Design Studio 05 New Norm of Sentul Depot

Page 1

Chong Yit Sian | 1001850927

ARCHITECTURE DESIGN STUDIO 5 PORTFOLIO

NEW NORM OF SENTUL DEPOT


Project 1 : New Norm of Libraries Perpustakaan Kuala Lumpur (Library of Kuala Lumpur)

Site location Address: 1, Jalan Raja, City Centre, 50050 • • • •

Kuala Lumpur, WPKL

Located in the heart of Kuala Lumpur. Near to the River of Life. Easily accessible by public transport. ( Ex: MRT Merdeka, LRT Masjid Jamek.) Surrounded by tourist attraction.


Project 1 : New Norm of Libraries Impact of Covid-19 Library restriction

Borrowing of books

During RMCO limit the entry of library, many spaces had been restricted.

Books are not allowed out of the compound

Book sanitization

Space and capacity

The capacity of people allowed to enter for borrowing are only a few at a time and registration is needed upon entrance.

Books return from the user are sent to sanitize for 3 days


Project 1 : New Norm of Libraries Space and Capacity

The library provide all kind of spaces to serve different function and varies groups of user. Such as, discussion room, children reading zone, computer lab, interactive multimedia learning room, meeting room, creative room and others.

Due to the pandemic and the compliance of social distancing listed in the SOP, the capacity of the library had significantly decreased.


Project 1 : New Norm of Libraries Intervention The architecture intervention allows more reading space surrounding the library which also try to follow the SOP in a creative way. The intervention can be spread like a virus around the city to encourage the reading behavior.

Stair – like reading space to create social distancing and serve as a bookshelf to store books under sitting place. To utilized the space more efficiently in the pandemic situation.

Mirrored reading space to avoid face to face situation which might increase the risk of spreading virus, while also allow user to connect with each other.

Reading capsule to avoid physical contact between user while promoting automated and digitalized reading services and sanitization.


Project 1 : New Norm of Libraries Intervention The architecture intervention allows more reading space surrounding the library which also try to follow the SOP in a creative way. The intervention can be spread like a virus around the city to encourage the reading behavior.


Project 1 : New Norm of Libraries Intervention of Individual User


Project 1 : New Norm of Libraries Intervention of Group User


Project 1 : New Norm of Libraries Intervention of Public User


PROJECT 2 : URBAN STRATEGY


Project 2 : Urban Strategy Sentul Depot

Background Sentul Depot Located at Sentul West, Kuala Lumpur was once the largest complex of railway workshop in Malaysia with a history dating back to 1905. The 200,000 square feet depot was once the finest engineering workshops in the word and served the needs of the federated Malay States Railways (FMSR) in the early 1900s up to the early 2000s for Keratapi Tanah Melayu Berhad (KTM Berhad)


Project 2 : Urban Strategy Figure Ground

Sentul Park Site Analysis


Project 2 : Urban Strategy Sentul Zonning

Sentul Park Site Analysis


Project 2 : Urban Strategy Site Issue & Programs & Design Aim Site Issue •

Privatization of the Land

Access to the park

Low Average Income of Surrounding Community

Proposed Programs Open rental business area Open rental business area allow the community to run small business to increase their household income, while the rental will be return to the developer as minor profit.

The Sentul Park Land is under the property of YTL developer, hence the land are not friendly on allowing community to access Due to the privatization, the are only 1 access to enter to the Sentul Park

Historical locomotive installation The installation serve as a landmark in the park, while also stimulated the activities in the site to increase the crowd. To educate knowledge about the locomotive.

The surrounding community is living under the standard of living which caused by the low average income per family

Lack of Public Education Facility

The nearest public library which is the national library is located at 5km away from the site, which is not user friendly to the student in Sentul

Design Aim • •

Create more recreational space and educational spaces for the community Create Business opportunity for the community

Locomotive related intervention The intervention create space of interaction while it also able to educate people about the knowledge of locomotive/


Project 2 : Urban Strategy Urban Planning


Project 2 : Urban Strategy Urban Planning (Process & Sketches)


Project 2 : Urban Strategy Urban Strategy Outcome Educational Intervention & Interactive intervention Future Development

Coal Tower Educating the process of coal mining and collecting, which is the main resources of train in the past Exploded locomotive structure Create space of recreation and learning opportunity about the structure of train

Exploded locomotive structure Create space of recreation and learning opportunity about the structure of train

Abandon train coach Market The train coach rent out to the community to run small business


Project 2 : Urban Strategy Urban Strategy Outcome Educational Intervention & Interactive intervention

Future Development

Trench Gallery A gallery to exhibit the history of Sentul Depot and World War 2

Abandon train coach Rent by the community and open for small business

Train Coach Reading Space / Mini Library A mini library that store donated books for the community to promote reading behavior.


