In this week’s tutorial, we went to visit a construction site near Victoria market. The building is an apartment with 55 suites. The span of the building is 12 m.
The name of the construction company.
The view from bottom of the apartment.
We can see the structure of the wall is running bond. It is commonly used for cavity and veneer walls. Also, it’s composed of overlapping stretchers. From the right picture, we can see many pipes on the ceiling. The white and thick is the top is PVC pipe. It’s for sewage and storm water. Also, the steel ring on the PVC pipe is for protection and fixed. There are 3 different concrete be used in the building. The caulfield basswood also be used.