Yiyi Zhou University of Kansas Architecture Portfolio [2017] M.Arch.I Work Selection
Yiyi Zhou yiyi.zhou0722@gmail.com m. +(01) 785 393 8639 University of Kansas, 2017
Education Aug 2011- May 2017 Sep 2016- Dec 2016 May-June 2014 Mar 2016
University of Kansas, Lawrence, KS, USA École nationale supérieure d’architecture de ParisVal de Seine, Paris, France Nordic Countries Study Abroad Program Biography of London Study Abroad Program
Experience Aug 2016- Dec 2017
Jean-Paul Viguier et Associés
Jan 2017- Feb 2017
International Architecture Competition: Kip Island Auditorium 2015-2016 TIMBER IN THE CITY: Urban Habitats Competition
Aug 2015- Dec 2015
Intern Architect
Skills 3D Modeling Rendering/ Graphics Others Languages
Software Revit, Sketchup, AutoCAD, Rhinocero Photoshop, Vary, Illustrator, InDesign, Lumion,Lightroom. Free-hand Drawing, Sketches, Watercolor, Model Making, Woodwork Machine, Laser Cutter Chinese, English, Basic French
Reference Work Academic University of Kansas
David Sebastian Martin, Jean-Paul Viguier et Associés. dsbastianmartin@viguier.com
Kent Spreckerlmeyer, D.Arch.,FAIA. Professor of Architecture kents@ku.edu
Nilou Vakil, AIA,LEED AP BD+C.
Architect, Urban Designer, Adjunct Professor of Architecuture,Lecturer, Principal of SITU DESIGN. nilou.vakil@ ku.edu
TOUR HYPERION
QUARTIER BORDEAUX ST JEAN BELCIER
11 OCTOBRE 2016
01
Place for Art Denver Art Center Site: 7th Santa Fe St, Denver, CO Project Type: Site Research, Art Galleries, Auditorium, Art Studios, Museum Year: Spring 2016 Scale:32,000 ft2 Project Team: Myat Htoo Aung Professor: Nilou Vakil
02
Santa Fe art district is rich in character,
culture, and creativity. As Denver’s first and oldest Art District, the Art District on Santa Fe is the heart of neighborhood which hosts the city’s popular First Friday Art Walk. The Denver Art Center located at the corner of Santa Fe and 7th street,where gives us an opportunity to enhance the experience of the Art District. Being at the corner, the site has the potential to grasp city’s attention to the neighborhood. The site serves as a possible destination or beginning point to explore the vibrant neighborhood. This location becomes the most prominent social hub in the Santa Fe Art District. Therefore, the building will not only serve as a destination point, but also a
25
Ft
25’ Existing Urban Grid
Maximum Sunlight into Courtyard
place for cultivation and dispersion of ideas for the enrichment of civic life.The idea of borderless or blurry edge will be carried out as the main theme of the building. The form of the architecture on the street edge has a subtle gravity to draw people into the building by fusing between the street edge and the building. The spaces within the building will also have a sense of continuity in both movement and visual. This will provide the sense of simultaneous and interrelated discoveries as one move through the spaces rather than feeling enclosed in one space.
