Yaoyuan Zhang WORKSAMPLE 2022

Page 1

YAOYUAN ZHANG | WORKSAMPLE 张耀元 | 作品集 Zhangvegeta@163.com+8617187756967

JINGDONG (JD) SHANGHAI WEST RAILWAY STATION COMPLEX DESIGN COMPETITION ECADI / Arcplus Group APARTMENT PUBLIC AREA Building StreamShelteredBoxboatPlan Elements extracting Elements extracting Elements extracting Shape Finding Shape Finding for reception Shape Finding for Back Wall By SU/Rhino/Grasshopper/Enscape

Before After After

STATION COMPLEX DESIGN COMPETITION ECADI / Arcplus Group

SU/Rhino/Grasshopper/Enscape

Before

(JD) SHANGHAI

JINGDONG WEST RAILWAY

APARTMENT PUBLIC AREA/APARTMENT GUESTROOM REPLANNING

By

the Plan and plan refinement -Collect the idea and creat the Concept for this Public Area, and use Rhino, SU, Grasshopper to make the 3D model and render it with Enscape -Documentation set up

-Making

-Talking with Client for their needs of planning and set up the concept for the design -For small space, to design and 3d Modeling, then render the space with Enscape -Talking with DD CD team for the design to make sure the project goes on well

(SDIC) STATE DEVELOPMENT AND INVESTMENT GROUP CO. OFFICE DESIGN

-This is a project which is under construction

Office Lobby Area

ECADI / Arcplus Group

SDIC's "S"

ECADI Arcplus

/

Group Other Area

Tea House Hub Area Hub Area

By SU/Enscape

(SDIC) STATE DEVELOPMENT AND INVESTMENT GROUP CO. OFFICE DESIGN

Terrace Space

Office Lobby Area

-In charge of making plans of some levels, to develope the concept of Lobby area.

-This is a project which is under construction

(SIPG) SHANGHAI INTERNATIONAL PORT (GROUP) NORTH BUND HEADQUARTER DESIGN

-Talking with DD CD team for the design to make sure the project goes on well 2

ECADI / Arcplus Group

STANDARDPLANPLAN

LEVEL 1 PLAN LEVEL

-For small space, to design and 3d Modeling, then render the space with Enscape

ECADI / Arcplus Group Employee Restaurant

CHINA BOHAI BANK SH COMPETITION

By SU/Rhino/Grasshopper/Enscape

-In charge of this 2 space, making the concept and develope into the Design -Finish the planning and make plan into 3D model, with SU, Rhino, Grasshopper to develope the design, and Enscape to render

Water elements Evolving

ECADI / Arcplus Group

BOHAI

Water elements extraction Line work Line to net Net to surface Final shape

VIP Lounge Area

By SU/Rhino/Grasshopper/Enscape

CHINA BANK SH COMPETITION

-In charge of this plans of some levels, making the concept and develope into the Design -Finish the planning and make plan into 3D model, with SU, to develope the design, and Enscape to render

Lobby Area

(COMAC)COMMERCIAL AIRCRAFT CORPORATION OF CHINA HEADQUARTER DESIGN

By SU/Enscape

ECADI / Arcplus Group

FUNCTION ROOM ARRIVAL LOBBYLIBRARYCAFETERIA L2 PLAN

HALL RECEPTION

FOUR SEASON

TAIKANG SHENZHEN SENIOR LIVING CLUBHOUSE STUDIO HBA -Take part in the project planning design and polishment -Coordinate with the Interior Designer for the design of Rendering space and make progress change CLUBHOUSE PUBLIC AREA L1 PLAN L3 PLAN

