Teddy_Work Portfolio

Page 1

A R C H I T E C T U R E

P

O

RTFOLI

T E D D Y , F A N

O

T I A N P E N G



CONTENT

Genzon Binhaiwan Bay Area Industrial Park 08/2019-Present

Chongqing CIFI Group Yuelai Plot Commer- Chongqing Haicheng Group Yangtze River Star Phase II cial Project 10/2019-Present

12/2019-Present

Facade

Labo G/F 1 Tai

Revision

Nr. Date

01 31/08

Issue D

FOR REF Check al drawings the spec immedia remains not to be permissi Construc Authoris

以供参考 于项目地 此图纸必 如有任何 建筑师的 或完整复 资格认可

Project

Ningbo Plot 1‐

宁波新 1-4#、

Hang Lung Plaza Zhengzhou

SCE Property Fuzhou Commercial Project

Selected Internship and Academic Works

12/2019-04/2020

03/2020-Present

2017-2018

1

Main Entrance & Drop off Entrance Plot 1 West 主入口及落客区 地 一块 西侧 N.T.S. @ A1

Drawin

Main En Plot 1 W 主入口及

Format Scale

Drawin

NB


GENZON DONGGUAN BINHAIWAN BAY AREA INDUSTRIAL PARK 正中集团东莞滨海湾新区产业园 Round I (Aug. 2019-Sep. 2019) Round II (Sep. 2019-Oct. 2019)

Located in Jiayiwan plate of Dongguan Binhaiwan New Area, this project occupies the prime lot in the eastern coast of the Pearl River. It is also adjacent to Shenzhen Airport and the International Convention Center, giving it an advantageous geographical location. The new area is endowed with important missions of testing the integrative development of Guangdong, Hong Kong and Macao, and promoting scientific innovations. Using the natural environment as landscapes and taking “embracing everything in our hearts” as the overall design philosophy, this industrial park is both magnificent and unique.

Selected Work Portfolio 2019-2020


Round One- Project Overall Facade It has three plots, including 12 towers and 3-4-floor podiums.

GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase I


Project: GENZON Dongguan Binhaiwan Bay Area Industrial Park Location: Dongguan, Guangdong Scope of Work: Competition-1st Round Result: The Bidding Winner Total Site Area: 222,601.83m2 Total Countable GFA: 890,407m2 Plot Ratio: 4.0 Program: Office, Hotel, Industrial Facility, Retail, Exhibition, Conference Architect: PH Alpha Design Limited Responsibility: Conceptual Ideas, 3D Modeling, Booklet, Rendering Selected Work Portfolio 2019-2020


东莞

滨海湾新区

深圳

Location The site located in the crossing bay area of Dongguan and Shenzhen, which has a possibility to attract talents from all over the world.

科技

Technology

生态

Ecology Ecology-Technology There is a good opportunity for this project to combine Ecology and technology in a new industrial park.

Site

City-Nature The project is located in a core area where a variety of “textures“, such as technology, water, human landscape and etc.

GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase I


The Growing Mangrove Forest The design concept comes from a natural phenomenon that mangrove forest grow well beside the bay area even though it is not suitable to grow for most of vegetations. Science, technology and innovation are basic elements that this industrial park has to include. They are going to bloom like the young trees.

Selected Work Portfolio 2019-2020


Tower View Plot One

GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase I


Tower View Plot One- two

Selected Work Portfolio 2019-2020


TowerView View Tower Plot One- Two Plot Three

GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase I


Massing Diagrams Tower design

T8 T7 134.9m

Plot One T6

T7

T6

147.5m

View to Nature

147.5m

T8

Hight

Plot Three

T3

Science and Technology

Open views to the river

Crown deign like the wave

Folded massing becomes special office spaces

Diagonal facade design

Diagonal design responding to the theme

Diamond massing becomes special office spaces

T1

122.3m 147.5m

T1 T3

The yard space

T5

T4

143.3m

T5 T4

126.5m

Towers facing high speed train rail

Selected Work Portfolio 2019-2020


Massing Diagrams Tower design

T12

Plot Two

Urban yard

95.8m

T12 The green garden surrounds

Facade retreat to highlight the balcony

Gradient depth of balconies become the unique pattern of facade

Twisted massing response to the central yard

The yard high in the air

Massing changes according to central yards

Co-working spaces open to outside to have more views to the city

T2

130.7m

T2 Hight

T9

134.9m

147.5m

T11 T9

T11

T10

T10

100m

Yard between towers

GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase I


Selected Work Portfolio 2019-2020


GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase I


GENZON DONGGUAN BINHAIWAN BAY AREA INDUSTRIAL PARK 正中集团东莞滨海湾新区产业园 Round I (Aug. 2019-Sep. 2019) Round II (Sep. 2019-Oct. 2019)

