Sem 6 Architecture Portfolio Cemetery X Museum X Park

Page 1



TABLE OF CONTENT

PROJECT 1 : DESIGN BY RESEARCH 1. 2. 3.

ATMOSPHERE PROMINENT FIGURE SITE ANALYSIS

PROJECT 2 : URBAN & BUILDING STRATEGIES 1. 2.

URBAN STRATEGIES BUILDING STRATEGIES

PROJECT 3 : CEMTERY X MUSEUM X PARK 1.

ARCHITECTURE DRAWING

TECHNICAL REPORT



Architecture Design Studio Semester 6 Project 1 : Design by Researching Chong Yit Sian (1001850927)



ATMOSPHERES PETER ZUMTHOR


Texture Matrix

Normal

Craving

Cracking

Spots/Pun ching

Ratio Fabrication process (grind, polish, split, drill) Light n Shadow Scale Texture The material has unlimited combination, and the outcomes are always unpredictable until it works on site.

Craving

Factor of the “chemistry” :

Spot/Pun Cracking ching

Material is like chemistry that the mixture of 2 material with different ratio would have reaction also known as effect in architecture.

Normal

Material and Compatibility

This is an experiment on matching different texture to form new combination. Different combination of texture may have different feeling and effects on the user.

Rust stain on stone wall act like the tears of the wall. It represents the life of the stone wall which built for a long time and been through every incident. This is to bring the emotion of serious or unfortunates to the user or influence them in the same way.

Rust stain can also represent bleeding effect on the wall where the hole is like the bullet hole while experienced the world war 2.


Tension Between Interior and Exterior

Fully Open Door It gives a clear vision into the space, where this will make people feel calm and not offended.

Half Open Door This is a weird situation where people usually wondering what happen to the door. It creates an intention to people either fully open the door or fully close the door.

Feelings : Clear, Calm

Feelings: Weird, impulsive

Closed Door There are no visual or information from the other space, thus people feel unknow to the space.

Left with Gap A little light leaked from the space, making people curious about what is inside the space. People may only know some hints from the gap, making them tantalized by truth.

Feeling: unknown,

Feeling: Curious


Distance of the panel layers

Light ray

Medium distance arrangement This arrangement has optimal sunlight reflection, which allowing the indirect sunlight to light up the interior space.

The angle of light ray is consistence throughout the study, this to simulate the same sun light condition.

Short distance arrangement This arrangement reflected most of the sunlight to the exterior. Otherwise, the light will also be reflected between the panel and making the light ray to lost its intensity

Long distance arrangement This arrangement having big gap in between which allow direct sunlight in penetrate into the spaces.

Mockup Transformation of light effect from the door gap

Exterior

Interior

The wall barrier opening which the entrance is layered between the overlapping walls making the door is unnecessary and it might help passive ventilation

Interior Exterior

Interior

Exterior

Interior

Exterior

Exterior

Interior

The entrance of the barrier wall opening avoiding direct visual access into the space. Exterior

Interior

The natural sunlight reflected few times before entering user’s eye, which make the light ray softer and more comfortable to receive.


Model 1 Short distance arrangement


Model 2 Medium distance arrangement


Model 3 Long distance arrangement



Prominent Figure of Kuala Lumpur Development Kapitan Yap Ah Loy Yap Kwan Seng Loke Yew





Kwong Tong Cemetery Site Analysis Unit A



Site Analysis Report

Transportation Train

Infrastructure

Transportation Bus

Transportation Car


Site Analysis Report

Sun Path

Existing Water Body

Wind Direction

Contour


Architecture Design Studio Semester 6 Project 2 : Urban X Building Strategies Chong Yit Sian (1001850927)



Kwong Tong Cemetery Urban Strategies YS


Urban Strategies

Site Issue : 1.The land is not utilized all the time, mainly for funeral event 2. Communities are avoiding from getting themselves into the site due to ritual beliefs.

Urban Strategies Idea : 1. Creating moment of silence for user who come for tomb sweeping. 2. Time tunnel, underground tunnel beneath the highway that link the upper part and lower part of the Kwong Tong Cemetery. Leading to the proposed site. 3. Bring up the historical value of the site to the communities.

Program proposed: 1. Columbarium of Remembrance. (event : MH370, MH17, Covid, Disaster)

Question : 1. Who is the user?

2. Photography booth to record the photo for annual visitor.

2. How they access?

3.Related history Telling

3. How to make the land more lively? 4. How to bring people of different races?


Urban Strategies Consideration

Primary & Secondary Access

The primary access used for visitor who is mainly accessed by car which the access is the surrounding highways. The secondary access is the small and narrow road that passing through the internal of the Kwong Tong Cemetery.

Node & Intersection Point

The intersection of access mainly happen in the graveyard area. Hence the challenge is to bring outsider into the cemetery space to have activities between each other

Existing Greens

The greeneries in Kwong Tong Cemetery is relatively denser compared to city center. Although, the graveyard zone is slowly bald due to the expansion of land the use for burring.


Urban Strategies Consideration Existing Building & Graves

Space Zoning


The overall urban intervention are combined with three layers of network:

Master Plan

First Layer (Upper layer) : The network that elevated from the ground which the the canopy walk and some elevated resting gazebo. Second Layer (Mid layer) : The network of water cannel route and the usual pedestrian walk way that used to travel around the graveyard Third Layer (Lower Layer) : The network of underground path way which also called as the silent path way.

Urban Intervention - Memorial Columbarium / Landscape

Urban Intervention - Time Tunnel

For the remembrance of victim who past away in disaster such as Covid-19 , MH370 incident , MH17 incident and others in future.

A tunnel that link with the north part of the Kwong Tong Cemetery beneath the high way.

Also a business plan that might benefit to Kwong Tong Cemetery , where the can offer lower price of funeral service to the victim who is financially not viable after the lost of relative.

The access point is beside the World War 2 Memorial Peace Park where they can visit after they browsed the WW2 memorial peace park.

The time tunnel is a place for the annual visitor to record their every year photo with their family members, making a timelapse photo album for each family.

Their photo can also published in the tunnel and making it as a place of memories in the future.

Urban Intervention - Canopy Walk

Urban Intervention - Pathway of Silence

The canopy walks are mostly located at the west which is to promote the program to the community located at west.

A underground walkway that connect the proposed site and the time tunnel.

The canopy also link several historical architecture, tombstone of capitans and memorial park to direct visitor to respective place.

Which often served for visitor who purposely come the the proposed program rather than the funeral event.

Alongside the canopy walk there are also some information board of the history for the next historical place.

A dull flush concrete finished high wall which create narrow walkway for visitor, promote the emotion of keeping quite during the walk, to show respect to people who having funeral event.


Zone A Zone A is the main stretch of canopy walk which covered most of the historical architecture and the tombstone of the prominent figure The canopy walk also lead to the memorial landscape which serve the remembrance of the disaster happen in Malaysia.


Zone B Zone B, the canopy walk mainly connect the tombstone of the prominent figure. The tombstone that connected are as following: 1.Tomb of Liang Xiang Ting 2.Tomb of Kwong Chiu Guild Hall 3.Tomb of Yap Kwan Seng The canopy walk in Zone B would not have direct access to the tombstone but only elevated platform which allow visual access only.


Zone C Zone C is the intersection of all layer of network. Canopy walk in Zone C are elevated on the water cannel route and linked with the tomb of Chiew Yoke and Yap Ah Loy. While the Path of Silence located underground to avoid visual contact for some sensitive issue, and it does provide stair to access to the ground.


Water Cannel Route The water cannel flow along the pedestrian walk way on ground covering the most dense place of gravestone in the cemetery. Providing natural coolant to the environment , and sense of peacefulness while listening to the water flow. There are some little stone bridge with 50meters apart with each other. Since the water cannel divided the walkway into half.


