introduction
C
ompany DENEZA M Inzenjering d.o.o. (LLC) was founded in 1992. Company's core business consists of construction works (excavating with foundation, piling, building, insulating, plumbing, HVAC, finishing, facade works, turnkey, etc.) and shipbuilding works in the past period. Over 18 years of successful business activity, the number of employees was constantly increasing (currently on Deneza’s projects are employed app. 800 people) followed by spreading of Company activities on new markets, and thus DENEZA M Inzenjering is now working on the entire territory of Serbia. The position of the company is the strongest in Belgrade – where competition is on the highest level and where contractors can only be serious and stable construction companies with good reference lists. Company’s headquarter is composed of Management, Technical sector, Estimating, Commercial, Administrative and Financial Departments
2
Technical and technology resources
R
esume comprises the overview of equipment and machinery list. Those two resources are the base point for (in time-quantity-quality) performing of core business covered by Company’s offer. Company’s strategy is aimed at building construction, as part of civil engineering. It is important to notify that Company is constructing business-residential buildings in turnkey option.
Details of technical and tecnology recources are on next four pages
3
equipment and machinery list Name of E/M
Type
Pcs.
Year of production
Concrete mobile mixer
Mercedes - Benc 3541 Actros
5
2007
Dumper track
Mercedes - Benc 4141 Actros
5
2007/2008
Dumper track
Mercedes - Benc 3341 Actros
4
2008
Tug truck
Mercedes - Benz 3346; GOĹ A FPPN 50
1+1
2008
Truck lorry
Mercedes - FAP 2635
1
1986
Trailers
Deangelis DA 180
1
1981
Concrete mobile pump
SCHWING S39 SX
1
2007
Concrete stabile
MAYCO LS 60
1
2008
Mobile crane
Locatelli ATC 2D
1
2004
Water tank truck
FAP 12 13 V=6000lit
1
2008
Minibus
Mercedes Benc Sprinter 906
1
2006
Dumper track
Renault Mascott 150.35 DC
4
2007
Supply vehicle (open lorry)
Mercedes 602 D
1
1978
Supply vehicle (furgon)
Mercedes 307 D
1
1986
Supply vehicle (pick-up)
Zastava Poly
1
1996
Supply Vehicle (open lorry)
Mercedes Sprinter 311 CDI
1
2008
Bulldozer
Caterpillar D6K XL
1
2008
Bagger
Caterpillar 323 DLN
1
2008
Bagger
Caterpillar M 318 D
1
2008
Bagger
Caterpillar 307 C
1
2008
Bagger
Caterpillar 304 C
1
2008
4
Name of E/M
Type
Pcs.
Year of production
Combined machine
Caterpillar 434 E
2
2008
Telescopic handler
Caterpillar 460 I TH 580
2
2005/2007
Skid steer loader
Caterpillar 272 C
2
2007/2008
Agriculture tractor + trailer
IMT 539 I IMT 635
2+2
2008/2007
Rig. for driven, CFA piles and diapramgs
Mait midi drill HR 30, Mait HR 130, Mait HR 180
3
2008
Crane
Raimondi MR 75 E L=48m
1
2005
Crane
Raimondi GMT 69 L=46m
1
2005
Crane
Raimondi GRT 60 L=60m
1
2008
Crane
Potain MCT 88 L=52m
1
2008
Crane
Potain 744 E l=48m
2
1979/1980
Elevator
Delta MC 750
1
2008
Compressor
Atlas Copco XAS 77
3
2007/08/09
Formwork
NOE Deck - slab “drop head” system
Formwork
NOE H 20 - slab20cm beams system
5000 m
Formwork
NOE AluL - wall light system
1200 m2
2007/2008
Formwork
NOE wall heavy system
800 m2
2008
Formwork
NOE circular columns set
30
2007/2008
Formwork
NOE rectangular columns set
20
2008
Scaffolding
LAYHER facade system
25000 m2
2007
Vehicles
5500 m2 x 2 2
2007 2007
23
5
Earth works
F
or the excavation of construction pits and other earth works DENEZA M Inzenjering is very well equipped with all necessary machinery. With heavy and light machines (badgers, bulldozer, combined machines, Bobcats, skippers, etc.) in cooperation with means of transport (18 different units) Company is capable for (in time-quantity-quality) executing any in situ task.
6
Rigs for piles
F
rom July 2008 DENEZA M Inzenjering is equipped with new rigs for piling works. Supplier of rigs and technology is Italian company MAIT. Teams of experienced and trained rigs operators with excellent technical management can fast and quality fulfill any designer and investor demands in next scope: - driven piles (R400-1.500 mm) up to depth of 40 m; - diaphragms (d=450-800 mm) up to depth of 35 m; - CFA piles (R400-800 mm) up to depth of 24 m. Rig MAIT Midi Drill HR30 is convenient for work in small construction pits and narrow spaces and it is capable to drill nearby the edge of existing building wall.Rig MAIT HR130 is high effective and suitable for driven piles and diaphragms up to depth of 30 m.The biggest rig MAIT HR180 can be used for driven piles up to Ř1.500 mm in diameter and for diaphragms up to depth of 35 m.
