PEIYAN JIANG
Selectev Work 2017-2020
ARCHITECT/ DESIGNER
5101 E Ocean Blvd. Long Beach, CA Project Type: Area: Year: Structure: Condition:
Commertial - Restaurant Remodel 4892 SF 2017 V-A Approved
RIPPLES
01 / COMMERCIAL-RESTAURANT
p. 3
EXISTING TO DEMO DIAGRAM
Scope of Work : Proposed remodel of existing 4,892 Sq. Ft. building including 4,340.7 sq. ft. nightclub and 551.27 sq. ft. liquor store, into a new 4,526.17 sq. ft. ‘Burgers and Beer’ restaurant venue with a full kitchen and maintaining the liquor store at a reduced size of 365.83 sq. ft. Reframe roof and second floor walls, relocate interior stairway. Add roof canopy over outdoor bar. No addional footage will be added and 50% of exterior walls will be maintained.
EXSITING BUILDING STREET VIEW
Job Responsibility: Lead Designer • Executive zoning research and developing design options • Prepare documentation for design development • Collaborate with Planning government agencies • Prepare presentation for the client meeting • Corporate with multiple consultants
p. 4
3525 E ANAHEIM AVE. LONG BEACH, CA Project Type: Area: Year: Structure: Condition:
CARWASH - Business 5042 SF 2018 II-B Under Construction
Scope of Work : Demo existing car wash and propose 2,357 SF new car wash tunnel, 2,685 SF office area and 21 new parking stall with vacuum area.
COASTLINE
02/ COMMERCIAL-CARWASH
p. 5
EXT. WALL HEAD BEAM DETAIL
STORE FRONT - HEAD BEAM DETAIL
PARAPET DETAIL
STOREFRONT CONNECT TO CANOPY DETAIL
1. MANAGER’S OFFICE 2. RESTROOM 3. OFFICE 4. DOG WASH 5. CARWASH TUNNEL 6. STORAGE 7. MECH. 8. WASH EQ. 9. VACUUM EQ. 10. ELECTRICAL 11. VACUUM PARKING 12. PAY STATION
12 12
Job Responsibility:
11
1.
Lead Designer • Executive zoning research and developing design options
10
9
9
8
7
6
2
• Prepare documentation for design development and construction drawing 5
• Collaborate with Planning and building safety government agencies • Prepare presentation for the client meeting • Corporate with structure engineer during construction administration
2
3
4
• Review and process construction administration documents under the supervision of project architect under the supervison of project architect
GRADE LEVEL FLOOR PLAN
p. 6
AZUL
03 / RESIDENTIAL-APT
14631 W. Erwin St, Van nuys, CA
Site Context
Project Type: Area: Year: Structure: Condition:
Residential - Affordable Housing 30,850 SF / 21 units 2018 I-A / V-A Under BS Review
Scope of Work : Demolition of one single family dwelling with detached garage and two buildings with a total of 3 residential units. New construction of 5 story multi-family dwelling with 21 units and ground level parking garage.
p. 7
3RD LEVEL FLOOR PLAN 11
TYP. UNIT FLOOR PLAN
10
9
1
8
7
A301
5
A202
3
1
1
85' - 11 1/2" 25' - 5" 301-BAL 3115
3212
2.1%
2.1%
AA 3
302-BED-3 W-2W-1
D09
G
42" H. FENCE 3
2' - 6"
AA
3211
AA
17' - 7"
302-BAL 3214
302-CLS-2
AA
3' - 6"
H
17' - 7"
D18
D18
D18
AA
EXT 2B
W-1W-2
D18
D09
EXT 2B
AA
301-CLS-2
H
3' - 6"
25' - 5"
3110
G
301-BED-3 3113
302-BED-2
EXT 2B
301-BED-2
3208
3109
D03 6
D03
D03
D04
301-RR-2 3111
D02
301-CHASE
3203 2' - 0" 4' - 0"
2' - 0"
D01 D01
D02
301-RR-1
3108
3
45 MIN D08
3304
90 MIN D13
2
303-RR
4
D02
AA
D01 20 MIN
EXT 2B
3309
D02
3302
3311
3 A334
3' - 8"
EXT 2B
4' - 0"
2
2' - 4"
5' - 1"
303-BAL 3312
6
303-KCH
EXT 3C
OPEN TO BELOW
12
2' - 0"
3303
1
F1
3301
2
1
A330
FEB
D05
EXT 2C
306-CHASE
305-CHASE
2
3606
3508
D03 D16305-LAU
6
3603
12
D02
306-RR-1
D03 INT 1
305-CLS-1
14' - 5"
10
9
8
A202
7
1 30"
3 3' - 6"
1 A404
5
4
2
12
2
1' - 6"
1' - 6"
0' - 6"
1 ø 5'
INT 2
1' - 6"
9
11' - 10"
48"
10 11
5
48"
- 0"
D07
503-BED-2 5308 F-1 C-1 W-A 133 SF
AA
INT 2
503-BED-1 5306 F-1 C-1 W-A 120 SF
1' - 0"
11' - 0"
D03
set of documents.
