Joel and Amanda 5 Projects

Page 1


6AM INSTRUCTOR: CASEY REHM LOCATION_ ARTS DISTRICT_LOS ANGELES_CALIFORNIA SITE AREA_700,000SQFT SIZE_2800,000SQFT PROGRAM_HOTEL_RESIDENTIAL_LIVE/WORK_SCHOOL_GALLERY _THEATER_MARKETPLACE

JOEL WONG & AMANDA GUNAWAN



JOEL WONG & AMANDA GUNAWAN


6AM/ THESIS


JOEL WONG & AMANDA GUNAWAN


6AM/ THESIS


JOEL WONG & AMANDA GUNAWAN


6AM/ THESIS


JOEL WONG & AMANDA GUNAWAN


6AM/ THESIS


JOEL WONG & AMANDA GUNAWAN


6AM/ THESIS


JOEL WONG & AMANDA GUNAWAN



JOEL WONG & AMANDA GUNAWAN


6AM/ THESIS


SBERBANK TECHNOPARK INSTRUCTOR: ERIC OWEN MOSS LOCATION_ MOSCOW_RUSSIA SITE AREA_700,000SQFT SIZE_1400,000SQFT PROGRAM_OFFICES_CANTEEN_RESTAURANTS_MULTI-PURPOSE SPORTS HALL

JOEL WONG & AMANDA GUNAWAN



JOEL WONG & AMANDA GUNAWAN


SBERBANK/ TECHNOPARK


JOEL WONG & AMANDA GUNAWAN

1.

Core Primary Columns

3.

5.

Roof framework, steel tube channels

6. Roof Glazing mullion structure

8.

Inner Bracer connectors (connects one arm to the other) Secondary tube channels for upper structure

11.

Floor plates

14.

Circulation Elements Escalators Stairs

Large Bracers for Upper Structure

9.

4.

15.

4.

7. Primary tube channels for Upper Structure

Columns for floor plates

10.

Floor Plate beams

13.

Seconday beams for roof structure

Partition Walls (Gypsum)

Seconday beams for roof structure

16.

Tertiary truss structure for facade glazing

Steel facade cladding Double curved glass glazing


SBERBANK/ TECHNOPARK


JOEL WONG & AMANDA GUNAWAN


SBERBANK/ TECHNOPARK



SBERBANK/ TECHNOPARK



SBERBANK/ TECHNOPARK


BERKELEY ART MUSEUM INSTRUCTOR: HERWIG BAUMGARTNER (3B) PAVEL GETOV, SCOTT URIU (DD) LOCATION_ SAN FRANCISCO, CALIFORNIA SITE AREA_80, 000SQFT SIZE_300,000SQFT PROGRAM_MUSEUM

JOEL WONG & AMANDA GUNAWAN




BERKELEY ART CENTER


B

C

D

E

F

G

H

I

J

K

L

M

N

16.02

20.00

3.98

30.63

30.63

A

22.08

13.92 26.08

109.63

2.00

SEE A.1.1

19.00

7.00

SEE A.1.0

A

B

C

D

E

F

G

H

I

J

K

L

M

N KEY PLAN

10

JOEL WONG & AMANDA GUNAWAN

20

50

100


1

2

3

4

5

6

7

8

9

G

G

F

F

E

E

D

D

C

C

B

B

A

A

KEY SECTION

1

2

3

4

5

6

7

8

9

N

10

20

50

100

BERKELEY ART CENTER


OVERALL BUILDING OCCUPANCY TYPE: ASSEMBLY A3 (Exhibit Gallery and Museum: 15 SQF/ Occupant TOTAL BUIDLING OCCUPANCY : LOAD 1500 FULLY SPRINKLERED : MAX DIST TO EGRESS: 200’ MINIMUN STAIR EGRESS FOR BUILDING: STAIR MAX LOAD: 850 MIN WIDTH FOR BUILDING: 170”

LEVEL 4 ASSEMBLY UNCONCENTRATED: 4200 SQ FT STAIR MAX LOAD: 280 MIN WIDTH: 56” LEVEL 3 ASSEMBLY UNCONCENTRATED: 4800 SQ FT STAIR MAX LOAD: 280 MIN WIDTH: 62” LEVEL 2 ASSEMBLY UNCONCENTRATED: 4500 SQ FT STAIR MAX LOAD: 260 MIN WIDTH: 60”