Located in Jiayiwan plate of Dongguan Binhaiwan New Area, this project occupies the prime lot in the eastern coast of the Pearl River. It is also adjacent to Shenzhen Airport and the International Convention Center, giving it an advantageous geographical location. The new area is endowed with important missions of testing the integrative development of Guangdong, Hong Kong and Macao, and promoting scientific innovations. Using the natural environment as landscapes and taking “embracing everything in our hearts” as the overall design philosophy, this industrial park is both magnificent and unique.

Selected Work Portfolio 2019-2020


GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase II


Project: GENZON Dongguan Binhaiwan Bay Area Industrial Park Location: Dongguan, Guangdong Scope of Work: Competition-2nd Round Result: The Bidding Winner Total Site Area: 222,601.83m2 Total Countable GFA: 89 0,407m2 Plot Ratio: 4.0 Program: Office, Hotel, Industrial Facility, Retail, Exhibition, Conference Architect: PH Alpha Design Limited Responsibility: Conceptual Ideas, 3D Modeling, Booklet, Rendering Selected Work Portfolio 2019-2020


GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase II


High Mountain, Flowing Water 高山流水 The story comes from nature and ancient Chinese culture. “高山流水“(High mountain, Flowing water) represents dreams, love, friendship and passion to one’s life. The project aims to embrace all friends from all over the world, and provide attractive spaces with them to visit, explore, and work in.

Selected Work Portfolio 2019-2020


GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase II


Massing Diagrams Tower design

Group One

"Gate"

T1

T4 T2 T3

T1

T2 T3

T4

"Open gate"

Group Two

"Mountain"

"Flowing Water"

T8

Yards

T7

T6

T5

T8 T7

T6

T5

The central green yard is the focus.

Form a curved massing

Yards high in the air

Group Three

Natural landscape

T9 T10

T11

T10

T11

T9

Towers facing the river

Selected Work Portfolio 2019-2020

Twisting the massing

Cut the massing to simulate the wave and provide good views to the river.


GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase II


Selected Work Portfolio 2019-2020


GENZON Dongguan Binhaiwan Bay Area Industrial Park-Phase II


Selected Work Portfolio 2019-2020


CHONGQING CIFI GROUP YUELAI COMMERCIAL PROJECT 西南旭辉重庆悦来片区商业项目 Oct. 2019-Dec. 2019)

The Commercial Project of Chongqing Yuelai Area of CIFI GROUP is located in the important junction port of “the One Belt and One Road” and “Yangtze River Economic Belt”, important strategic port of the Development of Western China and central location of the northern new area of Liangjiang New District in Chongqing. It is the financial center and innovation center in the upper reaches of the Yangtze River and it is an important gateway for the inland area to open to the outside world and a demonstration window for scientific development. Based on the rich natural resources of the mountain city Chongqing, the Project manifests features of Chongqing known as Mountain City and China’s Capital of Fog. The staggered skirt building space and tall and straight-up tower group form a building planning concept in which the buildings are mutually dependent.

Chongqing CIFI Group Yuelai Commercial Plot Concept Design


Gaoyikou MTR 高义口站

9#Plot Project: Chongqing CIFI Group Yuelai Plot(910-G) Commercial Project Location: Chongqing Scope of Work: Competition

10#Plot

Result: The Bidding Winner Total Site Area: 44,122.8m2 Total Countable GFA: 224,050m2 Plot Ratio: 5.08 Program: Office, Loft Apartment, SOHO, Retail, TOD Park Architect: PH Alpha Design Limited Responsibility: Conceptual Design, 3D Modeling, Booklet, Rendering Selected Work Portfolio 2019-2020

