Portfolio for Job Application

Page 1

PORT FOLIO

CONTENT

01. NEO Homes

Battersea Church Road Housing Project

Duration: 10 weeks, Jan 2022 - Mar 2022

Group Work

02. Home of Organic

School Building Reconstruction, Liverpool

Duration: 12 weeks, Feb 2021 - May 2021

Individual Work

03. The City is My Orcharad

Apple Cider Making Community Center Design

Duration: 12 weeks, Oct 2020 - Jan 2021

Individual Work

04. Brick Wave

Music School Design

Duration: 12 weeks, Feb 2020 - May 2020

Individual Work

Jianfeng Zhou

Phone: 18829505570

Email: jianfeng_zhou99@163.com

01 NEO Homes

Battersea Church Road Housing Project

Academic

Group work

Role: 3D model making, weather study, shadow study, wind simulation (CFD), indoor daylight simulation, carbon calculation, some diagrams.

From January 2022 to March 2022

The assignment for Term 2 is a Design Research Project for a proposed residential development located in Battersea District in the London Borough of Wandsworth in South London. The objective of the term’s project is to create visions of living environments by knowledge and application of the sustainable and environmental design principles and tools. The emphasis is on creative exploration of future urban scenarios of work from home and climate change mitigation, within the larger gamut of Sustainable Environmental Design.

Based on initial research of local climate and surroundings, the project was designed to be a 14-storey half courtyard form in order to receive enough sunlight for each unit. Considering possible impacts to the neighbor, the roof was stepped down from one corner along two edges. Meanwhile, analytic work and simulation (Daylight simulation, Thermal simulation, etc.) was conducted before and after design for the purpose of improving design and verifying the feasibility.

N
Weather Study 12AM 6PM 12PM 6AM 12AM Jan Feb Mar DryBulbTemperature(C) - Hourly LondonWeaCtrStJamesPark_ENG_GBR 1JAN LOO-31 DEC24:00 Apr May Jun Jul Aug Sep Oct Nov Dec London Wea Ctr St James Park_ENG_GBR 芦:a;罚:;�:tSolarRadiation. $。二rt onB:n N d 15251) .笠二芦。mu:::ature ■ ��:�g�o����� SolarRadaton 厂 �:�;�m&MinimumTemperature c 20,00< 18.00 16.00 14.00 12.00 10.00 8.00 600 4.00 2.00 <0.00 (s/E)P$d5 PU!M 10 40.0 35.0 30.0 2520归10 0050 (U)3m芯怎dEa A.la 5.0 2000.0 lBOO.O 1600,0 l400,0 1200.0 1000,0 800.0 600.0 400.0 200.0 0.0 (NEI乏A)uo,�e,pe'tl 1e�uozpOH 1eqo18 Jan Feb Mar Apr May Jun Jul Aug Sep Oct NDV Dec Program Analysis Hybrid Working 血 HomeOffices Virtual Presence Digital Dependence ,、 nerrs 、' 乙 •••• ••• Warmer, Wetter Winters Increased Energy Loads andlnte「nal Gains 巳·7I户 比咚 Imperativeto provide comfortable indoors and microclimate 瞪 A More Extreme Events 斗古比 .> <.可^厂 Building close knit communities , ' 1 `, □-"` LIItD ··' 巳土 ... Designwith opportunities for DigitalDetox 令竺 .. ung Couples .. ung couples 0e 遣. Artists'/ Start Up Entrpreneurs M Familieswith children . . I MARKETSALE UNITS | M . Familieswith children . . . 1-2 PERSONS 2-3 PERSONS 1 BHK (6 Units) 2 BHK (20 Units) 1-2 PERSONS 1 BHK (48 Units) 2-3 PERSONS 3-4 PERSONS 2 BHK (10 Units) 3 BHK Maisonette (5 Units) _ a n y 01 wer01 ce7d l' n 4r an 20 t nds a1 ds eta n g_ n ch uRod ff ne ys r y y a ao r a rr d. ed bb 1f uy Ala a LILI oo CS oeooo Gymnasium (Source: Ladybug) (Source: Ladybug)
1. 2. 3. 4.
. . . .
(Source: Autodesk CFD) (Source: Autodesk CFD) (Source: Autodesk CFD) (Source: Ladybug)
0.8-1.5m 1-2.5m 1-2.5m 1-2 m 1-2.5m
Floor Plan with Balconies Unit Type