Terrace Public Gathering Space
03
Open Corner + Courtyard
Maximize View
Santa Fe Dr 7th St
N SITE PLAN N 04
AA WC
WC
Shaft
Loading
25’-0”
Security Coat Room EC
BB Lobby
26’-0”
BB
35’-9”
SANTA FE DRIVE
Open Seating Area
Library
Cafe
Shaft
22’-0” 31’-0”
15’-0”
15’-0”
15’-0”
17’-11”
AA
7TH ST
10’-0”
LEVEL 1
AA
AA
AA WC
Shaft
WC
WC
WC
4
WC
Shaft
Kitchen 25’-0”
Studio
25’-0”
25’-0” EC
Conference Room
EC
Permanent Gallery
BB
BB Temporary Gallery
Permanent Gallery
BB Open Office
Conference Room
Studio
26’-0”
26’-0”
26’-0” Open Seating Area
Studio Studio Terrace
Temporary Gallery
BB
BB
BB
35’-9”
35’-9”
35’-9” Temporary Gallery
Terrace
Terrace Shaft
Storage
15’-0”
15’-0”
17’-11”
31’-0”
15’-0”
10’-0”
LEVEL 2
15’-0”
15’-0”
17’-11”
31’-0”
15’-0”
AA
AA
AA
15’-0”
22’-0”
22’-0”
22’-0” 31’-0”
10’-0”
LEVEL 3 05
15’-0”
15’-0”
17’-11”
10’-0”
LEVEL 4
WEST ELEVATION
1
SOUTH ELEVATION
2
3
4
A
5
SECTION AA
B
SECTION BB
06
C
D
E
F
G
H
39
48
1 29
Open Office @ 100net = 29 Conference RM 1 @ 15net = 39 Conference RM 2 @ 15net = 25 Kitchenette @ 200net = 1 Copy Room @ 100net = 2 4th Floor Occupants = 96
2
48
25
5 4 5
55
57
Studio 1 @ 100gross = 5 Studio 2 @ 100gross = 4 Studio 3 @ 100gross = 5 Studio 4 @ 100gross = 1 Temporary Gallery @ 30net = 100 3rd Floor Occupants = 115
4
100
33 33 33
Permanent Gallery @ 30net = 100 2nd Floor Occupants = 100
113
Lobby @ 30gross = 29 Coat Room @ 300gross = 1 Open Seating Area @ 115net = 119 Loading Dock @ 300gross = 1 Security Room @ 100gross = 2 Library @15net = 55 Cafe @ 15net = 22 1st Floor Occupants = 249
113 22
5 9
9
5 5 3
HVAC SYSTEM
STRUCTURE SYSTEM
ART CIRCULATION
07
FIRE EGRESS
Collection Storage @ 300gross = 5 Conservation Room @ 300gross = 3 Wood Shop @ 100gross = 5 Mech Room @ 300gross = 5 Basement Occupants = 18
08
Gypsum Board Finish
Swiss Pearl
Translucent Polycarbonate
Studs Framing Members
Concrete Wall Vapor Barrier Thermal Insulation
CARAT Panels are integrally colored with a transparent or pigmented acrylic top finish shade in shade. The colors we chose are Black and Opal.
Insulated Glass
Post -Tensioned Truss
EXTECH® is a LEED Certified product, which host of benefits including daylighting, energy savings, superior impact resistance and insulation properties. The benefits of this flexible and green product are insurpassable in terms of quality and function.
Moisture Barrier Plywood 18 mm Rivet 15 mm, EPDM Washer Fastener Swisspearl Cement Composite Panel 8 mm Ventilated Cavity
G
I-Beam
Translucent Polycarbonate Screen
F
Parapet Sheathing Sloped Insulation
Glass Railing Stone Flooring Tiles Parapet
Terrace
36’ - 0” LEVEL 4
5” Metal Decking Wide Flange Joist 6’ O.C. Wide Flange Beam Suspended Ceiling
Stainless Steel Facade Support Polycarbonate Screen Brushed 316 Stainless steel cable Solar Control Double Glazing
Art Studio
5” Metal Decking
Wallwash Light Fixture
Post-tensioned Glulam Beam
316 Stainless Steel Grid Catwalk
24’ - 0” LEVEL 3
Swiss Pearl Panel
Terrace
Open Auditorium
Wood Finish Flooring HONEYCOMB Accoustic Insulation
12’ - 0’ LEVEL 2
Wood Seating Concrete floor Custom- made Steel Structure Stud Wall
Sedum Mat Engineered Soil Water Retention Mat Janitorial Room
Root Barrier Courtyard
Water Barrier Sloped Insulation 0’ LEVEL 1 Concrete Wall Drainage Mat 4”Rigid Insulation
4” Welded Wire Fabric Reinforcement Slab 4” Rigid Insulation 2” Sand 4” Crushed Stone
Collection/ Storage Room
Mechanical Room
Gravel Concrete Footing 4” Min Dia Perforated Drainpipe -15’ - 0” BASEMENT
09
FEATURED ON
10
11
12
13
Place for Habitation
Timber in the City
Site: Lower East Side, Manhattan, New York City, NY Project Type: Site Research, Timber Construction Reasearch,Housing, Market, Museum Scale:280,000 ft2 Year: Fall 2015 Professor: Chad Kraus
14
Project Background The competition challenges participants to design a mid-rise, mixed-use complex with affordable housing units, a NYC outpost of the The Andy Warhol Museum and a new and expanded home for the historic Essex Street Market.Timber is an ideal green building material: it is well suited for a broad range of structural and aesthetic applications, it offers economical construction and high performance characteristics.