Urban Intervention Artificial Water Cannel


Urban Intervention Artificial Water Cannel

The water cannel which flow around the graveyard can serve as a natural coolant for the environment since the land are mostly gravestone rather than plantation. The water cannel may also promote ritual program such as lifting paper boat, flower lantern while having commemoration day. The wishes sent can be collected and bring to a shrine for further blessing. The water cannel also aim to make the site more lifelines by having the voice of flowing water, and the creature brought by the water sources. The paper boat and flower lantern floating will also represent one of our kind, allowing visitor to know there are someone around even though they cant see each other. The model is to show the concept of water channeling in different height of contour so that every part of the water cannel can contain certain level of water and channeling the paper boat and flower lantern.


Urban Intervention Time Tunnel


Urban Intervention Time Tunnel

Urban Intervention - Time Tunnel A tunnel that link with the north part of the Kwong Tong Cemetery beneath the high way. The access point is beside the World War 2 Memorial Peace Park where they can visit after they browsed the WW2 memorial peace park. The time tunnel is a place for the annual visitor to record their every year photo with their family members, making a time-lapse photo album for each family. Their photo can also published in the tunnel and making it as a place of memories in the future.

Target user : Family To record thier every year changes into the gallery, becoming a public album which exhibit to everyone.


Urban Intervention Historical Canopy Walk


Urban Intervention Historical Canopy Walk

The canopy walks are mostly located at the west which is to promote the program to the community located at west. The canopy also link several historical architecture, tombstone of capitans and memorial park to direct visitor to respective place. Alongside the canopy walk there are also some information board of the history for the next historical place.

Station Location & Distances


Urban Intervention Pathway of Silence


Urban Intervention Pathway of Silent

The Path of Silence is the path way that connect the proposed site and the time tunnel (where the targeted user come from). The intervention not only leading visitor to the site but also promote the attitude of keeping quite while passing along the graveyard and encourage visitor to show respect to the people who having funeral event if there are. It also avoid direct visual contact to the graveyard since there are minority that might feel uncomfortable while looking at that due to spiritual reason. Along the pathway, there are some alcove that serve as a resting place which also enhance the sense of strictness in the graveyard area. The model showed different height of the wall and depth of the path, while the protrusion of the wall may act as a visual barrier in between Bandar Malaysia and the site.


Urban Intervention Memorial Columbarium


Urban Intervention Memorial Columbarium

The memorial columbarium is where the urn of the departed of disaster can be kept. Such as MH 370 incident, MH17 incident, Covid-19. The columbarium design will consist of a space or alcove for the relative to have a moment of silence. The alcove would also promote the moment of silence without entering into it. The Memorial Columbarium and Landscape can also gather the relative of the victims during the commemoration day, this could encourage each other of not being alone especially for those who cant get rid of depression. Not to mention, the intervention might increase the revenue of the cemetery although offering in lower price.


Urban Intervention Memorial Landscape

The memorial landscape is a sub-program that co-relate to the columbarium. There will be some installation such as information board and commemorate lighting fixture or etc. The information board provide detail information of respective incident such as MH370, the documentation of investigation that published by the government, the name list of victims and other information. This also serve as a documentation for future if there are people who wanted to retrace the incident since it still in mystery. While the commemorate lighting is to commemorate the victim whose body still cannot be found, this also to reserve the existence of the departed other than having urn of ash.


Kwong Tong Cemetery X Museum X Park Building Strategies YS


Building Strategy Bubble Diagram


Building Strategy Mockup model (Axis by the Pond)


Building Strategy Mockup model (Form follow Contour)


Building Strategy Massing

Mass

Form follow Axis

Split Level

Form follow Contour

Insertion

Final


Building Strategy Schematic Section


Façade Assembly

Building Strategy Façade Treatment Concrete X Green Wall

Concrete Planter Box


Building Strategy Concrete Cubes


Building Strategy Concrete Cubes

Underground Room

On Ground Space


Building Strategy Concrete Cubes

Sunken Space

Tunnel Exit


Building Strategy Plaster Cubes

Tunnel / Underground space

Dry Tunnel with split level

Wet Tunnel connected with water body in Site


Architecture Design Studio Semester 6 Project 3 : Cemetery X Museum X Park Chong Yit Sian (1001850927)


Cemetery X Museum X Park



Site Plan


Ground Floor Plan


19

18 18 12

13

14

16

5

15

17

4

2

3 9

1

6

Legend :

7

8

10 11

Ground Floor Plan

1. Main Atrium 2. Prominent Figure Museum 3.Yap Kwan Seng’s Museum 4. Loke Yew’s Museum 5. Yap Ah Loy’s Museum 6. Locker Room 7. World War 2 Museum 8. WW2 Simulation Space 9. Food Store 10. Lift Lobby 11. Toilet 12. Registration Lobby 13. Cafe 14. Accommodation 1 15. Accommodation 2 16. Recreation Area 17. Hostel 18. Dropoff Area 19. Memorial Area


Underground Floor Plan


26

27

29 21 28

20

22 23

Legend :

25

Underground Floor Plan

24

20. Front Yard 21. Basement Carpark 22. Tunnel link BM 23. Office 24. Tomb Museum 25. Lift Lobby 26. Electrical Service Room 27. Mechanical Service Room 28. Pathway of Silence 29. Recreation Area


First Floor Plan


40

30

Legend :

37 38 31 39 32 33

36

35

34

First Floor Plan

30. KL Development History Galley 31. World War 2 Museum 32. Lift Lobby 33. Toilet 34. Workshop’s Corridor 35. Photos Restoration Workshop 36. Arts Restoration Workshop 37. Mechanical Services Room 38. Electrical Services Room 39. Loading Bay 40. Hostel


Second Floor Plan


Legend :

41. Photo Gallery Spaces 42. Lift Lobby 43. Toilet

41

42

43

Second Floor Plan


Front Elevation

Front Perspective


Right Elevation

Section Z - Z


Section X - X

Section Y - Y


Programmatic Section


Perspective&Render


Bird Eye View


Main Atrium

The main atrium is triple volume while the top level is enclosed with glass panel. This make the spaces more independent from artificial light. And the triple volume might counter the emotion of depress from the cemetery zone.


Link from Silent Pathway

The pond water fall on the concrete wall, the movement of water create washing pattern on the wall. The sound of flushing water also making visitor to feel calm after coming from the cemetery area.


Yap Kwan Seng’s Museum

The Kapitan’s Museum is designed to have green roof skylight, and vent block in certain wall. This is to allow more penetration of sunlight that make the spaces more liveliness


Kuala Lumpur Development History Gallery

The Corridor exhibit the history of the development in Kuala Lumpur. The information and history of Kuala Lumpur in engraved on the glass panel. This would allow user to read thru while also allowing natural light into the spaces.


Kuala Lumpur Development History Gallery

The Corridor exhibit the history of the development in Kuala Lumpur. While going thru the information and history, user may also enjoy the skyline of Kuala Lumpur City Centre. Hence to make them more appreciate to the contribution that build up Kuala Lumpur


World War 2 Simulation Space

The wall of the space is finished by rusted masonry, which to enhance the feelings of World War 2 within the sensory of visual and smell. The drip of the rust can be seen as the bleeding effect while the rust also diffuse smell of blood.


Workshop

The sunken space for the workshop is hidden from the back of the building. Forcing visitor to travel around of the building to look for the place.


Photo Gallery

This gallery is mainly used to exhibit the photos or art that is restored by its owner from the workshop provided. Making this gallery to become a public memory storage. The movable translucent panel can be rearrange depending on new events. The translucent panel also trying to create feelings of memory pieces.