Structure & Materials

Simulation
Daylight
Figure 112 Construction Material details(Source: Rhino and Photoshop) (Source: Ladybug)

(Source: Energy Plus)

(Source: Energy Plus)

(Source: Energy Plus)

Toilet Living EntranceBedroom LETI Standard Total Energy Consumption LETI Standard kWh/m2 kWh/m2 36kWh/ m2 24 kWh/m2 Internal WallConstruction Layer +Floor 1: Paint 2: Rockwool Insulation 3: Gypsum Green Roof Construction 1: Engineered Soilwith Planting 2: Filter Fabric 3: Moisture-Retention Layer 6: Drainage Layer 7: RootBarrier 8: Membrane Protection 10: Structural Support U Value: 2K U ValueWall: 0.13W/m2K U ValueFloor: 2K U ValueRoof: 0.12W/m2K TotalHeatingDemand External Wall Construction 1: Gymsum 2:Timber 3: Rockwool Insulation

8:WellnessCentre 11:CycleParking

9:CarPark 10:ElectricCarPark 12:RecycleBinStorage

A:JoggingTrail B:Pergola C:Waterbody D:SteppedGreens E:OpenAirTheatre(OAT)

(Source: FCBS Carbon Tool) (Source: FCBS Carbon Tool) (Source: FCBS Carbon Tooolol))

School Building Reconstruction, Liverpool

Student Service Center Barclays Bank Student pub Preserved structure Life Express Post Office Bakery Original structure Main structure preserved Original building function Sitopia Academic Individual work From Feburary 2021 to June 2021
02 Home of Organic University use Residential building Commercial building City service building Students Teachers Residents Workers Cultural related ppl 500m Cultural building Site & Usage

The design preserved the main structure of this building creating a platform area at the west part of the building using the existing columns. It aims to attract local residents, students and teachers who might be interested in planting and enjoying organic food. Food shop and shared kitchen were located at the east part of the building to share food grown in this building with local people

vertical circulation (original plan)

Second floor

First floor Basement

Ground floor
Ground Flooor Plan 1: 250
University use Public use Dormitory
Preserved structure

Program diagram

Platform function

Verticle circulation & growth

Crops growth

Circulation & growth

Exhibition room

Lift

perspective section

Food shop Pub
growth
use
farming
Indoor
University
Vertical

Detailed Section

louvers

doube layer glazing facade

translucent internal wall

spider joints for glazing

100mm x 200mm timber beam

20mm timber flooring

20mm plaster board

12mm vapour barrier

air layer

40mm insulation between timber batten

30mm screed

80mm x 140mm timber beam

80mm timber board

40mm insulation

20mm OSB

Detailed Structure of Platform

Platform View Rendering

Academic

The City is My Orchard

Apple Cider Making Community Center Design, Liverpool

Site location master plan (Sefton Park)

Individual work

From October 2020 to January 2021

This project focuses on people's everyday experience of architecture in communities. The site is in Sefton Park in Liverpool, UK. After learning about the apple cider making process, a community center is designed for apple cider making. The building intends to fit into the park naturally and attract people who come to the park leading them to explore more of both the building and the park.Through the combination of sightseeing and production process, the parkwillbemoreattractive.

Before building design process, several movement models about verticle circulation are made to help exploring more opportunities of space.

Collage of Apple Cider Making

trees river roads contour line grass site grass site trees road residential building bus stop car park church school access to site
Movement Model Environmental Analysis 03

