Propeller Shaft Puller Systems safer and cost effective inspection and repair
MariNE
Oil & Gas
Special Products
Service
www.ndm.no
www.ndm.no
A global supplier Your trusted partner
Since the foundation in 1989 Norwegian Deck Machinery has grown to be a well known supplier of equipment for the marine and offshore market. Existing ways of doing operations can be improved by developing new and innovative equipment. NDM has extensive experience in customized solutions. Throughout the years we have delivered a range of products that just started out as an idea or a problem and turned out to be a complete turnkey product. Our typical projects are purpose-built mechanical equipment and structures for marine or offshore operations and onshore equipment like shipyard equipment and equipment for general mechanical industry.
We take care of the total process from idea to concept development through design and manufacturing and all the way on to delivery, installation, start up, training and lifelong service. Our experienced engineers solves the most complex problems and always aim to find the most cost effective solution for our customer without compromising on quality. We possess all the technical expertise and associated documentation requirements needed to meet CEmarking, NORSOK, NS5820, DNV and others.
Extensive engineering expertise combined with high level of customer focus and quality management makes us a reliable and innovative partner.
2
SAFER, FASTER and Cost effective INSPECTION & REPAIR
Advantages using propeller shaft puller systems compared to traditional methods Safer operations Less damage on shaft and propeller during the pulling operation. By using the propeller shaft puller system, the risk of damaging the shaft during the pulling operation is reduced to a minimum compared to doing it the traditional way with slings and shackles. The shaft and propeller can be pulled out safely and quickly with high accuracy by continuously adjusting the support unit and puller unit from the control position. Increased personnel safety and HSE Risk of personnel injuries during operation is reduced to a minimum since the entire operation is done with less personnel and without man driven hoist. Faster Repair and Inspection The shipyard can reduce the time needed with up to 90% by using the propeller shaft puller system. The whole operation is normally done in just a few hours.
Cost saving for shipyard The traditional way with slings and shackles often takes several days and require double of personnel. By using the propeller shaft puller system the hours and number of personnel are reduced to a minimum. Cost saving for shipowner Reduced time in dock – reduced loss in off hire cost for the ship owner. Other advantages • Can be delivered with equipment for taking down thrusters • Low maintenance • Easy to stow away • Quick and Easy to install before use • Easy to move from one dock to another • Short payment period on investment. (Depending on activity at the repair yard.)
3
special Products
STANDARD systeM 30 - 50T The standard propeller shaft puller system consists of a puller unit, a fork for taking down rudders and one ore more support units. Depending on configuration, SWL is ranging from 30 – 50TSWL. All units are quickly installed and connected prior to a propeller shaft pulling operation. When not in use, the system is easily stowed away. The puller unit and support unit(s) can be adjusted in vertical and horizontal direction and are easily operated from the control valves on the puller unit. The puller system can be delivered with equipment for taking down thrusters.
Features Standard Model (30 – 50T SWL) • • • • • •
1 puller unit 1(2) support unit(s) 1 Fork for taking down rudders up to 6T 1 HPU 1 Control system Standard A75 railtrack (Customer supply)
Puller unit Lifting capacity: Driving length, standard: Working envelope, Vertical: Working envelope, Horizontal:
4
20 T 20 m 1,5-4,0 m +/- 75 mm
Approx. power consumption: 20 kW, 400V/60Hz The propeller shaft puller system is operated by a fixed hydraulic control panel (station) placed on the propeller shaft puller unit. The Propeller shaft puller unit and support units are quipped with lifting eyes placed in each corner for balanced lifting of the units on to the rail system.
Support unit: Load capacity: 20 T Working envelope, Vertical: 2,0–3,5 m Working envelope, Horizontal: +/- 200 mm
special equipment
SE Propeller Shaft Puller Unit Length of trolley
4865 mm
Width of trolley
2200 mm
Height of trolley (lowered)
2430 mm
Maximum lifting height
4000 mm
Total weight
4364 Kg
Distance between wheels:
2000 mm
Longitudinal
4500 mm
Width of rail track
2000 mm
Height from floor to center Front plate (lowered)
1500 mm
Max tilting of front plate
53,5 °
Sideway adjustment of front plate
± 150 mm
Max. Lifting capacity
20 tons
Max pulling force
4 tons
Travelling speed
0-9 m/min
Pull arrangement
Traction winch
Hydraulic system
HPU placed on Puller unit
Control system
1 off Control panel placed on HPU is included
Starter cabinet
1 off starter cabinet
Rails
Regular A75
Support Unit Length of trolley
1740 mm
Longitudinal
2200 mm
Width of trolley
2300 mm
Width of rail track
2000 mm
Height of trolley (lowered)
2100 mm
Working Envelope Vertical
2,0 -3,5m
Height of trolley (Lifted)
3600 mm
Working envelope Horizontal
± 200 mm
Total weight
2576 Kg
Max. Load capacity
20 tons
Distance between wheels:
1574 mm
Fork for taking down rudders Length
3370 mm
Width
1270 mm
Height
1541 mm
Total weight
730 Kg
Max Lifting Capacity
6 tons
The fork is mounted on the propeller unit.
Rail System (Customer supply) Rail type
Standard A75
Length
According to customer requirements
5
special Products
LARGE system 50 - 80T For doing propeller shaft pulling operations on larger ships, NDM has developed a larger propeller shaft puller system consisting of a puller unit and two off combined support/rudder removal units suitable for taking down rudders up to 40T In addition the system can be delivered with equipment for taking down thrusters. Depending on configuration, SWL of the system is ranging from 50 – 80T SWL. All units are quickly installed and connected prior to a propeller shaft pulling operation. When not in use the system is easily stowed away. The puller unit and support unit(s) can be adjusted in vertical and horizontal direction and are easily operated from the control valves on the puller unit.