Technical Report


PROJECT2&3:GA DRAWI NG &DET AI LDRAWI NG


PROJECTWRI T EUP

T hepr opos edpr oj ecti nt ot hes i t ei sar ecr eat i onalpar kofmus eum,whi cht hef or ml ai dagai ns tt hes l opys i t econt extt hatcr eat es t ep l evel i ngoft hes paces .Att hemeant i me,t her oofofeachl eveli sdes i gnedt obeagr eenr oofofgar den,whi chal l ow us ert ol i nger i ng ar oundaf t ervi s i t i ngt hemus eum.Enhancet hemus eum i st obr i ngmor epeopl ef r om s ur r oundi ngi nt ot hes i t ewher ebyi sagr aveyar dar ea, t hatpeopl et r yi ngt oavoi d.Bycr eat i ngmor epubl i cs pacesandgr eenar i est oover comewr ongmi nds etofgr aveyar dz onet obeamor e f r i eandl yr ecr eat i onals pace. t heact i vi t i esoft hemus eum al s ot r yi ngt ocr eat et hel as tmemor i esoft hef ami l i esmemberwi t ht hi err el at i vewhopas sawayaf t ert heyhave endt hi erf uner alevent .T heyar ewor ks hopofphot or es t or at i ont oal l ow mor eout s i dert ovi s i tt hebui l di ngwhi l eal s opr ovi di ngchancet o makenew memor i esandr es t or ememor i esandr ecor dmemor i es . L as t l yt hepr oj ecti sai mt obeas us t ai nbl ebui l di ngi nt er m ofener gycons umpt i onandal s ot hebenef i tbr i ngt ot hecommuni t i esandal s ot he member sofKwongT ongCemet er y


DRAWING LIST : NO. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

DRAWING TITLE

DRAWING NO.

SIZE

SCALE

REV

DATE

SITE PLAN & LOCATION PLAN ROOF PLAN GROUND FLOOR PLAN SECTION A-A ELEVATION ACCOMODATION UNIT PLAN OVERALL SECTION DETAIL FACADE ASSEMBLY DETAIL STAIRCASE DETAIL MISCELLANEOUS DETAIL

YS / AR724 / GP00 / 100 / 01 YS / AR724 / GP02 / 200 / 01 YS / AR724 / GP01 / 300 / 01 YS / AR724 / SE01 / 301 / 01 YS / AR724 / ELE01 / 400 / 01 YS / AR724 / AC / 500 / 01 YS / AR724 / DT / 500 / 01 YS / AR724 / DT / 501 / 01 YS / AR724 / DT / 503 / 01 YS / AR724 / CL / 600 / 01

A0 A0 A0 A1 A1 A3 A1 A1 A3 A1

NTS 1 : 200 1 : 200 1 : 100 1 : 200 1 : 50 NTS NTS 1 : 20 1 : NTS

01 01 01 01 01 01 01 01 01 01

1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021 1 / 1 / 2021

SCHEDULE OF AREA : SPACE

FLOOR AREA

BASEMENT BASEMENT CAR PARK OFFICES RECREATION AREA

SQM 754.5 (EXCL) 116.5 125.3 241.8 SQM 212.3 487.4 526.3 238.5 78.9 1543.4 SQM 296.9 279.1 238.5 243.8 51.2 42.4 1151.9

GROUND FLOOR MAIN ATRIUM MUSEUM 1 MUSEUM 2 SERVICES AREA CAFE FIRST FLOOR MUSEUM 1 MUSEUM 2 SERVICES AREA WORKSHOP MECHANICAL ROOM PUMP ROOM

SPACE

FLOOR AREA

SECOND FLOOR MULTIPURPOSE EXHIBITION HALL SERVICE AREA

SQM 572.4 198.7 771.1

ACCOMODATION 164.3 + 192.4 + 39.4X8 ACCOMODATION RECEPTION & WALKWAY 152.4 + 348.5

671.9 500.9 1172.8

SQM 4881.0

TOTAL FLOOR AREA PROJECT TITLE

CLIENT

ARCHITECT

CONSTRUCTION DRAWING

DRAWING TITLE

YS. YOURSPREADSHEET SDN. BHD.

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEWAN BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

Filing no. : Scale : Drawn By :

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

Date : 1 / 1 / 2021 Check By : Date : 3 / 1 / 2021

Ar. Chong Yit Sian

ARKITEK PROFESIONAL No Pendaftaran LAM : A/C 272

Sayamemperakuibahawabutir- butirdalampelan- pelanini adalahmenerutkehendakkehendakUndang- Undang Kecil BangunanSeragam1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

DRAWING NO.

YS / A / A3 / 002 / 001

REVISION

01


BRI CKFI EL DS BUKI TPET AL I NG

T ANAHPERKUBURAN KWONGT ONG

KAMPUNG KERAYUNG

KEYPL AN NT S

L OCAT I ON PL AN NT S

SI T EPL AN SCAL E1:500


WINDOW SCHEDULE : SYMBOL

W1

DOOR SCHEDULE : -

DESCRIPTION

DIMENSION(mm)

LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

W2

1000MM X 1600MM

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

W3

D1

REFER PLAN

900MM X 1200MM

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

W4

SYMBOL

600MM X 1200MM

DIMENSION(mm)

LOCATION

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

1600MM X 2300MM

SINGLE SWING TIMBLE DOOR

D3

REFER PLAN

DESCRIPTION

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

D2

REFER PLAN

SCHEDULE OF SANITARY : -

900MM X 2100MM

BARE CONCRETE OPENING

D4

2500MM X 2200MM

SYMBOL

REFER PLAN

REFER PLAN

REFER PLAN

SCHEDULE OF CEILING FINISHES : -

DESCRIPTION

hb.

HAND BASIN

shwr.

SHOWER

tp.

TAP

sq.

SQUATING

gt.

GULLY TRAP

vp.

VENTILATION PIPE

MH

MANHOLE

ft.

FLOOR TRAP

wc.

WATER CLOSET

SYMBOL

SCHEDULE OF FLOOR FINISHES : SYMBOL

14 13 12 A1

DESCRIPTION

CL1

GYPSUM BOARD WITH PAINT FINISH

CL2

TIMBER BOARD

CL3

BARE CONCRETE

SCHEDULE OF WALL FINISHES : -

DESCRIPTION

SYMBOL

DESCRIPTION

KB1

HOMOGENEOUS TILE

WL1

SKIM COAT WITH LOW VOC PAINT

KB2

TRAVELTINE TILE

WL2

BARE CONCRETE AND POLISH FINISH

KB3

CERAMIC TILE

WL3

TIMBER BOARD FINISH

PL1

CEMENT RENDER

BV1

BRICK VANEER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

A2 A3

A4 A5

SYMBOL

-

K

A6

-

EL

DESCRIPTION EXIT SIGN EMERGENCY LIGHT FIRE ALARM BELL HOSE REEL FIRE EXTINGUISHER

A6a

GENERAL NOTES :

DB DA

B1 B2 B3

NO.

B4 333231 30 22 29 242526 27

DN

DATE

REVISION

B5 A7

DN

D03 D02

D4

CLIENT :

BA D3

AA

DN

BB Z1

D01

YS. YOURSPREADSHEET SDN. BHD.