Project 2 : Urban Strategy Preliminary Building Strategy Outcome

The north part of the Sentul Depot is selected due to the flexible access which nearer to the KTM station. The location of the propose building also helps to enhance the circulation between the site.

The 3d model created a prototype of the extension of Sentul Depot. Perspective view from the exterior and interior is taken. The idea of extension at this stage is a cantilevered extension that attached to the existing building


PROJECT 3 : ADAPTIVE REUSE OF SENTUL DEPOT


Project 3 : Adaptive Reuse of Sentul Depot Design Intention Intergrade the program from the site while also solve the site issue of lacking public educational facilities by proposing a building with Library and Locomotive Museum. This is to retain the original value of Sentul Depot which is a locomotive workshop in the past but now is a locomotive museum. Both contribute to the locomotive field while the museum aim to improve the future development in locomotive

Kikuchi City Central Library by Nomura Co

LocHal Public Library: An Intensive Redesign

Taiwan National Library and Repository in Tainan City

LocHal Public Library: An Intensive Redesign

The Russian Railway Museum in St. Petersburg, Russia

National Railway Museum - Museum in York


Project 3 : Adaptive Reuse of Sentul Depot Design Concept

Adaptive Reuse of Industrial Property for Biotech Labs

By utilizing the existing building for the proposed program with the extension, The extension will be having absolute different material of construction to show the contrast between the new extension and the current existing building Adaptive Reuse - upcycling buildings | CBRE The Green Building Louisville, United States / (fer) studio

Zeitz MOCAA, Cape Town, South Africa


Project 3 : Adaptive Reuse of Sentul Depot Target User Student

Student are the main targeted user, where the proposed program provide them free space of reading and other educational purpose. The main typology of the design building is to create educational space which highly compatible to the student around Sentul Park.

Active Period

Tourist / Visitor

Tourist / Visitor are the secondary target user, where the location of the design building complemented with public transport, simply allows more people from far to travel to the site. This also stimulate more human activity in the site while increasing the business opportunity for the Sentul community.

Active Period


Project 3 : Adaptive Reuse of Sentul Depot Precedent Study on Library Yue Library / Beijing Fenghemuchen Space Design

Het Predikheren Public Library, Mechelen, Belgiument

The arch window of library provide lots of natural lighting into the building while creating a classical and vintage library environment.

The library fully utilize the space by creating different leveling. It also turn negative spaces into books keeping place by using customize built in bookshelves. The double volume of the design create more harmonic reading environment.


Project 3 : Adaptive Reuse of Sentul Depot Program & Bubble Diagram

Bubble Diagram Entrance

Plaza

Foyer Library

Locomotive Museum

Cafe

Program & Spaces • • • • • •

Reading (Reading Spaces, Library) Exhibition (Gallery, Museum) Dining (Cafe) Working (Reception, Offices) Commercial / Business (Plaza) Recreational (Plaza, Avenue)

Sentul Depot Gallery

Avenue

Art Gallery

ICTL Resources Area Reading Space

Discussion Room

Reading Area (Corridor)

Toilet Individual Reading Area

Bridge Offices


Project 3 : Adaptive Reuse of Sentul Depot Material & Texture Sketches on expected outcome

The reason of choosing stone as the main material for the new extension building, because stone masonry able to have similar arrangement compared with brick but having different texture. This also show the respect to the existing building while building something new on it but still following the rules.

Brickwork Glass Panel Providing natural lighting into the building while do not lost the characteristic of the existing building. The uses of the glass panel shows the adaption of the current building into modern architecture.


Project 3 : Adaptive Reuse of Sentul Depot First Approach - Design Process (Sketches) The first approach mainly focusing on the distribution of space, space arrangement and space organization

This sketches show the intervention of green space from the site in to the building. Creating a green avenue in the building as an internal courtyard that allowed multiple events.

The green intervention into the building by set into the ground step by step.

Schematic section that show the expected double volume the the library and the reading space

The blue box show the consideration of the extension building location.


