Zack Grossl Portfolio

Page 1

Zack Grossl Landscape Architecture Portfolio BSLA West Virginia University


Zackery Dale Grossl

Projects

Education Bachelors of Science in Landscape Architecture Expected May 2018 GPA Overall 3.4 Major 3.6

T: 304.646.9407 E: zdgrossl@gmail.com A: 498 Big Mtn Rd Rupert, WV 25984

Skills Vectorworks Adobe Suite AutoCAD DynaScape TR-55 Sketchup ArcMap ArcScene Microsoft Office Lumion

Awards WVNLA 2017 Scholarship Winner National Society of Leadership+Success Presidents List (Fall 2016) Jack H. Paules Memorial Scholarship NALP Top 5 Place Winner (3D exterior Landscape Design)

2018 ASLA Certificate of Merit Recipient

1

Work Experience The Greener Side LLC. June 2017 - August 2017 • Work with the designers on developing designs for current clients. • Developed construction drawings and a system for future interns to utilize. • Gathered relevant site dimensions and elevations for constructing AutoCAD drawings and 3D models.

Design Intern

2 3

Baltimore Maryland Under Armour Corporate HQ

Pittsburgh Pennsylvania Manchester Design Initiative

Alexandria Virginia Christian School Playground Plaza

Project Assistant West Virginia University March 2016 - August 2016 • Assisted with organization of AutoCAD files. • Built large and small scale 3d models of the Health Science Campus. • Updated newly constructed site features into AutoCAD files. Teaching Assistant West Virginia University January 2015 - May 2017 • Teaching assistant for four classes: Basic Drafting, Computer Graphics, and Planting Design, Natural System Design. • Assisted with instruction and provided assistance to students • Gave lectures on current class topics in studio. • Helped students work from concept development to final poster production.

4

Davis West Virginia Gateway to Recreation

5

Construction Detailing

6

Photography


Under Armour Corporate HQ Our mission is to develop a dynamic image for the face of Under Armour’s corporate campus through the use of ‘high performance’ amenities in Port Covington. In revitalizing the shoreline, we will promote public access to the site’s waterfront, which will encourage activity and give it a sense of ‘place’. The Patapsco River is positioned in a manner which allows opportunities for growth, preservation and recreation. By balancing the site, the amenities, and the mobility- we will create a vibrant and athletic character for Under Armour’s headquarters, and a major destination for the city of Baltimore. This is a group capstone project, which took up the entire final semester. Following is just a small portion of the work completed that highlights an area that I was the main designer for.

Baltimore, Maryland


Under Armour HQ

ELEVATED TRACK

The elevated track and its interior design, which houses a partial turf field and gathering spaces with design inspiration linked to Fort McHenry, is a central hub of the private corporate campus. It’s a space which will be heavily used throughout all times of the day for exercise, games, equipment testing, and lunch breaks.

Figure 2.34(Elevated Track Plan)

25’

50’

[

Zackery Grossl

0’

7


Under Armour HQ

DESIGN BREAKDOWN FORT MCHENRY

MULTI-USE FIELD

Fort McHenry, located a mile East of the site, is a famous military fort which defended Baltimore’s harbor during the war of 1812. As a national monument and famous attraction in Baltimore, it represents an iconic connection which anchors the site to the city.

The multi-use turf field within the track provided a chance to use local symbols and icons in the design. The Maryland flag not only connects the Under Armour HQ to the state, but also to the University of Maryland where CEO Kevin Plank went to college.

ELEVATED TRACK

VIEWS The innovative elevated track design allows UA to continue to push the boundaries of the norm in sports. It also supports our concept of “Connected Fitness” by linking multiple buildings and portions of our site in a unique manner.

The elevated track design is intended not just as a functional sports facility, but also as an aesthetically interesting viewpoint. In return, it also provides good views to the rest of the site for users.

Zackery Grossl

9


Under Armour HQ

ELEVATED TRACK

Directly to the right of the elevated track is a publicly accessible green roof, located on top of the recreation facility. Although the track and amenities located beneath it are limited to the employees of Under Armour, the green roof provides a beautiful perennial filled garden that allows public users to have a perfect view overlooking the track and field, almost as if they were right on it.

