HISTORY 1995 – 2015
•
•
•
•
•
CEO Management Planning
Research
Productio n
Sales
Laboratory
R&D
QC
Domestics
Overseas
Productio n
Production Management
Support
Management
Procurement
Numbers Each Department: Sales(4), Production(14), Laboratory(8), Support(5). Total : 35 members
Compound : Polyolefin Resin, Compound to Engineering plastic – Coloring, reinforcing Properties and Functionality. WIN-WIN system by Fulfilling Users Requirement and maximizing Customers satisfaction. Product list Talc Reinforced (5~40%)
PP Compounds
Glass Fiber Reinforced (10~40%)
Application
Automobile Inner parts( Filler, console, Cowl Top cover, etc) Electronics(Rick Cooker, Refrigerator, TV, Air-Conditioner, High Impact Washing Heat Resistant Machines), Industrial parts, General Injection, Heat Resistant Parts High Impact Heat Resistant Electronics, Air-Conditioner’s fan, Fabric Bobbin, Pump Housing. Dimensional Stability High Gloss
High Gloss
High Impact
Talc Reinforced (5~40%) PA 6 / PA 66
Properties
Glass Fiber Reinforced (10~40%)
Electronics(Exterior) , Fan Body, Electric Iron’s Handle, Impact Resistant Rice Cooker(Top cover, Lower Case, Body Case), Moisturizer Body, houseware, Industrial parts Heat Resistant Low/High Automobile parts, In panel, Side Mold, Door Trim , Sun-visor, etc Temperature Coldness/Heat Resistant parts Impact Strength Heat Resistant
Electronics, Automobile parts, Heater Housing, Radiator Fan, Blow er Fan Shroud,, Bracket , Cable Jacketing – Heat Resistant parts. Flame Retardant PWB Case (printed wiring board )
1. Details of Expansion 1) Land : Approx 14,850 m2 2) 1st step : Building new plant and movement from Goesan(old location) : 2 Extrusion line ex Goesan : 1 Extrusion line - New : 1 Pilot Extrusion line - New 3) 2nd Step Expansion : Expansion of production building Expansion of Ware House : Auto-Feeding system – Raw Material : Auto-Packing system : Expansion - 3 Extrusion lines ďƒ Prime Virgin production : Annex Research Laboratory 4) Completion : Within November 2015.05.
2. Aerial view of Expansion
3. Expected Investment Investment 1st Step
2nd Step
Cost(USD 1 mil)
Land 14,850 m2, Building 4,125 m2
4.0
1 x Twin Extruder & Auto-Feeding line, subsidiary Installations
3.5
Expansion of Production building, Ware-House. Auto-Feeding Lines and Auto-Packing system
4.0
3 x Twin and Auto-Feeding Lines
4.0
Laboratory facilities
0.8
Total
Completion within May. 2015
16.3
4. Time schedule Sept. 2013 Purchase land and Start building
June. 2014
FEB. 2015
MAY. 2015
1st Step completion
2nd Step starts
2nd Step
Completion
5. Facilities and Capacity •110MT Per Day
Per Month
• 33,000MT
• 2,750MT
Per Annum
Capacity
Line
Type
MARKE
SCREW, L/D
1
TWIN EXT’
SM / ALPA
75mm, 40/1
5,000
2
TWIN EXT’
SM / ALPA
75mm, 36/1
5,000
2013 Production Capacity
(Ton/Year)
10,000
3
TWIN EXT’
SM / ALPA
75mm, 44/1
6,000
4
TWIN EXT’
SM / ALPA
40mm, 40/1
NA
2014 1st Half Production Capacity
16,000
5
TWIN EXT’
UNI / ALPA
75mm, 44/1
6
TWIN EXT’
UNI / ALPA
75mm, 44/1
7
TWIN EXT’
UNI / ALPA
75mm, 44/1
2014 Total Production Capacity
2014. 8 Order place
33,000
REMARK
+ Auto Feeding System (Loss weight Feeder) + Magnet System (10,000 Gauss) + Blanding System (10Ton Bland Mixer) + Drying System (Elimination of remaining Gas, and Moisture) + Auto Packing System (Robot System)
Dehumidi fying Hopper
Automatic Weighing Ribon Blander AUTO SIDE 1 AUTO SIDE 2
Sub-material 1
GAS & Moisture Vent Heater Elimination of Metal/Foreign material
Sub-material 2 Blower
AUTO MAIN FEEDER
CUTTER
TWIN EXTRUDER Raw Material Silo Feeding Blower
Air Wiper Cooling Bath Vacuum Pump
AUTO PACKING
Cooling Vibrator
2013.6~2014.11
Building Plant And Stabilizing Business
2014.12~2015.6
Dominant Position in Quality & Production Efficiency
2015.6~
Development of New Technology New Materials
Plan for Practice Technical Management - Expansion of Core Source Technology - Develop New Technology & Materials : Weight Lightening, Impact Strength Improving Technology Customer Satisfying Management - Customer Satisfaction Attitude - Securing World-Wide Customers - Development of New Materials and New Markets.
