PORTFOLIO Yuliya Pozynich, Ing. Arch. Selected works 2014-2017
YULIYA POZYNICH GRADUATED ARCHITECT 18.08.1992 yuliya.pozynich@gmail.com +420 774 072 853 Prague, Czech Repubic
PROFESSIONAL EXPERIENCE / PROFESIONÁLNÍ ZKUŠENOSTI Chisholm Maslo Company (CMC) - Prague, Czech Republic (Junior architect - 2014- present) Praha, Česká republika (Junior architekt - 2014 - současnost) - Worked on 12 architectural projects (competitions) from begining until submission, which meant participation in all aspects of architectural process: preparing analysis, looking for concepts, developing architectural drawing and final presentation (renders, schemes, siteplans, etc). - Worked on several projects which are currently in under construction stage, mostly preparing changes of the original design and working on floorplans. - Prepared models for 3d printing as well as produced traditional architecture models. Cigler Marani Architects (CMA) -
Prague, Czech Republic (Intern - summer 2014) Praha, Česká republika (Stážista - léto 2014)
- Worked on one project for renovation of Vystaviště, Prague 7 in a team of 3 (+1 group leader). Role included designing proposals and preparing presentation for the city, including final visualizations and concept schemes. Archichel - Chelyabinsk, Russia
- Pracovala jsem na 12 architektonických projektech (soutěžích) od počátku až po podání, což znamenalo účast ve všech aspektech architektonického procesu: příprava analýz, hledání konceptů, rozvíjení architektonické kresby a konečné prezentace (vykreslování, schémata, územní plány). - Pracovala jsem na několika projektech, které v současné době probíhají stavební fáze, (většinou je připrava změn původního návrhu a práce s půdorysy). - Příprava modelu pro 3D tisk a výroba architektonických modelů.
- Pracovala jsem na projektu rekonstrukce Vystaviště, Praha 7 v malém týmu (3+ vůdce skupiny). Role zahrnovala návrh a přípravu prezentace pro město včetně konečných vizualizací a schémat koncepce.
(Intern - summer 2011) / Chelyabinsk, Rusko (Stážista - léto 2011)
- Role included producing architectural and 3D models
- Výroba architektonických a 3D modelů
EDUCATION / VZDĚLÁNÍ 2015/2017
Engineer Architect (Ing. Arch.) in Czech Technical University (ČVUT) Inženýr architekt (Ing. Arch.) České vysoké učení technické (ČVUT)
2011/2014
Bachelor of Architecture (B. Arch.) in Architectural University in Prague (ARCHIP) Bakalář architektury (B. Arch.) Architektonická univerzita v Praze (ARCHIP)
2010/2011
South Ural State University - Chelyabinsk, Russia Jižní Uralská státní univerzita - Chelyabinsk, Rusko
HONORS / OCENĚNÍ 2011/2014
ARCHIP Academic Scholarship (merit based financial scholarship) ARCHIP Academic Scholarship (finanční stipendium založené na zásluhách)
2013/2014
Environmental Pavilion- reSITE Architectural Festival in Prague, winning and built proposal. Environmentální pavilon - reSITE Architektonický festival v Praze, vítězný a postavený návrh.
ADDITIONAL INFORMATION / DODATEČNÉ INFORMACE Software Software
Rhino Autocad Sketchup ArchiCAD
Languages Jazyky
Russian / Ruština English / Angličtina Czech / Čeština
**** **** **** ***
Adobe Photoshop Adobe Illustrator 3DsMax Vray
***** ***** ** ***
native speaker / rodilý mluvčí fluent / plynulý fluent / plynulý
WORK IN OFFICE 2014-2017 selected works
VACLAV HAVEL AIRPORT CMC II stage competition, 3 months, spring 2015- under development SMALL SCALE URBAN PROJECT
The basic concept of the design is to connect to the configuration of the existing terminals, and to close the inner space of the airport complex by creating a “trac circle�, clearly defined points of entry and exit. From the pedestrian point of view, the proposal creates a more clear and a safe walking system among existing buildings and added public spaces. The most important urban-transportation elements of the design are the entrance gate - a pair of newly designed buildings of the congress center, the transport circuit ow along the perimeter of the area, the two main pedestrian axes crossing in the center of the area (SKWALK), public areas in front of terminals 1and 2 and Aviatics Square near Aviatic Museum. SKYWALK forms the main urban axis and connects all 4 parts of the area. It is located on the ground level and is covered with a glass pergola. I was a part of this competition since the beginning, preparing analytical research as well as participating in both concept development and preparing the presentation graphics (visualizations, schemes, landscape). Competition was held in 2 stages. Currently project is in the development stage.
