Design Studio 5 Portfolio

Page 1

ARCHITECTURAL PORTFOLIO DESIGN STUDIO 5 PARITOSH AMIT JOSHI


CONTENTS

PROJECT 01 REIMAGINE POST COVID COMUNAL SPACES

2

PROJE

URBAN AND BUILD


ECT 02

DING STRATEGIES

PROJECT 03 SPORTS AND RECREATIONAL CENTER

3


PROJ

REIMAGINE POST COV

4


JECT 01

VID COMUNAL SPACES

5


SPORTS

6


PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

7


PRE & POST COVID OF BANGSAR SPORTS COMPLEX

8


PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

9


RECREATIONAL

10


PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

11


PRE & POST COVID OF KIARA PARK

12


PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

13


14


PRE & POST COVID MODEL Left side of the drawings represent the interpretation of PreCOVID situation of our sites , the Bangsar Sports Centre and The Bukit Kiara Parks from Sports and Recreation activities categories and the one on the right side shows our interpretation on the current situation in our sites representing the sports and recreation condition in our country, Malaysia. Our 2 drawings can be combined to show the big trees, the greens, the roots and we hope to share the beauty of nature we enjoyed throughout the site visits. The 2 sites of ours is actually the important spot for the local neighbourhood to carry out their favorite sports activities Bangsar Sports Complex fulfill the needs of the local neighbourhood for courts or facilities type sports activities while Bukit Kiara Parks is a hill serving several functions from sports to recreation or bonding activities such as picnic. Besides that Bukit Kiara Hills not just fullfill the needs of local neighbourhood but also cater the needs of the joggers, hiker to cyclist from whole Kuala Lumpur state covering from beginner to advance levels.

PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

15


16


POST COVID INTERVENTION MODEL After a series of surveys, site visit and interviews, we decided to make our intervention more towards the Family Parks of Bukit Kiara Hills because we found out that visiting the park is now a new favourite for all age groups after the pandemic hits. The people visiting Bukit Kiara Hills for hiking and hill walks actually decreased but the people visiting the park increased drastically so we decided to plan some changes and intervention for the parks to increase the usage while still following the SOP requirements.

PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

17


POST COVID INTERVENTION MODELS

18

SKYBRIDGE INTERVENTION

To cater the high users volume of this new norm, the elevated zone is proposed to increase the usable space and maximise the space usage of parks so that it can adapt usage of more people

PRIVATE ISLAND INTERVENTION

These small islands platform located on the lake allows people to enjoy recreational activities such as picnic surrounded by the beautiful lake and enjoy the precious lake biodiversity. The islands are relatively 15m2, which can fit 5 people approximately, perfect for a family.


YOGA INTERVENTION

The yoga space is located near the late with openable bamboo partitions to follow SOP and also provide privacy

EXERSCISE AREA INTERVENTION

The exercise area is made up of partition which are flexible to slides in and out to arrange the space according to the comfort of the user by utilising the present light pole and trees in garden.

