Zach Weston Sample Work Potfolio - May 2020

Page 1

ZACH WESTON PREVIOUS WORK EXPERIENCE z a c h a r y w 2 0 0 2 @ y a h o o. c o m

STUDENT WORK 858-666-5690


ZACH WESTON

WORK EXPERIENCE Aug 2019 - Dec 2019

California Polytechnic University Dept. of Architecture Pomona, CA

2nd Year Design Studio Teacher’s Aid, helping students with model making, red-lining, and computer help within the semester studio project.

INFO

Jun 2019 - Aug 2019 Jun 2018 - Aug 2018

3114 Briand Ave San Diego, CA Jun 2017 - Jan 2018

858-666-5690

Jan 2016 - Sep 2016

linkedin.com/in/zachweston/ Oct 2014 - Apr 2015

ACCOMPLISHMENTS Architectural Honor Society Member since 2017

2018 Lumen West Lighting Competition 1 Place st

2017 Blueprint for Functional Sutainability Design Competition 3rd Place

San Diego, CA

Rodriguez Park Architecture & Design San Diego, CA

Drafted elevations, sections and details of various projects ranging from healthcare facilities to educational buildings using AutoCAD

LinkedIn

TAU SIGMA DELTA

Self Employed Drafter / Designer Designed conceptual plans and 3D model for a second occupancy granny flat addition to two San Diego homes.

Email zacharyw2002@yahoo.com zaweston@cpp.edu

Pasadena, CA

Summer Internship working closely with the development / construction team doing quatity take-offs for estimating and schematic design for potential housing / mixed use projects. Also working to develop several projects through multiple stages of the design/construction phase. Working primarily with Revit, Sketchup and Bluebeam

Address

Phone

ADEPT Urban

Rob Fender Architecture San Diego, CA

Worked with a small group to do a tenant remodel of churches in Encinitas and Temecula for the Julian Charter School using Revit

HIGHLIGHTS

EDUCATION Aug 2016 - May 2020

California Polytechnic University, Pomona

Aug 2018 - May 2019

DIS Copenhagen, Denmark

Bachelors of Architecture

Year long Study Abroad

San Diego Air and Space Museum Aviation Restoration Volunteer Since June 2009

Aug 2013 - May 2016

San Diego Mesa Community College Associates of Science : Architecture

Advanced knowledge of: Sketchup AutoCAD Revit Rhino Adobe CC Bluebeam Strong Leadership in groups Advanced Model Building Drafting / Freehand Drawing Lumion / Rendering Ability to learn new tasks quickly


SCHOOL WORK 722 MATEO California Polytechnic University Pomona Instructor: Sarah Lorenzen Fall 19 - Spring 20

NØRREBRO CO-HOUSING DIS Copenhagen, DK Instructor: Maja Popovic Spring 19

WEST HOLLYWOOD HOUSING California Polytechnic University Pomona Instructor: Kip Dickson Fall 17 - Spring 18

WORK EXPERIENCE OFFICE EXPANSION Adept Urban Design Internship Summer 18

PENTHOUSE INTERIORS Adept Urban Design Internship Summer 18

CONTENTS


POMONA, CA

CAL POLY POMONA

722 MATEO - SENIOR PROJ

Since the early 1960s, the Los Angeles Arts District has been a haven for artists. Today, as the District evolves and more people move to the area, the definition of an ‘artist’ has broadened. While some of these new residents have mainstream jobs, others are craftsmen, designers, or people that do creative things part-time. These people have moved to the area looking for a community of likeminded individuals. Being around other creative people is motivating and productive. Living or working among those who share your interests can benefit the group as a whole. Makerspaces are public workshops where creative people can share tools and knowledge. It is a resource for amateurs and professionals alike. The mixed-use creative housing development at 722 Mateo St, combines a public makerspace on the ground floors with a mix of several different residential unit types above. The project uses large open public makerspaces spaces and semi-private work areas to foster collaboration and learning among the maker community. By creating an environment that nourishes the creative spirit and promotes a sense of community, those that want to get involved in the creative arts and those who already are involved, can come together and learn from one another. By opening space to the public, the project also allows anyone who is interested in the field, or needs access to certain tools such as heavy machinery that they don’t normally have access to, a place to work and design freely.