The Design Plots

G#Plot N


160M

95M

LOFT 120M

OFFICE MALL

150M

90M

120M

SOHO 120M

105M 150M

TOD PARK COMMERCIAL STREET

Ax is

80M

Ce nt

ra l

60M

MTR Line

RETAIL ALONG STREET

60M

LOFT 80M

HEADQUATER 60M

MTR Station Bus Stop

The TOD Park Efficient TOD centre

The Image of "Shancheng" Iconic mountain-like skylines

The 24-Hour-Active Ring Mixed use Roof Garden

TOD Transfer Hub

Civil Square

Infiltrate greening

Rainwater Collection

下沉广场

Roof Garden

Walkable Path On Ground

Terrace

Co-working Space

Walkable Path Above Ground

Vegetation

Spatial Nodes

Wakable Networks 3D street

Seepage Ground

Open Public Space

Sustainable System and Smart City

Urban Design Principles Chongqing CIFI Group Yuelai Commercial Plot Concept Design


Selected Work Portfolio 2019-2020


Split the basic massing by circulation lines.

Terraces and roof gardens connect with the central (TOD) park.

The concepts of podium and tower facade are respectively Wood Craftsmanship and Wushan Mountains.

Adjust the views of buildings to the central park.

Massing Design Diagrams

Chongqing CIFI Group Yuelai Commercial Plot Concept Design


Selected Work Portfolio 2019-2020


The Digital Logic of Loft Tower Facade Design The window-wall facade system keeps changing the edge of the slabs and degree of the floded glasses. In the process of realizing the complex changes, parametric tools are used for a easier design work and smoother workflow.

Core Part of Grasshopper Code

Main Facade

3# 2#

1#

120m

150m

4#

120m

100m

Basic massing and skyline

LOFT Towers display the main facade with special patterns to the central park.

Four towers integrate the facade as a whole to show a complete pattern which form the image of mountain.

From bottom to top, the facade colour changes from deep to light, which is like fog and cloud.

Design Diagram Chongqing CIFI Group Yuelai Commercial Plot Concept Design


Selected Work Portfolio 2019-2020


CHONGQING WANZHOU HAICHENG GROUP STAR OF YANGTZE RIVER PHASE II 重庆万州海成集团长江之星商业项目二期 Dec. 2019-Feb. 2020

Haicheng Changjiang star Phase II is a large-scale commercial complex with a 200-meter-high tower, approximately 360,000 square meters GFA in total, which contains business facilities, loft apartments, hotels and offices. The CBD center located in Jiangnan New district, Wanzhou, city of Chongqing provides the significance supplies trading hubs for eastern Sichuan, western Hubei, south of Shaanxi, eastern Guizhou and western Hunan since antiquity as the commercial landmark in the future, rebuild the glory of “Frequent trading activities, Gathering quantities businesses ” which even more important as the economic intersection of Yangtze river especially for “One Belt One Road”.

Chongqing Wanzhou Haicheng Group Star of Yangtze River Phase II


Project: Chongqing Wanzhou Haicheng Group Star of Yangtze River Phase II Location: Wanzhou, Chongqing Scope of Work: Competition

Yangtze River

Result: The Bidding Winner Total Site Area: 34,973m2 Total Countable GFA: 200,659m2 Plot Ratio: 5.74 Program: Office, Loft Apartment, SOHO, Retail, Hotel Architect: PH Alpha Design Limited Responsibility: 3D Modeling, Conceptual Ideas, Booklet, Rendering Selected Work Portfolio 2019-2020

N


Chongqing Wanzhou Haicheng Group Star of Yangtze River Phase II


HOTEL

APT

See the Bridge

AP

T

APT

O

FF

IC

E Circulation

View Aix

1. The view aix allows all architecture at site have good views to the Yangtze river.

2. Split the massing into piece islands according to the site circulation.

3. Responding to the site (a slop), bridges and terraces are set. This also allows for more attactive commercial spaces and good views.

4. Cut the tower massing for better views towards the River.

5. Extend the landscape upto the terraces.

6. Facade color changes and becomes more attactive.

Transformation Diagrams

Selected Work Portfolio 2019-2020


Chongqing Wanzhou Haicheng Group Star of Yangtze River Phase II


Selected Work Portfolio 2019-2020


Chongqing Wanzhou Haicheng Group Star of Yangtze River Phase II


Hang Lung Plaza Zhengzhou 郑州恒隆广场商业项目 Dec. 2019-Apr. 2020

Located in one of the most popular commercial centers of Zhenzhou, Henan Province, the project will focus on how to enhance the connection between a new commercial landmark and the historic and cultural icon of this old city. Chinese Rose, as know as “Yueji“ in China, is regarded as the symbol of Zhengzhou. The design concept comes out of “Yueji“ which results in a flow-like massing and a wide open space on the rooftop as the roof garden. Then a unique facade which shows the pattern of Songshan Mountain is designed in a parametric way. Some suspended massing and big openings are set towards the Erqi Tower which aims to increase the visual connection to it.