Zackery Grossl

Figure 2.37(Green Roof Perspective)

11


Under Armour HQ

ELEVATED TRACK

ATHLETIC

OFFICE

COMMERCIAL

B2

25’

0’

50’

10’

20’

Zackery Grossl

B1

0’

13


Manchester Design Initiative The Manchester-Chateau neighborhoods, located in the Northwest region of Pittsburgh, are rich in history and have had their fair share of upswings and declines. There are many historic properties within Manchester which now, after roughly a century of existence, are showing their age, while some are gone altogether. The signs of wear in the two neighborhoods, however, aren’t simply the result of old age. Economic strain, public relations, changes in infrastructure, and crime have left the area in noticeable distress, and caused population numbers to steadily drop over the last half century. In an effort to revamp this historic and valuable piece of Pittsburgh, and bring a better quality of life for current and future residents, we’re now at a point where funding and resources have made a design collaboration possible.

Pittsburgh, Pennsylvania

15


Inventory and Analysis Zoning

Infrastructure

Soils

Traffic Counts

Lynch Diagram

Road Types

Public Transit

This central map shows the location of the project site within Pittsburgh. It also shows different ways of transportation and some common travel times. To located the site in relation to some popular places a few were highlighted below: (Three Rivers Casino, Heinz Field, PNC Park,Downtown, Point State Park, and Station Square).

Project site

Composite Analysis

Manchester, Pittsburgh, Pennsylvania

Noise

Industrial

Route 65 to be lowered and converted into a boulevard

Heinz Field

Existing streets to be extended to the waterfront

Residential

Commercial

PNC Park

Mixed-Use

Three Rivers Casino Downtown

Station Square

Zackery Grossl

Point State Park

Green Space Looking at the information gathered from the inventory and analysis, a composite analysis was formed. The streets are the driving force as they define the structure of the site. The relationship to existing housing was considered next, with looking at travel distances the commercial core is located closer to the largest amount of residences in Manchester, which will allow them to utilize the new development. Then looking at the river the cross streets will be driving visual connections with the river and drawing users all the way through.

17


With the Ohio River riparian zone poised in a region for growth- we aim to provide endless natural amenities and opportunities for preservation and recreation. Create green spaces that emphasize the natural environment and connections at every level. Create streets and a network that will offer a connected community to each other and to the natural amenities- through a balance of automobiles, transit connections, bikes and pedestrian ways. By balancing the site, amenities, districts and mobility- create a vibrant and diverse place where businesses can emerge and grow and families can live. Preserve the rich history and enhance the neighborhood’s important cultural past and present.

Rivers Edge Typologies Rail trail

Boat Dock 50’

100’

250’

500’

Boardwalk

Natural

Zackery Grossl

0’

Manchester, Pittsburgh, Pennsylvania

Conceptual Masterplan

19


Normal

2 yr Flood

Individual Design This design is focuses around strong ecological ideas. All of the key design elements work to help with water movement and water quality. The main component of this design is the wetland area. This wetland will be working nonstop to help cleanse the Ohio River at where it begins. There is a large boardwalk that cuts right through the majority of the wetland and this is not only to move users in the most efficient way, but it also creates an educational element to the design. Most people think of wetlands being bad and only occurring in wild areas. This would be a great way to introduce this ecological component to people who may otherwise never see one.

Concept Sketches 10 yr Flood

Passive Open Space Riparian Forest Waters Edge Planting

Floodzone Boardwalk

Designed Floodzone Interwoven Paths Riparian Forest

Manchester, Pittsburgh, Pennsylvania

Flood level typologies

Uses

100 yr Flood Zackery Grossl

Paths

21


Open Space Perspective

Manchester, Pittsburgh, Pennsylvania

Natural Stormwater Management

Zackery Grossl

Boardwalk Floodzone

Boardwalk Park Space

23


Christian School Playground Plaza This playground plaza was designed for a Christian school in Alexandria. The base for the design was formed around a central axis that was designed to resemble a cross. This will be used as multiple things for this school. Gathering space for daily activities, playground when outside. This will become one of the schools most used spaces as they spend a lot of time outside. This allows for multiple opportunities for outdoor learning. Vegetable gardens, Rain gardens and other things are being integrated for the children to use.

