Denver Art Center Arch 609 portfolio

Page 1

Denver Art Center Comprehensive Studio 609, 2014 Vakil, Nilou & Nichols, Denton Dong, Yi & Yu, Ran


Final

Tectonic Details

Diagrams

Parti

Site Strategies

CIRCULATION

Third Level

Second Level

Loading Dock Level

Ground Level

Vertical Staff Visitor Artwork

Horizontal

01

07

Basement Level

09

Staff Visitor Artwork Staff Entry

11

Visitor Entry

Artwork Entry

13


Site Strategies

Trafic Pressure & Narrow Sidewalk Site Culture Denver’s Art District on Santa Fe is a unique, nationally known art and cultural district with over 60 galleries, restaurants and shops located a few short blocks from downtown Denver, Colorado. The Art District opens its doors freely to lively crowds for popular events such as the First Friday Art Walk, held every first Friday of the month, and Preview Night, a more intimate gathering held every third Friday of the month.

01

?

02


15 Degree Entrance

Two Outdoor Galleries Opmize Urban/ Mountain Views Urban View - NE

15 Degree

15 Degree

03

Mountian View - SW

04


Thesis

Collage

DESIGN PROCESS Brise-soleil en verre pour façade,SAHEL

Museum ≠ Exhibition Museum = Experience + Inspiration + Create your own artwork Digital Exhibitions and Workshop

Building Skin

Interactive Landscape

Blaffer Museum, NY by WORKac

Small Size ≠ Single-function Small Size = Multi-function

Local Material Corten Steel and Concrete

Multi-Function Areas

Our site at the corner of 7th St. and Santa Fe located in the Denver Art Distract embraces most creative arts environments sourcing from mix culture of Mexican, American Indian, Hispanics, etc. Walking along the Santa Fe Street, various urban arts and street arts re? late to unique characters of this city and illustrate creativity of local residence. Therefore, we decide to design a community space to expand art literacy by collecting, storing, and exhibiting local arts; to create an interactive platform allowing citizens and visitors to participate. This interaction focuses on not only contents of exhibition, but also architecture itself. This could be achieved by structure, building skin, variable spaces, and physical environment design. The size limitation of our site requests rooms for multi-function, which helps to reduce building footprint, and also open to public event. 15 Degree

15 Degree

Fast Traffic, Narrow Sidewalk enhancement, consideration of views, fast traffic, 15 Degree Angle sidewalk, Entrance Releaselocal Preesure materials, texture, and Climate should be conBeyond cultural narrow Landscape Design tained as design criteria. We provide sustainable technology as optional solution. Exterior design is also a significant portion in this project. We strive to release the pressure from narrow sidewalk with landscape reform, bringing in visual protection and comfortable pedestrian outdoor space.

05

+

06


Parti Parti 1

07

Parti 2

Parti 3

08


STRUCTURE

Diagrams

Wide Modular Concrete Joint System

USERS CIRCULATION 1

A

POINT 1

B

CIRCULATION

EGRESS POINT 1 STUDIO (LEVEL 3)

EGRESS LENGH = 88’ (< 150’MAX WITHOUT SPRINKLER)

POINT 2 STUDIO (LEVEL 2)

EGRESS LENGH = 62’ (< 150’MAX WITHOUT SPRINKLER)

Third Level

POINT 3 STORAGE (BASEMENT)

EGRESS LENGH = 95’ (< 150’MAX WITHOUT SPRINKLER)

Storage Office

POINT 2

Second Level Staff Visitor Artwork

USERS CIRCULATION 2

Ground Level

HVAC

Vertical Staff

LEVEL 3

Visitor

Company Name :: Street Name, Suite Number :: City, State Zip Code :: MONTH DD, YYYY ::

Loading Dock Level

Artwork LEVEL 2

Horizontal

LOADING DECK

Staff

LEVEL 1

Visitor Artwork

BASEMENT

Staff Entry Visitor Entry Artwork Entry

Staff Visitor

HVAC INTAKE SUPPLY AIR

::

Artwork

HVAC SUPPLY

PROJECT TITLE ::