MULTI

ProjectDateDrawnDrawingProjectwww.studiohba.comApprovedbyScaleSheetNoNoSHENZEN,CHINA立面图 立面图 所需框架支撑 所需框架支撑 开放 开放 开放 木饰面 金属踢脚 金属踢脚 石材 石材石材 展板展示 展板展示 展板展示 金属边框 暗藏灯由灯光顾问负责 乳胶漆 详见门表 木饰面 金属踢脚 木饰面 金属 亚克力灯带 详见门表 展示架及吧台材料详见节点图 拼接缝 接待台材料详见节点图 RevisonsProjectApproved by ProjectDrawn No CHINASHENZEN 立面图 立面图 所需框架支撑 所需框架支撑 开放 开放 开放 木饰面 金属踢脚 金属踢脚 石材 石材石材 展板展示 展板展示 展板展示 金属边框 暗藏灯由灯光顾问负责 乳胶漆 详见门表 木饰面 金属踢脚 木饰面 金属 亚克力灯带 详见门表 展示架及吧台材料详见节点图 拼接缝 接待台材料详见节点图 DrawingRevisonsApproved by Drawn by DateScaleSheet ProjectNoNoThisdrawing information only used by contractors as general arrangement interior used project and site specifically identified herein and used any other project. returned request 立面图 立面图 立面图 立面图 所需框架支撑所需框架支撑 所需框架支撑所需框架支撑 开放 开放 木饰面 金属踢脚 金属踢脚 金属踢脚 金属踢脚 石材 石材 石材展板展示 拼接缝 金属踢脚 拼接缝 木饰面 拼接缝 暗藏灯由灯光顾问负责 暗藏灯由灯光顾问负责 暗藏灯由灯光顾问负责 暗藏灯由灯光顾问负责 暗藏灯由灯光顾问负责 乳胶漆乳胶漆 石材 乳胶漆 壁纸 金属 窗框结构由建筑放负责 详见门表 壁纸 金属 拼接缝 暗藏灯由灯光顾问负责 木饰面装饰画 详见门表 石材 拼接缝 石材 金属踢脚 木饰面 木饰面 FF PLAN DD ELEVATION DD ELEVATION DD ELEVATION -Coordinate with client for the comments and try to control the project schedule -Check the Sales Center DD drawings -Comunicate with MEP consultant about all the possible problems and make the -Checkrespondthe SPEC book SALES CENTER TAIKANG SHENZHEN SENIOR LIVING CLUBHOUSE STUDIO HBA

3 2 4 5 8 11 6TH STREET SERRANO HOBART key plan KEY PLAN LEVEL SEVEN LEVEL SEVEN 1. WOMEN’S SPA AREA 2. TREATMENT ROOMS 3. SALON 4. SPA LEVEL LOBBY 5. HOTEL GUEST ELEVATORS 6. FITNESS 7. RESIDENTIAL ELEVATORS 8. MEN’S SPA AREA 13 key plan KEY PLAN LEVEL EIGHT LEVEL EIGHT MOUNTAINVIEWS DOWNTOWNCITYVIEWS 6TH STREET SERRANO HOBART 1. POOL TOILETS 2. HOTEL POOL DECK 3. POOL BAR 4. LOBBY TOILETS 5. RETAIL 6. HOTEL RECEPTION 7. HOTEL GUEST ELEVATORS 8. RESIDENTIAL ELEVATORS 9. LOBBY LOUNGE RESTAURANT 1 3 54 9 8 HyattCentric_KoreaTown HIRSCH-BEDNER ASSOCIATES (HBA) -Participating interior design and Make 3D model in SU -Take part in the development of public area space design, finish the 75% DD set with Plans, Elevations and Sections. -About Guestroom part, I am in charge of the development of bathrooms, Kitchen DD phase drawings, including plans, elevations, sections, and the Spec tags -Cooperate with FF&E spec designer to perfection guestroom and bathroom detail drawings

SDT GR BATHROOM DETAIL TYPE-1 @ GR TYPE: K1, K1-R, K1.1, K1.2, K3, K3.1, K6/C, K7, K8, K9.1, K9.3 K9.3-R ID 3-91 SHEET DUPLICATED,NUMBERUSEDORDISCLOSED WITHOUT WRITTEN PROJECT PROJECTDESCRIPTIONNUMBERSCALENAME AS SHOWN 3800 WEST STREET6TH 3800 WEST 6TH STREET LOS ANGELES, CA 90020 NO. DATE ISSUES & REVISIONS 02-14-2020 ID 10% CD PROGRESS11307SET11-07-2019 PROGRESS SET 12-03-2019 PROGRESS SET 03-13-2020 ID 25% CD PROGRESS SET 04-20-2020 ADDENDUM REFLECTED CEILING PLAN04SCALE: 1/2" = FURNITURE1'-0" AND FIXTURE PLAN01 ARCHITECTURAL REFERENCE PLAN02 FLOOR COVERING PLAN05 ELECTRICAL & MECHANICAL PLAN03SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" ELEVATION06 SCALE: 1/2" 1'-0" ELEVATION07 SCALE: 1/2" = 1'-0" ELEVATION08 SCALE: 1/2" = 1'-0" ELEVATION09 SCALE: 1/2" = 1'-0" ELEVATION10 SCALE: 1/2" 1'-0" ELEVATION11 SCALE: 1/2" = 1'-0" ELEVATION12 SCALE: 1/2" = 1'-0" HyattCentric_KoreaTown HIRSCH-BEDNER ASSOCIATES (HBA)