Construction works
D
ENEZA M Inzenjering Company’s Management and Technical Department (assembled of civil engineering experts with great experience) is guiding all the activities in construction works, followed by technical staff and numerous construction workers (men power). Staff education and training to work with modern formwork and scaffolding systems and with other equipment and machinery is at the Company’s first place, therefore the investor’s triple aim (in timequantity-quality) can be easily achieved without neglecting maximum of safety, health and environmental criteria. Purchase of modern concrete mobile mixers, mobile and stabile concrete pumps, formwork and scaffolding systems, mobile cranes and numerous modern site cranes represent very good base point for faster and better quality of construction works.
Finishes Formworks system
R
educing the construction time (even for 25% of planed time) is possible with using modern formwork system for slabs NOE Deck (drop head system). DENEZA M Inzenjering is equipped with 3.500 m2 of such system.
Scaffolding systems
I
n year 2007 DENEZA M Inzenjering was equipped with 25.000 m2 modern facade frame scaffolding system from German company Layher.
B
y own capacities and through cooperation with reliable and quality subcontractors DENEZA M Inzenjering can answer to all investor’s demands for finishes, what is approved on many construction sites.
7
human recources
C
ompany DENEZA M Inzenjering currently deplyes approximetaly 800 workers (out of which 357 are permanently employed and 450 are subcontractor staff). Whithin Deneza’s employes there are 68 with college and university degree. Amongst highly competent staff, there are 50 experienced engineers. In its’ Management and Technical Department, Company is proud to have twenty three civil engineers who are holders of License for the execution of works, same as seven architects and one mechanical engineer. Also, there are nine holders of License for Designing – 5 civil engineers, 3 architects and one mechanical engineer.
8
Accommodation for workers – motel
I
n New Belgrade – Bezanija in Vinogradska Street DENEZA M Inzenjering is the owner of Motel for accommodation for approximately 350 employees in area size of 3.500 m2. Motel is in high standard with complete infrastructure.
9
reference list Total value of projects
Project size in m2 170.040 m2
72.714.744 €
133.334 m2
42.182.136 € 132.803 m2
40.245.398 €
Year 2007/2008
Year 2009
Year 2010
Year 2007/2008
Year 2009
Year 2010
PROJECTS COMPLETED IN 2007 Project “DELTA CITY’’“ MAXI”MEGAM ARKET
“MAXI” DELTA CITY
Location
investor
Building type
Contract Price
size m2
Scope of works
Novi Beograd
‘DELTA M’’
Business
3,916,008 €
80,000
Civil and finishing works
Subotica
“DELTA” MAXI
Business
1,700,000 €
2,200
Civil and finishing works;Landscaping
Novi Beograd
“DELTA” MAXI
Business
1,000,000 €
4,680
Civil works
6,616,008 €
86,880
Total Value
PROJECTS COMPLETED IN 2008 Contract Price
size m2
MFC "Ušće"
Project
Novi Beograd
Location
European construction
investor
Business
Building type
1,606,449 €
22,000
Underground garage floor
"GORENJE"
Novi Beograd
Gorenje
Business
4,450,000 €
8,500
Civil and finishing works;Landscaping
Business Building "B2"
Beograd
Mali Kolektiv - ETB
Business
750,000 €
3,500
interior works
"Tri lista duvana"
Beograd
Tri lista duvana
Business
2,322,941 €
10,160
civil works
Accomodation for workers "Deneza"
Bežanija
Deneza M inženjering
Business-Residential
1,000,000 €
3,000
Civil and finishing works;Landscaping
10,129,390 €
47,160
Total value
“Business building B2” - Belgrade
“Gorenje” - Belgrade
Scope of works
“Tri lista duvana” - Belgrade
“New building for air traffic control Batajnica” - Belgrade
“Petrol station - Šabac
“Business building block 11a” - Belgrade
PROJECTS COMPLETED IN 2009 Project
Location
investor
Building type
Contract Price
size m2
Scope of works
Belville GP1
Novi Beograd
Preduzeće blok 57 Associates
Business
3,714,665 €
16,000
Civil works
Belville GP4/3
Novi Beograd
Preduzeće blok 57 Associates
Business Residential
3,513,355 €
10,850
Civil works
Belville GP4
Novi Beograd
Preduzeće blok 57 Associates
Business Residential
2,950,080 €
7,100
Civil works
Belville GP6
Novi Beograd
Preduzeće blok 57 Associates
Business Residential
1,542,423 €
9,000
Civil works
Belville GP1 installation
Novi Beograd
Preduzeće blok 57 Associates
Business
1,439,027 €
16,000
mechanical and electrical installations
Belville GP4/3 installation
Novi Beograd
Preduzeće blok 57 Associates
Business Residential
2,398,020 €
10,850
mechanical and electrical installations
Business building
Novi Beograd
Imperijal gradnja
Business
10,500,000 €
55,000
Civil works
Business residential building
Beograd
KOLLING
Business Residential
840,000 €
3,000
Civil works
MAXI MEGAMARKET
Beograd
C MARKET
Retail (store)
450,000 €
800
Civil and finishing works;Landscaping
MAXI MEGAMARKET
Beograd,
C MARKET
Retail (store)
650,000 €
1,200
Civil and finishing works;Landscaping
"CC TEMPO"
Vrnjačka Banja "DELTA MAXI'
Business
950,000 €
2,800
Civil and finishing works;Landscaping
Printing company
Beograd
Komerc invest
Business
1,500,000 €
4,200
Civil works
Business object block 43
Novi Beograd
Imobilija
Business
2,000,000 €
6,000
Civil works
New building for air traffic control
Beograd
Agencija za kontrolu letenja Srbije
Business
980,000 €
1,000
finishing works
EFG bank .
