Constructing Environments Week 8 Journal

Page 1

Week 8 Journal In this week, we talked about how to draw the details of the section.

Image 1

Image 2

Image 3

Image 4

The plan of our group is the plan of Omond college. The images above are the photos that we taken about the details we chose. The Image 4 is the detail that I should focus on. We are required to redrew the section detail and change the 1:5 scale to 1:1.

The main structure:

1. Weep hole: A weep hole or weeper hole is a small opening left in the outer wall of masonry construction as an outlet for water inside a building to move outside the wall and evaporate.

2. Flashing : Flashing refers to thin pieces of impervious material installed to prevent the passage of water into a structure from a joint.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.