ARC343; SCHOOL PLEIN AIR PROJECT – THE EXHILARATING EXPANSION

Page 1

In Berlin

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


The school Plien Air project - The project is located in Berlin, germany, with the school project that should provide to have a open space, it quite of challenge to provide the function of the building to get the open air space becuase of duing the winter time, so the architecture of the school it should achieve and finding the solution of this issue.

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


The school it provide the space to have a multi-function space to let the student have a group activities; to study and playing around, the educator can also the one who leading the activities to the student to encourage them to working together and create a social for the children in this age, let them to have a good atmosphere in the classroom and activities space.

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Site Analysis Sun path

Wind rose

Wind direction; in each session the wind mostly come from the west side, so the schemetic of the building provide to be a have a opening that can cross through the building to have a good ventilation .

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


User Analysis Regular User

Other

Learning / Reading

Playing / Dancing

Painting / Drawing

Student

Approach / Goal

- Children in 6-12 years old ( for primary school)

- Finding knowledge and experience, encounter with some of challenging, in physical and mental leanding to learning method. - Be happy in childhood and with their family.

- Learning 6-8 hours per day starting at around 8:15 am to 4:00 pm.

Educator

Janitor

- Teaching / Giving a knowledege - Encourage a student to do the activity. - Development thier skill to teaching pupils to understand thier lesson .

Behavior

Administrator

- Take caring the school cleaning and orderliness in a school.

Resting / Sleeping

- Take care of a document stuff for the student and staff in the school.

Parent

- Playful / Energetic. - Looking for fun thing or attractive thing. - Curious of a thing.

- Take caring their child. - Giving a positive thought and love to thier child. - Joining event of children activities. - Giving some experience that the children can not get from the school.

Other staff

People around the site

- For the canteen staff, Nurse, etc. - Take caring of student.

- From the site surrounding it havve many of the public facilities such as sport area, green space area, a area of activities.

Program Analysis Outdoor Program

Indoor Program

Pedestrain Tram

Surrounding

Transportation

Bike

Shop

Administration Science (Open air)

Education Cafe

Museum

Restuarant

Art Gallery

Super Market

Library

Toilets

General class room (Private)

Specialist rooms (Semi-public)

Educators

Pupils

Classroom

Art / Music / Workshop

First-Aid room

Educators

Break out room

Storage

Cleaning

Handicapped

Activity room

Open air class room

Bus Facilities S-Bahn / U-Bahn

Dancefloor Park

Entrance to site

Church

Yoga school

Cinema

Park (Green space)

ARC343 Architecture Studio III Semester 1/2021

Entrance

Public hall

Fitness area

Valleyball field

Basketball court

Swimming pool

School Plein Air Project - The Exhilarating Expansion

Sports hall Storage

Administration

Sport

Nuttakorn Karakate 62120500011 (Boss)

Sports hall

Theater

School management

Changing room (shower /toilet) Educators (shower / toilet)

Administration

Common Areas (Public) Foyer / Exhibition

Canteen

First-Aid room Cleaning

Secretariat

Assemply hall

Kitchen

Maintenance

Storage (for hall)

Storage

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Concept School Philosophy Beginning of children development, they shaped from learning sources, one of the them is the book a children book is the one of the thing that creating the imagination and have the idea to let the children have some of processing the method.

Encourage children to be brave Encourage children to working together. Using their ability to solve the problem. Cheer up them when encountering with challenge thing.

Architecture Conceptual

The architecture conceptual try to achieve about the open the view to the Monbujou park, to create linkage between the open space and the school. the schemetic in the school provide to be on the side of the park creating opening of perception and view of the park. the slope and opening of the building provide the function to achieve the mentioned statement. About the entrance, the conceptual tryin to achieve about one accessible way, with the conceptual gesture it will force the circulation to the one main entrance, also with small entrance it will create some of negetive feeling to the user untill thier reach inside that the space is expanded to be a bigger space.

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


The site plan, it is redesigned to the shape from the prjection line of the school to provide the space and walkway to be a facility space such as a lawn to used as the event space during festival, a sport field, a playground and a satellite for the school.

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Main structure: frame system; that is a col-

umns and beams to take the load also the elevator core and fire stair core that can using to be a load traffering structure.

Rooftop

Main materials Fifth floor

Concrete; using as the columns, beams, floor slab and walls.

Fouth floor

Brick; using as the walls Third floor

Second floor

Glass; using as the glass panels and windows.

Ground floor Steel; using as the main structure of the building Underground floor

Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit


Nuttakorn Karakate 62120500011 (Boss)

ARC343 Architecture Studio III Semester 1/2021

School Plein Air Project - The Exhilarating Expansion

ADVISORS : Instructor : Paripol Tangtrongchit Christian Phongphit



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.