Project 3 : Adaptive Reuse of Sentul Depot First Approach - Design Process (Sketches)

Bubble diagram Form modifying

Schematic section

Space organization

Space planning


Project 3 : Adaptive Reuse of Sentul Depot Grid System Used General Grid (Existing)

The general grid follow the existing building which is the Sentul Depot

Radial Grid (Urban Strategy)

The radial grid is the expansion of node that determined from the urban planning

Intersection of Both Grid (Applied)

This grid is the outcome of the intersection of previous grid where the expansion meet the center grid of the Sentul Depot.


Project 3 : Adaptive Reuse of Sentul Depot First Approach - Massing

Depot mass

Expansion from nodes

Addition & Insertion

Subtraction

Subtraction


Project 3 : Adaptive Reuse of Sentul Depot First Approach – Schematic Plan

Ground Floor

First Floor


Project 3 : Adaptive Reuse of Sentul Depot Second Approach - Design Process (Sketches)

Form making sketches

The second approach had applied the ideal from project 1, which is the concept of pixilation that will increase the social distancing between each individual to comply SOP. Where the concept also make contrast between the existing building. The pixilation also act like a virus which spread through the building with it concept of split leveling. After the SOP had announced, face mask must be wearing in the public spaces. Hence, the most possible virus spreading way will be physical contact. The split of level is to avoid physical contact between each user.


Project 3 : Adaptive Reuse of Sentul Depot First Approach - Design Process (Sketches & Mockup Model)


Project 3 : Adaptive Reuse of Sentul Depot

ARCHITECTURAL DRAWING


Project 3 : Adaptive Reuse of Sentul Depot Site Plan & Roof Plan


Project 3 : Adaptive Reuse of Sentul Depot Ground Floor Plan 1.Plaza 2.Reception 3.Library front hall 4.ICT resources area 1 5.Reading Area 1 6.Resources area 7.Cafe 8.Children Area 9.Intervention 1 10.Intervention 2 11.Reading Area 2 12.Museum hallway 13.Gallery 14.Locomotive museum 15.Landscape

1

2 4 3

5

7

6

15 9 8 14

13

10 11

12


Project 3 : Adaptive Reuse of Sentul Depot Ground Floor Plan (Toilet) The toilet is located underground which can be access from the avenue


Project 3 : Adaptive Reuse of Sentul Depot First Floor Plan

16.ICT resources area 2 17.Study space 18.Discussion room 19.Toilet 20.Reading space 16

20

17 18 19


Project 3 : Adaptive Reuse of Sentul Depot Second Floor Plan

21.Office 22.Corridor 23.Reading area 21

22

23


Project 3 : Adaptive Reuse of Sentul Depot Library Plan & The Intervention

Reading area that split to different height to avoid physical contact between the user. Recommended for Group user and individual user

This Intervention is a combination of book collection area and individual reading space. There is a staircase to the top for resources while avoiding physical contact with the user.


Project 3 : Adaptive Reuse of Sentul Depot Reading Space Plan & The Pixelating Concept Staircase seat reading area

Individual reading area

Reading area

Reading area

Washroom Resources area

Glass box reading area

Glass box reading area

Spill out zone


Project 3 : Adaptive Reuse of Sentul Depot Section A-A


Project 3 : Adaptive Reuse of Sentul Depot Section B-B


Right Elevation

Right Elevation Left Elevation

Front Elevation

Project 3 : Adaptive Reuse of Sentul Depot Elevation


Project 3 : Adaptive Reuse of Sentul Depot Perspective Avenue Perspective

Avenue Perspective The Avenue allow users to have recreational activities while also experience the architecture of the extension building. The different material and glass window used created large contrast between the current building and the new extension building. From the perspective, users in the reading area may also enjoy the view of the avenue while reading.


Project 3 : Adaptive Reuse of Sentul Depot Perspective Reading Space Perspective

Reading Space Perspective The split level of the reading space cover different type of the use of library, such as discussion room, individual reading area, bookshelves. All point of reading space provide different experience in terms of volume, view, and environment.


Project 3 : Adaptive Reuse of Sentul Depot Perspective Library Perspective

Library Perspective The arch window and the skylight provide significant amount of natural lighting, which promote the environment of reading space. More natural lighting will make users more expressive instead of depressive.


Project 3 : Adaptive Reuse of Sentul Depot Perspective Outdoor Corridor Perspective

Outdoor Corridor Perspective This perspective allows users to notice the existing building arch wall which build by bricks and the newly added stone arch wall. The only different between both wall in term of design is the material used, which allow user to recognized the old building even after the renovation.