Apple Cider Making Process and Space Requied

Ground Floor Plan

Spatical Arrangement

Apple
off area Working space Waste Liquid produce area Equipment storage 2 3 4 5 6 7 8 8 9 10 11 1
drop
Delivering Apple drop o area Working space Waste Liquid produce area Working space Equipment storage Picking Washing Chopping Crushing Squeezing Composting Fermenting Bottling Tasting Sharing
Apple drop off area
drop off
Working space (chopping, crushing, squeezing)
space
Working space (bottling) Working space (bottling) Waste Waste Liquid produce area Liquid produce area Equipment storage Equipment storage Delivering Apple drop off area Apple drop off area Apple drop off area Apple drop off area Apple drop off area Apple drop off area Working space Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Waste Waste Waste Waste Waste Waste Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Working space Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Picking Washing Chopping Crushing Squeezing Composting Fermenting Bottling Tasting Sharing Delivering Apple drop off area Apple drop off area Apple drop off area Working space Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Waste Waste Waste Waste Waste Waste Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Working space Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Picking Washing Chopping Crushing Squeezing Composting Fermenting Bottling Tasting Sharing Delivering Apple drop off area Apple drop off area Apple drop off area Apple drop off area Apple drop off area Apple drop off area Working space Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Waste Waste Waste Waste Waste Waste Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Working space Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Picking Washing Chopping Crushing Squeezing Composting Fermenting Bottling Tasting Sharing Delivering Apple drop off area Apple drop off area Apple drop off area Apple drop off area Apple drop off area Apple drop off area Working space Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (chopping, crushing, squeezing) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Working space (bottling) Waste Waste Waste Waste Waste Waste Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Liquid produce area Working space Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Equipment storage Picking Washing Chopping Crushing Squeezing Composting Fermenting Bottling Tasting Sharing
Apple
area
Working
(chopping, crushing, squeezing)

First Floor Plan

Detailed Section

20 mm chestnut wood floor panel

40 mm screed

60 mm cellulose-fibre thermal insulation between 60/60 mm oak wood beam

80 mm oriented-strand board

15 mm oriented-strand board

160 mm cellulose-fibre thermal insulation between 60/160 mm oak wood post and rail

15 mm oriented-strand board

40/60 mm battens

20 mm chestnut wood clidding

20 mm chestnut wood floor panel

40 mm screed

60 mm cellulose-fibre thermal insulation between 60/60 mm oak wood beam

15 mm oriented-strand board

200 mm cellulose-fibre thermal insulation between 200/400 mm oak wood beam

concrete footing

training room 14.Event space 15.Event storage 8 8 12 13 14 15
West-east Section AA' 12.Office 13.Meeting/
A A‘

Ventilation

Drainage

View of North Side Staircase View of South facade Sun path Bird View of The Building

04 Brick Wave Music

School Design, Liverpool

This project is to design a music in a residential area in Liverpool, UK. It's mainly focus on how to make the building blend in with the surrounding buildings in terms of both the shape of the building and the material it use for the facade. Besides, the organization of the space and how would the space be usedinside the building is also worth exploring.

Academic

Individual work

From February 2020 to May 2020

Site Main road Railway Railway station Liverpool
1.Main entrance 2.Main auditorium 3.Performance area 4.Shop 5.Store (for shop) 6.Rehearsal room 7.Large teaching room 8.Medium teaching room 9.Small teaching room 10.General office 11.Instrument Storage 12.Toilet 13.Cleaners store 14.Meeting room 15.Staff room 16.Director’s office 17.Staff office 18.Plant room 19.Control room 20.Club 1 2 3 4 5 6 7 7 8 8 8 8 9 9 10 11 12 12 13 9 9 9 9 9 9 12 12 14 17 16 17 17 17 17 15 18 19 20
Ground Floor Plan First Floor Plan
Section AA'
A A' B B'
Section BB'

From Sound Wave to Brick Pattern

Detailed Section of East Facade

Flashing Vapor retarder

Angled blocking Drainage material M3 grouth material

Dense mineral wool and fire protection Mineral wool packing Steel "I" beam

Nadir

disperse

Exploded axonometric of east facade

Peak Peak private semi-public semi-dense public&dense semi-public&semi-dense private&disperse ① ② ③

Vapor retarder

Sheathing Rigid insulation Air barrier Steel support system 220/100/60 mm Brick

Concrete Rigid insulation

Aluminum header

Kawneer 1600 curtain wall system

Viracon low E double glazing

Kawneer 1600 curtain wall system 12 ventro iso lock ventilator Sealant

Nadir
View of Rehearsal Room View of Space Outside Club View of Main Entrance View of Southeast Corner of the Building

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.