Basement Level

POINT 3

01

09

10


Tectonic Details

A5 B6

A4

A3

A2

B5 1' 2" Tall Fall Protection Finish Layer Protecting Water Prove Sheet Below

Finish Layer Protecting Water Prove Sheet Below

Water Prove Sheet Rigid Insulation in slope of 1/4" per feet, with Minimum Thickness at 6"

Rain Drain

Water Prove Sheet Rigid Insulation in slope of 1/4" per feet, with Minimum Thickness at 6"

Level 4 45' - 0"

Roofing Membrane

Level 4 45' - 0"

Concrete Roof Deck Vapor Barrier 1" Sheething 6" Rigid Insulation Between Studs 6" Steel Studs 2" Back Venting of GFRC Panel Allows Drying by Means of Air Movement and Vapour Diffusion

HVAC 5/8" Playwood

3" GRFC Panel

Hanging Track Lighting

1/2" Gap Between Panels 2" Steel Panel Holder

5/8" Wallboard

Sprinkler System

1/2" Gap Between Panels 3" GRFC Panels

1" (25mm) Insulating VE1-2M Glass Curtain Wall Sample Performance Data: Transittance (Visible Light 70% ; Solar Energy 33% ; U-V 10%) Reflectance (Visible Light-Exterior 11% ; Visible Light-Interior 12% ; Solar Energy 31%) NFRC U-Value (Winter 0.29 Btu/(hr*sqft*F) ; Summer 0.26 Btu/(hr*sqft*F)) Shading Coefficient (SC) 0.44 Relative Heat Gain 91 Btu/(hr*sqft*F) Solar Heat Gain Coefficient (SHGC) 0.38 LSG 1.84

5/8" Playwood 5/8" Wallboard Drainage Plane

2" Steel Panel Holder Drainage Plane

Flashing with drip edge

Flashing with drip edge

6" Insulation

5/8" Floor Wood Finishing

5/8" Drywall 2 5/8" Wood Block 3/8" Wood Ceiling Planks

0' - 3 7/32"

Level 3 Plan 30' - 0"

Level 3 Plan 30' - 0"

3' Glass Louver System

Recessed Downlight 6 1/2" Structure Mullion Insulating Glass Unit 1" (25mm) Insulating VE1-2M Glass Curtain Wall 3' Glass Louver System

Fiber Glass Concrete Wall Plywood

5/8" Drywall

Acoustic Panel

5/8" Plywood 3" Metal Stud Recessed Downlight

Acoustic Ceiling System

Acoustic Ceiling System

1" Concrete Finish 4" Concret Floor

Level 2 Plan 15' - 0"

Level 2 Plan 15' - 0"

3" Wood Seating

Recessed Downlight Concrete

5/8" Drywall D=8" Roof Light

Vapor Barrier

5/8" Drywall

6" Rigid Insulating Panel Vapor Barrier 1" Sheething 6" Rigid Insulation Between Studs

1" Sheething

5/8" Plywood 3" Metal Stud

Recessed Downlight

1' *1' Ventilation Supply Pipe

Suspended Peetle Kill Pine Wood Ceiling System

1/2' *1' Ventilation Supply Pipe

6" Rigid Insulation Between Studs 6" Steel Studs 2" Back Venting of GFRC Panel allows drying by means of air movement and vapour diffusion

6" Steel Studs 2" Back Venting of GFRC Panel allows drying by means of air movement and vapour diffusion

6" Steel Panel Holder and Isolation Material between 3" Concrete Panel

4' Loading Dock Level Plan 4' - 0"

4' Loading Dock Level Plan 4' - 0"

1" Concrete Finish

4" Concret Floor

Level 1 0' - 0"

Level 1 0' - 0"

Suspended Fluorescent Light 5/8" Drywall 5/8" Plywood 3" Metal Stud

Water Barrier 6" Thermal Insulation Water Barrier

6" Thermal Insulation

Drainage Mat Allows Water to Flow Down to The Footing Drains Well-rounded Gravel

Drainage Mat Allows Water to Flow Down to The Footing Drains

Basement Level Plan -15' - 0"

Well-rounded Gravel

Basement Level Plan -15' - 0"

Protect Top of Pipewith Filter Fabric Protect Top of Pipewith Filter Fabric Footing Drain of Perforated Pipe

