6AM INSTRUCTOR: CASEY REHM LOCATION_ ARTS DISTRICT_LOS ANGELES_CALIFORNIA SITE AREA_700,000SQFT SIZE_2800,000SQFT PROGRAM_HOTEL_RESIDENTIAL_LIVE/WORK_SCHOOL_GALLERY _THEATER_MARKETPLACE
JOEL WONG & AMANDA GUNAWAN
JOEL WONG & AMANDA GUNAWAN
6AM/ THESIS
JOEL WONG & AMANDA GUNAWAN
6AM/ THESIS
JOEL WONG & AMANDA GUNAWAN
6AM/ THESIS
JOEL WONG & AMANDA GUNAWAN
6AM/ THESIS
JOEL WONG & AMANDA GUNAWAN
6AM/ THESIS
JOEL WONG & AMANDA GUNAWAN
JOEL WONG & AMANDA GUNAWAN
6AM/ THESIS
SBERBANK TECHNOPARK INSTRUCTOR: ERIC OWEN MOSS LOCATION_ MOSCOW_RUSSIA SITE AREA_700,000SQFT SIZE_1400,000SQFT PROGRAM_OFFICES_CANTEEN_RESTAURANTS_MULTI-PURPOSE SPORTS HALL
JOEL WONG & AMANDA GUNAWAN
JOEL WONG & AMANDA GUNAWAN
SBERBANK/ TECHNOPARK
JOEL WONG & AMANDA GUNAWAN
1.
Core Primary Columns
3.
5.
Roof framework, steel tube channels
6. Roof Glazing mullion structure
8.
Inner Bracer connectors (connects one arm to the other) Secondary tube channels for upper structure
11.
Floor plates
14.
Circulation Elements Escalators Stairs
Large Bracers for Upper Structure
9.
4.
15.
4.
7. Primary tube channels for Upper Structure
Columns for floor plates
10.
Floor Plate beams
13.
Seconday beams for roof structure
Partition Walls (Gypsum)
Seconday beams for roof structure
16.
Tertiary truss structure for facade glazing
Steel facade cladding Double curved glass glazing
SBERBANK/ TECHNOPARK
JOEL WONG & AMANDA GUNAWAN
SBERBANK/ TECHNOPARK
SBERBANK/ TECHNOPARK
SBERBANK/ TECHNOPARK
BERKELEY ART MUSEUM INSTRUCTOR: HERWIG BAUMGARTNER (3B) PAVEL GETOV, SCOTT URIU (DD) LOCATION_ SAN FRANCISCO, CALIFORNIA SITE AREA_80, 000SQFT SIZE_300,000SQFT PROGRAM_MUSEUM
JOEL WONG & AMANDA GUNAWAN
BERKELEY ART CENTER
B
C
D
E
F
G
H
I
J
K
L
M
N
16.02
20.00
3.98
30.63
30.63
A
22.08
13.92 26.08
109.63
2.00
SEE A.1.1
19.00
7.00
SEE A.1.0
A
B
C
D
E
F
G
H
I
J
K
L
M
N KEY PLAN
10
JOEL WONG & AMANDA GUNAWAN
20
50
100
1
2
3
4
5
6
7
8
9
G
G
F
F
E
E
D
D
C
C
B
B
A
A
KEY SECTION
1
2
3
4
5
6
7
8
9
N
10
20
50
100
BERKELEY ART CENTER
OVERALL BUILDING OCCUPANCY TYPE: ASSEMBLY A3 (Exhibit Gallery and Museum: 15 SQF/ Occupant TOTAL BUIDLING OCCUPANCY : LOAD 1500 FULLY SPRINKLERED : MAX DIST TO EGRESS: 200’ MINIMUN STAIR EGRESS FOR BUILDING: STAIR MAX LOAD: 850 MIN WIDTH FOR BUILDING: 170”
LEVEL 4 ASSEMBLY UNCONCENTRATED: 4200 SQ FT STAIR MAX LOAD: 280 MIN WIDTH: 56” LEVEL 3 ASSEMBLY UNCONCENTRATED: 4800 SQ FT STAIR MAX LOAD: 280 MIN WIDTH: 62” LEVEL 2 ASSEMBLY UNCONCENTRATED: 4500 SQ FT STAIR MAX LOAD: 260 MIN WIDTH: 60”
LEVEL 1 ASSEMBLY WITH FIXED SEATS 200 ASSEMBLY STANDING: 400 SQ FT MIN WIDTH: 48”
LEVEL 1 ASSEMBLY STANDING: 7275 STAIR MAX LOAD: 850 MIN WIDTH: 170”