King 4 – 54 sqm 大床4-54平方米 King 5 – 59 sqm 大床5-59平方米 Suite – 69 sqm 套房1-77.8平方米 bell carts storage 行李车停放位 17 JW 万豪 大东海湾 | JW Marriott Dadonghai Bay Villa Level One Option 1 别墅一层 方案一 Floor Plan | 平面图 L Focal Art Element 焦点艺术品 16 Presidential Suite 207 sqm 总统套房 207 平方米Villa Presidential Suite别墅总统套房平面图 Floor Plan 32 4 9 1 5 6118 10 1. ENTRY 入口 2. DINING 餐厅 3. LIVING ROOM 客厅 4. POWDER ROOM 洗手间 5. MASTER BEDROOM 主卧 6. MINI BAR 小酒吧 7. W.I.C. 步入式衣帽间 8. BATHROOM 浴室 9. BEDROOM 次卧 10. BATHROOM 浴室 11. PANTRY 直通备餐间 30 JW 万豪 大东海湾 | JW Marriott Dadonghai Bay 31 JW Marriott Sanya HIRSCH-BEDNER ASSOCIATES (HBA) -Take part in Model Room DD drawings including plans, elevations sections and detail development,-Guestroomdrawings. perfection, details drawing together with Project Manager

合作设计COOPERATIVEDESIGN 建设单位CLIENT 版权所有 如有不符须立即通知设计单位 施工单位须现场校验尺寸 施工时须以标注尺寸为准 This drawing is copyright 苏州市沧浪区念珠街105号 邮编:215003 苏州建筑装饰设计研究院有限公司 NO,105NianzhuRoad,Suzhou,Jiangsu, China 图号 制图 DRAWN BY 设计 DESIGNE BY 校对 CHECKED BY 审核 VERIFIE BY 审定 APPROVE BY 版本 EV 索引图KEY PLAN 项目总设计师 DESIGNCHIEF 专业负责人 PRO.CHIEF 图纸内容 出图说明日期 ATEDESCRIPTIONS 项目负责人 PRO.CHIEF 修改记录REVISEDRECORD 版本REVISION出图日期ATE PROFESSIONAL项目编号PROJECT No. 专业 SANYATMARRIOTJW CHINA,BAYDADONGHAI大东海,中国JW 万豪三亚 金杭剑 徐赛 凌燕芳 郭建华 赵慧娟 郭建华 金杭剑 蒋缪奕 2020.04.15 室内设计 海南三亚湾新城开发有限公司 备用纸巾架 卫生纸架 卫生间门拉手 淋浴间门拉 浴巾挂钩 花洒 手持淋浴 花洒手控 长条形地漏 中心线 加气混凝土砌块墙 钢架隔墙 详见MR-8.1隔墙详图描述 轻钢龙骨+隔音棉(分户隔墙) 阳台材料由建筑师负责 阳台毛巾架 MODEL ROOM DD DRAWINGS JW Marriott Sanya HIRSCH-BEDNER ASSOCIATES (HBA)