Arts District Map Scale : 1”=1000’-0”

Makerspaces are public workshops where creative people can share tools and knowledge making it is a resource for amateurs and professionals alike. The Downtown LA area has a number of private art spaces for various artists, but few spaces that can be accessed by the general public. In my personal life, I’ve developed a passion for woodworking and furniture making, but it’s really difficult to find places that offer the ability to use heavier machinery that I don’t normally have access to. I felt it was important to offer people the chance to learn a new set of skills while promoting creativity within the District. The Project is located on the corner of Mateo and 7th Place, a few blocks away from the 6th Street Viaduct and north of the 10 Freeway. It is open on three sides with a back alley to the north Axonometric in Context

Legend Private Art Studios Public Fabrication Space Project Location

North


T ET VIADUC 6TH STRE

LO S ANGE LES RIVER

7TH STREET S S A N TA F E AV E

M AT E O S T R E E T

77 T TH H P P LL A C E

Vicinity Map Scale: 1”=200’


Massing

Tradidtional 5 over 2 Developer Model

Comparing this typology to that of a standard 5 over 2 developer model. The building accepts some of the 5 over 2 ideals, but injects new life into the building to improve the overall quallity of the space, be it from blending the public program, the unique formation of balcony space due to the rotation, and the creation of larger community space though the circulation core. I felt that given the unique and individualistic ideals of the client, this shift offered more variation and a chance for growth within thier home.

5 over 2 with Rotated Housing


Program Barriers

Balconies

Circulation CirculationCore Core

HHOO UU HHOO SSIINNGG UU HHOO SSIINNGG UUSS HHOO IINNGG UU HHOO SSIINNGG UU PRI SSIINNGG

VAT EA MM PU ENIT BLI IES C/ RET AIL Segmented Program Divide

Repetative / Segragated

Neighbors Neighbors

Eccentric / Joined

Community Community

HHOO UU HHOO SSIINNGG UUSS IINNGG HHOO PU HHOOUUUUSSININGG BL SSIN IN

IC

BL

PU

IC W GG OR CCOOMMMM UNIT KS Y

E AC SP

ER AK M E LIV

ITS UN RK O /W

Community Program Blending


Perspective Section A.A Scale: 1/16”=1’-0”


Legend Legend 1.1.Drop DropCeiling Ceiling 2.2.Structural StructuralThermal ThermalBreak Break 3.3.Fixed Fixed Window Window 4.4.Exterior ExteriorInsulated InsulatedFinishing FinishingSurface Surface 5.5.Fiber FiberCement CementPanel Panel- Verical - VericalSlat Slat 6.6. Ventilated VentilatedRainscreen Rainscreen 7. 7.Inset InsetAchor AchorMount Mount 8.8.Double DoubleStud StudPlumb PlumbWall Wall 9.9. Composite CompositeConcrete ConcreteFlooring Flooring 10.10.Fiber FiberCement CementPanel Panel- Vertical - VerticalPanel Panel

10 10 99

7

8

6

5

44

22

11 33


North

Floor Plans and Vignettes

Ground Floor Plan in Context

Second Floor Plan

Third Floor Plan

Scale: 1/16”=1’-0”

Scale: 1/16”=1’-0”

Scale: 1/16”=1’-0”


Fourth Floor Plan

Fifth Floor Plan

Sixth Floor Plan

Scale: 1/16”=1’-0”

Scale: 1/16”=1’-0”

Scale: 1/16”=1’-0”


Typical Unit Plans



KØBENHAVN, DK

DIS COPENHAGEN

N ØRRE B RO CO- HOUS IN G

1. MASS EXTRUSION

2. PROGRAM DIVISION

3. HOUSE TYPOLOGY

The Nørrebro Commons Community Housing complex attempts to create a space that is both open to the surrounding community, and curated to the needs of the chosen group of individuals that live within the complex. After taking the full capable building envelope, and designating the ground floor as public/ semi private, the space is able to meet the needs of the community with a library cafe space, and a kitchen that can be closed off for the living residents, or rented out to the cafe. The ground floor also houses a shared living space as well as dining and laundry facilities for the residents to create social interaction.