Selected Work Portfolio 2019-2020


Zhengzhou Hang Lung Plaza


Project: Zhengzhou Hang Lung Plaza Location: Zhengzhou, Henan Scope of Work: Tender

MTR Exit J

Total Site Area: 29,000m2 Total Countable GFA: 120,000m2 Plot Ratio: 4.14

MTR Exit H

Program: Office, Apartment, Retail Architect: PH Alpha Design Limited Responsibility: 3D Modeling, Conceptual Design, Booklet, Rendering, Coordination Selected Work Portfolio 2019-2020

N


The main city facade is on the west(Minzhu Road) and the south(Jiefang Road) where the mainly potential visitors com from.

Minzhu Road

Three main entrances together with the central atrium form the “Y“-shape circulation.

Jiefang Road

Cut the massing to generate a form of “Yueji“

Visual connection with Erqi Tower and Erqi Plaza.

Erqi Tower

Zhengzhou Hang Lung Plaza


Selected Work Portfolio 2019-2020


The Interior Rink Hall

(With views to the Erqi Tower)

The Skylight and Main Atrium

(With a water pool on the skylight)

Zhengzhou Hang Lung Plaza


Selected Work Portfolio 2019-2020


Facade Pattern The project has a facade pattern that shows how the architecture relates to the native culture-the Songshan Mountain, which is regarded as an iconic landscape in the central China. The facade pattern changes gradually in hight which reminds people of the image of the mountain.

Core Part of The Codes

mm

mm

1800

600

60mm 90mm 120mm 150mm 200mm

Facade Design Diagram Zhengzhou Hang Lung Plaza


SCE Property Fuzhou Commercial Project 中骏福州世界城商业项目 Mar. 2020-Present

Location: Fuzhou, Fujian Scope of Work: SD-DD Total Site Area: 73,012m2 Total Countable GFA: 40,978m2 Plot Ratio: 1.78 Program: Retail Architect: PH Alpha Design Limited Responsibility: Facade Design, including 3D modeling, Rendering, Facade optimization

Selected Work Portfolio 2019-2020


SCE Property Fuzhou Commercial Project


5.4M 5.4M 5.4M

Module 2

Module 3

Module 4

Module 5

5.4M

5.4M

Module 1

铝板节点 0.2M 0.5M 1.2M

0.3M 0.6M 1.0M

0.4M 0.9M 0.6M

0.5M 1.2M 0.4M

5.4M

0.1M 0.2M 1.5M

Module 1

Module 2

Module 3

Module 4

Facde Aluminum Panel Modules Selected Work Portfolio 2019-2020

Module 5


1 F

400

400

3600 1800 5400 27600

9500

3100 5400

3600

3600 5400

2300

4 F

3 3 0 0 3 0 01 8 0 0 5400

300

3600

5400 5400 27600

3600

5400

5400 5400

1300

3000 300 2700 6000

2 F

6000

5400 5400

1000

9600

9600

1000

300

3000 300

5000 6000

250

22100

19000

13600

LED Screen

1300

R F R F

5 F 5 F

3 F

4 F

3 F

2 F

1 F

SCE Property Fuzhou Commercial Project


New World K11 Ningbo Facade Design Company: The Laboratory for Explorative Architecture & Design Ltd.(LEAD) Duration: Aug. 2018 Scope of Work: DD Responsibility: 3D modeling, CAD Drawing

Facade Design Consultant

Laboratory for Explorative Architecture & Design Ltd. G/F 1 Tai On Terrace, Sheung Wan, Hong Kong www.l‐e‐a‐d.pro