DN DN

D2

ARCHITECTS

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

BC BD

D1 C3

C1

C2

BE

Ar. Chong Yit Sian

ARKITEK PROFESIONAL

No Pendaftaran LAM : A/C 272 Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

BF

DN

AB CONSULTANTS

BG 2

CA 3

CIVIL STRUCTURAL

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778

CB

12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

AC MECHANICAL ELECTRIACAL

AD

DN

C02

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

AE C03

Ir. MAK BAO

AF C01

AG

-

AH

CONSTRUCTION DRAWING Filing no. :

AJ AK

Scale

:

1 : 250

Drawn By : Author

Date :

5/7/2021 9:02:35 PM

Check By : Checker

Date :

5/7/2021 9:02:35 PM

PROJECT TITLE Project Name

AL AM DRAWING TITLE ROOF PLAN

DRAWING NO. GF02


WINDOW SCHEDULE : SYMBOL

W1

DIMENSION(mm)

LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

1000MM X 1600MM

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

W3

A5

DESCRIPTION

DIMENSION(mm)

LOCATION

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

D1

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

D2

REFER PLAN

600MM X 1200MM

SCHEDULE OF SANITARY : -

SYMBOL

REFER PLAN

900MM X 1200MM

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

W4

A3 A4

DESCRIPTION

ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

W2

A1 A2

DOOR SCHEDULE : -

SINGLE SWING TIMBLE DOOR

D3

REFER PLAN

1600MM X 2300MM

900MM X 2100MM

BARE CONCRETE OPENING

D4

2500MM X 2200MM

SYMBOL

REFER PLAN

REFER PLAN

REFER PLAN

A6

5145

2328

5300

DESCRIPTION

hb.

HAND BASIN

shwr.

SHOWER

tp.

TAP

sq.

SQUATING

gt.

GULLY TRAP

vp.

VENTILATION PIPE

MH

MANHOLE

ft.

FLOOR TRAP

wc.

WATER CLOSET

SYMBOL

SCHEDULE OF FLOOR FINISHES : -

25118 2328

SCHEDULE OF CEILING FINISHES : -

SYMBOL

10018

A6a 2118

B5

B1

GYPSUM BOARD WITH PAINT FINISH

CL2

TIMBER BOARD

CL3

BARE CONCRETE

DESCRIPTION

SYMBOL

DESCRIPTION

KB1

HOMOGENEOUS TILE

WL1

SKIM COAT WITH LOW VOC PAINT

KB2

TRAVELTINE TILE

WL2

BARE CONCRETE AND POLISH FINISH

KB3

CERAMIC TILE

WL3

TIMBER BOARD FINISH

PL1

CEMENT RENDER

BV1

BRICK VANEER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

SYMBOL

A7

K EL

DESCRIPTION EXIT SIGN EMERGENCY LIGHT FIRE ALARM BELL

12763

33578

B2

CL1

SCHEDULE OF WALL FINISHES : -

B4

B3

DESCRIPTION

HOSE REEL FIRE EXTINGUISHER

4232 13672

2911

AA 1316 1316 1316 1316 7 1 3 1 1319 1315 1316 1316 1316 402

MAIN ROAD PL6

---

---

GENERAL NOTES :

BA

FFL + 0.00

5400

D5 D4

11 00 0

BB HOSTEL LOBBY PL2

---

UP

WL3

5400

FFL + 0.225

D5

DN

24162

00 50

W1

D4

BC

W3 D1 W1

NO.

D1

D1

HOSTEL

W3

PL2

CL2

BV1

DATE

REVISION

FFL + 0.17

D1

32200

D4

BD

D5 W1

5400

UP

6000

5400

D1

D1 D1 W3

D5

D5

W3

6000

AB

BE

D4

W1

5400

KB2

CL1

D5

BV1

FFL + 0.17

BF

D4

D1

D1

8.51 °

BG

W1

7° 11.4

° .05 90

D1

D5

1589

D4

D1

CLIENT :

2.94°

2.98°

UP

W1

W3

5200

2.94°

D1

23145

ACCOMODATION

D1 D1

DB

ARCHITECTS

CARPARK PL6

---

YS. YOURSPREADSHEET SDN. BHD.

---

FFL + 0.00

DA

-

DN

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

CA

---

--FFL - 0.15

CB

AC

6533

D4

---

96381

5 662

ROOF TOP TF1

Ar. Chong Yit Sian

ARKITEK PROFESIONAL

No Pendaftaran LAM : A/C 272

D3 AD

UP

D2

UP

ROOF TOP TF1

---

---

5507

W1

D1

W1

D02

1177 4

311 9

FFL - 0.15

UP

D9

W1

AE

CAFE

D1

CONSULTANTS

6262

D03

W1

Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

KB2

CL1

WL1

FFL + 0.00

6175

6267

W1

UP

MUSEUM 2 PL1

D1

CL4 FFL + 0.00

WL2

LOCKER ROOM

D1

PL1

CL4

AF

WL2

FFL + 0.00

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

4069

D1

D9

FFL + 0.00

65 .53 °

D3

WL1

° 24.45

D01

CL1

74 .04 °

MUSEUM 1 PL1

CIVIL STRUCTURAL

UP

51° 98.

AG

---

WL2

4629

MAIN ATRIUM PL1

D1

FFL + 0.00

AH MECHANICAL ELECTRIACAL

D1

Ir. MAK BAO

ENGINEER PROFESIONAL

7278

No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

DN

AJ 3218

Z1

AK SERVICES LOBBY CL4

FEMALE TOILET

WL2

FFL + 0.00

KB1

CL1

5409

KB3

WL2

FFL - 0.05

9 1099

AL 0 1280 MALE TOILET KB1

CL1

WL2

C02

FFL - 0.05

AM

7610

C03

1218 7

CONSTRUCTION DRAWING

5500

UP

C01

Filing no. : Scale

:

1 : 200

Drawn By : Chong YIt Sian

Date :

5/7/2021 9:09:30 PM

Check By : --

Date :

5/7/2021 9:09:30 PM

PROJECT TITLE Project Name

8124

00 100

C1 00 100

C2

D1 C3

DRAWING TITLE Ground floor plan

DRAWING NO. GF01


DOOR SCHEDULE : SYMBOL

D1 D2 D3 D4

SCHEDULE OF WALL FINISHES : DESCRIPTION

DIMENSION(mm)

LOCATION

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

1600MM X 2300MM

REFER PLAN

SINGLE SWING TIMBLE DOOR

900MM X 2100MM

REFER PLAN

BARE CONCRETE OPENING

2500MM X 2200MM

REFER PLAN

SYMBOL

C8

C9C10

SCHEDULE OF CEILING FINISHES : -

DESCRIPTION

SYMBOL

DESCRIPTION

WL1

SKIM COAT WITH LOW VOC PAINT

WL2

BARE CONCRETE AND POLISH FINISH

CL1

GYPSUM BOARD WITH PAINT FINISH

WL3

TIMBER BOARD FINISH

CL2

TIMBER BOARD

BV1

BRICK VANEER

CL3

BARE CONCRETE

61920

A12328A2

A32328A4

5145

4900

45186

2034

SCHEDULE OF FLOOR FINISHES : SYMBOL

WINDOW SCHEDULE : SYMBOL

W1 W2 W3 W4

DESCRIPTION

DIMENSION(mm)

LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

1000MM X 1600MM

B5

REFER PLAN

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

900MM X 1200MM

REFER PLAN

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

600MM X 1200MM

REFER PLAN

B1

B2

DESCRIPTION

KB1

HOMOGENEOUS TILE

KB2

TRAVELTINE TILE

KB3

CERAMIC TILE

PL1

CEMENT RENDER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

33578 30667

2911

BA

13102

GENERAL NOTES :

C7 UP 32200

NO.

DATE

REVISION

2.94°

2.94°

BG

2 3

SS1

CLIENT :

SS1 1

6533

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

AD 6262

1173 7

5507

YS. YOURSPREADSHEET SDN. BHD.