EGRESS
ADA
ADA
3
1
RETURNING DUCT
R= 20’
DIFFUSER COOLING TOWER
COOLING TOWER COMPRESSOR CONDENSER EVAPORATOR 2 R= 20’
ADA PARKING
AHU UNIT3 LECTURE HALL MAIN RETURNING DUCT MAIN SUPPLY DUCT SUPPLIER
+0
360”
SUPPLIER BOILER
BOILER
AHU UNIT2 +30”
AHU UNIT1
HVAC
18” 46”
JOEL WONG & AMANDA GUNAWAN
ADA CIRCULATION 1
ADA Circulation Detail
46”
2
ADA Restroom Detail
18” 16” 80”
64”
1
2
3
4
5
6
7
8
9
G
G
F
F
E
E
D
D
C
C
B
B
A
A
1
2
3
4
5
6
7
8
9
KEY SECTION
N
10
20
50
100
3RD FLOOR PLAN BERKELEY ART CENTER
3
4
5
1
1
1
10 - 8
10 - 8
10 - 8
6
7
1
1 6-6
1 6-6
1
1
1
1
8-6
6-6
6-6
6-6
1
1
1
8-6
6-6
6-6
PIPING AT 11’-8” F.F - CL 26” CL - T.O.S
1
8-6
1 6-6
1 1
1
1
1
1
8-6
6-6
6-6
6-6
8-6
1 8-6
1
1
8-6
8-6
1
1
8-6
8-6
E
1
1
8-6
8-6
1
1
6-6
6-6
8-6
1 6-6
1
1
1
8-6
6-6
6-6
B
B PIPING AT 13’-1½” F.F - CL 12” CL - T.O.S
A
A
1
1
2
3
4
5
6
7
RISER DETAIL
3
C
1 8-6
1
PIPING AT 11’-8” F.F - CL 26” CL - T.O.S
8-6
1
C
1 8-6
PIPING AT 13’-1½” F.F - CL 12” CL - T.O.S
1 10 - 8
1 8-6
F
D
8-6
1 8-6
1 12 - 6
1 8-6
G
STANDPIPE UP
8-6
1
1 8-6
1
1 6-6
1
1 6-6
8-6
1
STANDPIPE UP
D
1 8-6
1
8-6
1 1
1 6-6
1 8-6
8-6
1 6-6
10 - 8
1
1 6-6
1 8-6
10 - 6
1 6-6
8-6
E
9
10 - 6
1 6-6
G
F
8
10 - 6
1
2
8-6
1
8
1. 6” Underground by others see site plan for continuation 2. 6” Flanage @ 12” AFF start of contract 3. 6” Flanged 90 degree below 4. 6” OS&Y valve w/ tamper switch wired by others 5. 6” AMES 2000SS backflow preventor assembly 6. 6” Pipe stand as per NFPA #13 6. 6” Flanged Tee 8. 6” x 4” reducing flange 9. 4” underground by others to freestanding FDC 10. 6” flange X groove adapter 11. 4” grooved reliable model G riser check valve 12. 4” grooved 90 degree below 13. 12 spare gead box w/ spare geads & wrench 14. 10” potter rowmer 6230 red elec bell wired by others 15. 4” to system see first floor plan for continuation
9
FIRE PROTECTION PLAN
A B C D E F G H J
4” Fire main led-in (by others) 4” x 2½ Flanged concentric reducer 2½ Ame 4000SS reduced pressure backflow w/ OS&Y valves & Tamper switches (wiring by others) 2½ Grooved tee to F.D.C. 4” x 2½ Grooved reducing coupling 2½ Riser manifold w/ gauge, flow switch and test/ drain valve piped outside building 2½ Piping to sprinklers 2½ Grooved check valve Fire department connection (verify type, size, and location with local fire department)
2
JOEL WONG & AMANDA GUNAWAN
RISER DETAIL
Secondary I-Beams
I-Column
Concrete Column Diagonal Beams
Bolts Welding Plates
Diagonal Beams
Primary I-Beams
Primary Plate Secondary Plating Large Bolts
Primary Structure Secondary Structure
Building Core (Concrete)
Floor Beams Horizontal Bracing