Project 3 : Adaptive Reuse of Sentul Depot 3D Model


F i r eapp l i ance Acce s s

e ag r nve Co ant Pr oper t yL i ne ydr eH r i F S et backL i ne

6. 5m et er wi de



Z6 Z5 Z4 Z3 Z2 Z1

G1

H1 I1

19

18

17

16

15

14

13

DRAWING TITLE

TITLE

DRAWN BY

BLOW UP LOCOMOTIVE MUSEUM PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

12 REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 200

13 / 11 / 2020

BP02


I

H

G

F

E

D

C

B

A 1 2 3

DRAWING TITLE

TITLE

DRAWN BY

BLOW UP LIBRARY PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 200

13 / 11 / 2020

BP01


DRAWING TITLE

TITLE

DRAWN BY

FIRST FLOOR PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 400

13 / 11 / 2020

FP02


Z12 Z11 Z9

Z7

11d

11c 11b

11a

Z10

Z8

DRAWING TITLE

TITLE

DRAWN BY

BLOW UP LOCOMOTIVE MUSEUM PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 200

13 / 11 / 2020

BP02


DRAWING TITLE

TITLE

DRAWN BY

SECOND FLOOR PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 400

13 / 11 / 2020

FP03


1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

Sentul Depot Roof (22029)

Library Roof (14721)

Museum Roof (9800)

Second Floor (6000)

First Floor (3000)

Ground Level (0)

DRAWING TITLE

TITLE

DRAWN BY

FRONT ELEVATION

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 500

13 / 11 / 2020

EL01

19


I

H

F

G

E

D

B

C

A

Sentul Depot Roof (22029)

Library Roof (14721)

Museum Roof (9800)

Second Floor (6000)

First Floor (3000)

Ground Level (0)

LEFT ELEVATION

A

B

C

D

E

F

G G1

H

I H1

I1

Sentul Depot Roof (22029)

Library Roof (14721)

Museum Roof (9800)

Second Floor (6000)

First Floor (3000)

Ground Level (0)

RIGHT ELEVATION

DRAWING TITLE

TITLE

DRAWN BY

SIDE ELEVATION

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 500

13 / 11 / 2020

EL02



DRAWING TITLE

TITLE

DRAWN BY

BLOW UP AVENUE & TOILET PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 200

13 / 11 / 2020

BP04


A

B C

D

1 2 3 4 5 6

DRAWING TITLE

TITLE

DRAWN BY

WASHROOM DETAIL PLAN

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 50

13 / 11 / 2020

DT01


A

B

C

D

DRAWING TITLE

TITLE

DRAWN BY

RC STAIRCASE DETAIL DRAWING

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

1001850927 SCALE

DATE

1 : 50

13 / 11 / 2020

DT02


SHEATHING 20MM THICK

INSULATION 100MM THICK GYPSUM BOARD 20MM THICK

WATER CONTROL LAYER 10MM THICK

EXTERIOR CLADDING 15MM THICK

CHAIR FOR TILES

FLOOR FINISHES 10MM THICK CEMENT LAYER 10MM THICK

DECK WATERPROOFING 10MM THICK TIMBER PAVER TRAFFIC SURFACE 20MM THICK

CONCRETE SLAB 300MM THICK GROUND BEAM WIDTH. 300MM

DRAWING TITLE

TITLE

DRAWN BY

LIBRARY WALL AND FLOOR DETAIL

ADAPTIVE REUSE OF SENTUL DEPOT LIBRARY AND LOCOMOTIVE MUSEUM

CHONG YIT SIAN

REMARK

STUDENT ID NO. DRAWING NO.

DT04

1001850927 SCALE

DATE

1:5

13 / 11 / 2020


FLOOR BEAM 450MM X 300MM

GLASS CURTAIN WALL TO ARCHTECT'S DETAILS

GLAZING GLASS 10MM THICK

GLASS CURTAIN WALL MULLION 40MM X 20MM

SINGLE GLAZED GLASS WINDOW FRAME

GLASS CURTAIN WALL FRAME 40MM X 20MM

BACKER ROD SEALANT FLASHING & DRIP

WINDOW L-TRIM

SKIN PANEL 100MM THICK

SKIN PANEL FINISHES CONCRETE SLAB 300MM

BRICKWORK WINDOW SECTION DETAIL SCALE 1 : 2

BRICKWORK WINDOW SECTION SCALE 1 : 25

DRAWING TITLE

TITLE

BRICKWORK ARRANGEMENT WINDOW SECTION DETAIL ADAPTIVE REUSE OF SENTUL DEPOT (READING SPACE) LIBRARY AND LOCOMOTIVE MUSEUM

DRAWN BY

REMARK

CHONG YIT SIAN STUDENT ID NO.