4. ROTATE FOR VIEWS

5. COMMUNITY SPACE

Taking into consideration the surrounding buildings and views, the top residential floors are rotated slightly to align to the views of the nearby lake. this creates a shifted grid within the plan and allows for various articulations within the wall orientation to give each resident a truly unique living experience. By turning each unit into a lofted apartment, the second floor can accommodate the secondary needs of each resident as well as opening them up to a fully connected private courtyard open only to the residents so they can experience the views of the city together and create social bonds with their neighbors.



ZACH WE

WEST HOL 1041 N Spa West Hollyw CLIENT

No.

POMONA, CA

CAL POLY POMONA

WEHO HOUSING DESIGN

PROJECT

TITLE

3 Job # Date Size Drawn by Revision #

Scale


24" SWEET GUM

DIRT

5'-10"

9

8

10

11

PROJECT CONSULTANTS

130'

39' 15'

7

NEIGHBOR'S BLDG.

DIRT

15'-2"

8'-10"

3 A3.1

13'-4"

13'-4"

12'

12'-0"

13'-4"

15'

12'

N89째23'56"W 130.06'

A B

9'-4"

DIRT

9'-4"

B

6

5

4

5'-0"

CONC.

A

3

2

5'-10"

1

C

A.C.

C

CONC.

12" MAGNOLIA

21'-6"

21'-6"

DIRT

ZACH WESTON

102 1 BED

202 TH

101 1 BED

201 TH

15'-2"

15'-2"

203 TH

F

204 TH

104 1 BED

205 TH

105 1 BED

206 TH

CONC.

106 1 BED

F

DIRT

G

G

27'-6"

21'-3"

21'-3"

15'-0"

34'-8"

E

NEIGHBOR'S BLDG.

H

H

15'

1

15'-2"

2

8'-10" 10" LOQUAT

3

13'-4" 14" TREE

4

130.07'

13'-4" N89째23'56"W

12'

24" FICUS

5

5'-10"

5'-0"

J

1 A3.1

5'-10"

I

13'-2"

13'-2"

DIRT

6

12'-0"

7

13'-4"

8

ITALIAN CYPRESS

12'

9

HEDGE

10

15'

DRIVEWAY ENTRY

I

WEST HOLLYWOOD MULTI-FAMILY HOUSING 1041 N Spaulding Ave West Hollywood, CA 90046 CLIENT

No.

LEGEND:

A.C. BW CONC. D/W E FF FL N S TC TG TW W

Description

Date

ASPHALT CONCRETE BACK OF WALK CONCRETE DRIVEWAY EAST FINISHED FLOOR FLOWLINE NORTH SOUTH TOP OF CURB TOP OF GRATE TOP OF WALL WEST SELECTED STACK BUILDING LINE CENTERLINE

A.C.

EDGE OF PAVEMENT ELECTRIC METER GAS METER LIGHT POLE POWER POLE PROPERTY LINE SEWER MANHOLE

J

11

TITLE

STREET LIGHT BOX

SITE PLAN

TREE (NOT A DRIP LINE)

NEIGHBOR'S BLDG. DIRT

WALL

Job #

NEIGHBOR'S BLDG.

01

Date

31 May 2018

Size

24 x 36

Drawn by

ZACH WESTON

Revi sion #

00

N

0 1 2

4

8

SITE PLAN SCALE: 1/8" = 1'-0"

A 1.1

16FT

1

Scale

5/31/2018 2:34:44 PM

103 1 BED

100'

100.03'

ELEV.

N0째17'10"W

100.03'

E

D

N SPAULDING AVE

N0째17'10"W

D


24" SWEET GUM

PROJECT CONSULTANTS

DIRT

NEIGHBOR'S BLDG.