LEVEL 1 ASSEMBLY WITH FIXED SEATS 200 ASSEMBLY STANDING: 400 SQ FT MIN WIDTH: 48”

LEVEL 1 ASSEMBLY STANDING: 7275 STAIR MAX LOAD: 850 MIN WIDTH: 170”

EGRESS

ADA

ADA

3

1

RETURNING DUCT

R= 20’

DIFFUSER COOLING TOWER

COOLING TOWER COMPRESSOR CONDENSER EVAPORATOR 2 R= 20’

ADA PARKING

AHU UNIT3 LECTURE HALL MAIN RETURNING DUCT MAIN SUPPLY DUCT SUPPLIER

+0

360”

SUPPLIER BOILER

BOILER

AHU UNIT2 +30”

AHU UNIT1

HVAC

18” 46”

JOEL WONG & AMANDA GUNAWAN

ADA CIRCULATION 1

ADA Circulation Detail

46”

2

ADA Restroom Detail

18” 16” 80”

64”


1

2

3

4

5

6

7

8

9

G

G

F

F

E

E

D

D

C

C

B

B

A

A

1

2

3

4

5

6

7

8

9

KEY SECTION

N

10

20

50

100

3RD FLOOR PLAN BERKELEY ART CENTER


3

4

5

1

1

1

10 - 8

10 - 8

10 - 8

6

7

1

1 6-6

1 6-6

1

1

1

1

8-6

6-6

6-6

6-6

1

1

1

8-6

6-6

6-6

PIPING AT 11’-8” F.F - CL 26” CL - T.O.S

1

8-6

1 6-6

1 1

1

1

1

1

8-6

6-6

6-6

6-6

8-6

1 8-6

1

1

8-6

8-6

1

1

8-6

8-6

E

1

1

8-6

8-6

1

1

6-6

6-6

8-6

1 6-6

1

1

1

8-6

6-6

6-6

B

B PIPING AT 13’-1½” F.F - CL 12” CL - T.O.S

A

A

1

1

2

3

4

5

6

7

RISER DETAIL

3

C

1 8-6

1

PIPING AT 11’-8” F.F - CL 26” CL - T.O.S

8-6

1

C

1 8-6

PIPING AT 13’-1½” F.F - CL 12” CL - T.O.S

1 10 - 8

1 8-6

F

D

8-6

1 8-6

1 12 - 6

1 8-6

G

STANDPIPE UP

8-6

1

1 8-6

1

1 6-6

1

1 6-6

8-6

1

STANDPIPE UP

D

1 8-6

1

8-6

1 1

1 6-6

1 8-6

8-6

1 6-6

10 - 8

1

1 6-6

1 8-6

10 - 6

1 6-6

8-6

E

9

10 - 6

1 6-6

G

F

8

10 - 6

1

2

8-6

1

8

1. 6” Underground by others see site plan for continuation 2. 6” Flanage @ 12” AFF start of contract 3. 6” Flanged 90 degree below 4. 6” OS&Y valve w/ tamper switch wired by others 5. 6” AMES 2000SS backflow preventor assembly 6. 6” Pipe stand as per NFPA #13 6. 6” Flanged Tee 8. 6” x 4” reducing flange 9. 4” underground by others to freestanding FDC 10. 6” flange X groove adapter 11. 4” grooved reliable model G riser check valve 12. 4” grooved 90 degree below 13. 12 spare gead box w/ spare geads & wrench 14. 10” potter rowmer 6230 red elec bell wired by others 15. 4” to system see first floor plan for continuation

9

FIRE PROTECTION PLAN

A B C D E F G H J

4” Fire main led-in (by others) 4” x 2½ Flanged concentric reducer 2½ Ame 4000SS reduced pressure backflow w/ OS&Y valves & Tamper switches (wiring by others) 2½ Grooved tee to F.D.C. 4” x 2½ Grooved reducing coupling 2½ Riser manifold w/ gauge, flow switch and test/ drain valve piped outside building 2½ Piping to sprinklers 2½ Grooved check valve Fire department connection (verify type, size, and location with local fire department)