DRAWING NO.

1001850927 SCALE

DATE

N/A

13 / 11 / 2020

DT03


CHONGYI TSI AN 1001850927

SCHEMATI CDESI GN THEDESI GNOFADAPTI VEREUSEOFSENTUL SECONDFLOORPLAN DEPOTI STOCOUNTERTHESI TEI SSUES WHI LEALSOACTASACENTERTOGATHER COMMUNI TYANDRESI DENTSFROM THE SURROUNDI NGAREA. THEEXTENTI ON DESI GNHASDI FFERENTMATERI ALUSEDTO SHOW THECONTRASTBETWEENTHENEW NG, THI SI SALSOTOSHOW ANDOLDBUI LDI RESPECTTOTHEEXI STI NGBUI LDI NG. THEEXTENTI ONOFTHENEW BUI LDI NG DESI GNHASTHECONCEPTOFPI XALATI NG SPACES. THI SFEATURESI STO CREATEMORE DI STANCI NGBETWEENEACHI NDI VI DUAL , ALSOTOPROMOTETHENEW NORM AND THES. O. POFSOCI ALDI STANCI NG. FI RSTFLOORPLAN SECTI ONAa

GROUNDFLOORPLAN

SECTI ONBB

BASEMENTTOI LET

SUNPATHDI AGRAM RI GHTELEVATI ON

LEFTELEVATI ON THEMODELI NTHESUNPATHDI AGRAM ONLY SHOW THEPARTOFEXSI STI NGBUI LDI NG WI THTHENEW EXTENTI ONDESI GN.

FRONTELEVATI ON


Vent i l at i onst udy Nat uralvent i l at i on UBBL

B y l aw3 9( 1 ) , nat ur al v ent i l at i onr equi r ementnot l es st han5 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 6 0 0s . q. m Mi ni mum openi ngr equi r ed: 6 0 0x5 % =3 0s . q. m T ot al ar eaof openi ng: 3 5s . q. m 3 5s . q. m >3 0s . q. m( UB B Lcompl i ed)

readi ngspace

Av er ageopeni nghei ght s: 1 . 4 m T ot al wi ndowl engt h: 2 5 m Ar eaof openi ng: 1 . 4 m x2 5 m =3 5s . q. m

UBBL

B y l aw3 9( 1 ) , nat ur al v ent i l at i onr equi r ementnot l es s t han5 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 1 0 0 0s . q. m Mi ni mum opev ni ngr equi r ed: 1 0 0 0x5 % =5 0s . q. m T ot al ar eaof openi ng: 1 . 9 2s . q. m x3 2 =6 1 . 4 0s . q. m 6 1 . 4 0s . q. m >5 0s . q. m( UB B Lcompl i ed) Ar eaof wi ndow: 1 . 6 m x1 . 2 m =1 . 9 2s qm

1 6 0 0 mm

Number of wi ndow : 3 2

l i brary

1 2 0 0 mm

UBBL

B y l aw3 9( 1 ) , nat ur al v ent i l at i onr equi r ementnot l es st han5 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 9 0 0s . q. m Mi ni mum opev ni ngr equi r ed: 9 0 0x5 % =4 5s . q. m T ot al ar eaof openi ng: 0 . 9 6s . q. m x4 8 =4 6 . 0 8s . q. m 4 6 . 0 8s . q. m >4 5s . q. m( UB B Lcompl i ed) Ar eaof wi ndow: 0 . 8 m x1 . 2 m =0 . 9 6s qm

Awni ngWi ndow

8 0 0 mm

Museum

1 2 0 0 mm

Number of wi ndowi n1s et : 6pcs Number of s et : 8s et s T ot al number of wi ndow: 6x8=4 8

Chongyi tsi an 1001850927

mechani calvent i l at i on


l i ght i ngst udy Nat uralLi ght i ng

Chongyi tsi an 1001850927

art i fi ci all i ght i ng

UBBL

B y l aw3 9( 1 ) , nat ur al l i ght i ngr equi r ementnot l es s t han1 0 %of t ot al f l oor ar ea.