99 228

Ar. Chong Yit Sian

CD

9 493

6175

6230

ARKITEK PROFESIONAL

AE CE

No Pendaftaran LAM : A/C 272 Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

CONSULTANTS

49074

4629

4069

AF AG CIVIL STRUCTURAL

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778

AH

12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

7278

D01

0 800

Da

CC

4 333

D02

CB

AJ UP

MECHANICAL ELECTRIACAL 8627

DB

12

2

D03

ARCHITECTS

Ir. MAK BAO

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

AL UP

C1

5500

295 5

Db

5 662

311 9

AC

DA 560 0

CA

SE01

UP

116 74

2.98°

19098

3

AM

7610 3

C11

SS1

1218 7 2792 1

CONSTRUCTION DRAWING

C3

8124

D4

1

Filing no. :

SE01

D3

Scale

2 SS1

D2

:

1 : 200

Drawn By : Author

Date :

5/20/2021 8:37:06 AM

Check By : Checker

Date :

5/20/2021 8:37:06 AM

PROJECT TITLE

C2

D1

Project Name

C12 DRAWING TITLE Underground Floor Plan

DRAWING NO. GF02


DOOR SCHEDULE : SYMBOL

D1 D2 D3 D4

SCHEDULE OF WALL FINISHES : DESCRIPTION

DIMENSION(mm)

LOCATION

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

1600MM X 2300MM

REFER PLAN

SINGLE SWING TIMBLE DOOR

900MM X 2100MM

REFER PLAN

BARE CONCRETE OPENING

2500MM X 2200MM

REFER PLAN

SYMBOL

2328

A1 A2

WINDOW SCHEDULE : -

W1 W2 W3 W4

DESCRIPTION

DIMENSION(mm)

LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

1000MM X 1600MM

900MM X 1200MM

REFER PLAN

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

600MM X 1200MM

REFER PLAN

DESCRIPTION

SKIM COAT WITH LOW VOC PAINT

WL2

BARE CONCRETE AND POLISH FINISH

CL1

GYPSUM BOARD WITH PAINT FINISH

WL3

TIMBER BOARD FINISH

CL2

TIMBER BOARD

BV1

BRICK VANEER

CL3

BARE CONCRETE

SCHEDULE OF FLOOR FINISHES : -

5145

2328

A3 A4

5300

A5

10018

34768

A6

2034

SYMBOL

A7

2118

A6a

REFER PLAN

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

SYMBOL

WL1

C9C10 61920

SYMBOL

SCHEDULE OF CEILING FINISHES : -

DESCRIPTION

DESCRIPTION

KB1

HOMOGENEOUS TILE

KB2

TRAVELTINE TILE

KB3

CERAMIC TILE

PL1

CEMENT RENDER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

B5 B3 B1

33578

B2 13672

B4 12763

4232

6 6 131 6 131 6 131 1 3 1 7 7 131 15 91 16 13 16 13 3 1 6 131

2911

AA

1 SS4

BA 5400

GENERAL NOTES :

BB DN 24162

5400

BC 2302

C7 32200

3098

BD

NO.

DATE

REVISION

5400

AB

BE 5400

BF

13

BG 2.94°

2.94°

14

23145

5200

12

CLIENT :

2 3

2.98°

SS1

SS1

ARCHITECTS

CA

5507

D02 1177 4

DN

6533

0 800

CD

6267

D01

Ar. Chong Yit Sian

ARKITEK PROFESIONAL

No Pendaftaran LAM : A/C 272

DN

Da

AD

99 228

DA

AC

9 493

DN UP

Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

6262

560 0

CC

4 333

DB

CB

2

D03

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

AE CE

CONSULTANTS

6175

311 9

Db

96381

5 662

116 74

295 5

YS. YOURSPREADSHEET SDN. BHD.

4069

AF DN DN

CIVIL STRUCTURAL

AG

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778

4629

12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

AH 7278

UP

MECHANICAL ELECTRIACAL

3218

77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

AK

DN

7610

66 248

6 486

C02 3

1218 7

C11

5409

AL

9 1099

SS1

C01 C1

5500

00 100

00 100

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 174

AJ

UP

Ir. MAK BAO

AM

CONSTRUCTION DRAWING

C2 Filing no. :

8124

2792 1

Scale

C3

D4 C4

D3

:

1 : 200

Drawn By : Author

Date :

5/20/2021 8:39:55 AM

Check By : Checker

Date :

5/20/2021 8:39:55 AM

PROJECT TITLE Project Name

D2 2 SS1

D1

C12

DRAWING TITLE FIRST FLOOR PLAN

DRAWING NO.

1

WD First Floor Plan 1 : 200

GF03


DOOR SCHEDULE : SYMBOL

D1 D2 D3 D4

DESCRIPTION

DIMENSION(mm)

LOCATION

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

1600MM X 2300MM

REFER PLAN

A1 A2

A3 A4

A5

A6

SCHEDULE OF WALL FINISHES : -

A7

SYMBOL

A6a 76167

SINGLE SWING TIMBLE DOOR

900MM X 2100MM

REFER PLAN

BARE CONCRETE OPENING

2500MM X 2200MM

REFER PLAN

2328

5145

2328

5300

7900

2118

WL3

TIMBER BOARD FINISH

CL2

TIMBER BOARD

BV1

BRICK VANEER

CL3

BARE CONCRETE

SCHEDULE OF FLOOR FINISHES : -

B1 LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

33578

12763

20815

AA

1 ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

900MM X 1200MM

REFER PLAN

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

600MM X 1200MM

REFER PLAN

SS4

BA

DESCRIPTION

KB1

HOMOGENEOUS TILE

KB2

TRAVELTINE TILE

KB3

CERAMIC TILE

PL1

CEMENT RENDER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

32200

47306

GENERAL NOTES :

BG

NO.

DATE

REVISION

2 3

SS1

SS1

0 996

Db

96381

CA

DB

AC

CC 12795

CLIENT :

DA 0 800

Da

ARCHITECTS

CD CE

YS. YOURSPREADSHEET SDN. BHD. Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

10244

9 493

DN

AE

Ar. Chong Yit Sian

AG

ARKITEK PROFESIONAL

No Pendaftaran LAM : A/C 272

4629

Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

AH

CONSULTANTS

7278

W4

GYPSUM BOARD WITH PAINT FINISH

DN

AJ 3218

W3

CL1

DN

CIVIL STRUCTURAL

AK

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

5409

W2

BARE CONCRETE AND POLISH FINISH

AL C01

5500

W1

WL2

B5

WINDOW SCHEDULE : DIMENSION(mm)

DESCRIPTION

SKIM COAT WITH LOW VOC PAINT

SYMBOL

DESCRIPTION

SYMBOL

WL1

51049

B4

SYMBOL

SCHEDULE OF CEILING FINISHES : -

DESCRIPTION

MECHANICAL ELECTRIACAL

AM 385 25

C11

Ir. MAK BAO

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

3 SS1

2 SS1

66 148

C2

CONSTRUCTION DRAWING

C12 C4

Filing no. : Scale

:

1 : 200

Drawn By : Chong Yit Sian

Date :

5/20/2021 8:37:54 AM

Check By : Checker

Date :

5/20/2021 8:37:54 AM

PROJECT TITLE Project Name

DRAWING TITLE Second Floor Plan

DRAWING NO. GF04


GENERAL NOTES : WINDOW SCHEDULE : SYMBOL

W1

DOOR SCHEDULE : -

DESCRIPTION

DIMENSION(mm)

LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

W2

1000MM X 1600MM

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

W3

900MM X 1200MM

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

W4

600MM X 1200MM

SYMBOL

D1

REFER PLAN

DIMENSION(mm)

LOCATION

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

1600MM X 2300MM

SINGLE SWING TIMBLE DOOR

D3

REFER PLAN

DESCRIPTION

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

D2

REFER PLAN

SCHEDULE OF FLOOR FINISHES : -

900MM X 2100MM

BARE CONCRETE OPENING

D4

2500MM X 2200MM

SYMBOL

REFER PLAN

REFER PLAN

REFER PLAN

DESCRIPTION

KB1

HOMOGENEOUS TILE

KB2

TRAVELTINE TILE

KB3

CERAMIC TILE

PL1

CEMENT RENDER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

SCHEDULE OF WALL FINISHES : SYMBOL

DESCRIPTION

SCHEDULE OF CEILING FINISHES : SYMBOL

DESCRIPTION

WL1

SKIM COAT WITH LOW VOC PAINT

WL2

BARE CONCRETE AND POLISH FINISH

CL1

GYPSUM BOARD WITH PAINT FINISH

WL3

TIMBER BOARD FINISH

CL2

TIMBER BOARD

BV1

BRICK VANEER

CL3

BARE CONCRETE

NO.