Business Stabilization
Expansion of Turn Over and Growth
Global Material Company
Internal Stability Management - Strengthening Cost Competitiveness - Cultivation of Core Human Resources
Trend of Materials in Automobiles
Lightening
High Functional
Replacement of Metal
Improve Fuel Efficiency Reduction of CO2 Eco-Friendly
Thin parts High Heat Resistant, High impact Strength More IT parts High Quality Interior Materials Super Fiber Super Engineering Plastics
Road Map - Low Density Compounds Recipe : Glass-bubble Compounds - EMI Shielding Compound Technology - High Heat Resistant, High Impact Strength Alloy - High Flow Engineering Plastics - Fiber Impregnated High Functional Plastics - Super En-pla Recipe/ Production Technology - Surface Treatment Technology to increase sensitive Quality - Eco-Friendly Recycled Resin Recipe
211-90
TYPE-A
FAN SHROUD
W6640GM
PA66 (Approved)
211-52
TYPE-B
ROOF RACK(SL)
Not Fixed
PA6 (Processing)
211-48
TYPE-B
ROOF RACK(DM)
Not fixed
PA6 (Processing)
211-60
TYPE-A-1
ENGINE COVER
W0620GM
PA6 (Processing)
211-60
TYPE-A-1
SIDE MIRROR
Not fixed
ABS Heat Resistant (Recipe Developing)
213-28
TYPE-A TYPE-B
Not fixed
Reinforced PP TALC / GF / GB (Recipe Developing)
Air-Conditioner parts
Non Painting (Processing)
GMW 15188
BUMPER
GMW 15187
BUMPER
GMW 15340
I路P
GMW 15549
Door Trim, etc
(Processing)
GMW 15548
PPT 20
INTERIOR (Processing)
Apr. 2015 : GM actual investigation Apr. 2015 : Development of material for Automobile part May. 2015 : Enterprise registration June. 2015 : Sale GM Motors material for Auto mobile part
Painting (Processing)
(Processing)
AS 1
BUMPER
AS 2
I/P
AS 3
내장재
PA 6 / 66
내 외장
Painting (Processing))
Oct. 2014 : Renault Samsung actual investigation Nov. 2014 : Development of material & Submit an injection sample Dec. 2014 : Recognition of injection sample Mar. 2015 : Recognition of an initial product Apr. 2015 : Enterprise registration May. 2015 : Application of Renault Samsung Motors material part
(Approved]
(Processing))
(Processing))
INTERIOR (Processing))
MI
Melt indexer
Qmesys/Olsen
Density
Density Meter
YouYou
Impact Strength
I-zod Impact
Qmesys
Ash content
Electronic Furnace
TO Korea
Heavy Metal
IR
PerkinElmer
Tensile, Elongation, F/M
UTM
Tinius Olsen
Heat Distortion Temp.
HDT
Tinius Olsen
Isotermal-Isohumidity
controller
TO Korea
R Hardness
ROCKWELL
TO Korea
Dry
DRYER
TO Korea
Moisture
Moisture tester
Precisa
Foreign material
Hot Press Mold
TO Korea
COLOR
COLOR COMPUTER MINOLTA
Specimen injection
Injector Electronic Microscope V Notched
Shrinkage Impact Strength Specimen
Woojin/Dongwoo Nikon Tinius Olsen
Adding More Lab’ Facility
Analysis Equipment
X R F
Measuring microscorpe
C C M & L B
F T - I R
Low temp CHMB
D S C
Manufacturing equipment
Catapult
Cooler
Lab’ TWIN EXTRUDER(L W F SYSTEM)
PRESS MD
CONTROLER
Auxiliary research Lab
Trade Association
Certificated TS 16949
Certificated Environment14001
Dec.2015.now : Certificated a final recycle approval of waste, INO-BIZ(Technical innovation corp)processing
www.wooripla.com
Daeso JC
Chungbu Expressway
158-2. Chapyong-Ri, Umsung-Gun, Chungbuk Province Tel 070) 4895-2701~3 Fax 070) 4032-6233
Umsung IC
Jechon IC Kumwang Direction Samkeuk, Chapyong Direction