Architecture Portfolio - Wongel Yohannes

Page 1

ARCITECTURE PORTFOLIO

WONGEL YOHANNES


WONGEL YOHANNES yohannwl@mail.uc.edu (513)-288-1620 https://www.linkedin.com/in/wongel-yohannes https://issuu.com/yohannwla89/docs/yohannes_wongel_ portfolio_06122023

EDUCATION UNIVERSITY OF CINCINNATI Cincinnati, Ohio College of Design Architecture, Art, and Planning Bachelor of Science in Architecture Class of 2025 Participating in the Professional Practice Program, alternating semesters of classroom study with work in the field of design. ROGER BACON HIGH SCHOOL Cincinnati, Ohio High School Diploma Class of 2020

2

SKILLS

EXPERIENCE

SOFTWARE Microsoft Word PowerPoint Excel

PANERA BREAD| TEAM LEAD May 2021-Current | Cincinnati, Ohio Coached and motivated my team to exceed Panera’s goals for sales, speed of service, order accuracy, and cafe health Managed team performance while maintaining a warm and inclusive team culture Trained over 25 employees and took leadership in organizing orders and properly distributing it to customers

DESIGN Adobe Illustrator Adobe InDesign Adobe Photoshop Auto Cad Sketchup Rhino Revit OTHER LANGUAGES Amharic

HONORS/ACHIEVEMENTS NSLS, 2022-current Dean's list, 2021-current AP classes, 2017-2020 Assisi scholar, 2016-2020 First honors, 2016-2020

M.SELAM KIDANEMIHERT CHURCH SUNDAY SCHOOL | TEACHER ASSOCIATE June 2016-Current | Cincinnati, Ohio Wrote objectives/prepared the weekely readings Assisted with fundraising events/led children and educational activites explaining the faith Organized and oversaw bible study lessons P&G | PRODUCT DESIGNER June 2017-July 2017 | Cincinnati, Ohio Designed 2 different forms of toothpastes to be considered for marketing and analyzed the pros and cons of each product Communicated and discussed 5 key points with the CEO on further plans of how to effectively advertise and distribute the product Illustrated the plans and layouts of our design to then present our ideas for our advertisement

COLLECTIVE ARCHITECTURE| INTERN January 2023-April 2023/August 2023-December 2023 | Washington Dc Prepared vision sessions, schematic designs, design development, and revised construction documents under close supervision of the project manager Developed rendered plans, worked on floor plans, and organized finish boards for client presentations Ordered finish samples and engaged with reps Updated Company standards Reviewed shop drawings and submittals during construction for conformance with design intent Particpated in pre-construction, pre-installation, and regular progress meetings with design team Assisted project manager in obtaining necessary permits and approvals

ACTIVITIES Cross Country | Team Captain Bacon Buddies | Bacon Buddies Committee member Planeteers | Student Planner for environment-based activities Marketing Project (P&G) | Product Designer

3


INDEX

06-07 | 1600 WILSON BLVD

24-29| PERFORMANCE PAVILION

40-41| 100+1

08-11| PROMENADE

30-31 |NORDIC PAVILION

42-43| OTHER FIRM WORK

12-19|INWOOD PARK

32-35| ROOFTOP PAVILION

44-45| PERSONAL WORK

20-23| PUBLIC BATHROOM

36-39 | MODULAR UNIT

4

5


01| 1600 WILSON BLVD

Project Description During my tenure at Collective Architecture, I actively contributed to the 1600 Wilson Blvd project. My responsibilities included rendering the 3rd-floor option 2 floor plan and collaborating with Ismail Khelalfa, Liz Turncliff, Alex Hurtado, and Max Cuzmuc in the initial phases of developing office spaces and open workspaces for the 4th-floor option 2 floor plan. Location: Arlington, VA Software: Revit Photoshop

6

7


02 | PROMENADE

Project Description During my tenure at Collective Architecture, I was actively involved in the Promenade project. As part of my responsibilities, I conducted a comprehensive site survey, gathering measurements of specific interior characteristics of the building. In collaboration with Ismail Khelalfa, Liz Turncliff, Alex Hurtado, and Max Cuzmuc, I translated my on-site observations into an elevation drawing, contributing to the project’s overall development.

-

-

7

A200

A200

1 3 A202

1

A202

2

2 A201

Location: Bethesda, MD

1 A201

DN

2

4 A202

A200 3

Software: Revit

-

-

8

9


10

11


03 | INWOOD PARK

Project Description The objective of this project is to conceptualize and design a museum, incorporating fundamental design concepts, including but not limited to site response, program, circulation, and atmosphere design.