DATE

REVISION

CLIENT : CONCRETE BEAM AND COLUMN STRUCTURE SYSTEM TO ENGINEER DETAIL

GLASS PANEL RAILNG TO DETAIL 1100MM HEIGHT

METAL SHEATING ROOF WITH INTERNAL TRUSSES SYSTEM TO ARHCHITECT DETAIL AND ENGINEER DETAIL

500MM THK ROOF TOP SOIL

ALUMINIUM FRAMED GLASS PANEL TO DETAIL 1000MM X 1600MM

TIMBER TRUSSES BRIDGE WITH STAIRCASE &RAMP TO ARCHITECT DETAIL

CONCRETE PLANTER BOX FACADE TO ARCHITECT DETAIL

ARCHITECTS

AM

AL

AK

AJ

AH

AG

AF

AE

AD

AC

YS. YOURSPREADSHEET SDN. BHD. Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

Level 5 Ar. Chong Yit Sian

15000

WL2

ARKITEK PROFESIONAL

No Pendaftaran LAM : A/C 272

D2

Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

CONSULTANTS

Second Floor Plan

PL1

11000 WL2

D4

WL2

CIVIL STRUCTURAL

W1

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778 PL1

12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

First Floor Plan

TF1

7000 WL2

D4

WL2

PL1

PL1

Ground Floor Plan

TF1

MECHANICAL ELECTRIACAL

3000

Ir. MAK BAO

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

W1

Underground Floor Plan -500

Foundation -4000

1

Section A-A 1 : 100

CONSTRUCTION DRAWING Filing no. : Scale

:

D:\UCSI Architecture1\Sem 6\Design studio\P3\museum2.rvt 1 : 100

Drawn By : Author

Date :

5/7/2021 9:57:48 PM

Check By : Checker

Date :

5/7/2021 9:57:48 PM

PROJECT TITLE Project Name

DRAWING TITLE Unnamed

DRAWING NO. GF03


GENERAL NOTES : WINDOW SCHEDULE : SYMBOL

W1 W2 W3 W4

DOOR SCHEDULE : -

DESCRIPTION

DIMENSION(mm)

LOCATION

ALUMINIUM FRAMEED GLASS PANEL TO DETAIL

1000MM X 1600MM

REFER PLAN

ALUMINIUM FRAMED TRANSLUCENT PANEL TO DETAIL

1000MM X 1600MM

DOUBLE CASEMENT WINDOW TO MANUFACTURE DETAIL

AM 5500

AK 5409

AJ 3218

7278

AG 4629

SINGLE SWING ALLUMINIUM FRAMED GLASS DOOR

1000MM X 2300MM

REFER PLAN

1600MM X 2300MM

900MM X 2100MM

2500MM X 2200MM

SYMBOL

REFER PLAN

REFER PLAN

REFER PLAN

DESCRIPTION

KB1

HOMOGENEOUS TILE

KB2

TRAVELTINE TILE

KB3

CERAMIC TILE

PL1

CEMENT RENDER

PL6

ASPHALT

CPT

CARPET

TF1

TURFING

SCHEDULE OF WALL FINISHES : SYMBOL

DESCRIPTION

SCHEDULE OF CEILING FINISHES : SYMBOL

DESCRIPTION

WL1

SKIM COAT WITH LOW VOC PAINT

WL2

BARE CONCRETE AND POLISH FINISH

CL1

GYPSUM BOARD WITH PAINT FINISH

WL3

TIMBER BOARD FINISH

CL2

TIMBER BOARD

BV1

BRICK VANEER

CL3

BARE CONCRETE

NO.

AF 4069

LOCATION

BARE CONCRETE OPENING

D4

AH

DIMENSION(mm)

SINGLE SWING TIMBLE DOOR

D3

REFER PLAN

DESCRIPTION

DOUBLE SWING ALLUMINIUM FRAMED GLASS DOOR

D2

REFER PLAN

600MM X 1200MM

AL

D1

REFER PLAN

900MM X 1200MM

SINGLE CASEMENT WINDOW TO MANUFACTURE DETAIL

SYMBOL

SCHEDULE OF FLOOR FINISHES : -

AE 6175

AD 6262

AC

6533

AB

96381

23145

DATE

REVISION

AA 24162

Level 5 CLIENT :

15000 Second Floor Plan 11000

ARCHITECTS

First Floor Plan 7000 YS. YOURSPREADSHEET SDN. BHD.

Ground Floor Plan

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

3000

Ar. Chong Yit Sian

ARKITEK PROFESIONAL

No Pendaftaran LAM : A/C 272 Saya memperakui bahawa butir - butir dalam pelan - pelan ini adalah menerut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

CONSULTANTS

1

East Elevation 1 : 200 CIVIL STRUCTURAL

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

A7

A6 A6a 51049

2118

A5 7900

A4 A3 5300

2328

A2 A1 5145

2328

MECHANICAL ELECTRIACAL

Ir. MAK BAO

ENGINEER PROFESIONAL

No Pendaftaran IEM : A/C 174

Level 5

77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

15000 Second Floor Plan 11000 First Floor Plan 7000 Ground Floor Plan 3000

CONSTRUCTION DRAWING Filing no. : Scale

2

WD North 1 : 200

:

D:\UCSI Architecture1\Sem 6\Design studio\P3\museum2.rvt 1 : 200

Drawn By : Author

Date :

5/7/2021 10:07:49 PM

Check By : Checker

Date :

5/7/2021 10:07:49 PM

PROJECT TITLE Project Name

DRAWING TITLE Elevation

DRAWING NO. ELE01


GENERAL NOTES : BOUNDARY LINE

BUILDING SETBACK LINE

FIRE APPLIANCES ACCESS

H

FIRE HYDRANT

NO.

DATE

REVISION

Y FIRE H

CLIENT :

T COV

DRAN ERAG

H

E ARE

NT CO YDRA FIRE H

1 SS4

ARCHITECTS

YS. YOURSPREADSHEET SDN. BHD.

A

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

DN

A

E GE AR

VERA

H

Y FIRE H

2 SS1

Ar. Chong Yit Sian

ARKITEK PROFESIONAL

DN

No Pendaftaran LAM : A/C 272

DRAN

Sayamemperakuibahawabutir - butir dalampelan- pelanini adalah menerutkehendak- kehendakUndang - Undang Kecil Bangunan Seragam1984 dan saya setujuterimatanggungjawap penuhdengan sewajernya

T COV

DN DN

DN

CONSULTANTS DN

A

DRAN

E ARE

Y FIRE H

ERAG

H

T COV

CIVIL STRUCTURAL

DN

No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

ERAG A

E ARE

H

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL

DN

MECHANICAL ELECTRIACAL

DN

Ir. MAK BAO

ENGINEER PROFESIONAL No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

DN

3 SS1

CONSTRUCTION DRAWING Filing no. : 00718-21 Scale : 1 : 500 Drawn By : CHONG YIT SIAN

Date : 27 / 4 / 2021

Check By :

Date :

PROJECT TITLE

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEWA BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

DRAWING TITLE

SITE PLAN WITH BOMBA REQUIREMENT DRAWING NO.