Alexandria, Virginia

25


Rendered Concept Plan

3 2

A

Alexandria, Virginia

Concept Sketch

c

Elements • • • • • • •

4

B

Vegetable Gardens Sun/Rain Garden Multi-Age Playscape Large Gathering Space Storage Buildings Cross-Shaped Central Axis Fenced in Area

a Planned Sun/Rain Garden b Playscape Area C Designed Gathering Space 0

8

16

Zackery Grossl

1

27


Alexandria, Virginia 2

Terraced Seating/Gathering Space

Entrance View

1 Sun and Vegetable Gardens

2

Zackery Grossl

Mid-Allee Planter Boxes

4

29


PLANT SCHEDULE TREES

CODE

Height: 20-35’ ACE PAL Spread: 20-35’ Yellow, Orange, Red Fall color Part shade to Full shadeAME DOW

Hackberry - Celtis occidentalisCAR AME

Butterfly/ Hummingbird Wildflower COMMON NAME SIZE QTY Mix DETAIL

BOTANICAL NAME Acer palmatum

Japanese Maple

---

1

Amelanchier arborea

Downy Serviceberry

---

1

Carpinus caroliniana

American Hornbeam

---

10

Height: 30-50’ Spread: 20-35’ CEL OCC Yellow Fall color Part shade to Full shade

Celtis occidentalis

Common Hackberry

---

5

CER CAN

Cercis canadensis

Eastern Redbud

---

8

BOTANICAL NAME

COMMON NAME

SIZE

QTY

COR BL3

Cornus sanguinea

Dogwood

---

20

HAM VIR

Hamamelis virginiana

Common Witch Hazel

---

17

Spicebush

---

17

Ninebark

---

12

Eastern Redbud - Cercis canadensis SHRUBS CODE Height: 25-30’ Spread: 15-20’ Red Fall color Full sun to Part shade

Downy Serviceberry - Amelanchier LIN BEN arborea Lindera benzoin Height: 25-30’ Spread: 15-20’ Red Fall color Full sun to Part shade

PHY NI2

Physocarpus opulifolius

Japanese Maple - Acer japonica Height: 10-25’ Spread: 8-15’ Orange, Red Fall color Full sun to Part shade

Red Twig Dogwood - Cornus sanguinea Ht 5-6’ Sp 5-6’ Red Stems Full sun to Part shade

Planting Plan (1) ACE PAL ---

(3) CEL OCC ---

(10) CAR AME ---

DETAIL

(5) PHY NI2 --(2) CER CAN ---

CER CAN (3) ---

Alexandria, Virginia

Plant Inventory American Hornbeam - Carpinus caroliniana

(8) HAM VIR --COR BL3 (2) ---

(2) CEL OCC ---

CER CAN (2) ---

CEL OCC (1) --AME DOW (1) ---

(7) PHY NI2 ---

COR BL3 (3) ---

PLANT SCHEDULE TREES

Witchhazel - Hamamelis virginiana

Height: 15-20’ Spread: 15-20’ Yellow Fall color/ Fall flowering Full sun to Part shade

CODE

BOTANICAL NAME

COMMON NAME

SIZE

QTY

ACE PAL

Acer palmatum

Japanese Maple

---

1

AME DOW

Amelanchier arborea

Downy Serviceberry

---

1

CAR AME

Carpinus caroliniana

American Hornbeam

---

10

CEL OCC

Celtis occidentalis

Common Hackberry

---

5

CER CAN

Cercis canadensis

Eastern Redbud

---

8

CODE

BOTANICAL NAME

COMMON NAME

SIZE

QTY

COR BL3

Cornus sanguinea

Dogwood

---

20

HAM VIR

Hamamelis virginiana

Common Witch Hazel

---

17

LIN BEN

Lindera benzoin

Spicebush

---

17

PHY NI2

Physocarpus opulifolius

Ninebark

---

12

DETAIL

Spicebush - Lindera benzoin

Ninebark - Physocarpus opulifolius Height: 3-8’ Spread: 3-8’ Red Fall color Full sun to Part shade