Revisions Nr. Date

Description

01 31/08/2018 Detail Design 90%

Issue Date

发出日期

31/08/2018

FOR REFERENCE ONLY Check all measurements on site. Do not scale from drawings. This drawing is to be read in conjunction with the specifications and any discrepancies are to be immediately reported to the Architect. The drawing remains the copyright property of the Architect and is not to be reproduced in whole or in part without permission of the Architect. Government and Construction drawings must be expressly certified by an Authorised Person. 以供参考 于项目地点检查所有现场尺寸。不能缩放图纸。 此图纸必须跟其他相关图纸及规范一并阅读理解, 如有任何差异,必须立刻报告建筑师。此图纸乃 建筑师的版权,未经建筑师同意许可,不得部分 或完整复制。政府相关图纸及施工图纸必须经合 资格认可人士认证。

Project Name

项目名称

Ningbo New World Shopping Mall Project Plot 1‐4#,6# K11 Shopping Art Mall Facade 宁波新世界广场项目 1-4#、6#地块 K11 购物艺术中心外立面

Internship Works 2016-2018

Drawing Title

设计图

New World K11 Ningbo Facade Design Plot 1 Street Shop Front 地块1铺面



Facade Design Consultant

KWP

250

750

230

204‐205 800

800

PS4‐002

LEVEL 5

700

700 1000

FFL +24.10

1000

1000

700

700

MT‐04

MT‐02A

700

700

KWP

204

GL‐01

700

700

PS4‐002

1000

1000

700

870

870 700

LEVEL 4

1000

1000

FFL +16.75

700

700 1200

1000

Revisions

870

870

870

870

1200

1200

1000

1200

1000

870

LEVEL 2 FFL +6.15

1200

500

1200

700 1200

700

1200 700

1000 870

1000

1200

1200

700

870

LEVEL 3 FFL +11.65

1000

700

700

1000

1000

FFL +16.75

750

1000

400

710

1170

870 700

1200 1200

1200 1000

870

GL‐01

870

MT‐02A

LEVEL 4

700

MT‐04

1200

DD‐700

250

Laboratory for Explorative Architecture & G/F 1 Tai On Terrace, Sheung Wan, Hong Kon

870

2

500

1000

250

1000

750

1200

250

1000

500

1000

250

700

500

870

500

700

750

LEVEL 5 FFL +24.10

1000

+25.30

Nr. Date

Description

1

Stone Wall Pattern sizing Elevation (All Plots) 1:100 @ A1

700

700

700

2

1000

01 31/08/2018 Detail Design 90 LEVEL 1 SFL +0.05FFL +0.15

Stone Wall Pattern sizing Elevation - Stone Dimensions Detail

4

1:50 @ A1

Full Height Stone Cladding Wall (All Plots) 1:50 @ A1

3

Stone Wall Material Axonometric View N.A

485

Planter

KWP

KWP

PS3‐101

PS3‐202

1

250

500

1

Issue Date

500

KWP

发出日期

1

250

1

PS3‐202

FOR REFERENCE ONLY Check all measurements on site. Do n drawings. This drawing is to be read i the specifications and any discrepanc immediately reported to the Architec remains the copyright property of the not to be reproduced in whole or in p permission of the Architect. Governm Construction drawings must be expre Authorised Person.

250

500

250

500

KWP PS3‐102

350 250 250 350 250 250

500

以供参考 于项目地点检查所有现场尺寸。不 此图纸必须跟其他相关图纸及规范 如有任何差异,必须立刻报告建筑 建筑师的版权,未经建筑师同意许 或完整复制。政府相关图纸及施工 资格认可人士认证。

Project Name

项目名称

Ningbo New World Shopping Plot 1‐4#,6# K11 Shopping A

宁波新世界广场项目 1-4#、6#地块 K11 购物艺术 Drawing Title

设计图

Generic Vertical Stone Cladding (Plot 1-4) 竖向挂石外墙系统 (地块一至四)