Features Large System (50 – 80T SWL) • • • • •
1 puller unit 1 (2) support/rudder removal unit(s) 1 HPU 1 Control system A75 railtrack (Customer supply
Puller unit Lifting capacity: 30 T Driving length, standard: 26 m Working envelope, Vertical: 2,5 - 5,0m Working envelope, Horizontal: +/- 150mm
6
Approx. power consumption: 20 kW, 400V/60Hz The propeller shaft puller system is operated by a fixed hydraulic control panel (station) placed on the propeller shaft puller unit. The Propeller shaft puller unit and support/rudder units are quipped with lifting eyes placed in each corner for balanced lifting of the units on to the rail system.
Support unit: Load capacity: 30 T Working envelope, Vertical: 1,4 – 3m Working envelope, Horizontal: +/- 200mm
special equipment
SE Propeller Shaft Puller Unit Length of trolley
5364 mm
Width of trolley
3316 mm
Height of trolley (lowered)
2501 mm
Maximum lifting height
5031 mm
Total weight
8890 Kg
Distance between wheels:
Sideway adjustment of front plate
± 150 mm
Max. Lifting capacity
30 tons
Max pulling force
10 tons
Travelling speed
0-9 m/min
Hydraulic system
HPU placed on Puller unit
Longitudinal
4950 mm
Control system
1 off Control panel placed on HPU is included
Width of rail track
3000 mm
Starter cabinet
1 off starter cabinet
Height from floor to center : Front plate (lowered)
1500 mm
Rails
Regular A75
Max tilting of front plate
53,5 °
Support / Rudder Removal Unit This unit is designed to function as a support unit during the pulling operation, but by taking off the upper part, the unit can easily be transferred into a unit for taking down rudders up to 40 tons. Important: Two off support units are needed in order to obtain stability during removal of rudders up to 40 Tons. Length of trolley
1764 mm
Width of trolley
3420 mm
Height from rail to base of U frame (lifted)
1420 mm
Height from rail to shaft cradle In top position
3028 mm
Sideway adjustment of U frame
± 200 mm
Height of trolley (lowered)
3028 mm
Total weight
4221 Kg
Distance between wheels: Longitudinal
1100 mm
Max. Lifting capacity
30 tons
Width of rail track
3000 mm
Max pulling force
10 tons
Rudder fixation system
manually operated
Rudder Fixation Arms
4 off.
Number of Sections
2 Off
Length of front section
12500 mm
Length of front section
13525 mm
Width of each section
3480 mm
Height to top of rail
975 mm
Capacity
90T (metric)
Total Weight, front section
10043 kg
Total Weight, rear section
10336 kg
Rail type
A75
Height from rail to base of U frame (lowered) Height from rail to top of U frame (lowered)
420 mm 2500 mm
Large Rail System A larger rail system can be required to get the acquired height for operations. The large rail system is customer supply, and based on standard A75 rails. Drawings are included in NDM`s delivery.
7
special Products
SYSTEM DESCRIPTION Both the standard and the large system are designed for rails and delivered with hydraulic driven units that are adjustable in horizontal and vertical direction. The main difference is the total SWL and the way of removing the rudder prior to the pulling of the shaft. The propeller shaft puller unit is the main part of both systems. One or two support units completes the system depending on length of shafts. The rails are customer supply and length is made according to customer needs. The equipment can easily be stowed away when the job is finished. The operator runs the entire operation from the control central on the propeller shaft puller unit. The shaft is pulled out safely and quickly without man driven hoist.
Preparation The rail track is set up as a prolongation of the propeller shaft axis - sufficiently beyond the propeller hub to make sure the front plate of the shaft puller can be brought in contact with the propeller hub. The shaft puller is lifted on to the rails, connected, wire is tightened and the HPU is started. Support unit(s) can be placed on the rails now or later depending on operation.
Rudder removal The standard system is delivered with a fork for removal of rudders up to 6T. The fork is mounted on to the puller unit and the rudder is taken down by help of the lifting lugs on the fork and slings. The rudder is lifted off and placed on the side until the operation is completed. The large system has an integrated rudder removal function in the support units which can take down rudders up to 40T. Please note that two support units are needed for this operation The support units are locked to the rail, by using the rail clamps. The U-frame is lifted up until the rudder rests on it and the fixation arms are tightened up clamp the rudder to the U-frame. When the rudder is disconnected from the rudder stock, the support units can be lowered to the bottom position before the operator takes them out in the crane coverage area.
8
special equipment
SE
Shaft removal with the 20 T standard system
Shaft removal After the shaft puller is placed in position by operating the control valves, the propeller hub is strapped to the front plate. When the shaft coupling is disconnected (between the propeller shaft and gearbox) the operator can start pulling the shaft outwards whilst constantly adjusting the boom height and front plate to keep the shaft in centre of the shaft bushing. When the shaft has been brought out to an extent where support is needed the support unit is lifted. For longer shafts use two support units. The entire process is reversed to put the shaft back in and the rudder back in place.
Thruster Removal NDM has developed equipment for taking out thrusters. The equipment is connected to the propeller shaft front plate using the same principle as the fork for taking down rudder.
9
Photos: NDM, Shutterstock,
Norwegian Deck Machinery AS Ulvenvegen 34, N-5210 Os, Norway Phone: +47 56 30 32 80 Fax: +47 56 30 32 82 E-mail: office@ndm.no Web: www.ndm.no