3

1

1

1

2

3

TB

TB

CT

CT

CPT CT CT

CT

CT

CR

CT

CR

4

1

4

5

4

ROOMS LEGEND:

1 PROJECT TITLE

ACCOMODATION UNIT TYPE A

2

SCALE 1 : 75

CLIENT

ACCOMODATION UNIT TYPE B SCALE 1 : 75

ARCHITECT

BED ROOM LIVING ROOM BALCONY BATHROOM UTILITY ROOM KITCHEN DINING AREA

DRAWING TITLE

YS. YOURSPREADSHEET SDN. BHD.

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEWAN BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

1. 2. 3. 4. 5. 6. 7.

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

7

6

ACCOMMODATION UNIT PLAN

SCHEDULE OF FINISHES : TB

TIMBER PLANK

CT

CERAMIC TILES

CPT

CARPET

CR

CEMENT RENDER

CONSTRUCTION DRAWING Filing no. : 00718-21 Scale : AS SHOWN Drawn By : CHONG YIT SIAN Date : 11 / 4 / 2021 Check By :

Ar. Chong Yit Sian

ARKITEK PROFESIONAL No Pendaftaran LAM : A/C 272

Sayamemperakuibahawabutir- butirdalampelan- pelanini adalahmenerutkehendakkehendakUndang- Undang Kecil BangunanSeragam1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

DRAWING NO.

YS / A / A3 / 002 / A3 SIZE

REVISION

01


GENERAL NOTES :

14 15 1

DETAIL LEGEND: 1. 2. 3. 4. 5. 6. 17.

SOIL R.C FLOOR SLAB TO ENGR'S DET. R.C BEAM TO ENGR'S DET. R.C FACADE WALL TO ENGR'S DET. AND ARCHI'S DET. CONCRETE PLANTER BOX TO ARCHI'S DETAIL GALVANIZED STEEL DRAINAGE GUTTER R.C PAD FOUNDATION & RETAINING WALL TO ENGR'S DETAIL

1 7 8

NO.

DATE

REVISION

16

9 10 11

9 18

12

19 20

13

CLIENT :

2

1 2

ARCHITECTS

3

YS. YOURSPREADSHEET SDN. BHD.

ROOF GARDEN DETAIL SCALE 1 : 20

2

3

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

DETAIL LEGEND: 1. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 18. 19. 20.

4 5

SOIL CLEAN SAND DRAINAGE CELL WATERPROOFING MEMBRANE CONCRETE PLANTER BOX DRAINAGE HOLE PLANTER BOX STEEL BRACKET WATER SUPPLY PIPE PARAPET WALL METAL CAP FLASHING L - SHAPE SOIL RETAINER WATER RESERVOIR MOISTURE RETAINING LAYER DRAINAGE LAYER

Ar. Chong Yit Sian

ARKITEK PROFESIONAL No Pendaftaran LAM : A/C 272 Sayamemperakuibahawabutir - butir dalampelan- pelanini adalah menerutkehendak- kehendakUndang - Undang Kecil Bangunan Seragam1984 dan saya setujuterimatanggungjawap penuhdengan sewajernya

CONSULTANTS

CIVIL STRUCTURAL

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

6

MECHANICAL ELECTRIACAL

No Pendaftaran IEM : A/C 174

24 1

Ir. MAK BAO

ENGINEER PROFESIONAL 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

25 26

21 22 17

27

23

CONSTRUCTION DRAWING Filing no. :

00718-21

Scale : AS SHOWN Drawn By : CHONG YIT SIAN

Date : 11 / 4 / 2021

Check By :

PROJECT TITLE

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEW BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

3 1

OVERALL TYPICAL DETAIL SCALE 1 : 50

FLOOR DETAIL SCALE 1 : 10

DETAIL LEGEND: 21. 22. 23. 24. 25. 26. 27.

GRAVEL LAYER DRAINAGE CAP GALVANIZED STEEL DRAINAGE GUTTER SKIRTING FLOOR FINISHES LAYER R.C SLAB TO ENGR'S DET. R.C BEAM TO ENGR'S DET.

DRAWING TITLE

OVERALL TYPICAL SECTION DETAIL DRAWING NO.

YS / A / A1 / 001 / A1 SIZE


GENERAL NOTES :

2

CONCRETE PLANTER BOX DETAIL SCALE 1 : 10 9

10

11

12

13

14

50 0

55

0

45

NO.

100

50

DATE

REVISION

10

00

CLIENT :

ARCHITECTS

1

FACADE ASSEMBLY SCALE 1 : 50

YS. YOURSPREADSHEET SDN. BHD. Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

Ar. Chong Yit Sian

ARKITEK PROFESIONAL No Pendaftaran LAM : A/C 272 Sayamemperakuibahawabutir - butir dalampelan- pelanini adalah menerutkehendak- kehendakUndang - Undang Kecil Bangunan Seragam1984 dan saya setujuterimatanggungjawap penuhdengan sewajernya

1 2 3

CONSULTANTS

DETAIL LEGEND: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

SOIL R.C FLOOR SLAB TO ENGR'S DET. R.C BEAM TO ENGR'S DET. R.C FACADE WALL TO ENGR'S DET. AND ARCHI'S DET. CONCRETE PLANTER BOX TO ARCHI'S DETAIL TIMBER PANEL FRAME CAST IN R.C BOT & NUT BRACKET CONCRETE PLANTER BOX 50MM THK CONCRETE PLANTER BOX SANDY SOIL MIX CLEAN SAND DRAINAGE HOLE DRAINAGE CELL WATERPROOFING MEMBRANE

CIVIL STRUCTURAL

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

MECHANICAL ELECTRIACAL

4

Ir. MAK BAO

ENGINEER PROFESIONAL No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

5

6

CONSTRUCTION DRAWING 7

Filing no. :

00718-21

Scale : AS SHOWN Drawn By : CHONG YIT SIAN Check By :

Date : 11 / 4 / 2021 Date :

PROJECT TITLE

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEW BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

8

DRAWING TITLE

FACADE ASSEMBLY DETAIL DRAWING NO.

YS / A / A1 / 001 / A1 SIZE


3

4 1

5

6

2

DETAIL LEGEND:

1 PROJECT TITLE

CLIENT

STAIRCASE DETAIL SCALE 1 : 50 ARCHITECT

DRAWING TITLE

YS. YOURSPREADSHEET SDN. BHD.

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEWAN BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

1. 2. 3. 4. 5. 6.

Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

STAIRCASE DETAIL

R.C BEAM TO ENGR'S DET. R.C PAD FOUNDATION TO ENGR'S DET. STEEL HANDRAIL & BALUSTRADE TO ARCH'S DETAIL GLASS PANEL TO ARCHI'S DETAIL R.C LANDING W/1800MM WIDTH R.C STAIRCASE TO ENGR'S DETAIL RISER WIDTH 900MM, R = 173, T = 280

CONSTRUCTION DRAWING Filing no. : 00718-21 Scale : AS SHOWN Drawn By : CHONG YIT SIAN Date : 11 / 4 / 2021 Check By : Date :

Ar. Chong Yit Sian

ARKITEK PROFESIONAL No Pendaftaran LAM : A/C 272

Sayamemperakuibahawabutir- butirdalampelan- pelanini adalahmenerutkehendakkehendakUndang- Undang Kecil BangunanSeragam1984 dan saya setuju terima tanggungjawap penuh dengan sewajernya

DRAWING NO.