Basement Column Basement Beams Concrete Ground Protection Board Drainage Material Water Proofing Membrane Retaining Wall Spread Footing Slab Concrete Piling
BERKELEY ART CENTER
Building Part B
Building Part A
Theater
JOEL WONG & AMANDA GUNAWAN
GFRC Water Proofing Primary I-Beams GFRG
Inner Cladding (Metal Sheet)
Inner Wall Aperture Mullions Inner Wall Apertures
Aperture Primary Mullion Secondary Column Diagonal Structure Double Curved Glass Concrete Floor Corrugated Floor Sheets
HVAC Ceiling
Building Column
Escalator
Escalator Beam Structure Floor Finishing Floor Topping Iron Rebar Floor Beams Diffusers Ceiling Vertical Brace Ceiling Horizontal Brace
BERKELEY ART CENTER
Mullion GFRC Panel Connection Metal Sheet Insulation Water Proofing Secondary I-Beam Primary Structure GFRG
Gutter
Top Deck Corrugated Steel Deck Steel Frame Structure Bridging Clip Angle HVAC Ceiling
JOEL WONG & AMANDA GUNAWAN
1 2 3 4 5 6
7 8 9 10 11 12
Glass Fibre Reinforced Concrete Pedestal GFRC Clips Vacuum Void Weatherproofing Membrane Metal Sheathing
Protective Sheathing Glass Fibre Reinforced Gypsum Primary Steel I-beam C-stud Steel Plate Secondary Steel I-beam
Aperture
Aluminium Frame Primary Structure Insulating Sheet Secondary Mulions
Glass
1 2 3 4 5 6
7 8 9 10
11 10
1
23
4
5
6
3
12
7
8
9 10 11
Glass Fibre Reinforced Concrete Pedestal GFRC Clips Vacuum Void Weatherproofing Membrane Metal Sheathing
7 8 9 10 11 12
7
12
4
1 2 3 4 5 6
6
Protective Sheathing Glass Fibre Reinforced Gypsum Primary Steel I-beam C-stud Steel Plate Secondary Steel I-beam
5
1 2 3 4 5 6 7
Steel Connector Aluminium Fixing Strip Main Mullion Connection Steel Frame Primary Mullion Heat-Insulated Glass Secondary Mullion GFRG Primary Beams
Secondary Beams
C-Studs
Metal Sheeting
W.P.M
GFRC Rail
GFRC Panels
BERKELEY ART CENTER
BERKELEY ART CENTER
BERKELEY ART CENTER
LA TRINIDAD, STORAGE CITY INSTRUCTOR: JOHN ENRIGHT LOCATION_MEXICO SITE AREA_1237,000 SQFT SIZE_ >6000,000 SQFT PROGRAM_STORAGE CITY
JOEL WONG & AMANDA GUNAWAN
JOEL WONG & AMANDA GUNAWAN
LA TRINIDAD, STORAGE CITY
JOEL WONG & AMANDA GUNAWAN
LA TRINIDAD, STORAGE CITY
JOEL WONG & AMANDA GUNAWAN
LA TRINIDAD, STORAGE CITY
JOEL WONG & AMANDA GUNAWAN
LA CANTERA, COLUMBARIUM INSTRUCTOR: JOHN ENRIGHT LOCATION_MEXICO SITE AREA_400,000 SQFT SIZE_ >100,000 SQFT X 12 PROGRAM_COLUMBARIUM
JOEL WONG & AMANDA GUNAWAN
curves
lofted surface
lodging between two buildings
circulation
inner niche slabs
multiplication and rotation
JOEL WONG & AMANDA GUNAWAN
LA CANTERA, COLUMBARIUM
JOEL WONG & AMANDA GUNAWAN
LA CANTERA, COLUMBARIUM
JOEL WONG & AMANDA GUNAWAN
LA CANTERA, COLUMBARIUM
JOEL WONG & AMANDA GUNAWAN
LA CANTERA, COLUMBARIUM