Urban - architectural concept • Organization of the airport area using new axes • a new communication circuit linking all features • 4 primary destinations - entrance, T1, T2, aviation museum • inside the circuit - “airport city”
Morphology • new buildings create the atmosphere of the city - streets, square
Main public areas and infosystem • individual public spaces are interconnected • digital information panels are used to guide visitors
Lighting • Lighting is designed in the following categories: - Main street lighting - illumination of attractive elements of public space
G300/650 G300/650 G300/650 G300/650 G300/650 G300/650 G300/650 G300/650
TERMINÁL TERMINÁL TERMINÁL TERMINÁL TERMINÁL TERMINÁL BuS TERMINÁL TERMINÁ BuS BuS BuS BuS B
VÝTOPNA VÝTOPNA VÝTOPNA VÝTOPNA VÝTOPNA VÝTOPNA
RODOP RODOP RODOP RODOP RODOP RODOP
POLICIE čR POLICIE čR POLICIE čR POLICIE čR POLICIE čR POLICIE čR
KO KO KO KO KO KO
POLICIE čR POLICIE čR
KO KO
VÝTOPNA VÝTOPNA
RODOP RODOP
A2 A2 A2
OD ODST V ODSTA A B ODSTAV BuS ODST V BuS OD STAV uS S AV Bu OD TAV B S ODST Bu S STAV uS AV Bu BuS S
A2 A2 A2 A2 A2
ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA
ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA
ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA
ADMINISTRATIVA ADMINISTRATIVA
ADMINISTRATIVA ADMINISTRATIVA
ADMINISTRATIVA ADMINISTRATIVA
P300/100 P300/100 P300/100 P300/100 P300/100 P300/100
P300/100 P300/100 P300/100 P300/100 P300/100 P300/100
P300/100 P300/100
P300/100 P300/100
ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA
OD ODST V ODSTA A B ODSTAV BuS ODST V BuS OD STAV uS S AV Bu OD TAV BuS ODST Bu S STAV S AV Bu BuS S
ADMINISTRATIVA ADMINISTRATIVA
ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA ADMINISTRATIVA APC APC APC APC APC APC
ADMINISTRATIVA ADMINISTRATIVA
APC APC
CATERING CATERING CATERING CATERING CATERING CATERING CATERING CATERING
LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA:
OBJEKTY STÁVAJíCí OBJEKTY STÁVAJíCí OBJEKTY STÁVAJíCí OBJEKTY STÁVAJíCí NAVRHOVANé OBJEKTY STÁVAJíCí OBJEKTY STÁVAJíCí NAVRHOVANé OBJEKTY OBJEKTY NAVRHOVANé OBJEKTY STÁVAJíCí OBJEKTY NAVRHOVANé KOMuNIKACE NEVEŘEJNé STÁVAJíCí OBJEKTY NAVRHOVANé KOMuNIKACE NEVEŘEJNé OBJEKTY NAVRHOVANé KOMuNIKACE NEVEŘEJNé OBJEKTY NAVRHOVANé KOMuNIKACE NEVEŘEJNé VEŘEJNé OBJEKTY NAVRHOVANé KOMuNIKACE NEVEŘEJNé KOMuNIKACE VEŘEJNé KOMuNIKACE NEVEŘEJNé KOMuNIKACE VEŘEJNé KOMuNIKACE KOMuNIKACE NEVEŘEJNé VEŘEJNé POCHOzí NEVEŘEJNé KOMuNIKACE VEŘEJNé KOMuNIKACE VEŘEJNé POCHOzí KOMuNIKACE KOMuNIKACE POCHOzí KOMuNIKACE KOMuNIKACE POCHOzí CYKLOTRASY VEŘEJNé VEŘEJNé KOMuNIKACE POCHOzí CYKLOTRASY POCHOzí KOMuNIKACE CYKLOTRASY KOMuNIKACE POCHOzí CYKLOTRASY TRASA ŽELEzNICE KOMuNIKACE POCHOzí CYKLOTRASY TRASA ŽELEzNICE CYKLOTRASY TRASA ŽELEzNICE CYKLOTRASY TRASA ŽELEzNICE CYKLOTRASY TRASA ŽELEzNICE TRASA ŽELEzNICE TRASA ŽELEzNICE TRASA ŽELEzNICE