YS / A / A3 / 002 / A3 SIZE

REVISION

01


GENERAL NOTES :

1 2 3 4

8

DETAIL LEGEND: 1. 2. 3. 4. 5. 6. 7.

STEEL BOT & NUT TO ENGR'S DET. ROLLER TO MFR'S DET STEEL ROLLER TRACK TO MFR'S DET. STEEL HOOK TO MFR'S DET. TRANSLUCENT PANEL TO ARCHI'S DET. LED LIGHT SOURCE TO ARCHI'S DET & ENGR'S DET. 100MM GAP RAISE FROM FLOOR

NO.

9

DATE

REVISION

10 11 12

5 DETAIL LEGEND: 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

6

13

CLIENT :

POND WATER R.C RETAINING WALL TO ENGR'S DET & ARCHI'S DET/ GRAVEL LATER STEEL MESH LATER PAVING FINISHES FLOOR SLAB BACKFLOW WATER PIPE DRAINAGE PIPE R.C RETAINING WALL TO ENGR'S DET. R.C PAD FOUNDATION TO ENGR'S DET.

14

ARCHITECTS

15 16

YS. YOURSPREADSHEET SDN. BHD. Jalan Taman Seputeh 3, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Tel : 03-45231598 Fax : 03-45235785 Email : YourSpread@gmail.com

7 17

Ar. Chong Yit Sian

ARKITEK PROFESIONAL No Pendaftaran LAM : A/C 272 Sayamemperakuibahawabutir - butir dalampelan- pelanini adalah menerutkehendak- kehendakUndang - Undang Kecil Bangunan Seragam1984 dan saya setujuterimatanggungjawap penuhdengan sewajernya

CONSULTANTS

1

TRANSLUCENT PANEL ROLLER DETAIL SCALE 1 : 2

2

POND WATER RETAINING WALL DETAIL SCALE 1 : 10 CIVIL STRUCTURAL

Ir. Wong Zhou Lam

ENGINEER PROFESIONAL No Pendaftaran IEM : A/C 778 12, Jalan Lokmon 1 54100, Cheras, Kuala Lumpur Tel : 03 - 45236996 Fax : 03 - 45236886 Email : CS.Civil.Structural@outlook.com

31

DETAIL LEGEND: 18 19 20 21 22 23 24 25 26

18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30.

METAL CAP FLASHING SEALANT SANDWASED GLASS TO MFR'S DET. SPIDER FRAME TO ENGR'S DET L-SHAPE SOIL RETAINER FILTERING FABRIC SINGLE GLAZING WINDOW SKYLIGHT STEEL FRAMING TO MFR'S DET R.C SLAB TO ENGR'S DETAIL RESERVOIR LAYER MOISTURE RETENTION LAYER DRAINAGE LAYER

3

ROOF GARDEN SKYLIGHT DETAIL SCALE 1 : 5

No Pendaftaran IEM : A/C 174 77, Jalan Duron 8 55100, Cheras, Kuala Lumpur Tel : 03 - 47236946 Fax : 03 - 47236846 Email : ME.Mecha.Electric@outlook.com

33

37 35

28

30

32

Ir. MAK BAO

ENGINEER PROFESIONAL

34

27

29

MECHANICAL ELECTRIACAL

CONSTRUCTION DRAWING Filing no. :

DETAIL LEGEND: 31. 32. 33. 34. 35. 36. 37.

UNDISTURBED SOIL COMPACTED BACKFILL GRAVEL BACKFILL R.C RETAINING WALL TO ENGR'S DET TOP SOIL REINFORCED BAR TO ENGR'S DET. WEEP HOLE

00718-21

Scale : AS SHOWN Drawn By : CHONG YIT SIAN Check By :

Date : 11 / 4 / 2021 Date :

PROJECT TITLE

CADANGAN PEMBANGUNAN INDUSTRI DI ATAS 72792 (HDS 51412364), LOT 5, JALAN DEW BAHASA, BUKIT SEPUTEH, 50460, KUALA LUMPUR, WILAYAH PERSEKUTUAN.

36

4

SOIL RETAINING WALL DETAIL SCALE 1 : 25

DRAWING TITLE

MISCELLANEOUS DETAIL DRAWING NO.

YS / A / A1 / 001 / A1 SIZE


Chongyi tsi an 1001850927

art i fi ci all i ght i ng Nat uralLi ght i ng

KLdevel opmentGal l ery

UBBL

B y l aw3 9( 1 ) , nat ur al l i ght i ngr equi r ementnot l es s t han1 0 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 6 0 0s . q. m Mi ni mum openi ngr equi r ed: 6 0 0x1 0 % =6 0s . q. m T ot al ar eaof openi ng:

Av er agewi ndowhei ght s: 3 . 5 m T ot al wi ndowl engt h: 3 5 m Ar eaof openi ng: 3 . 5 m x2 0 m =7 0s . q. m


Vent i l at i onst udy

Chongyi tsi an 1001850927

capi t anmuseum

UBBL

B y l aw3 9( 1 ) , nat ur al v ent i l at i onr equi r ementnot l es st han5 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 6 0 0s . q. m Mi ni mum openi ngr equi r ed: 6 0 0x5 % =3 0s . q. m T ot al ar eaof openi ng: 3 5s . q. m

Mechani calvent i l at i on Nat uralvent i l at i on

3 5s . q. m >3 0s . q. m( UB B Lcompl i ed)

Av er ageopeni nghei ght s: 1 . 4 m T ot al wi ndowl engt h: 2 5 m Ar eaof openi ng: 1 . 4 m x2 5 m =3 5s . q. m


wat ersuppl ysyst em

Chongyi tsi an 1001850927

F RPwat er t ank F RP( F i br egl as sRei nf or cedPl as t i cs , al s ok nown asGRP, or Gl as sRei nf or cedPl as t i cs ) i sa moder ncompos i t emat er i al of cons t r uct i on f or chemi cal pl ant equi pment l i k et ank sand v es s el s . Chemi cal equi pment t hat r angei n s i z ef r om l es st hanamet r et o2 0met r esar e f abr i cat edus i ngF RPasmat er i al of cons t r uct i on.

Groundfl oor

t ypeofwat ert ank

F i r s t f l oor T oi l et

Mal ewas hr oom 8wat er cl os et s 8B as i n

Mal ewas hr oom 2wat er cl os et s 2B as i n

Cal cul at i onof wat er capaci t y needed =8wat er cl os et s+8bas i n =8 ( 1 8 0 ) +8 ( 9 0 ) =2 1 6 0l i t r es

Cal cul at i onof wat er capaci t y needed =2wat er cl os et s+2bas i n =2 ( 1 8 0 ) +2 ( 9 0 ) =5 4 0l i t r es

F emal ewas hr oom 8wat er cl os et s 8B as i n

F emal ewas hr oom 2wat er cl os et s 2B as i n

Cal cul at i onof wat er capaci t y needed =8wat er cl os et s+8bas i n =8 ( 1 8 0 ) +8 ( 9 0 ) =2 1 6 0l i t r es

Cal cul at i onof wat er capaci t y needed =2wat er cl os et s+2bas i n =2 ( 1 8 0 ) +2 ( 9 0 ) =5 4 0l i t r es

T ot al wat er capaci t yneeded 2 1 6 0 +2 1 6 0 +5 4 0 +5 4 0 =5 4 0 0 l i t r es Pr opos edwat er t ankcapaci t y: 5 4 0 0l i t r es F RPwat er t ankwi t h1 5 0 0gal l oons( appr ox . 5 7 0 0l i t r es )

wat ert ank

secondfl oor

B as ement T oi l et

Fi rstfl oor

Cal cul at i onof wat er capaci t y



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.