Exisiting Trees Pond Sun Path Wind Direction

Location: Cincinnati, Ohio

MAIN GALLERY ENTRY

Exisiting Conditions: Dance Pavilion/Monument to Fredrich Ludwig Jahn, WPA-era bathroom building (historic), heritage trees (trunk diameters of 24” and greater) Softwares Used: Rhino Photoshop Illustrator

MAIN ENTRY

ADMIN ENTRY

Main Roads Minor Roads Pedestrian Walkway Parking Lot

BALCONY ENTRY

Pond

12

13


GROUND FLOOR

SECONDFLOOR

RENDERING

14

FIRST FLOOR

15


ELEVATIONS 16

17


EXTERIOR RENDERING 18

MATERIALITY/RENDERING

19


04 | PUBLIC BATHROOM

Banos Publicos - Precedent

Project Description Concept-Spatial experience The project’s goal is to propose distinct spatial qualities and articulate movement patterns in response to the given site. The site, situated in an urban area adjacent to Findlay Market in Cincinnati, serves as the focal point for our design considerations. Additionally, we were tasked with studying relevant precedents for this project and generating 3D models and diagrams to gain a comprehensive understanding of its inherent qualities.

Diagrams

Software: Rhino Illustrator

20

21


1/8”=1’-0”

1/8”=1’-0”

22

23


05 | PREFORMANCE PAVILION

Project Description Concept- Tectonics The objective of this project is to formulate a pavilion design, drawing inspiration from our precedent model, that skillfully conveys tectonic elements. Key considerations include incorporating rhythm, structure, fragmentation, modules, units, repetition, and difference. The challenge is to transition from an abstract concept to a specific design. The designated site for this endeavor is Burnet Woods. Software: Rhino Illustrator Photoshop

24

25


St. Benedict Chapel- Section Model

St. Benedict Chapel- Diagrams Tectonic Study

26

27


28

29


06 | NORDIC PAVILION

Project Description Concept- Line weights The goal of this assignment is to produce a digital set of drawings for one of our assigned studio precedent studies. These drawings encompass a plan, section, and elevation, emphasizing the utilization of appropriate line weights and poche. The primary focus is on refining our skills in Rhino. Software: Rhino

30

31


07 | ROOFTOP PAVILION

Project Description Concept- Circulation The objective of this project is to design a rooftop pavilion, based on a precedent assigned, that will be placed on top of the materials library building. It is meant to provide a functional space where people may escape to enjoy the company of the outdoors. Selected Precedent: Openhome House

32

33


34

35


08 | MODULAR UNIT

Project Description Concept- Assembly This project asked us to explore with repetitive units and examining the part-to-whole relationship that emerges through the aggregation of multiple units within a system. Working collaboratively as a group, our objective was to design individual units and proficiently assemble them to convey a system characterized by qualities such as depth, rhythm, and movement.

36

Shadows/Context

Construction Drawing of Unit

37


PATTERN/RYTHUM

38

39


09 | 100+1

Project Description Concept- Unification The objective of this project is to explore the creative integration of materials without relying on traditional adhesives such as glue, staples, or tape. A minimum of 100 objects must be interconnected using stitching as the primary method of connection.

Outline of Model

40

41


OTHER FIRM WORK

SUITE 1: 1,100 USF

Project Description During my tenure at Collective Architecture, I actively contributed to 1003 K St NW. My responsibilities included designing a test fit for the 3rd-floor and collaborating with Charles Plymale, Liz Turncliff, and Makaela Faldani to design mutiple suites for a multi-tenant space. I have also developed elevations for pantries that would be implemented in an active project.

OFFICE

PANTRY

IT/LAN

OFFICE

WOMEN'S RR

OFFICE

Location: Washington DC

MEN'S RR

CONFERENCE

CONFERENCE

PHONE ROOM

SHARED AMENITY: 774 USF WORKSTATIONS

WORKSTATIONS

WORKSTATIONS OFFICE

Software: Revit

OFFICE

OFFICE

OFFICE SUITE 2: 615 USF

42

1

SUITE 3: 542 USF

TEST FIT - MULTI TENANT 3/32" = 1'-0"

43


PERSONAL WORK The compilation showcases a selection of projects completed during my high school and college journey, encompassing a range of works in both 3D art and photography.

44

45


CONTACT INFORMATION Wongel Yohannes yohannwl@mail.uc.edu (513)-288-1620 https://www.linkedin.com/in/ wongel-yohannes-1206231b8/

46


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.