Rigid Insulation Between Studs 6" Steel Studs 2" Back Venting of GFRC Panel allows drying by means of air movement and vapour diffusion
6" Steel Studs 2" Back Venting of GFRC Panel allows drying by means of air movement and vapour diffusion
6" Steel Panel Holder and Isolation Material between 3" Concrete Panel
4' Loading Dock Level Plan 4' - 0"
4' Loading Dock Level Plan 4' - 0"
1" Concrete Finish
4" Concret Floor
Level 1 0' - 0"
Level 1 0' - 0"
Suspended Fluorescent Light 5/8" Drywall 5/8" Plywood 3" Metal Stud
Water Barrier 6" Thermal Insulation Water Barrier
6" Thermal Insulation
Drainage Mat Allows Water to Flow Down to The Footing Drains Well-rounded Gravel
Drainage Mat Allows Water to Flow Down to The Footing Drains
Basement Level Plan -15' - 0"
Well-rounded Gravel
Basement Level Plan -15' - 0"
Protect Top of Pipewith Filter Fabric Protect Top of Pipewith Filter Fabric Footing Drain of Perforated Pipe
Footing Drain of Perforated Pipe
4" Concrete Ground Slab
4" Concrete Ground Slab
Waterproofing membrane
Waterproofing membrane
Base Course of Gravel to Prevent The Capillary Rise of Groundwater
11
Base Course of Gravel to Prevent The Capillary Rise of Groundwater
12
Final
Sun Study June 21st
9 am
June 21st
December 21st
1 pm
9 am
1 pm
9 am
December 21st
4 pm
4 pm
1 pm
9 am
1 pm
June 21th Sunset
4 pm
4 pm
June 21th Sunrise
9am
4pm
June 21th Sunset
June 21th Sunrise
1pm
December 21th Sunset
December 21th Sunrise 9am
4pm
13
Site Plan
1pm
9am
14
Plans
Basement Plan
First Floor Plan
4’ Plus Floor Plan
Second Floor Plan
Third Floor Plan
B
-
-
-
B
A1
A2
A3
A4
A5
A6
A1
A7
A2
A3
-
B
-
B
A4
- North
A5
A6
A1
A7
A2
A3
A4
A5
A6
B1
B1
A1
A7
A2
A3
A4
A5
A6
A2
B
A3
A4
A5
B1 Outdoor Gallery 614 SF
DN
B2 Restroom 122 SF
Mechanical Room 1227 SF
Library and Research 450 SF
Santa Fe Drive
Restroom 120 SF
Conservation Room 770 SF
MECH. 53 SF
A
Exhibition 3191 SF
B4 -
A
A
West
UP
-
Lobby 868 SF
UP
-
B4
DN
-
-
Auditorium 589 SF
C2
C2
B5
B5 UP
C
-
-
C
C
UP
Outdoor Gallery 707 SF
C1
N
C1
Basement Level Plan 1/8” = 1’- 0”
3
N
C1
4’ Loading Dock Plan 1/8” = 1’- 0”
N
4
C1
Level 2 Plan 1/8” = 1’- 0”
B5 C
B6
B6
C2
B5
Studio 2 379 SF
-
-
A
Studio 1 375 SF
Security Room 267 SF
Auditorium 579 SF
B4
A
C2
B5
1
B3
Exhibition 1881 SF
B4
C2
N
MECH. 53 SF
B3
Coffee Counter 76 SF
-
B6
Restroom 108 SF Workshop 587 SF
Studio 3 512 SF
Loading Dock 497 SF
Storage 1567 SF
C
Studio 4 477 SF
Coat Room 157 SF
-
Wood/Metal Shop 837 SF
Conference Room 2 318 SF
Restroom 95 SF
MECH. 56 SF
B3
B3
B4 -
Restroom 84 SF
Open Office 1154 SF
East
B3
B2
B2
B2
Conference Room 1 385 SF MECH. 55 SF
A7
UP
B2 2 Staff Office 389 SF
A6
B1
B1
UP
A1
A7
B6
DN
N
5
B6
C1
Level 3 Plan 1/8” = 1’- 0”
- South1
2
15
Level 1 Plan
7th Street
-
1/8” = 1’- 0”
16
Elevations & Sections
South Elevation
West Elevation West
Elevation
1/8” = 1’0” South Elevation
East Elevation West Elevation
1/8” = 1’- 0”
1/8” = 1’- 0” B
A7
Section A
17
1
A6
Section A 1/8” = 1’- 0”
A5
A4
A3
A2
A1
B1
B2
B3
B4
-
-
A
C
B5
B
A7
A6
B6
A5
A4
A3
A2
A1
Level 4 45' - 0"
Level 4 45' - 0"
Level 4 45' - 0"
Level 3 Plan 30' - 0"
Level 3 Plan 30' - 0"
Level 3 Plan 30' - 0"
Level 2 Plan 15' - 0"
Level 2 Plan 15' - 0"
Level 2 Plan 15' - 0"
4' Loading Dock Level Plan 4' - 0"
4' Loading Dock Level Plan 4' - 0"
4' Loading Dock Level Plan 4' - 0"
Level 1 0' - 0"
Level 1 0' - 0"
Level 1 0' - 0"
Basement Level Plan -15' - 0"
Basement Level Plan -15' - 0"
Basement Level Plan -15' - 0"
Section B 2
Section B 1/8” = 1’- 0”
Section C 3
Section C 1/8” = 1’- 0”
18
Renderings
19
Model
20
Slice Model
21
22