SHRUBS

DETAIL

Zackery Grossl

Height: 6-12’ Spread: 6-12’ Yellow Fall color Full sun to Part shade

CER CAN (3) ---

31

COR BL3 (2) ---


Gateway to recreation The town of Davis looks to the future with plans to improve it’s appearance for permanent residents and to spark new economic growth within the community. The project site is located on the South side of town adjacent to the river, and encompasses the existing riverside park. The site includes a brown-field which will need remediation. To encourage more permanent resident there must be 10,000 sq ft. of affordable housing on site.

Davis, West Virginia

33


Open Space

Building/ Land Usage

Davis, West Virginia

Gis Analysis Figure Ground

Looking at the land use map it is easily noticed which part of town is the commercial district. Almost all of the buildings located on Route 32 have some sort of commercial use integrated into the building layout. This creates a destination in the town that will help with making our site a location as well, with being in such close proximity. The town is missing housing that is close to the commercial area, which would increase walkability.

The amount of open space in Davis is a good sign for green development. It shows there is site possible sites for greenway development or mixed-use. This will help the sustainability of the Davis area.

Community Circulation

Land Use Intensity

Zackery Grossl

Corridor H will provide Regional Connections connection with many parts of the state and it also will connect with Washington D.C.. This will help Davis tremendously. The possibility of trail connections or even a trail head is a great chance for regional connections in Davis. Two separate trails come The sidewalks are not in good condition and the do not in close proximity of the cover every portion of town, which leaves some unsafe south side of town. walking areas in parts of town. The main street and the adjacent areas are lined the most with sidewalks.

35


Davis, West Virginia

Conceptual Masterplan Nearly all recreational traffic flows through Davis, creating an opportunity to showcase a taste of the natural beauty the area is known for. To keep a connection with the town, the axes of 3rd, 4th, 5th, and 7th street were extended across the site. This created four “zones” in the site which become representations of diverse natural systems. The four representations selected were Spruce Knob, Canaan Valley, Farmlands of Parsons and Dolly Sods.

B

D C

A

0

B Canaan Valley Canaan Valley is an upland wetland located in northern West Virginia. It has extensive wetlands that house many plant species that are seldom found in the eastern US.

C Parsons Farmland Parsons is apart of the lower lying lands of Tucker county. The fields are easily flooded, which helps create a more diverse ecosystem differing from surrounding farmland.

D Dolly Sods Dolly Sods is a high-altitude plateau that is defined by is diverse ecosystem ranging from heath barrens to bogs. This area also has unexploded ordinance from training exercises for WWII.

Zackery Grossl

A Spruce Knob Spruce Knob is the highest point in West Virginia (4,863’). It is defined by an alpine feel created by the Red Spruce that cover the area also accented by large boulders and small grasslands.

75

N

37


Winding Paths

Route 32 Spruce Knob Forest

Neighboring Rail trail Black Water River

Davis, West Virginia

Community Center

Section AA' B

A

Bio-Retention Swale

B’

A’

Residential Parking

Designed Wetland Farmland Meadow

Affordable Housing

Blackwater River

Zackery Grossl

Section BB'

39


Davis, West Virginia Zackery Grossl

41


Construction Details Included here are some construction details that I completed during my summer 2017 internship. These drawings were used by our construction teams to complete our projects.

43


Construction Details

Finished Product

Finished Product

Zackery Grossl

45


Top Stairs Finished Dimensions

61 2"

1'-6"

Scale: 41" = 1'

6'

6'

6'

8'-10"

3 4"

= 1'

2 1 0

R5

0

tbd on site

Bottom Stairs Finished Dimensions

24"

24"

tbd on site 1'-6"

Construction Details

113"

2

= 1' 3 4"

3

0

1

Middle row is centered

1

2

4

72"

Zackery Grossl

47


Photography Zackery Grossl

49


Thank You


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.