-Together with project manager, we create and develop lobby, Chinese restaurant, all day dining, ballroom, spa & pool area, meeting room, executive lounge and guestrooms ±0,000 a a a e e m m q c c g g k o o b b f n d d h l p pplankey1Leveloption1 一层平面方案一 Level 1 一层 Hotel Lobby 酒店大堂 Lobby Bar 大堂吧 All Day Dining Chinese Restaurant Kitchen 厨房 PDR 包厢 1 PDR 包厢 2 PDR 包厢 3 PDR 包厢 4 PDR 包厢 5 PDR 包厢 6 PDR 包厢 7 PDR 包厢8 PDR 包厢 9 PDR 10 包厢 PDR 11 包厢 PDR 12 包厢 Male TOTALFemaleRestroomRestroom 总计 DESIGN OPTION DETAILS Hotel Lobby 酒店大堂 More traditionally formal lobby layout that may not be very active and energized. reception is the focal element.Chinese Restaurant Chinese main dining and most private dining rooms are located by glazing allowing day light. Easy access to the kitchen and service line. All Day Dining All day dining is integrated with lobby and lobby lounge. Flow to the space from the lobby is activating the area well. the lounge is a destination space separate from casual guest flow. Its location quietly placed for gathering but may lose the benefit of impromptu interactions guests flowing through the lobby or casually meeting. Lobby lounge can be part of the all day dining with sliding screens to allow more breakfast capacity also can be closed off while all day dining not Ballroom floorplan 宴会厅平面 6,000 水疗和泳池平面 1.KeyPool deck & Lounge 泳池面 & 休息区 2. Retail Display 零售展示 3. Roof Garden Entry 屋顶花园入口 4. Office 办公室 Spa 接待 员工室小组讨论室 电梯大厅 Treatment Room 治疗室 Spa waiting lounge Spa等候室 Massage prep & supply storage 按摩准 Clean linen storage 净床单房 Dirty linen storage 湿桑拿房瑜伽室脏床单干桑拿房打扫间 Male Lockers Room 男士更衣室 Female Lockers Room 女士更衣室 Female Restroom食物准备室男洗手间女洗手间 18,000 King Bedroom 大床房 Foyer 门厅 Corridor 走廊 Luggage Bench 行李凳 Bathtub 浴缸 Bathroom 洗手间 Shower卫生间淋浴 Mini Bar & Coffee/Tea Station 迷你吧/茶道 Closet & Safe 壁橱与保险柜 11. Room Entry 入口 12. TV on Adjustable Bracket 可调壁挂支架式电视 13. Free Standing Decorative Console Unit 装饰电视柜 14. Semi-Open Sliding Glass Doors on Knee Wall 支撑墙上半开推拉玻璃门 15. Full Height Sliding Doors 通顶推拉门 Typical Floor Ceiling Height: 3,900 客房层层高: 3900mm