DIRT

CONC.

N89째23'56"W 130.06'

5'-0"

6' FENCE WALL ALONG PROPERTY LINE

GRASS

34'-3"

PRIVATE DECK 200 SQFT

PRIVATE DECK 200 SQFT

A.C.

PRIVATE DECK 295 SQFT

CONC.

12" MAGNOLIA GRASS

9

8

7

1047 N SPAULDING

10

6

11

5 4

ZACH WESTON

5

3

1

2

UP

DN

1

6 3/8" x

3

11" x 17

4

2

WEST HOLLYWOOD MULTI-FAMILY HOUSING 1041 N Spaulding Ave West Hollywood, CA 90046

100.03'

N0째17'10"W

CIRCULAT

CLIENT

2' TALL PLANTER BOX

2' TALL PLANTER BOX

100.03'

ION BRIDG

PROPOSED SETBACK

N0째17'10"W

4'-0"

E CENTRA

L AXIS 8

2' TALL PLANTER BOX

2' TALL PLANTER BOX

DEGREE

CONC.

SHIFT

LEGEND: GRASS

27'-6"

DN

x 17

UP

15'-0"

6 3/8" x 11"

1 2

1

3

2

4

3

5

A.C. BW CONC. D/W E FF FL N S TC TG TW W

6

10

No.

Description

Date

PLANTER BOX LANDSCAPE/ VEGETATION HARDSCAPE/ CONCRETE

4 5

11

1041 N SPAULDING

ASPHALT CONCRETE BACK OF WALK CONCRETE DRIVEWAY EAST FINISHED FLOOR FLOWLINE NORTH SOUTH TOP OF CURB TOP OF GRATE TOP OF WALL WEST

7 8

BUILDING LINE CENTERLINE

NEIGHBOR'S BLDG. 9

EDGE OF PAVEMENT ELECTRIC METER

GRASS

DRIVEWAY ENTRY

PRIVATE DECK 200 SQFT

STREET LIGHT BOX TREE (NOT A DRIP LINE)

GRASS

10" LOQUAT

14" TREE

24" FICUS

5'-0"

A.C.

WALL CONCRETE

130.07'

LANDSCAPE

N89째23'56"W

TITLE

GROUND CONTEXT PLAN

UNIT NUMBER AND TYPE

HEDGE ITALIAN CYPRESS

Job # NEIGHBOR'S BLDG. DIRT

31 May 2018

Size

24 x 36

Drawn by

NEIGHBOR'S BLDG.

2

4

8

ZACH WESTON

Revision #

N

0

01

Date

A 1.3

16FT

GROUND CONTEXT PLAN SCALE: 1/8" = 1'-0"

00

1

Scale

5/31/2018 2:34:55 PM

PRIVATE DECK 200 SQFT

GAS METER LIGHT POLE POWER POLE PROPERTY LINE SEWER MANHOLE


KEY NOTES

PROJECT CONSULTANTS

3

2 P2

P1

4

P3

39'

PA

8'-10"

12'

7 13'-4"

P4

9

8

12'-0"

10

P5

13'-4"

12'

P6 11 15'

PA

4 A4.1

3 A3.1

A B

9'-4"

60.0000

9'-4"

B

13'-4"

15'-2"

5'-10"

A

15'

6

5

5'-10"

1

C

C

21'-6"

21'-6"

9

8 7

10

6

11

5 4

5

3

4

2

PB

UP

DN

1

x 17

3

1

6 3/8" x 11"

2

PB

ZACH WESTON

D

D

E

E

WEST HOLLYWOOD MULTI-FAMILY HOUSING 1041 N Spaulding Ave West Hollywood, CA 90046

15'-2"

15'-2"

CLIENT

180.0000

F

F

G

G

180.0000

PC

2

21'-3"

1

6 3/8" x 11"

21'-3"

DN

x 17

UP

PC

1

3

2

4

3

5

4

No.