PROJECT 01 - REIMAGINE POST COVID COMMUNAL SPACES

19


PROJ

URBAN AND BUILD

20


JECT 02

DING STRATEGIES

21


URBAN STRATEGIES SWOT ANALYSIS

22


Sentul West, 51100 Kuala Lumpur, Federal Territory of Kuala Lumpur

PROJECT 02 - URBAN AND BUILDING STRATEGIES

23


24


PROJECT 02 - URBAN AND BUILDING STRATEGIES

25


26


PROJECT 02 - URBAN AND BUILDING STRATEGIES

27


28


PROJECT 02 - URBAN AND BUILDING STRATEGIES

29


30


ACTIVIES MONTAGE: -

TABLE TENNIS YOGA EXERSCING STATION ELEVATED PATHWAYS

ELEVATED PATH MONTAGE

PROJECT 02 - URBAN AND BUILDING STRATEGIES

31


BUILDING STRATEGIES

32


PROJECT 02 - URBAN AND BUILDING STRATEGIES

33


BUILDING STRATEGIES

COMPLIMENTING ORIGINAL STRUCTURE

34


BRINGING THE SURROUNDING CONTEXT IN BUILDING

GOOD AIR QUALITY INSIDE BUILDING

ENCOURAGE USERS TO PASS THROUGH VEGITATION

STEPPING GARDEN

STEPPING GARDEN

PROJECT 02 - URBAN AND BUILDING STRATEGIES

35


36


PROJECT 02 - URBAN AND BUILDING STRATEGIES

37


BUILDING STRATEGIES

38


BUILDING STRATEGY MONTAGE The first montage was used to explore multi enterances into the depot. Along with that idea of of skybridge to connect the old to new building which will give interesting enterance view from the road. PROJECT 02 - URBAN AND BUILDING STRATEGIES

39


BUILDING STRATEGIES

40


BUILDING STRATEGY MONTAGE This montage is also on the north side of the depot. It was used to explore the activities inside the 20 meters tall warehouse of the depot. This height gives opportunity for pathways and sports activities to be inplace in here. PROJECT 02 - URBAN AND BUILDING STRATEGIES

41


BUILDING STRATEGIES

42


BUILDING STRATEGY MONTAGE This montage is on from the west side of the depot. It explores the new building to be on top of existing depot building.

PROJECT 02 - URBAN AND BUILDING STRATEGIES

43


BUILDING STRATEGIES

44


BUILDING STRATEGY MONTAGE This montage is the enterance of previous montage. It explores the idea of having green walls.

PROJECT 02 - URBAN AND BUILDING STRATEGIES

45


PROJ

SPORTS AND RECR

EAST ELEVATION

46


JECT 03

REATIONAL CENTER

47


MATERIAL STUDY

48


STEEL + GLASS + VEGETATION

CONCRETE + STEEL COLUMS + GLASAS + VEGETATTION MATERIAL STUDY MODEL

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

49


MATERIAL STUDY

STEEL

TERRA CO

50


RAW MATERIALS

CONCRETE

OTTA BRICK

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

51


MATERIAL STUDY

CONCRETE + BRICK

STEEL +

52


COMBINATION OF RAW MATERIALS

STEEL + CONCRETE

+ GLASS

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

53


MATERIAL STUDY

CONCRETE + STEEL + GLASS

STEEL + GLASS

54


SCHEMATIC MATERIAL STUDY

CONCRETE + STEEL

S + CONCRETE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

55


FORM DEVELOPMENT SITE LOCATION The location of the proposed sports and recreational center is north of the depot

56


SITE LOCATION Connection with elevated pathway connects the building to the whole site, allowing location to be accessable to the whole surrounding site

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

57


SUN PATH AND WIND DIRECTION Sun path and wind direction on context wirh proposed site

350 N, TOWARDS SOUTH

58


SURROUNDING CONTEXT KUALA LUMPUR PERFORMANCE ART CENTER (KL PAC) - Existing KL PAC can be used for event space for the dance and yoga programs for any speacial events - In relation with view, with historical building SAMIRA BY ASIAN TERRACE (RESTAURANT) - Close to sports complex, which will attract more people to the restaurant - A good eatery will be provided just beside complex on the north side while a new cafetaria on the south side is provided and also operates to attract more people from the south side of the depot SENTUL PARK - Getaway area for staff staying at the accomodation units - Connects to park with activities such as jogging, exerscise station - In relation with view, good view from proposed location

PARKING

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

59


BUBBLE DIAGRAMS Ground floor

60


BUBBLE DIAGRAMS First floor

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

61


ZONING & EXPLORATION

ZONING

SCHEMATIC DIAGRAMS

62


PROVIDDE SHADING DEVICES OR FACADE WHICH TACKLES THE HOT SURROUNDING OF THE SITE. WHILE SHADING AND HAVING A VENTILATED SPACE INSIDE