Cal cul at i on

readi ngspace

T ot al f l oor ar ea: 6 0 0s . q. m Mi ni mum openi ngr equi r ed: 6 0 0x1 0 % =6 0s . q. m T ot al ar eaof openi ng:

Av er agewi ndowhei ght s: 2 . 0 m T ot al wi ndowl engt h: 3 5 m Ar eaof openi ng: 2 . 0 m x3 5 m =7 0s . q. m

UBBL

B y l aw3 9( 1 ) , nat ur al l i ght i ngr equi r ementnot l es st han 1 0 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 1 0 0 0s . q. m Mi ni mum opev ni ngr equi r ed: 1 0 0 0x1 0 % =1 0 0s . q. m T ot al ar eaof openi ng: 3 2x2 . 8 8+0 . 9 6x4 8+1 6 0x0 . 4 8 =2 1 5 . 0 4s qm 2 1 5 . 0 4s qm >1 0 0s qm ( UB B Lcompl i ed) Ar eaof bot t om wi ndow( 3 2 pcs ) 2 . 4 m x1 . 2 m =2 . 8 8s qm Ar eaof t opwi ndow( 4 8 pcs ) 1 . 2 m x0 . 8 m =0 . 9 6s qm

l i brary

S k y l i ght ( 1 6 0 pcs ) 0 . 6 m x0 . 8 m =0 . 4 8s qm

UBBL

B y l aw3 9( 1 ) , nat ur al l i ght i ngr equi r ementnot l es s t han1 0 %of t ot al f l oor ar ea.

Cal cul at i on

T ot al f l oor ar ea: 9 0 0s . q. m Mi ni mum opev ni ngr equi r ed: 9 0 0x1 0 % =9 0s . q. m T ot al ar eaof openi ng: 0 . 9 6s . q. m x9 6 =9 2 . 1 6s . q. m 9 2 . 1 6s . q. m >9 0s . q. m( UB B Lcompl i ed) Ar eaof wi ndow: 0 . 8 m x1 . 2 m =0 . 9 6s qm Number of wi ndowi n1s et : 6pcs Number of s et : 1 6s et s

Museum

T ot al number of wi ndow: 1 6x8=9 6


wat ersuppl ysyst em

Chongyi tsi an 1001850927

t ypeofwat ert ank

F RPwat er t ank F RP( F i br egl as sRei nf or cedPl as t i cs , al s ok nown asGRP, or Gl as sRei nf or cedPl as t i cs ) i sa moder ncompos i t emat er i al of cons t r uct i on f or chemi cal pl ant equi pment l i k et ank sand v es s el s . Chemi cal equi pment t hat r angei n s i z ef r om l es st hanamet r et o2 0met r esar e f abr i cat edus i ngF RPasmat er i al of cons t r uct i on.

Cal cul at i onof wat er capaci t y B as ement T oi l et

F i r s t f l oor T oi l et

Mal ewas hr oom 8wat er cl os et s 8B as i n

Mal ewas hr oom 2wat er cl os et s 2B as i n

Cal cul at i onof wat er capaci t y needed =8wat er cl os et s+8bas i n =8 ( 1 8 0 ) +8 ( 9 0 ) =2 1 6 0l i t r es

Cal cul at i onof wat er capaci t y needed =2wat er cl os et s+2bas i n =2 ( 1 8 0 ) +2 ( 9 0 ) =5 4 0l i t r es

F emal ewas hr oom 8wat er cl os et s 8B as i n

F emal ewas hr oom 2wat er cl os et s 2B as i n

Cal cul at i onof wat er capaci t y needed =8wat er cl os et s+8bas i n =8 ( 1 8 0 ) +8 ( 9 0 ) =2 1 6 0l i t r es

Cal cul at i onof wat er capaci t y needed =2wat er cl os et s+2bas i n =2 ( 1 8 0 ) +2 ( 9 0 ) =5 4 0l i t r es

T ot al wat er capaci t yneeded 2 1 6 0 +2 1 6 0 +5 4 0 +5 4 0 =5 4 0 0 l i t r es Pr opos edwat er t ankcapaci t y: 5 4 0 0l i t r es F RPwat er t ankwi t h1 5 0 0gal l oons( appr ox . 5 7 0 0l i t r es )

om r yf pl p u s er t Wa

y t i r ho t au

wat er t ank


seweragesyst em

Chongyi tsi an 1001850927

S E CONDF L OORP L AN

F I RS TF L OORP L AN

GROUNDF L OORP L AN

e ol nh a M

S ewer aget o publ i cs ewer agel i ne

BAS E ME NTT OI L E T


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.