LEGEND
LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA: LEGENDA:
walking routes bicycle path bus stop bus terminal railway route taxi + shuttle bus terminal 1 terminal 2
PĚŠí TRASY PĚŠí TRASY PĚŠí TRASY PĚŠí TRASY CYKLOTRASY PĚŠí TRASY CYKLOTRASY PĚŠí TRASY CYKLOTRASY PĚŠí TRASY CYKLOTRASY LINKY MHD PĚŠí CYKLOTRASY LINKYTRASY MHD CYKLOTRASY LINKY MHD CYKLOTRASY LINKY MHDBuS TERMINÁL CYKLOTRASY LINKY MHD TERMINÁL LINKY MHDBuS TERMINÁL BuS LINKY MHD TERMINÁL BuS TRASA ŽELEzNICE LINKY TERMINÁL BuS TRASAMHD ŽELEzNICE TERMINÁL BuS TRASA ŽELEzNICE TERMINÁL BuS BuS TRASA ŽELEzNICE TAxI + SHuTTLE TERMINÁL BuS BuS TRASA ŽELEzNICE TAxI + SHuTTLE TRASA ŽELEzNICE TAxI + SHuTTLE BuS TRASA ŽELEzNICE TAxI + SHuTTLE IAD TERMINÁL 1 BuS TRASA ŽELEzNICE TAxI + SHuTTLE BuS IAD TERMINÁL 1 BuS TAxI + SHuTTLE IAD TERMINÁL 1 TAxI + SHuTTLE IAD TERMINÁL 1 2 BuS TAxI + SHuTTLE IAD TERMINÁL 1 IAD TERMINÁL TERMINÁL 2 BuS IAD 1 IAD TERMINÁL 2 IAD IAD TERMINÁL TERMINÁL 1 2 IAD TERMINÁL 1 2 IAD TERMINÁL 2 IAD TERMINÁL 2 IAD TERMINÁL 2
MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL MuzEuM LETECTVí + SHOWROOM MALÝCH LETADEL
Terminal 1 elevation
Terminal 1 public space
Terminal 2 elevation
Terminal 2 public space
KARLIN- HOLESOVICE BRIDGE CMC / W Architecture competition, 3 weeks; summer 2017 MIXED PROJECT The objective of the competition was the preparation of an architectural and structural design for a bridge for pedestrians and cyclists to connect the riverbanks of Karlín, Holešovice and Štvanice island. This design supports a major, citywide connection between city districts, while also providing access to Štvanice island. Currently both banks and the island are connected by ferry. Project was developed in a very short time, and my participation included concept/ form development and preparing final presentation (visualizations, 3d print, 3d model, landscape).
The structure consists of two main supporting arches made of reinforced concrete. The arches are straight at the top. The central part of the bridge consists of a curved beam of pre-stressed concrete. Structure of the bridge is monolithic, situated on a rigid frame into an elegant shape that harmoniously complements the water level. The exposed areas are finished with decorated concrete. The sloping concrete surface is divided for pedestrians and cyclists. LED panels are built in handrails and illuminate bridge at night. Railing of 1.3 m height is made of stainless steel. The filling consists of vertical bars with a pitch of 80 mm. Handrail has a 150 mm wide profile made of durable tropical wood to provide a pleasant tactile feeling. At the widest place bridge has a width of 10m (due to brief requirements) and is split into 2 parts: arch which continues to the other side and smaller arch which goes down to the Stvanice island.