Footing Drain of Perforated Pipe

4" Concrete Ground Slab

4" Concrete Ground Slab

Waterproofing membrane

Waterproofing membrane

Base Course of Gravel to Prevent The Capillary Rise of Groundwater

11

Base Course of Gravel to Prevent The Capillary Rise of Groundwater

12


Final

Sun Study June 21st

9 am

June 21st

December 21st

1 pm

9 am

1 pm

9 am

December 21st

4 pm

4 pm

1 pm

9 am

1 pm

June 21th Sunset

4 pm

4 pm

June 21th Sunrise

9am

4pm

June 21th Sunset

June 21th Sunrise

1pm

December 21th Sunset

December 21th Sunrise 9am

4pm

13

Site Plan

1pm

9am

14


Plans

Basement Plan

First Floor Plan

4’ Plus Floor Plan

Second Floor Plan

Third Floor Plan

B

-

-

-

B

A1

A2

A3

A4

A5

A6

A1

A7

A2

A3

-

B

-

B

A4

- North

A5

A6

A1

A7

A2

A3

A4

A5

A6

B1

B1

A1

A7

A2

A3

A4

A5

A6

A2

B

A3

A4

A5

B1 Outdoor Gallery 614 SF

DN

B2 Restroom 122 SF

Mechanical Room 1227 SF

Library and Research 450 SF

Santa Fe Drive

Restroom 120 SF

Conservation Room 770 SF

MECH. 53 SF

A

Exhibition 3191 SF

B4 -

A

A

West

UP

-

Lobby 868 SF

UP

-

B4

DN

-

-

Auditorium 589 SF

C2

C2

B5

B5 UP

C

-

-

C

C

UP

Outdoor Gallery 707 SF

C1

N

C1

Basement Level Plan 1/8” = 1’- 0”

3

N

C1

4’ Loading Dock Plan 1/8” = 1’- 0”

N

4

C1

Level 2 Plan 1/8” = 1’- 0”

B5 C

B6

B6

C2

B5

Studio 2 379 SF

-

-

A

Studio 1 375 SF

Security Room 267 SF

Auditorium 579 SF

B4

A

C2

B5

1

B3

Exhibition 1881 SF

B4

C2

N

MECH. 53 SF

B3

Coffee Counter 76 SF

-

B6

Restroom 108 SF Workshop 587 SF

Studio 3 512 SF

Loading Dock 497 SF

Storage 1567 SF

C

Studio 4 477 SF

Coat Room 157 SF

-

Wood/Metal Shop 837 SF

Conference Room 2 318 SF

Restroom 95 SF

MECH. 56 SF

B3

B3

B4 -

Restroom 84 SF

Open Office 1154 SF

East

B3

B2

B2

B2

Conference Room 1 385 SF MECH. 55 SF

A7

UP

B2 2 Staff Office 389 SF

A6

B1

B1

UP

A1

A7

B6

DN

N

5

B6

C1

Level 3 Plan 1/8” = 1’- 0”

- South1

2

15

Level 1 Plan

7th Street

-

1/8” = 1’- 0”

16


Elevations & Sections

South Elevation

West Elevation West

Elevation

1/8” = 1’0” South Elevation

East Elevation West Elevation

1/8” = 1’- 0”

1/8” = 1’- 0” B

A7

Section A

17

1

A6

Section A 1/8” = 1’- 0”

A5

A4

A3

A2

A1

B1

B2

B3

B4

-

-

A

C

B5

B

A7

A6

B6

A5

A4

A3

A2

A1

Level 4 45' - 0"

Level 4 45' - 0"

Level 4 45' - 0"

Level 3 Plan 30' - 0"

Level 3 Plan 30' - 0"

Level 3 Plan 30' - 0"

Level 2 Plan 15' - 0"

Level 2 Plan 15' - 0"

Level 2 Plan 15' - 0"

4' Loading Dock Level Plan 4' - 0"

4' Loading Dock Level Plan 4' - 0"

4' Loading Dock Level Plan 4' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Level 1 0' - 0"

Basement Level Plan -15' - 0"

Basement Level Plan -15' - 0"

Basement Level Plan -15' - 0"

Section B 2

Section B 1/8” = 1’- 0”

Section C 3

Section C 1/8” = 1’- 0”

18


Renderings

19

Model

20


Slice Model

21

22


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.