2

JOEL WONG & AMANDA GUNAWAN

RISER DETAIL


Secondary I-Beams

I-Column

Concrete Column Diagonal Beams

Bolts Welding Plates

Diagonal Beams

Primary I-Beams

Primary Plate Secondary Plating Large Bolts

Primary Structure Secondary Structure

Building Core (Concrete)

Floor Beams Horizontal Bracing

Basement Column Basement Beams Concrete Ground Protection Board Drainage Material Water Proofing Membrane Retaining Wall Spread Footing Slab Concrete Piling

BERKELEY ART CENTER


Building Part B

Building Part A

Theater

JOEL WONG & AMANDA GUNAWAN


GFRC Water Proofing Primary I-Beams GFRG

Inner Cladding (Metal Sheet)

Inner Wall Aperture Mullions Inner Wall Apertures

Aperture Primary Mullion Secondary Column Diagonal Structure Double Curved Glass Concrete Floor Corrugated Floor Sheets

HVAC Ceiling

Building Column

Escalator

Escalator Beam Structure Floor Finishing Floor Topping Iron Rebar Floor Beams Diffusers Ceiling Vertical Brace Ceiling Horizontal Brace

BERKELEY ART CENTER


Mullion GFRC Panel Connection Metal Sheet Insulation Water Proofing Secondary I-Beam Primary Structure GFRG

Gutter

Top Deck Corrugated Steel Deck Steel Frame Structure Bridging Clip Angle HVAC Ceiling

JOEL WONG & AMANDA GUNAWAN


1 2 3 4 5 6

7 8 9 10 11 12

Glass Fibre Reinforced Concrete Pedestal GFRC Clips Vacuum Void Weatherproofing Membrane Metal Sheathing

Protective Sheathing Glass Fibre Reinforced Gypsum Primary Steel I-beam C-stud Steel Plate Secondary Steel I-beam

Aperture

Aluminium Frame Primary Structure Insulating Sheet Secondary Mulions

Glass

1 2 3 4 5 6

7 8 9 10

11 10

1

23

4

5

6

3

12

7

8

9 10 11

Glass Fibre Reinforced Concrete Pedestal GFRC Clips Vacuum Void Weatherproofing Membrane Metal Sheathing

7 8 9 10 11 12

7

12

4

1 2 3 4 5 6

6

Protective Sheathing Glass Fibre Reinforced Gypsum Primary Steel I-beam C-stud Steel Plate Secondary Steel I-beam

5

1 2 3 4 5 6 7

Steel Connector Aluminium Fixing Strip Main Mullion Connection Steel Frame Primary Mullion Heat-Insulated Glass Secondary Mullion GFRG Primary Beams

Secondary Beams

C-Studs

Metal Sheeting

W.P.M

GFRC Rail

GFRC Panels

BERKELEY ART CENTER



BERKELEY ART CENTER



BERKELEY ART CENTER




LA TRINIDAD, STORAGE CITY INSTRUCTOR: JOHN ENRIGHT LOCATION_MEXICO SITE AREA_1237,000 SQFT SIZE_ >6000,000 SQFT PROGRAM_STORAGE CITY

JOEL WONG & AMANDA GUNAWAN



JOEL WONG & AMANDA GUNAWAN


LA TRINIDAD, STORAGE CITY


JOEL WONG & AMANDA GUNAWAN


LA TRINIDAD, STORAGE CITY


JOEL WONG & AMANDA GUNAWAN


LA TRINIDAD, STORAGE CITY


JOEL WONG & AMANDA GUNAWAN



LA CANTERA, COLUMBARIUM INSTRUCTOR: JOHN ENRIGHT LOCATION_MEXICO SITE AREA_400,000 SQFT SIZE_ >100,000 SQFT X 12 PROGRAM_COLUMBARIUM

JOEL WONG & AMANDA GUNAWAN



curves

lofted surface

lodging between two buildings

circulation

inner niche slabs

multiplication and rotation



JOEL WONG & AMANDA GUNAWAN


LA CANTERA, COLUMBARIUM


JOEL WONG & AMANDA GUNAWAN


LA CANTERA, COLUMBARIUM


JOEL WONG & AMANDA GUNAWAN


LA CANTERA, COLUMBARIUM


JOEL WONG & AMANDA GUNAWAN


LA CANTERA, COLUMBARIUM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.