p. 8
10
5
INT 2
INT 2
6' - 0"
7
48" 503-KCH 5301 F-1 C-1 W-K
5' - 0"
12
48"
30"
48"
48"
30"
EXT 2B
30" 4' - 0"
6
6 A450
Sim
2' - 4"
14 EXT 2B
EQ
3 2
ENLARGED ADA BATHROOM
13' - 1"
EXT 2B
503-LIVING ROOM 5313 F-1 C-1 W-A
D05 ø 6' - 0"
EQ
• Executive zoning research and developing design options
• Collaborate with consultants and provide oversight of the full
9
8
3 A461
12
Job Responsibility:
• Collaborate with building safety government agencies
4
30"
EQ
AA
• Prepare documentation for construction drawing
E 503-RR-1 5304 F-1 C-2 W-B
23
503-CLS-1 5307 F-1 C-2 W-A
EQ INT 1
5' - 8"
5
EXT 2B
5
D03
17
2' - 5"
30"
INT 2
4
Lead Designer
503-LAU 5303 F-1 C-2 W-B
2 A462
4 8
Sim
4' - 0" 4' - 6"
INT 2
D03
ø 5' - 0"
D16
AA
0' - 6"
D03
D02
F
503-RR-2 5310 F-1 C-2 W-B
7 23
INT 2
E 12
2' - 6"
INT 2
10
5' - 0"
8 12
503-CLS-2 5309 F-1 C-1 W-A
AA
6
INT 5
INT 1
INT 1
4' - 8"
3' - 6" 6' - 0"
85' - 11 1/2" 2
11
F
EXT 2B
13' - 1"
3
A
5311
EXT 2B
2' - 0"
27' - 3"
W-4
8 503-CHASE
2' - 0"
10' - 9"
EXT 2B
12 1' - 0"
0' - 6"
3' - 4"
AA
B
2' - 6"
16' - 1"
3607
3611
1' - 9"
15' - 1"
3
306-BED-1
306-BAL
2' - 0"
3
3408
11
EXT 2B
D18
3507
4' - 0"
304-BAL
D18
305-BAL
3' - 1"
AA
D18
3' - 4"
EXT 2B
8' - 0"
AA
3504
D18
1.9%
3403
2' - 6"
304-BED
2.2%
EXT 2B
3' - 6"
A
3608
D06
D02
305-BED-1
D18
2' - 6"
D18
B
306-CLS-1EXT 2B
D03
3505
D02
4' - 0"
INT 1
2 AA A403
3609
4
5' - 8"
D06
D07
2' - 0"
3405
3404
9' - 0"
304-RR
304-CLS
3604
306-CHASE
1' - 9"
6
306-RR-2
4
D04
3502
INT 3B
D03
1' - 9"
3501
3602
3' - 4"
3402
AA
3605
306-LAU
6
2' - 0"
305-KCH
EXT 3C
306-BED-2
D03
3506
2' - 0"
7' - 0"
D16
3601
305-RR-1
3' - 11"
7' - 2"
304-LAU
2' - 5"
3' - 8"
12
3401
0' - 6"
304-KCH 12
3' - 0"
1
D06
306-KCH
3006
INT 3B
EXT 2B
1' - 10"
D15 90 MIN ELEV. LOBBY
STAIR
C
AA 306-CLS-2
5' - 2"
D01
D
6' - 8"
3507
W-5
3606
3005
41' - 3 1/2"
3004
W-5
D01
0' - 6"
3406
D01
305-CHASE
6' - 8"
5' - 0"
INT 3B
CLASS I STAND PIPE
D25
300-HALL
4' - 6"
D20 3 A332
D01
304-CHASE
5' - 0"
45 MIN
6' - 5"
5' - 0"
90MIN
4' - 5"
3
INT 3B
3001
4' - 10"
2.1%
EXT 3C
A301
A201
W-5W-6
300-ELEV
2
E
3002
3007
303-CHASE
3308
303-CLS-2
D09
F
300-TRASH CHUTE STAIR
D04
303-LAU
28' - 7 1/2"
3307
303-BED-2
AA
3
D03
3107
301-CHASE
4' - 0"
303-BED-1
2
4
12
W-5W-6
303-RR-1
4
2' - 0"
35' - 6 1/2"
AA
3207
3306
D07 303-CLS-1 D03 3308
3' - 4"
AA
3101
302-CHASE
303-CHASEW-5W-6
AA
E
3201
2' - 0"
3206
3' - 4"
12
302-RR-1
AA
AA
3106
301-KCH 4' - 0"
4
4' - 0"
D03
3' - 3"
EXT 2B
302-KCH
3105
D04 301-CLS-1
3' - 3"
3204
F
3103
301-BED-1
3102
3' - 5"
302-CLS-1
301-RR
5' - 1"
D07
3205
2' - 0"
6' - 11"
2' - 0"
3202
302-BED-1
4' - 0"
2' - 4"
AA
114' - 6"
3' - 6"
D03 4
3104
6
114' - 6"
D04
302-RR
A201
D03 301-LAU
3216
D02
D03
INT 1
302-LAU
4 D03
36' - 5 1/2"
3209
302-CHASE-1
AA
3114
D03
3' - 6"
302-RR-2
30' - 8"
301-CLS-3D09
3213
30' - 8"
D09 302-CLS-3
AA
503-BAL 5312 F-2 C-1
ENLARGED UNIT PLAN
2' - 4" EXT 2B
D01
D 11
D 8
Scope of Work : Demolition of one story single family with detached garage. New construction of four story multi-family dwelling with 10 units and ground level garage.
