Project Management in Primavera P6 V 6.2 What you will learn:
costs. Professional Development Units: Earns 36 PDUs
Audience: • End Users • Project Manager • Business Analysts
• Format schedule data
Suggested Prerequisites: • Knowledge of project management principles
• Define roles and resources
• Assign roles
•Assign resources and costs
Are you new to Project planning ? SHORT DESCRIPTION OF COURSE This course is aimed at project management professionalswho are interested in learning how to plan a project. The
COURSE AIM The aim of this course is to demonstrate: • What a project plan is • Why projects should be planned • Some generic methods of planning projects • Why plans are used to control a project
COURSE DELIVERY The course is presented in 6 lecture hrs (one day) workshop at the end of each module where the planning documents.
Modules include : • Finalising the Plan, Baselines, Monitoring and Control
Certification :
2. 3.
• Scope Changes, Hints and Tips.
UNITED ARAB EMIRATES MINISTRY OF EDUCATION
course contents This course content is appropriate for students looking for V 6, V 6.2 and V 7.
Session 01 : Introduction to Primavera • • Primavera P6 • Enterprise and project-Specific Data Project-Specific Data Enterprise/project-Specific
Session 02 : Navigating in Primavera • Logging In • Home Window • Access Modes • Layouts
• Customizing a Layout Using Hint Help in Columns Dialog Box • • • • Saving Layouts • • Closing a Project
Session 03 : Building Project • Hierarchical Structures in Primavera • Viewing the OBS Users Tab Responsibility Tab • The Enterprise Project Structure (EPS) • Opening the EPS • Benefits of the EPS
• Work Breakdown Structure • View a Project’s WBS • • Create a New Project Wizard Entering Project Name Entering Project Start and End Dates Entering Responsible Manager Running Project Architect • Projects Window General Tab Dates Tab Notebook Tab Codes Tab Defaults Tab
•
Session 04 : Activities • •
•
Task Dependent Resource Dependent Level of Effort WBS Summary
Codes Tab WPs and Docs Tab
Session 05 : Dates in Primavera • Date Fields in Primavera Similar to P3 Viewing Remaining Dates in Primavera
Session 06 : Formatting Schedule Data • Customizing a Layout • Timescale Changing the Timescale Density Modify the Timescale Format Modify the Date Format • Grouping Data Group and Sort Dialog Box Grouping by Date Collapsing/Expanding Grouped Date
• • Filters Dialog Box Applying a Default Filter • • • Bar labels Tab
Session 07 : Resources • Defining Resources • Resource Details Units & Prices Tab • Assigning Resources and Costs • Analyzing Resources
Session 08 : Assigning Resources and Costs • Steps for Resource Management • Assigning by Role • Assigning Resources
Assigning a Material Resource • Planning Costs Expense Summary Tab
Session 09 : Analyzing Resources • • Resource Usage Profile • Displaying the Resource Usage Profile Viewing All Projects or Open Projects Only • Stacked Resource Histogram
Session 10 : Duration Types •
• • Adding a Resource
Session 11 : Calculating Percent Complete • Percent Complete Types • Assigning a Percent Complete Type • • • • Weighted Steps
Session 12 : Baselining the Project Plan • Baseline • Categorizing the Baseline Assigning a Baseline • Viewing Baseline Bars Displaying Baseline Bars Saving the Layout Bar Labels Tab
Session 13 : Updating a Project • • The Data Date • • Defining a Statusing Period Progress Spotlight Dragging the Data Date • Entering Actuals • Statusing
• Statusing a Mid-project Milestone • • • • Rescheduling the Project Viewing the Results of Rescheduling Project
Session 14 : Earned Value Analysis • • Customising columns for Earned Value Analysis •
Session 15 : Printing Layouts • Margins Tab Footer Tab Print Setup •
Session 16 : Reporting Performance • • Reports Window • Report Wizard Create or Modify Report Adding a Filter to the Report Run Report Dialog Box Print Preview Print Reports • Saving a Report Assigning a Report to a Report Group • Report Batch Run a Report Batch
Session 17 : Tips and Tricks • Using Undo • Fill Down • User-Defined Fields Overview • Displaying User-Defined Field, Assigning Values • Global Change
Session18 : Thresholds • Defining Project Thresholds • • Monitoring Issues Detail to WBS • Overview to Project Related Assessment
about zabeel institute
THE zabeel ADVANTAGE • • • • • •
Vats Resource of materials for reference and course.
•
Free online Support & further Assistance
•
other courses offered Sig Sigma Green Belt PMP
PSP : Planning & Scheduling Professional Oil & Gas Management etc.