Concept design - Park Hyllie

Page 1

FREE FLOW PARK

Hyllie Station

 

100m

Hyllie

 Water Infrastructure 1:2000

 Terrain 1:2000

WATER INFRASTRUCTURE - phase 1 As a first stage of the park’s development the terrain will be manipulated in a natural manner, mimicking a river bank with pauses on its way. The terrain will be dug slightly around 0,5-1m at the streams and the basins are around 1,5m deep. Some of the dug soil will be used to lift and shift meadow filled structures on North-West. The streams will be sometimes dry and sometimes with running water during storms. The meandering shape will be steered by curved stems at the turns (for reference, see Viktor Schauberger, River generator and Vortex Theory).

Galina Ekström LK0273: Design Project Site, Concept and Theory Final presentation: 15-03-2018

Terrain sections Perspective NORTH IS UP

Hyllievångsskolan


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.