1541 S. HAYWORTH AVE. LOS ANGELES. CA
Project Type: Area: Year: Structure: Condition:
ZABBA
04/ RESIDENTIAL - APT
p. 9
Residential - Affordable Housing 12,454 SF / 10 units 2020 I-A / V-A Under BS Review
TYP. UNIT PLAN
EAST ELEVATION
Job Responsibility: Lead Designer • Executive zoning research and developing design options • Prepare documentation for design development and construction drawing • Collaborate with planning and building safety government agencies TPY. FLOOR PLAN
p. 10
• Collaborate with consultants and provide oversight of the full
set of documents.
CELEST
HH NITRO
05 / RESIDENTIAL-APT
07 / RESIDENTIAL-APT
14728 w. Friar St, Van nuys, CA
Project Type: Area: Year: Structure: Condition:
Residential - Affordable Housing 14,728 SF / 12 units 2019 I-A / V-A Under BS Review
Job Responsibility:
14307 Friar St, Van nuys, CA Project Type: Area: Year: Structure: Condition:
Residential - Affordable Housing 39,429 SF / 30 units 2018 I-A / III-A Under Construction
Lead Designer
14631 w. Friar St, Van nuys, CA
• Prepare documentation for construction drawing • Collaborate with building safety government agencies
Project Type: Area: Year: Structure: Condition:
• Collaborate with consultants and provide oversight of the
full set of documents.
Job Responsibility:
Residential - Affordable Housing 14,797 SF / 11 units 2019 I-A / III-A Under BS Review
Job Responsibility:
Lead Designer
A SHH TR E LProject LA Nitro
Lead Designer • Prepare documentation for construction drawing • Collaborate with building safety government agencies
06
• Collaborate with consultants and providePROPOSED oversight of the STREET VIEW
• Prepare documentation for construction drawing SCOPE DOCUMENT THIS PRELIMINARY DRAWING INDICATES THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT. THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS AND THE TYPE OF STRUCTURAL, MECHANICAL, ELECTRICAL SYSTEMS. AS SCOPE DOCUMENTS THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORM AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. ON THE TERMS OF THE GENERAL SCOPE INDICATED OR DESCRIBED THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION ALL COMPLETION OF THE WORK. DECISIONS OF THE DESIGNER AS THE TERMS OF THE WORK INCLUDED WITHIN THE SCOPE OF THE DOCUMENTS SHALL BE FINAL AND BINDING ON THE CONTRACTOR AND THE OWNER.
• Collaborate with building safety government agencies
/RESIDENTIAL-APT 14631 W Friar Street Van Nuys, CA 91411
full set of documents.
• Review and process construction administration docu-
ments under the supervision of project architect
• Collaborate with consultants and provide oversight of the ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORGINAL AND UNPUBLISHED WORK OF THE DESIGNER AND THE SAME MAY NOT BE DUPLICATED USED OR DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE DESIGNER.
SHEET INDEX A0 A1.0 A2.0 A2.1 A3.0 A3.1 A4.0 A4.1 A4.2 A4.3
Cover Sheet Site Plan Floor Plans Roof Plan Elevations Elevations Sections Sections Sections Sections
full set of documents.