Description

Date

5 11

6

10

7

8

9

H

60.0000

15'

1

P1

15'-2"

2 P2

8'-10"

3

13'-4"

4

P3

13'-4"

12'

5

6

12'-0"

7

P4

13'-4"

8

15'

12'

9

P5

10

P6 11

I J PD

TITLE

FLOOR PLAN 1 Job #

31 May 2018

Size

24 x 36

Drawn by

2

4

8

ZACH WESTON

Revi sion #

N

0

01

Date

A 1.4

16FT

FIRST FLOOR/ GROUND PLAN SCALE: 1/8" = 1'-0"

00

4

Scale

5/31/2018 2:35:00 PM

6 A5.2

5'-10"

J PD

1 A3.1

5'-10"

I

13'-2"

13'-2"

H


1'

1'

3 A5.1

3

3

3

2'-6"

2'-6"

3

7'-1"

7'-1"

2'-6"

4

2'-6"

4

PROJECT CONSULTANTS

3

3

1

3'

3

3'

3

1

4'

6"

3'

1'-9"

2'-0"

1 2'-6"

1'-4"

2'-3"

2'-0"

4'

3

3

1 2'

3'

2'-6"

KITCHEN ELEVATION A SCALE: 1/2" = 1'-0"

12

1'-10"

7'-4"

9'-10"

KITCHEN ELEVATION B SCALE: 1/2" = 1'-0"

9

KITCHEN ELEVATION C SCALE: 1/2" = 1'-0"

6

KITCHEN ELEVATION D SCALE: 1/2" = 1'-0"

3

2'-6"

ZACH WESTON

1

VERTICAL - GRAIN MAHOGANY CABINETRY

5

12" X 18" CERAMIC TILE

3'

3'

CLIENT

C

3

B

3

2

1"

2 1'

STONE SLATE BACKSPLASH

A

2'

D 4

5

7'-4"

3

7'-2"

9" X 9" CERAMIC TILE FLOORING

1'-2"

2

WEST HOLLYWOOD MULTI-FAMILY HOUSING 1041 N Spaulding Ave West Hollywood, CA 90046

5

5

TONGUE AND GROOVE HARDWOOD FLOORING

8'-5"

1

5'-81 4"

MATERIAL CALLOUT LEGEND

6"

3'-0"

1'-6"

1'-6"

1'-6"

2'-6"

3"

No.

5

BATHROOM ELEVATION A SCALE: 1/2" = 1'-0"

BATHROOM ELEVATION B SCALE: 1/2" = 1'-0"

5'-9"

5

9

6

8

8'-5"

TITLE

5 3

INTERIOR ELEVATION 1 Job #

2

2'

2

31 May 2018

Size

24 x 36

Drawn by 1'-6"

1'-7"

00

A 4.5

7

ENLARGED KITCHEN FLOOR PLAN SCALE: 1/2" = 1'-0"

ZACH WESTON

Revi sion #

5'-9"

8'-10"

01

Date

7

BATHROOM ELEVATION C SCALE: 1/2" = 1'-0"

4

BATHROOM ELEVATION D SCALE: 1/2" = 1'-0"

1

Scale

5/31/2018 2:36:10 PM

10

9"

4

5

5'-9"

11

9"

12

3

3'

13

2

1'-2"

2

14

1

2'

C

B

Date

8'-218"

1'

A

7 1/2" x 11" x 14

UP

D

1'-3"

Description

2


METAL COPING 2 X 12 TOP PLATE

3

4"

DOUBLE PANE LOW - E WINDOW

WATER DRAIN 2 X 12 FLOOR JOISTS @ 16" O.C.