HAVING GREEN SPACE AROUND AND INSIDE TO COOL DOWN THE SURRONDING

STEPPING GARDENS ON THE BUILDING WHICH ACTS AS ANOTHER ENTERANCE POINT

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

63


PROJECT 03

ADAPTIVE REUSE

FORM DEVELOPMENT FORM DEVELOPMENT

SURROUNDING VIEWS

THE NEW STRUCTURE HAS CURVED FORM TO MAXIMIZE THE VIEWS TOWARDS THE SURROUNDINGS

CIRCULATION MODEL

28

64

INITAI L FORM MODEL WITH VEHICHLE CIRCLULATION INDICATED AS RED AND PEDESTRIAN CIRCULATION AS BLUE


EXISTING DEPOT MASSING TO SHOW CONNECTION WITH NEW BUILDING

SPACE PLANNING GROUND FLOOR

MATERIAL MODEL, SHOWING FACADE AT DEPOT WAREHOUSE

SPACE PLANNING FIRST FLOOR

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

65


FORM DEVELOPMENT

KTM FACTORY

FROM KL PAC AND RESTAURANT

OFFICE

KTM SENTUL

OFFICE

HUMAN DENSITY AND CIRCULATION This diagram show the human density and the arrows show the direction of the human flow around the site. From these human flow, tangent lines were extented to get the basic form and space quality

66


BUILDING FORM The floor form is developed by the surrounding views and enterances through out the building

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

67


FORM DEVELOPMENT

01 SITE RESPOND

ARRANGEMENT OF STRUCTURE BASED ON SITE CONTEXT & SURROUNDING

05 BUIILDING FORM

INITIAL BUILDING FORM

68

02 ADDITION

ADDITION ON FORM BASED ON SURROUNDING VIEWS OF SITE, THEREFORE THE USERS CAN HAVE A NICE VIEW OF THE SURROUNDING CONTEXT

06 INTE

ARRANGEMENT EXTRUDED SPACES TURNED INTO CO


03 EXTRUSION

THE 1ST FLOOR IS EXTRUDED OUTWARDS TOWARS CONTEXT WITH VIEWS AND SPACE BELOW CAN BE A SPACE FOR THE COMMUNITY

EGRATION

T OF STRUCTURE ON S AROUND WHICH ARE OMMUNITY SPACES

04 ADDITTION & SUBSTRACTION

ALLIGNMENT OF SPACES FOR PROGRAMS ACCORDING TO NEW FORM

06 LANDSCAPE

INTEGRATING VEGITATION IN THE BUILDING TO BRING THE ATMOSPHERE OF THE SURROUNDING LANDSCAPE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

69


FORM DEVELOPMENT

DESIGN STATEMENT: MAKE A TRANSITION FROM OLD EXISTING BUILDING TO NEW ADDITION AND ADDING THE ESSENCE OF SITE IN THE BUILDING WITH VIEW OUT TOWARDS SITE TO MAKE THE BUILDING HAVING CONNECTION WITH CONTEXIT

SCHEMATIC GROUND FLOOR PLAN

SCHEMATIC FIRST FLOOR PLAN

SCHEMATIC SECTION

70


MONTAGE 1

MONTAGE 2

MONTAGE 3

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

71


ROOF FORM

ROOF STRUCTURE WITH CONTEXT

THE ROOF FORM IS BASED ON THE EXISTING STRUCTURE BUT FOLLOWS THE BUILDING FORM WHICH IS MORE CURVED. THIS GIVES AN INTERESTING FORM AND ALSO ALLOWS VENTILATION TO GO THROUGH THE BUILDING

72


THIS STRUCTURE HELPS TO HAVE A OVERALL VENTILATED BUILDING AND THE ROOF STRUCTURE ALSO HAS RESEMBELANCE WITH THE EXSISTING ROOF STRUCTURES IN SENTUL DEPOT

THE ROOF IS MADE OF GLAVINIZED STEEL WITH STEEL SUPPORTING STRUCTURES

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

73


FACADE

THE EXISTING DEPOT SITE IS SUPPORTED BY REPETITIVE STEEL COLUMNS GIVING A VERY UNIQUE VIEW

PARAMETRIC SHAPE OF FACADE FOLLOWING NEW PROPOSED BUILDING

74


THE FACADE IS LOUVERS MADE FROM STEEL, WHICH FOLLOWS THE EXISTING STRUCTURE MATERIALS.