Beograd
EUROBANK EFG
Business
4,500,000 €
7,500
finishing and installation works
JOLLY hotel
Beograd
JOLLY
hotel
1,589,707 €
4,000
Civil works
Business object
Beograd
Atlas group
Business
1,912,059 €
4,500
Civil works
Petrol Station
Šabac
NIS Jugopetrol
Petrol Station
752,800 €
384
Total Value
“Air teaffic control” - Batajnica
finishing and installation works
42,182,136 €
“BB Takovska” - Belgrade
“CC Tempo” - Belgrade
Business building B2 Intrior
-Belgrade
Delta City Interior - New Belgrade
MAJOR PROJECT COMPLETED OR IN PROGRESS IN 2010 Project
Location
investor
Building type
Contract Price
size m2
Scope of works
Trade house "Pionir"
Niš
Robne kuće Niš
Business
8,353,277 €
18,000
civil,finishing and installation works
Building for Air traffic control, Belgrade
Beograd
Agencija za kontrolu letenja Srbije
Business
7,400,000 €
9,500
civil,finishing and installation works
Business Residential
Beograd
ADOC
Business Residential
3,022,462 €
7,420
civil,finishing and installation works
Hotel ''Nobel''
Beograd
BART&CO
hotel
550,000 €
2,800
Civil works
Fiorano - Sombor
Sombor
Kamgrad
Industrial
1,699,503 €
10,000
civil,finishing and installation works
Object in Gostivarska St.
Beograd
Neimar-V
Business Residential
4,975,760 €
20,946
Civil works
Object in Novopazarska St..
Beograd
Neimar-V
Business Residential
539,177 €
2,412
Civil works
Building for social accomodation
Sremska Mitrovica
Međunarodna donacija
Residential
486,350 €
1,631
civil,finishing and installation works
Object in Preševska St.
Beograd
Grafito real estate
Business Residential
504,666 €
1,673
foundation pit and structural works
Indoor Swimming pools JP SRPC "Milan Gale Muskatirovic"
Beograd
JP SRPC "Milan Gale Muškatirović"
Business sport and recreational
327,500 €
7,800
roof adaptation and reparatory works finishing works
Buildings 1G,1H,1L,within i-a phase ,touristic complex ,Stara planina
Stara Planina
JP Stara Planina Knjaževac
Hotel
31,503,985 €
34,431
technical:do cumentation ,civil,finishing and installation works
Object B3B.2-3
Beograd
Agencija za investicije
Business Residential
3,251,566 €
10,383
civil,finishing and installation works
67,579,246 €
126,996
Total Value MAXI MEGAMARKET - Belgrade
Trade house “Pionir”- Niš
Object B3B - New Belgrade
Delta City - New Belgrade
BUSINESS PROJECTS OVER 15 000m2 Project Trade house"Pionir"
Location Niš
investor Robne kuće Niš
Building type Business
Contract Price
size m2
Scope of works
8,353,277 €
18,000
civil,finishing and installation works
Business obNovi Beograd ject in block 11a - I i II phase
Imperijal grad- Business nja
10,500,000 €
55,000
Civil works
Belville GP1 installation
Novi Beograd
Preduzeće Business blok 57 Associates
1,439,027 €
16,000
mechanical and electrical installations
Belvile GP1
Novi Beograd
Preduzeće Business blok 57 Associates
3,714,665 €
16,000
civil works
MFC "Ušće"
Novi Beograd
European construction
Business
1,606,449 €
22,000
garage floor
"DELTA CITY''
Novi Beograd
'DELTA M''
Business
3,916,008 €
80,000
civil and finishing works
29,529,426
207,000
Total value
Belville - New Belgrade
MFC Ušće - New Belgrade
investors Name of investors MPC Holding Beograd ADOC Brodogradilište Sava Beograd Jolly travel Beograd Maxi marketi Beograd Atlas group Beograd Koling Beograd Praking servis Beograd C market Beograd Gorenje Beograd Delta city Beograd Delta M Beograd Imperial Beograd Delta generali osiguranje Beograd
C
onstruction Company DENEZA M Inzenjering LLC possesses all technical and technology resources, qualified and valuable staff and according to that, Company is capable to fulfill any investor’s and designer’s task. Arguments are all finished buildings and projects under construction. We are expecting to cooperate with you and to confirm our statements and references in aim of mutual benefits.
With compliments,
Deneza M - Company profile - september 2010 www.denezam.com