Z CLIP FRY REGLET "T" MOLDING ROOFING MEMBRANE TUCKED UNDER METAL COPING

METAL FIXED WINDOW BACKER ROD AND SEALANT WOOD SHIM WINDOW SILL

5

8" GYPSUM BOARD 2 X 12 DOUBLE TOP PLATE 3 4" PLYWOOD SHEATHING WEATHERPROOFING MEMBRANE

PLYWOOD DIAPHRAGM

ACROCRETE LAMINA ACROCRETE INSULATION BOARD

5

ACROCRETE LAMINA WINDOW HEADER

WATERPROOFING MEMBRANE

PROJECT CONSULTANTS

GYPSUM BOARD

ACROCRETE LAMINA

WOOD SHIM FRY REGLET REVEAL MOULDING BACKER ROD AND SEALANT

ACROCRETE MOISTURE BARRIER 3 4" PLYWOOD DIAPHRAGM 2 X 6 SILL PLATE

METAL FIXED WINDOW

EXTERIOR

8"

BATT INSULATION

DOUBLE PANE LOW - E WINDOW 3 4" TONGUE AND GROOVE HARDWOOD FLOOR 3

4" INSULATED SUBFLOOR W/ WOOD ADHESIVE

3

4"

PLYWOOD DIAPHRAGM

CANT STRIP 2 X 12 SILL PLATE

PARAPET SCALE: 3" = 1' - 0"

9

TYPICAL WINDOW JAMB (RECESSED) SCALE: 3" = 1' - 0"

6

TYPICAL WINDOW SILL (FLUSH) SCALE: 3" = 1' - 0"

3

ACROCRETE LAMINA ACROCRETE INSULATION BOARD WATERPROOF MEMBRANE 4" PLYWOOD SHEAR PANEL

DOUBLE PANE LOW - E WINDOW

3

METAL FIXED WINDOW

FLOOR HOLDOWN 3

ZACH WESTON

BACKER ROD AND SEALANT

4"

PLYWOOD SHEAR PANEL CANT STRIP 2 X 8 SILL PLATE 2 X 6 RIM JOIST

FRY REGLET "F REVEAL' WOOD SHIM WINDOW SILL

2X8 BLOCKING 2 X 12 FLOOR JOISTS @ 16" O.C.

5

5

8"

BATT INSULATION

2 X 12 RIM JOIST

ACROCRETE LAMINA

2 X 8 BLOCKING

WEST HOLLYWOOD MULTI-FAMILY HOUSING 1041 N Spaulding Ave West Hollywood, CA 90046

8" GYPSUM BOARD 2 X 6 DOUBLE TOP PLATE 3 4" PLYWOOD SHEATHING WEATHERPROOFING MEMBRANE

GYPSUM BOARD

CLIENT

ACROCRETE LAMINA ACROCRETE MOISTURE BARRIER BATT. INSULATION

3

4" PLYWOOD DIAPHRAGM 2 X 6 SILL PLATE

WINDOW HEADER WOOD SHIM BACKER ROD AND SEALANT

EXTERIOR 3

4" TONGUE AND GROOVE HARDWOOD FLOOR

METAL FIXED WINDOW DOUBLE PANE LOW - E WINDOW

3

4" INSULATED SUBFLOOR W/ WOOD ADHESIVE

3

BATT. INSULATION

4"

PLYWOOD DIAPHRAGM

2 X 6 DOUBLE TOP PLATE 2 X 8 DOUBLE TOP PLATE No.

DOUBLE WALL SCALE: 3" = 1' - 0"

8

TYPICAL WINDOW SILL (RECESSED) SCALE: 3" = 1' - 0"

5

TYPICAL WINDOW JAMB (FLUSH) SCALE: 3" = 1' - 0"

Description

Date

2

ACROCRETE LAMINA 12"

ACROCRETE INSULATION BOARD WATERPROOF MEMBRANE 4" PLYWOOD SHEAR PANEL

7 12"

3

BATT INSULATION

4"

3 4"

3

3

STAIR RISER / TREAD

5 8" GYPSUM BOARD 2 X 6 SILL PLATE HARDWOOD FLOOR WITH 3 4" SUBFLOOR

PLYWOOD DIAPHRAGM

2 X 12 RIM JOIST ACROCRETE MOISTURE BARRIER SOFFIT EDGE DRIP EDGE TITLE

KEY DETAILS

EXTERIOR

Job #

2 X 12 MAHOGANY FINISH STAIR COUNTERSUNK FINISH SCREWS

3 4" TONGUE AND GROOVE HARDWOOD FLOOR 3

4" INSULATED SUBFLOOR W/ WOOD ADHESIVE

3

OUTDOOR CEILING SOFFIT VENT SCALE: 3" = 1' - 0"

