WORK SAMPLES
zoĂŤ|pittman 404.447.2045 zoe_pittman@yahoo.com
PROJECT | 1
The concept for this project is taking the past, present, and future of Paris, France fashion and housing them under one roof. With the use of light, color, texture, line, and shape this project will highlight textiles in various dynamic and diverse platforms.
CLICK HERE FOR THESIS PRORGRAMMING DOCUMENT
FF&E SELECTIONS
RENDERINGS
PROJECT | 2
Using evidence based design, space planning, original concepts, and creating a programming document; this project is all about research for the 8th floor of a pediatric cardiology unit at The University of Chicago. Streamlining Health Through Nature takes the simplistic and modern approach of bringing nature indoors; through architectural elements, textiles, and materials. Research has proven that providing the user the opportunity to experience nature enhances the recovery process.
All of this information came from the 2010 Census.com - Chicago, IL. Because this is a pediatric healthcare project, it is imperative to mention the age breakdown Chicago. Persons under 5 years of age is 6.9% of the population. Persons under the age of 18 years of age is 23.1% of the population. Persons 65 years and over is 10.3% of the population. The average household income is $47,270 and the average person that has health insurance is 19.1%.
45% 32.9% 51.5%
48.5%
31.7%
WHITE black
Latino
5.5% ASIAN .5%
AMERICAN INDIAN
TOTAL POPULATION IN CHICAGO
2,695,598 DEMOGRAPHICS
CRITERIA MATRIX
ou s An tica tim l Pr Ca icro ivacy lm bia i l Fu ng C Pro rn olo du it r ct s Ha ure A s rsh rr a Int Cle nge eg ani me ra n nt Na ted g tur Te c Pa al Li hno tie gh log nt t y Po Use sit i Se ve D cu ist ri r Sta ty [B actio ff U adg n Va se e En rie try d ] Vi Lig ew ht I Vi n ew Vi Out su al W Priva ayc Fin y din g
Ac
Art Studio Butterfly Room Central Core and Structure Classroom Clean Utility Room Conference Room Consulation/ Quite Room Corridors Fmaily Respite Area Healing Gardens Housekeeping Closet Meds Room Music Therapy Room Nourishment Station Patient Bathrooms Patient Rooms Patient Care Manager Office Portable Equipment Storage Public Restrooms Reception and Waiting Area Rec/Rehab Rooms Resident’s Woorkroom Soiled Utility Room Staff Break Rooms + Lockers Staff Restrooms Storage Supply Room Support Offices Unit Director’s Office
LEGEND
Needed Indifferent Not-Needed
RENDERINGS
RENDERINGS
CONSTRUCTION
DOCUMENTS
FINISH FLOOR PLAN: FLOORING DETAIL Fall 2013 Retail Project
Zoe Pi ID Interior Constructi These examples of construction documents are from a Retail Project. These documents exemplify my AutoCAD, REVIT, graphic, and technical skills. All documents and layouts are done by me.
CHECKED BY DATE 03.10.2105 FLOORING
CHECKED BY DATE 03.02.2105
Reflected Ceiling Plan
N Reflected Ceiling Plan
RENDERINGS 1/4”=1’-0”
05
Reflected Ceiling Plan Fall 2013 Retail Project
Zoe Pittman ID 375 Interior Materials Construction Details
CHECKED BY DATE 05.02.2015
POWER: FF&E
N Power: Furniture. Fixture. Equipment Plan
1/4”=1’-0”
RENDERINGS
06
FURNITURE. FIXTURE. EQUIPMENT-PLAN Fall 2013 Retail Project
Zoe Pittman ID 375 Interior Materials Construction Details
Zoe Pittman ID 375 Interior Materials Construction Details CASEWORK OF ORIGINAL FIXTURE Fall 2013: Retail Project
General Notes: Fixture to be manufactured off-site and delievered to retail space put together. There should be a hole in the ground for the fixture to be placed and screwed into the ground.
CHECKED BY DATE 05.02.2015 CASEWORK
N
Casework: Original Fixture
RENDERINGS
1”=1’-0”
14
Zoe Pittman ID 375 Interior Materials Construction Details 1/4”=1’-0”
1/4”=1’-0”
ADA PATH PLAN AND RESTROOM ELEVATIONS Fall 2013 Retail Project
1/4”=1’-0”
1/4”=1’-0”
CHECKED BY DATE 05.02.2015 ADA
N
ADA Path Plan and Restroom Elevations
RENDERINGS
1/4”=1’-0”
09
INTERIOR + GRAPHIC WORK
INTERIORS WORK
posh events
CATHERINA BROWN-WILLIAMS phone:346.757.3035 email:catherinab01@gmail.com
Allyson Perry allysonperry43@gmail.com 678-234-6900
Allykat Kreations
GRAPHICS WORK
SKETCHES