Agenda Precedence Research – Seeking Inspiration / Structure and the Built Environment / Construct a Small Scale Model that Explores a selected Structural Approach – Iteration 1
Dynamics of Folding
Dynamics of Pattern
z
Factors to consider And analysis for 1,2 and 3. • Climate : - Precipitation - Wind - Temperature (Fog or rain) - Sun path • Geography • History • Infrastructural existing physical conditions (What are the boundaries?)
1
Site 3
Factors to consider And analysis for 1,2 and 3.
•
Climate : EXTREMELY windy because of its spaces opened up to four sides. Wind comes from the different directions so that it was hard to define exactly where the wind comes from. Installation would be wind-safe, solid or light flowing material so it can endure the hard pressure from the different weathers. • Geography: Rough and slanted and made me like I am climbing the mountain. If the installation set here, I think it Is good to see it from the bottom part to upward. • Infrastructural existing physical conditions (What are the boundaries?) : The space is in the garden back of the architecture department in the Batmale Building of CCSF. Nothing surrounds the space except for some fences at the edge or some trees. There are soccer fields right next to the place but it is separated by the road. It is completely feels free and fresh.
Site two
Factors to consider And analysis for 1,2 and 3. •
Climate : Wind is blocked by the wall as shown on the picture, so the weather will not be a huge problem on installing. Since the sun directly shine up from the right wallfree zone, the shadow come along clearly with the wall. • Geography : Flat space allowing a plenty of free spaces for installing. It has wall that installation can be hold up tightly up and down. • Infrastructural existing physical conditions (What are the boundaries?) : There is pathway to the exit of building connected to the spaces. Any installation here would not be huge to block up the pathway.
Site Three
•
• •
Site analysis on surrounding
Site analysis on weather
#1 Literation
#2 and final Literation
Budget & Material Items
Quantity
Price
2x4
84 x $2.34/ each
$196.56
Flat Washer s
2 boxes x $ 10.98
$21.96
Lock Washer s
1 box x $14 .87
$14.87
⅜ Bolt 6 ”
3 boxes x $ 18.97
$56.91
⅜ Hex Nut
1 boxes x $ 9.57
$9.57
Eye Bolt
4 x $.85
$3.40
Turnbuckle
4 x $ 3.27
$ 13.08
Cable
100ft x $.3 5/ft
$35.00
Total
$351.35
Michael is cutting off the wood
• • • • • • • • • •
Picture of wood arranged from the elevated view
Connecting system
Wire connection
Spike
Sky view