7

4"

01

Date

31 May 2018

Size

24 x 36

STEEL PAN W/ MOUNTING HOLES

Drawn by

STEEL CHANNEL STRINGER

Revision #

PLYWOOD DIAPHRAGM

ZACH WESTON 00

A 5.1 STAIR CONNECTION TO FLOOR SCALE: 3" = 1' - 0"

4

STAIR HANGER SCALE: 3" = 1' - 0"

1

Scale

5/31/2018 2:36:35 PM

METAL HANDRAIL STEEL CHANNEL STRINGER 2 X 12 MAHOGANY FINISH STAIR COUNTERSUNK FINISH SCREWS STEEL PAN W/ MOUNTING HOLES STEEL BRACKET BOLTED TO FLOOR


PASADENA, CA

ADEPT URBAN

OFFICE EXPANSION DESIGN



Cordova Avenue

AMERICAN

GENERAL

DESIGN

245 S. LOS ROBLES AVE. UNIT 100 PASADENA, CALIFORNIA 91101 TEL: 626.304.0800 FAX: 626.405.8061

(E) BUILDING LINE ABOVE

Revisions

Description

Date

04

Revision Ground Floor Plan

11.28.2018

(E) BUILDING LINE ABOVE

(E) BUILDING LINE ABOVE

S. Los Robles Avenue

(E) COMMERCIAL AREA

(E) Generator & Fire Pump Room (E) West Stair

(E) East Stair

(E) Breezeway

Existing Lobby

UP

(E) LOBBY

(E) BUILDING LINE ABOVE

2 Hr Rated Room

Notice The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated, or exploited, in whole or in part, without written permission of American General Constructors. These are available for limited review and evaluation by clients consultants, contractors, government agencies, vendors and office personnel only in accordance with this notice. Copyright American General Design All rights reserved

Project Owner:

245 S LOS ROBLES AVE, UNIT 100 PASADENA, CALIFORNIA 91101

Project Name:

EXISTING TOWER 245 S. LOS ROBLES AVE. PASADENA, CA 91042

(E) BUILDING LINE ABOVE

Drawing Title

EXISTING FLOOR PLAN Project Number 2000.01

Scale Date

1/8" = 1'-0" 6-28-2018

Designed Drawn by Checked by Reviewed

Drawing No.

AE - 1.01



(E) DOOR TO RE LOCATE HEADER AND FAN TO REMAIN PROVIDE THE 2HR RATED TRANSISTION DUCT CONNECTED TO THE EXISTING FAN

AMERICAN

GENERAL

DESIGN

245 S. LOS ROBLES AVE. UNIT 100 PASADENA, CALIFORNIA 91101 TEL: 626.304.0800 FAX: 626.405.8061

Revisions

Description

Date

04

Revision Ground Floor Plan

11.28.2018

5'-8"

4'-6 1/2"

(E) BUILDING LINE ABOVE

(E) GLAZING TO BE REMOVED

EXISTING

(E) WALL TO REMAIN

6'-6" Clear

(E) West Stair

(E) DOOR TO RE LOCATE HEADER AND FAN TO REMAIN PROVIDE THE 2HR RATED TRANSISTION DUCT CONNECTED TO THE EXISTING FAN

S. Los Robles Avenue

NEW HOA Room CEILING ABOVE

(E) Generator & Fire Pump Room

(E) East Stair

2 Hr Rated Room (E) GLAZING WALL TO REMAIN BEHIND THE NEW WALL

(E) WALL TO REMAIN

(E) STORAGE

ORIGINAL PERMIT AREA OF MAIL ROOM AND FIRE ALARM ROOM ADDITION NON COUNTABLE FAR AREA 54.0 SFT

(E) Fire Alarm Control Room

(E) STORAGE

Notice The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated, or exploited, in whole or in part, without written permission of American General Constructors. These are available for limited review and evaluation by clients consultants, contractors, government agencies, vendors and office personnel only in accordance with this notice. Copyright American General Design All rights reserved