-Prepare the plan check building set and Autocad drawings

-Coordinate with consultant with design work

ROW DTLA RENOVATION

WILLIAM F. BURCH ARCHITECTS

WORK EXPERIENCE

-Sketch and generate design concept

By ArchiCAD

-Build up 3D BIM Archicad Model

HYATT RENOVATION

WORK EXPERIENCE

the plan check building set and Autocad drawings

-Plan

-Identifying

changes in scope require additional service

with consultant with design work

check corrections and Responding to contractor RFI

LAX

-Prepare

WILLIAM F. BURCH ARCHITECTS

-Coordinate

EXITING PLAN 1/16" = 1'-0"  1/16"=1'-0" EXISTING EXITING PENTHOUSE LEVEL (FOR REF. ONLY)1 WILLIAM F. BURCH INCORPORATEDARCHITECTS A6225W CENTURY BLVD LOS ANGELES, CA 90045   AT  RENOVATIONFITNESSCENTER NEW EXITING PENTHOUSE LEVEL SCALE: 1/4" 1'-0" 1 CAFE SCALE: 1/4" 1'-0" 2 CAFE SERVER STATIONS BASE10-WD-02TYP10-T-02 10-WD-0210-ST-0810-PT-0310-ACC-0110-ST-1010-PT-03 10-ST-10 SCALE: 1/4" = 1'-0" 3 CAFE 10-WD-02 10-WC-02 10-PT-03 SCALE: 1/4" 1'-0" 4 CAFE 10-WD-02 10-WD-0210-WD-02 SCALE: 1/4" 1'-0" 5 MARKET A845A845 10-WD-0210-PT-03 10-PL-01 10-GT-0110-PT-0110-ST-02 ELECTRONIC SIGNAGE10-ACC-XX 10-30510-303 SCALE: 1/4" 1'-0" 6 MARKET 10-WD-02 10-GL-0110-ST-0310-PL-0110-T-02 SCALE: 1/4" 1'-0" 7 MARKET 10-WD-0210-PT-0210-PT-0310-ST-02 10-ACC-0310-WD-0210-T-0210-PT-03 SCALE: 1/4" = 1'-0" 8 MARKET 10-WD-0210-GT-0110-T-0210-ST-0210-ST-1010-PT-03 SCALE: 1/4" = 1'-0" 9 MARKET A850A850A850A850 A835 A875A875A875 A875 10-GT-0210-GL-0110-T-02 10-ST-0210-ST-04 10-WD-0210-PT-03 10-ACC-05 SCALE: 1/4" 1'-0" 10 MARKET 10-WD-0210-GT-0110-T-0210-ST-0210-ST-1010-PT-03 SCALE: 1/4" 1'-0" 11 MARKET 10-601 SCALE: 1/4" = 1'-0" 12 MARKET 10-WD-0210-WC-01 SCALE: 1/4" 1'-0" 13 MARKET 10-ST-02 10-WD-0210-GT-0210-ST-0410-T-0210-30410-GL-01 SCALE: 1/4" 1'-0" 14 MARKET 10-WD-0210-ST-0410-GL-01 SCALE: 1/4" 1'-0" 15 MARKET A855 A855 10-WD-0210-ST-02 ELECTRONIC SIGNAGE10-ACC-XX10-ST-05 10-T-03 10-WD-02 SCALE: 1/4" 1'-0" 16 MARKET A845 A845 10-WD-0210-ST-0210-T-02 10-WD-0210-WD-0210-T-0210-ST-0210-GL-01 SCALE: 1/4" 1'-0" 17 MARKET 10-WD-0210-ST-0210-ST-0610-ST-0510-T-03 1ST 1/4"CAFEELEVATIONSFLOOR&MARKET=1'-0"  WILLIAM BURCH ARCHITECTS A6225W CENTURY BLVD LOS ANGELES, CA 90045   AT  LOBBY BAR RESTAURANT&&REGENCYCLUBRENOVATION1-128 10 2 6 10 9 15 43 43 43 15 4 2 10 1-127 1-123LOBBY 1-149 WOMEN'S1-125 5 6 1ST FL ENLARGED FLOOR PLAN 3/16" = 1'-0"  3/16"=1'-0" FIRST FLOOR ENLARGED FLOOR PLAN1 NEW WALLS LEGEND CORRIDOR WALLS (1HR FIRE RATED, STC MIN, TYP.) SEE DETAIL 2/A800. ALL SLIDING DOORS SHALL HAVE SWING OUT PANELS OR TO COMPLY W/ CBC 1008.1.4.3 NOTE: GC TO VERIFY IN FIELD FIRE RATING AND PANIC HARDWARE OF ALL EXISTING EGRESS DOORS. 1.PREP FLOOR AND INSTALL NEW OWNER SUPPLIED CARPET CARPET 1/16" TYPICAL. FILL IN ANY SPACES WHERE TILE DOES NOT EXIST. SEE ID FINISH PLANS FOR FLOOR PATTERNS. FURNISH AND INSTALL NEW MILLWORK WALL BASE PAINT/STAIN AS SPECIFIED. REFER TO ID FINISH PLANS FOR MORE INFORMATION. 6.FURNISH AND INSTALL NEW TRANSITION STRIP AS SPECIFIED. INSTALL SCHLUTER STRIPS (STAINLESS STEEL) ALL CARPET TO TILE FURNISH AND INSTALL NEW DOOR(S) AND FRAME(S) AS SPECIFIED. REFER TO A600 DOOR SCHEDULE. 10.REPLACE ALL COVERPLATES AND ELECTRICAL DEVICES THROUGHOUT WITH NEW. COLOR: TBD REINSTALL ALL WALL MOUNTED DEVICES SUCH AS EXIT SIGNS, SMOKE DETECTORS, ETC ON NEW WALLCOVERED SURFACE. INSTALLINFORMATION.NEWOWNER SUPPLIED ARTWORK PACKAGE AS SPECIFIED FURNISH AND INSTALL NEW WALL. PAD AS SPECIFIED IN FINISH PLAN FOR MORE INFORMATION. 2.PREP FLOOR AND FURNISH AND INSTALL NEW FLOOR TILE BEFORE FINISH PLANS FOR FLOOR PATTERNS. 3.PREP WALLS AND INSTALL NEW OWNER SUPPLIED WALLCOVERING AS TO LINE BETWEEN FLOOR AND WALL WHEN PATTERN ALLOWS. GROUT JOINT TO BE 1/16" TYPICAL. SEE ID FINISH PLANS AND 6.FURNISHSPECIFIED.AND INSTALL TILE WALL BASE AS SPECIFIED. REFER TO 8.FURNISH AND INSTALL NEW TRANSITION STRIP AS SPECIFIED. INSTALL SCHLUTER STRIPS (STAINLESS STEEL) ALL CARPET TO TILE REFER TO A600 DOOR SCHEDULE. 10.PREP AND PAINT EXISTING DOOR(S) AND FRAME(S) SPECIFIED. 13.FURNISH AND INSTALL NEW VENEER WALLCOVERING AS SPECIFIED. ALL VENEER WALLCOVERING TO APPROVED BY AML. 15.FURNISH AND INSTALL NEW MILLWORK AS SPECIFIED. REFER TO SPECIFICATIONS AND DRAWINGS FOR MORE INFORMATION. 28.PREP EXISTING PAINTED GRILLS AND ACCESS PANELS WALLS TO AND PANELS CEILING NOT TO BE PAINTED. 30.REPLACE ALL COVERPLATES AND ELECTRICAL DEVICES THROUGHOUT OUTLETS CONNECTIONS AND WIRING WHERE SPECIFIED. 32.REINSTALL ALL WALL MOUNTED DEVICES SUCH AS EXIT SIGNS, SMOKE DETECTORS, ETC ON NEW WALLCOVERED SURFACE. 34.INSTALLINFORMATION.NEWOWNER SUPPLIED ARTWORK PACKAGE AS SPECIFIED 36.INSTALLSPECIFIED.NEW OWNER SUPPLIED SIGNAGE PACKAGE AS SPECIFIED. 39.PREP FLOOR AND INSTALL NEW CARPET TILE AS SPECIFIED. REFER TO FINISH PLAN FOR MORE INFORMATION. 41.FURNISH AND INSTALL NEW RESILIENT WALL BASE AS SPECIFIED. REFER TO FINISH PLAN FOR MORE INFORMATION. 65.NOT USED INCORPORATED A6225W CENTURY BLVD LOS ANGELES, CA 90045   AT  LOBBY BAR RESTAURANT&&REGENCYCLUBRENOVATION 3/16"=1'-0" FIRST FLOOR ENLARGED FLOOR PLAN2 PH A800 A800 HYATT LAX RENOVATION WILLIAM F. BURCH ARCHITECTS