ACCESS
Design Concept New york is a city build with stone, concrete. Nature has been demolished as the city grow. My design approach is to bring nature back to life, create a place where people can access to the nature, breath fresh air, and play with nature for the community and the city. Timber is an ideal green building material, it well suited with this concept both structurally and aesthetically. In addition inspried by Garden City movement, I designed a"green-belt" inside the city, provide to people a chance to interact with the nature. The green belt create a liveable enviroment for the local communities. The residents will be able to use the green space to cultivate their own foods. A mirco living circle will be created inside the timber city.
SUNLIGHT
GREEN SPACE
15
DEL
ANC
YS
SUF
FOL K
ST
ESS
EX
ST
T
BRO
OM
ES
NOR
FOL
KS T
T
16
N
SITE PLAN
N
GROUND FLOOR
N
17
SECOND FLOOR
18
MIRCO UNIT
325 SQ. FT, 150 UNITS
TWO BED
THREE BED
850 SQ. FT, 60 UNITS
1000 SQ. FT, 20 UNITS
19
20
1. PARAPET RAPE WITH MOISTURE BARRIER AND RIDGED INSULATION AND A LAYER OF TPO, ALUCOBOND AS UPPER CLOSURE. 1
2. 5 LAYERS OF CLT WALL PANEL WITH WHITE ALUCOBOND CLADING EXTERIOR FINISH. 3. PLANTPOT AS RAILING WITH WOOD CLADDING FINISH. 4. PUBLIC SEATING WITH CUSTOM-MADE LIGHT REFLECTING PANEL,SELF-STRUCTURED BY STEEL PLATE AT 4" O.C. AND FINISH WITH SOUND ABSORBING MATERIAL.
2
5. FRAME-LESS WINDOW WITH REMOVABLE WOOD CLADDING PANELS AS EXTERIOR FINISH. 6. 6.66" CLT WALL PANEL 5 LAYERS WITH RIDGED INSULATION AND THE WOOD RAIN SCREEN CLADDING FINISH.
3
7. 6" CONCRETE SLAB-ON-GRADE WITH WATERPROOFING MEMBRANE SIT ON GRAVEL OR CRUSHED STONE. 4" PERIMETER FOOTING DRAIN.
4
5
6
7 21
22
Place for Performance KIP Island Auditorium Site: Riga, Latvia Project Type: Competition, Auditorium, Exhibition, Conference. Year: Spring 2017 Competition Organization: Bee Breeders
23
?
Old Riga
LATVIA
The new builing not only serve for auditorium and conference hall, also should consider the relationship with the existing exhibition halls and the additional parking.
The underground connection maximize the public space between the new building and existing building. In addition, creating a grand entrance for the public access.
Old Riga
RIGA
Daugava River
Old Riga
KIP ISLAND
Introducing a grand atrium space to celebrate the path to the auditorium also brings people up to overlook the old Riga town.
24
Pitch form frames the old city Riga
N
Level 1 Auditorium, Conference Room, Outdoor Public Plaza, Cafe, Exhibition hall
East Elevation
25
Level 2 Auditorium, Conference Room, Connection to Parking
Level 3 Flexible Auditoriums, Storage
26
Level 4 Office,Conference Room, Cocktail Bar
27
28
TOUR HYPERION
QUARTIER BORDEAUX ST JEAN BELCIER
11 OCTOBRE 2016
Tour Hyperion-Housing Tower
Site: Saint-Jean Belcier District, Bordeaux, France Project Type: Timber Construction, Housing, Social Housing, Office Client: Clairsienne Partners: EIFFAGE,Woodeum Scale: 17,000 m2
16
29
T1
T15
+34.45 N11
1 2
+31.35 N10
3 4 5 6
+28.25 N09
7 8 9
2.57
53
+25.15 N08
10 11 12
+22.05 N08
13 14 15
+18.95 N06
1. Plateage classe 3 B 2. Lambourdes b.m cl IV Sur Plots 3. Etanchéité 4. Isolant HD 5. Panneau CLT 180 entre consoles HEA 200 6. Panneau Pils Douglas 30mm Autoclavé 7. Isolation 8. Mur Ossature Bios 9. Parement Extérieur Ventilé
10. Revetement de sol à définir 11. Chape béton 12. Domisol LV15 13. CLT 200mm 5 Pils 14. 100mm Larine de verre 15. BA13
30
Role -Design assistant in DD -BIM Modeling -Facade Design -Detailing Wall Section with CLT, -Prapering Presentation for Client and Engineers. -Graphic assistant in Competitions
31