Project Owner:

245 S LOS ROBLES AVE, UNIT 100 PASADENA, CALIFORNIA 91101

1'-10" TYP

UP 30'-0"

No Glazing

NEW RAMP

Project Name:

(E) Breezeway (E) 1st Floor Elevator Lobby

EXIT

(E) WALL AND GLAZING TO REMAIN CUT (E) STAIR TO ACCOMODATE NEW RAMP

EXISTING TOWER

No Glazing

245 S. LOS ROBLES AVE. PASADENA, CA 91042 CEILING HEIGHT LEGEND 10'-6" CEILING HEIGHT 13'-6" CEILING HEIGHT

WALL LEGEND

Drawing Title

SYMBOL LEGEND EXIST SIGN

EXIT

12'-6" EXISTING LOWERED CEILING

1,093 S.F. EXISTING INDOOR LOBBY AREA CONVERTED TO OFFICE (NOT A NEW ADDITION)

EXISTING METAL STUD WALL NEW METAL STUD WALL 2-HR RATED WALL (DOUBLE Type "X" GYP. BOARD ON BOTH SIDES)

9'-0" CEILING HEIGHT

PROPOSED FIRST FLOOR RCP PLAN

12'-0" CEILING HEIGHT 14'-6" CEILING HEIGHT

Project Number 2000.01

LEGEND:

RETURN AIR

ROUND SUPPLY AIR

TRACK LIGHT RAIL

SQUARE SUPPLY AIR

LINEAR RETURN AIR

T8 LIGHT

EXISTING PLUMBING

LINEAR SUPPLY AIR

WALL SUPPLY AIR

RECESSED LIGHT EXHAUST FAN

VERIFY LIGHT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION.

Scale

PENDANT LIGHT

JUNCTION BOX

Date

1/8" = 1'-0" 8-13-2018

Designed

N

Drawn by Checked by Reviewed

Drawing No.

A - 1.03


Cordova Avenue AMERICAN

GENERAL

DESIGN

245 S. LOS ROBLES AVE. UNIT 100 PASADENA, CALIFORNIA 91101

Revisions

Description

Date

04

Revision Ground Floor Plan

11.28.2018

S. Los Robles Avenue

175'-2"

EXIT

301'-5" (MOST REMOTE PATH)

5'-8"

4'-6 1/2"

TEL: 626.304.0800 FAX: 626.405.8061

EXIT

EXIT

DN

301'-5" (MOST REMOTE PATH)

Notice The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated, or exploited, in whole or in part, without written permission of American General Constructors. These are available for limited review and evaluation by clients consultants, contractors, government agencies, vendors and office personnel only in accordance with this notice. Copyright American General Design All rights reserved

Project Owner:

245 S LOS ROBLES AVE, UNIT 100 PASADENA, CALIFORNIA 91101

Project Name:

EXISTING TOWER 245 S. LOS ROBLES AVE. PASADENA, CA 91042

Drawing Title

SYMBOL LEGEND EXIST SIGN

PROPOSED FIRST FLOOR EGRESS PLAN

EXIT

MOST REMOTE EGRESS PATH OF TRAVEL (400 FEET MAXIMUM TRAVEL DISTANCE)

Project Number 2000.01

FIRE EXTINGUISHER, MIN. 2A-10BC

EMERGENCY LIGHTING

F.E.

EM

WALL LEGEND

Scale Date

EXISTING METAL STUD WALL NEW METAL STUD WALL 2-HR RATED WALL (DOUBLE Type "X" GYP. BOARD ON BOTH SIDES)

1/8" = 1'-0" 8-13-2018

Designed Drawn by Checked by Reviewed

Drawing No.

A - 1.01


PASADENA, CA

ADEPT URBAN

PENTHOUSE 7 INTERIORS



z a c h a r y w 2 0 0 2 @ y a h o o. c o m

858-666-5690


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.