ABBREVIATIONS TYP NTS MIN MAX HR NW / SW BLDG ELEV O.C. DIA DWG CLEAR MECH WH WMR CU FT SF AC W/D GM EM WM FAU SD/CM
-
Typical Not to Scale Minimum Maximum Hour Northwest / Southwest Building Building Elevation On Center Diameter Drawing Clearance Mechanical Room Water Heater Water Main Riser Cubic Feet Square Feet Air Conditioning Unit Washing Machine / Dryer Gas Meter Electrical Meter Water Meter Forced Air Unit Combination Smoke Detector / Carbon Monoxide Alarm
PROJECT INFORMATION SCOPE OF WORK: Demolition of 1 story single family dwelling & detached garage. New construction of 5 story multi-family dwelling with 11 units & ground level parking garage. This project includes 8 market rate units, 2 Very Low Income units and 1 Extremely Low Income unit. This project is requesting a 35% density bonus through 3 density bonus units, 3 on-menu incentives (height, side yards & open space) (per LAMC Sec. 12.22.A.31) and a Tier 3 TOC parking reduction. SITE ADDRESS: 14631 W Friar Street, Van Nuys, CA 91411 PLANNING COMMISSION: South Valley APN: 2241-007-014
VICINITY MAP
p. 11
CIVIL ENGINEER
SURVEYOR
OWNER
Pacific Land Consultants, Inc.
HHNITRO, Inc.
28441 Highridge Rd. Suite 230 Rolling Hills Estates, CA 90274
2324 Michigan Avenue Santa Monica, California 90404
LEGAL DESCRIPTION: Lot 18, Block 52, Tract No. 1200, in the City of Los Angeles, County of Los Angeles, State of California, as per map recorded in Book 19, Page 35 of Maps, in the office of the County Recorder of Sid County. ZONING: [Q] R3-1-CDO CONST. TYPE: V-A (3 over Podium) OCCUPANCY GROUPS: R-2/ S-2 (Residential/Low Hazard)
DCP Set Thursday, August 1, 2019
CHINQUAPIN
08 / RESIDENTIAL- COMDO
330 CHINQUAPIN AVE, CARLSBAD, CA Project Type: Area: Year: Structure: Condition:
p. 12
Residential 11,264 SF / 7 Condos 2018 V-B Planning Approved
SITE PLAN
Job Responsibility: Lead Designer
• Executive zoning research and developing design options • Prepare documentation for design development • Collaborate with Planning government agencies • Prepare presentation for the client meeting • Corporate with multiple consultants
Scope of Work : Demo existing one story single family dwelling and garage. New construction of there two story multi-family dwelling with total of 7 condos.
p. 13
AL WATHBA WETLAND, ABU DHABI,UAE Project Type: Area: Year: Condition:
Competition 9,612 SF/ VISITOR CENTER 2020 Conceptural
The site is located at the popular tourist spot Al wathba wetland attracting thousands of people who come to visit the spot observing flamingo. Creating a pleasant and joyful space for people to stay as well as present local culture is the main mission for architects. Also, considering the extreme weather in UAE, the efficiency of energy use and sustainability design is worth considering.
ABU DHABI VISITOR CENTER 09 / COMPETITION
p. 14
1. Using wide spread footing as the foundation could reduce the site disturb as well as provide enough support on the sandy soil type on this lot.
4. Palm wood as main structure material for roof.
2. All the exterior wall will employ prefabricated concrete block as mainly structure.
5. High reflection glass material wrapping around whole building.
3. Planting area are dedigned to locate at roof draing spot to clollecting rain water.
6. Additional future shading for parking as well as consistant with main building design.
MASTER PLAN
p. 15
MAIN ENTRANCE PERSPECTIVE
p. 16
1. Put the main body of building to the south while pushing the parking to the north to corporate the existing context and maintain the best view to observe flamingo.
p. 17
2. Solid space at the west and open space at the east. Turn the building slightly to the east to provide better view, and make the shading strategy more efficient.
3. The relatively bigger space which is the learning space will be put at the north and have a higher ceiling. A visual tunnel is created to help introducing view to the visitors get into the space.
4. A higher roof above the courtyard to offer extra shading to the space. High ceiling help ventilating the hot air and take advantage of air convention from the north and the south.
1458 W.14TH ST,LONG BEACH, CA Project Type: Area: Year: Structure: Condition:
Marijuana Cultivation Facility/ F-1 9,063 SF / 2-Story 2018 V-B Feasibility Study
Job Responsibility: Lead Designer
• Executive zoning research and developing design options • Prepare documentation for Schemetic Design
MMJ CULTIVATION 10 / MISC PROJECT
p. 18
5601 ORANGE 11 / MISC PROJECT
5601 ORANGE AVE,LONG BEACH, CA Project Type: Area: Year: Structure: Condition:
RESIDENTIAL 43,925 SF / 29 CONDOS 2021 V-B Feasibility Study
Job Responsibility: Lead Designer
• Executive zoning research and developing design options • Prepare documentation for Schemetic Design
p. 19