THE FACADE HELPS THE BUILDING TO BE SHADED STILL ALLOWS WIND TO PASS AND VENTILATE THE BUILDING. IT ALSO PROVIES PRIVACY BY BLOCKING VIEW INTO THE BUILDING FROM FEW SIDES

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

75


COVID-19 INTERVENTIONS

SOCIAL DISTANCING IS IN PLACE AT THE SPORTS COMPLEX TO ENSURE SAFETY OF USERES ALONG WITH USING BRIGHT TAPES TO INDICATE NO GO ZONE.

IN THE NEW BUILDING THE ACTIVITIES SUCH AS BADMINTON AND TABLE TENNIS ARE DIVIDED BY FOLDABLE PARTITION WALLS. WHICH ARE OPENED AND CLOSED AS THE USER WISHES.

76


THE IDEA IS TO USE LANDSCAPE TO PREVENT PEOPLE FROM GATHERING IN ONE PLACE AND ALSO DIVIDES THE SPACES AND ACTIVITES

THE HIGH CEILING IN THE DEPOT SIDE GIVES SPACES FOR VEGETATION AND WITH DIVIDING SPACES, THEY ALSO HELP IMPROVE THE GENERAL AIR VENTILATION IN THE BUILDING

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

77


SCHEDULE OF AREA

TERRITORY

THE SOCIAL FACILTY

ANCILLARY SPACES

THE LIVING COMPLEX

BUILDING SERVIES

78

ROOM TYPE

SIZE (m2)

PUBLIC / PRIVATE

Badminton Hall

234.2

Semi-private

Foyer (Existing Building)

102.3

Public

Foyer (New Building)

77.2

Public

Viewing Deck

95.2

Public

Squash Courts + Table tennis

421.4

Semi-private

Dance Studio

115.2

Semi-private

Gym

185.2

Semi-private

Yoga Studio

74.2

Semi-private

Mini - Library

45.6

Public

Indoor Fitness Game Room

134.2

Semi-private

Shop

44.2

Public

Cafetaria

214.2

Public

Skybridge

403.8

Public

Garden Spaces

418.2

Public

Total Soical Facilty Area

2330.9

Management Office

96.5

Private

Infirmary

47.7

Semi-private

Kitchen

62.2

Private

Storage Room

24.5

Private

Surau

42.2

Semi-private

Total Ancillary Spaces Area

273.1

Accomodation

321.4

Total Accomodation Area

321.4

MNE Room

24.5

Private

Male Toilet / Changing Rooms

115.7

Public

Female Toilet / Changing Rooms

104.2

Public

Total Building Servives Area

244.4

Grand Total

3149.8

Grand Total (without circulation)

2746

Private

7:00 AM 8:00 AM

9:0


00 AM

TIMELINE 10:00 AM 11:00 AM

12:00 AM 1:00 PM

2:00 PM 3:00 PM

4:00 PM

5:00 PM

6:00 PM

7:00 PM

8:00 PM

9:00 PM

10:00 PM

Operates full time Operates full time

Circulation

Storage

Operates full time

Building Sevices

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

79


80


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

81


82


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

83


84


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

85


86


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

87


NORTH ELEVATION 88


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

89


EAST ELEVATION 90


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

91


92


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

93


BLOW UP SECTION A.A

94


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

95


96


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

97


98


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

99


100


PROJECT 03 - SPORTS AND RECREATIONAL CENTER

101


102


FROM SOUTH - RESTAURANT VIEW

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

103


104


GOLF COURSE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

105


106


BADMINTON COURSE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

107


108


INDOOR GARDEN

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

109


110


FOYER

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

111


112


LOBBY - DROP OFF

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

113


114


SKYBRIDGE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

115


116


COMMUNAL SPACE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

117


118


EXTERIOR FROM KL PAC SIDE

PROJECT 03 - SPORTS AND RECREATIONAL CENTER

119


END


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.