GUGENHEIMTOM WISCOMBE ARCHITECTURE

Old Bank District Museum Deisgn

OBDM

Gugenheim Museum Competition

By Rhino/Maya

-Participated the project Old Bank District Museum Design in Los Angeles including site research, site 3D digital model building, new building design and physical model build up.

-Joined the competition team of Guggenheim Museum, taking part in concept design and finish the Drawings & Diagrams

TOM WISCOMBE ARCHITECTURE

Pieces

Selection Move & group rotate Self rotate & expand BridgeFinalshape By Rhino/Maya

BREAKING SYMMETRY This is a individual work instructed by Michael Rotondi.

FLAMINO Urben & Science Museum design Andrew Zago Studio Project [ Building

Original ShapeExtrude Shape Contort Shape

FROGETTO Form Rhino/Grasshopper

Contortion ] By

Glaze Frame Inner Construction Skirt BuildingGroundTrussesFloorGarage CURVE MOUNTAINS High Rise Complex design Eric Moss Studio Project [ Building Layers ] By Rhino/Maya

projectlocation:5960informationSunsetBlvdLosAngeles,CAbuildingtype:academyprojectarea:135645sq.ft CONCRETE FLOOR PLATES, COLUMNS AND CORES 9,083.446 13,937.41280,774.236lf $100/lf$125/lf$150/lf $6,134,133.900$97,966,217.566$13,908,038.758$5,245,959.486$8,077,423.600$1,742,176.523$1,362,516.962$58,972,341.236$3,728,570.24$466,071.280$6,991,069.200STRUCTURAL STEEL FRAME STRUCTURAL(SHELL) STEEL FRAME(FLOOR&BASE)COPMPONENT QUANTITYUNITY PRICE COST STEEL PATTERN PANELS FLOORFIREHVACSPRINKLERSFINISH TOTAL WALL CURTAINFINISHWALL GLASS PANELS SHADOW CLOUD Building Construction Development Design By Rhino/Maya Instructed By Tom Wiscombe & Herwig Baumagartner [ Steel Pattern Detail ] [ Roof Section Detail ] [ Wall Section Detail ] [ Auditorium Detail ] [ Floor Section Detail ]

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.