NEW CHYNE SCHOOL professional practice, competition (CMC) 1,5 months; spring 2014 ARCHITECTURE PROJECT One of my first projects at CMC where I had a design inuence was a competition for school at the area near Prague. My participation included preparing siteplan, visualizations, floorplans, sections and elevations. Inspiration for this project was found in water areas and partly in the early history of Chyne, here was found the first prehistoric furnace iron in Bohemia and Moravia. Both of these phenomenas were used to design a new school / community center. Urban design was inuenced by the analogy of the kinetic energy of the stream. The historical importance of iron to the site inspired us to reflect it in the usage of facade materials. A new school and community center were also seen as a continuation of the existing park, the fun and friendly spirit of which we tried to bring to the school grounds and develop in the outdoor spaces and new colorful gardens.
ground floor
inspiration
Common spaces are used by both school and community, including auditorium, gym and the library, which are located in the front part near the entrance, which ensures easy orientation, connection to the parking and safe space. Auditorium also has a function of a small gym. Because of phasing requirements we have put swimming pool to the east part of the complex, symbolically closing it, also making it easily accessible by the community and students. Swimming pool has the direct connection to the outdoor sport area.
morphology
the use of school during the day
program
School wings have three floors, they are simply and efficiently organized with communication cores on the both sides. Classes are oriented towards east and west. Smaller children study in the west wing, closer to the entrance.
section A
main entrance / gym cafeteria
section B
small gym
library
main entrance gym
south elevation
gym/ main entrance
axonometry detail
small gym
multifunctional hall
west elevation
main entrance / library / small gym
gym
entrance / swimming pool
primary school
axonometry- NW view
primary school
school swimming pool
school
library/ auditorium
gym
main entrance
SCHOOL PROJECTS 2014-2017 selected works
NEW CENTRUM ARNIKA master thesis (ČVUT) 3 months; spring 2017 ARCHITECTURE PROJECT This diploma thesis deals with the design of a new public multifunctional center in the northern part of a Czech Republic spa city, Marianske Lazne. The area is called “Arnika”, and after demolition of the original apartment block in the second half of the 20th century it has been a question about the architectural solution for this area. After studying analytical backgrounds and concepts of developing city, I came to the decision of the necessity of the features, which will bring life back to the area, and will be accesible for both local people and tourists.
Hotel
re
a squ é v o ír
Shopping and Congress Centrer
M
Masarykova
et
tre in s
Ma á vsk
lá gos
Ju
historical housing block
main axes
outer borders
soft edges
inner borders
hard edges
entrances
limits
center of block
Marienbad Schwartzplan Main Colonnade
historical part of the city
The Arnika complex was supposed to be used as a sanatorium instead of the original demolished building, residential block TepelskĂ˝ dĹŻm-Krym. The proposal was approved by the government and in 1987 an architectural competition for this sanatorium was announced. But over the years, it remained only as the construction site. Now the site serves as a space for occasional performances, summer festivals and other.
11 °
functional division
The formation of the courtyard
retail main entrance
Public space concept
“shopping street” courtyard
Public space concept: ground floor
Historical structure of the city blocks in the center of Mariánské lázně are arranged along the street axes, and a mass of the new centers support these axes from the outside. 2 main axes (in parallel with the main street and Mírové square) divide mass in 4 parts and forms the public space, which offers 3 landscaping typologies “green staircase”, business street and calm courtyard. Supply and service comes from the Main Street, and entrance to the underground parking and technical rooms are in the southern part of the shopping center.
Public space concept: terraces
shopping & congress courtyard
The location of the individual functions in the building is primarily based on logical arrangement with relation to the surroundings and in particular 6 m height difference between the northern and southern parts of the plot. Public part (business and congress center) is oriented to Main Street and Square, the Hotel and spa area of the complex is facing the Main Spa Colonnade. Southern part of the building is open to the park and courtyard and offers retail function.
3RD FLOOR 1140 m2
2ND FLOOR 4790 m2
1ST FLOOR 6135m2
0 FLOOR 6037 m2
hotel
beauty salon
community center/ library
kongress center
community center/ gallery
spa
restaurant/ cafe
juice bar
shopping
wellness
reception / waiting area
kitchen
examine area
parking
meeting room
service space
-1ST FLOOR 5653 m2
-2ND FLOOR 5653 m2
FUNCTIONS
Superblock’s functions: -Shopping center, congress center, community hall, galerie, restaurants -Hotel: wellness: water world, sauna world, spa; catering part, beauty salon, accommodation -Technological part and underground parking
tel
ho
tel
ho
fe
y
ca
nit mu m co ter n ce
y rar
lib ry
lle
ga
n
tio
ep
rec g
pin
p ho
s
ma
t
en
em
g na
Parking: located in 1st and 2nd underground levels. Entrance to the parking is located on Main Street in the southern part of the center.