Format Scale

规格

比例

Drawing Number

1

Plot 2 - Stone Module Elevation 1:100 @ A1

Internship Works 2016-2018

2

Plot 2 - Stone Module Section Detail 1:50 @ A1

3

Plot 2 - Stone Module Axonometric View N.A

A1

As indicate 图编

NBK11‐DD


1

2

15

3

16

17

18

19 +25.30

380

2295

2315

2315

2315

2315

1865

345

GL‐05

+24.36

MT‐04

500 50 30

1100

GL‐03

F.F.L. +24.10

270

1

Main Atrium Roof Skylight- Longitudinal Section 大中庭屋顶天窗入口长剖面图 1:50 @ A1

A

C

B

D

E

G

F

H

J

I

K

L

M

N

O

P

17105 1140

1140

1140

1140

1140

1140

1140

1140

1140

380

30

270

220 50

+24.36

1100

2

1140

1140

1140

1140

1140

485

655

+25.30

GL‐05

MT‐04

GL‐03

+24.20

F.F.L. +24.10

170

Main Atrium Roof Skylight Access- Short Section 大中庭屋顶天窗短剖面图 1:100 @ A1

3-1

3-2

3-2

1

2

3

4

5

6

8

9

10

11

12

13

14

15

16

17

18

18

1140

95 155

1140

5 95 13 155

P

O

1800

435

1-F

7

2

.

2-11

+25.30

N

1140

MT‐04

+24.10

1140

M

1140

L

415

GL‐03

K

1140

Water fall direction

2315

2315

2315

2315

2315

2315

2315

2305

2325

1140

I

42575

2315

2315

2315

2315

2315

2315

2315

15730

1640

1140

J

1

1140

H

Water fall direction

1140 F

1140

6470

740

+24.36

G

1-E

1140

5260

1140

E

D

1140

C

B

A

3

Main Atrium Roof Skylight Access- Plan 大中庭屋顶天窗入口平面图 1:100 @ A1

New World K11 Ningbo Facade Design


MixC Hangzhou Center Company: Lead-8 Hong Kong Ltd Duration: Jun. 2018-Jul. 2018 Scope of Work: DD Responsibility: Booklet, Drawing

效果

中心 Internship Works 2016-2018


中心

Facade Component Analysis

主幕墙单元节点

用于有背板的区域,从外检修 LED投光氛围灯 (调光控制,安装于竖向 龙骨侧面,投向背板)

半透明幕墙单元:彩釉玻璃,蓝灰色玻璃 + 背板

LED RGBW (调光控制,安装于竖向龙骨)

基底立面单元:弧形铝板 + 竖向铝方通

灯光空腔背板 灯光腔体空间1300mm

平台立面单元:LED幕墙或屏幕+背板玻璃

玻璃幕墙单元及龙骨 400mm

框架式龙骨 模块尺寸4800mm 模块的尺寸和幕墙深度待幕墙公司介入后优化调整

玻璃幕墙单元 玻璃支撑檩条

基底立面节点及参考

L1392 杭州中心

主力店门面立面 背板

竖向方通

曲面铝板,内切竖向凹槽

半透明幕墙单元:彩釉玻璃,蓝灰色玻璃 + 背板

曲面铝板单元

曲面铝板单元拆解

石材幕墙节点及参考

L1392 杭州中心 背板

顶棚立面:铝板折面单元

150mm

基底立面单元:弧形铝板 + 竖向铝方通

2500mm

网格龙骨

旗舰店立面:背板彩釉玻璃 石材幕墙板,接缝处铝件封口

横向铝条

主入口立面 石材幕墙示例

曲面铝板单元拆解

L1392 杭州中心

Mixc Hangzhou Center


Thesis Project: Computer-Aided Tiled Roof Structures Duration: Sep. 2018-Apr. 2019 Type of Work: Individual Summary: This thesis expands the design solution space for traditional tiled roof structures without necessarily increasing constructing complexity. Tutor: Pro. CROLLA Kristof

Academic Works 2017-2019


Thesis Project: Computer-Aided Tiled Roof Structures

Student Works


Force Matters: Bending Active Structures I Duration: Jan. 2018-May 2018 (M1) Type: Teamwork Summary: Before a project was considered, four weeks were taken to study computational tools of bending-active structures and the basic work flow. Tutor: Pro. CROLLA Kristof

Academic Works 2017-2019


Student Works


Force Matters: Bending Active Structures II Type: Individual Summary: Computational technology and structural material systems have been used to research unexplored opportunities for the design of urban architectural additions that can be realized within an economically, ecologically and practically viable framework. By bringing design simplicity into this intense area, this project achieves a balanced program and offers a moment of calm and pause in the heart of one of the world’s busiest cities. Tutor: Pro. CROLLA Kristof

Academic Works 2017-2019


Student Works



T/ (+852) 6765 0815 T/ (+86) 18202750295 E/ fantianpeng1992@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.