al
dic me rt pa
Business center + restaurant: The main entrance to the northern part leads visitors to the entrance hall, which can lead to the community center (2NP), Including a gallery and a small library, or can lead to the congress Center. On the opposite side of the main entrance there is a restaurant located above the colonnade leading to the courtyard. In the southern part on the same level, a visitor can reach the ground floor (retail level) by an escalator or elevator that is open to the park and the public courtyard.
tel
ho nt
ura
ta res
t we a sp dry a sp
n
gre
co
m
tru
en
c ss
fe
ca
view from Mirove Square
g
pin
op
sh
g
pin
op
sh
Architectural solution: Arrangement of individual building functions is based on relation to the surroundings.The public areas and main entrances are oriented to the historic square and park. Shopping and congress parts include a public courtyard and the hotel part offers a private atrium for the visitor. Due to the 6m difference between the north and south parts of the site, green staircase is introduced as a way to get from park to the historic square.
Congress Center: Entrance to the congress center is via the entrance hall at the level above. It includes a reception and offers various conference rooms for various purposes. One of the large spaces opens into the courtyard, with lectures, concerts and various publicly-oriented activities Hotel: The entrance leads to the reception and waiting room, which is connected to the examination (medical) area. Hotel is located in a part oriented to the Main Spa Colonnade and includes three above-ground floors. Rooms vary by size.
DETAILS section through supporting structure
asphalt sheet geotextile thermal insulation 150mm waterproofing reinforced concrete 350 ceiling
marmoleum 12mm concrete screed 65mm acoustic insulation 50mm reinforced concrete 200mm ceiling
Asphalt sheet geotextille thermal insulation mineral wool 150mm Hydro isolation reinforced concrete 350 mm ceiling
double glass service corridor 65 cm aluminum profile 5 cm anchoring perforated corten steel
stone facing 50mm air gap 50mm anchoring thermal insulation mineral wool 150mm vapor barrier 3 mm reinforced concrete 200mm plaster 5mm
marmoleum 12mm concrete screed 65mm acoustic insulation 50mm reinforced concrete 200mm ceiling gravel 3mm concrete screed 35 mm cardboard 2mm insulation 10mm concrete 200mm waterproofing 50mm concrete 100 mm gravel 150 mm
view from the main street
gravel protection system heat insulation EPS150mm waterproofing 50mm reinforced concrete 300mm plaster 5mm
SECTIONS
A
B
+18 m +15 m +10 m
C
C’
+6 m
A’
+/-0,0m
řez AA’
B’
+18 m +14 m +10 m +6 m +/-0,0m
řez BB’
+18 m +14 m +10 m +6 m +/-0,0m
řez CC’
view from the park main entrance individual entrances fire exits entrance to garage staircase elevator
ELEVATIONS
+18 m +14 m +10 m +6 m +/-0,0m
south facade +18 m +15 m
+14 m +10 m
+10 m
+6 m
+6 m
north facade +18 m
+18 m
+15 m
+14 m
+14 m
+10 m
+10 m
+10 m
+6 m
+6 m
+6 m
+/-0,0m
east facade
Due to the size of the whole structure, I decided to emphasize its various functions using different materials. Hotel: For Hotel and Spa part was chosen a local material trachyt, which visually relates to the surrounding architecture and emphisizes a traditional spa function for the town and which deposit is located 18 km away. Shopping and Congress Center: For this particular project, perforated corten was chosen to underline the function of a new public center in the northern part of Mariánské Lázně. Together with the glass facade it creates a vertical pattern to support the rhythm of the surrounding buildings. Corten color works well with the gray-beige color of trachyt and corresponds to the red roofs of surrounding historic buildings. Fasade Composite Principle: The entrance to the park courtyard is through an open colonnade that repeats the compositional principle of the historical Spa Colonnade, located west of the building. This rhythm is then repeated in both the stone and the perforated corten facade in order to visually connect two different materials. For the colonnade black metal is used, which is then repeated in the double glass facade elements for the Business and Congress Center, and for window frames and other details in Hotel Parts.
LONDON PUBLIC LIBRARY school project (ÄŒVUT) 2,5 months; spring 2016 ARCHITECTURE PROJECT In this studio I was encouraged to do the competition assignment for the new Public Library, located in the very heart of London, next to the Tower Bridge. The new library would be located on a place of the current Potters Fields Park, which is known to be popular among residents and guests of the area. The intention behind the concept was not only to create a library, but also try to preserve the sense of easily accessible public space, adding functions which would be beneficial to the area.
CONCEPT DIAGRAMS
media li pub c
conventional
creating public space in-between the buildings, allowing visual connection to the bridge
adjusting size to the functions and surrounding
connecting library and multimedia parts
creating public space in-between the buildings, allowing visual connection to the bridge
ORGANIZATION SCHEME vertical circulation/ tech spaces 889 m2 gathering point 100 m2 coworking + computer lab 1350 m2 children’s library 500 m2 multimedia 789 m2 entertainment/ relax 300 m2 workshops 432 m2 experimental classes 245 m2 event space 245 m2 shop/ leisure 850 m2 classes 145 m2 main lobby and public space 145 m2 shelfarea 1588 m2
learning area 6998 m2
administration 800 m2
Library was divided into several parts : northern part with the conventional functions of the library and southern part with additional functions such as kids library, multimedia center, shops, co-working and computer lab, all based on local community needs.
FLOOR PLANS
underground floor
areal view
ground floor
1st floor
2nd floor
3rd floor
4th floor
5th floor
6th floor
siteplan
Thames River
Potter’s Fields Park
SECTIONS WEST SECTION
NORTH SECTION
SOUTH ELEVATION
EAST ELEVATION
STRUCTURE PRINCIPLE
GSPublisherVersion 0.0.100.100
FACADE PRINCIPLE
GLASS
METAL PANELS
INSULATION
The main feature of this project is it’s steel parametric roof, which connects 2 library volumes (north conventional part and various functions in the south part). It covers public plaza, creating an interesting semi-interior space, which is accessible to the public 24/7, therefore not taking away, but re-thinking previous public function. Roof was designed with the Grasshopper software, based on tension areas and solar analysis.
STRUCTURE
ROOF STRUCTURE PRINCIPLE STRESS LINES
TENSION AREAS
ROOF DESIGN
BUDEJOVICKA school project (ÄŒVUT) 2,5 months; spring 2016 MIXED URBAN PROJECT BudejovickĂĄ is located in the Prague 4 district and plays very important role as a transportation hub - it accommodates metro station, tram and bus stops, which are connecting nearby housing estates with the city center. For this reason it is very important to create a pleasant public space and evoke a potential for various activities. Area lacks the clarity of space, permeability and possibility of movement for the residents of the surrounding neighborhoods, so the foundation of my concept was to create a functional and visual connection for the entire area.
02
POCKET PARK SQUARE
school green pass
Budejovicka Hospital
CONCEPT_4 PUBLIC SQUARES creating 4 squares, a green pass, and basic traffic directions
small square
green square
main square
pocket park
CIRCULATION
To support the green pass, 2 squares were designed in the center of the area: one of them is used for relaxation (contains urban park, cafe) and is oriented towards the green pass (east); second square has the character of a “pocket park” (west) where it is possible to accomodate sports activities and it is oriented towards the school. For the attractiveness and diversity of the site, 2 stone plazas were created perpendicularily to the green pass. North square is designed to support the urban character of the area and offers the possibility to hold cultural and public events. South Square is extended across the road into hospital Budějovická borders, uniting parts of the site.
07
03
05 02
01
04
06
05
TRANSPORTATION SYSTEM
06
07
DEFINITION OF PUBLIC / NON-PUBLIC SPACE
CREATION OF THE LINEAR PARK
Some parts of the public space are devalued by many parking lots, which significantly reduce the quality of the space, but also could be a potential area for development. Spaces between residential buildings are turned into a “green pass” which will function as a large garden, used not only by the residents, but also by the wider community. Additionaal parking spaces are achieved through new parking houses.
PRIVACY
MASSES
FUNCTIONS
private / semi-private / semi-public
demolished / new
administration / residential / commercial / amenities / other
01
LINEAR PARK
03
MAIN SQUARE
04 HOSPITAL SQUARE
SPORT HUB school project (ČVUT) 3,5 months; fall 2015 ARCHITECTURAL PROJECT Situated in Manhattan, New-York, this plot has a lot of potential. Unlike many other skyscrapers in the area the functional concept of the sportHUB is drastically different from all of them. The purpose was to create a meeting point for the many business people coming to the area - a place for stress relief, relax after a long day of work and teambuilding. Being the 21st century realization of the famous “Downtown Athletic Club“, sportHUB allows a spectrum of experiences in a single place.
skybar skypool hotel I level
hotel amenities hotel II level climbing wall hotel III level
hotel IV level
swimming pool squash
paintball skydiving
sport center technical floor skatepark shopping / lounge caffe lobby
FACADE DIAGRAM
LED FACADE
DIAGRID
GLASS
FLOOR SLABS
CORE
FLOOR PLANS & SECTION
skybar: 54th floor
pool: 52nd floor
hotel: 42nd floor
hotel: 26th floor
skatepark: 6th floor
lobby: ground floor
MODERN ORIGAMI bachelor project (ARCHIP) 3,5 months; spring 2014 ARCHITECTURAL PROJECT
Kampa Museum is located on the Vltava embankment close to the historical center of the city, having one of the best collections of modern art in Prague. The purpose of this project was to solve the existing circulation and provide a new variable exhibition spaces. Considering Kampa’s placement and spatial quality, it has a great potential to become a new cultural center; thus it’s important to renovate Kampa Museum turning it into a new landmark.
entrance from the park
inside new gallery
ground floor lobby, new part
interior circulation
exterior (public) circulation
programme volumes
views / orientation
orientation towards kampa park
passage to courtyard
orientation towards Vltava river
The problem of closeness and isolation was solved by removing stables on the west side, instead creating an arch between the existing part of the muzeum and the new extension, which will draw people to the museum’s territory. Ground floor of the extension is open from all 4 sides- main entrance on the sloped roof is emphasized by its alignment with the Renaissance gate. Sloped roof smoothly unites museum territory and the park around; its bridge part creates a raised platform for temporary/permanent exhibition which can be viewed from the public park.
south longitudinal section
west longitudinal section
east transverse section
south elevation
west elevation
east elevation
1- vegetation layer 150 mm - filter layer - drainage layer 45 mm - protective insulation - waterproof layer - thermal insulation 160 mm - root penetration protection 4 mm - asphalt underlayer - penetration coating - concrete slab 300 mm
2- concrete 100 mm - thermal insulation 180 mm - concrete bearing wall 200 mm - plaster 15 mm
3- concrete floor 60 mm - protection layer - sound insulation 30 mm - concrete slab 200 mm - plasterboard 15 mm
4- wooden floor 20 mm - concrete slab 60 mm - protective layer - thermal insulation 200 mm - concrete foundation 300-500 mm - polystyrene 40 mm - waterproofing - solid base 100 mm - gravel 150 mm
S 14
Second floor
15
13
11. Temporary exhibition, sculptures 12. Temporary exhibition, paintings 13. Permanent exhibition, paintings 14. Permanent exhibition, paintings 15. Terrace
11
12
10
First floor
9 7
7. Permanent exhibition, mixed 8. Storage space 9. Administration 10. Pemanent exhibition, paintings
8
5
Ground floor 6
4
1
3
2
1. Entrance hall 2. Storage space 3. Kitchen 4. Restaurant 5. Permanent exhibition, paintings 6. Temporary exhibition, sculptures
MOBIUS workshop - winning design followed by the group project (ARCHIP) 1,5 months; spring 2014 ARCHITECTURE PROJECT Base of this project is my original design, later followed by the collaborative work of Archip students and lead by the architect Marie Davidova. The goal of the project was to study the qualities of wood and how it changes with environment interventions. The group of students brought the project to life from the beginning to the end, performing the collaborative work. Nowadays, when sustainability and economy of resources and energy should be minimized, wood as one of the least energy consuming materials was the best entity to work with. Our pavilion was designed to be made of solid wood pieces to test the moisture effects on it. The shape is following the Mobius strip by an uninterrupted movement and can be used as a stage or gathering point. The pavilion was displayed during ReSite architectural festival in the summer 2014 and was placed at Charles Square, Prague.
unconnected construction details, produced by Grasshopper software and CNC machine
process of assembling the pavilion
finished pavilion
various events at the festival:
original
detail
trial model version
front view
left view
right view
back view
THANK YOU